  • 8/3/2019 Duct Design Final

    1/39

    DUCT DESIGN

    Overview.

    Duct Design Objective

    To design a duct system which will fit the available space which is economical in

    both first cost and operating cost, and which conducts air at satisfactory noise

    level, and at proper temperature to satisfy the job requirements.

    Duct design follows after the room load and air quantities have been determined.

    Table-2.1.2, shows the summary of calculated values. As calculations procedure

    is typical, ZONE 1 , duct design and calculation is only presented on this

    report.

    Steps in Duct Design

    1. Locate the supply air outlets, and then select the size and type required for

    proper air distribution.

    2. Determine how many zones of temperature control will be required for

    both perimeter and interior zones.

    3. Sketch the approximate path of the supply and return ducts on the plan,

    taking into account obstruction, clearances, architectural limitations, and

    all possible foreseeable contingencies.

    4. Size the main and all branch ducts by the following common adapted

    methodology by HVAC industry.

    5. Last calculate Air Pressure losses and select the fan.

    Points to avoid in Duct Sizing

    1. Duct should be sized properly to ensure that the air system can be

    balanced to deliver the required air volume to each space

    2. An oversize duct system will be difficult to balance and will drive up the

    installed cost of the system.

    3. Undersize duct system will create higher air pressure drops, high noise

  • 8/3/2019 Duct Design Final

    2/39

    levels and will not deliver required airflow quantities.

    A. ADMINISTRATION BUILDING

    The Machine Room ( AHUs ) are located in the third floor or covered roof

    deck. The building is composed of 3 stories ( Ground, First and Second

    floors ) and designed to 8 zones.

  • 8/3/2019 Duct Design Final

    3/39

    TABLE 2.1.2

    CALCULATED ROOM AIR FLOW RATES OF ZONE -1

    SN ROOM NO. /FLOOR

    RoomDimension

    L X W

    ( Meter )

    CeilingHeight

    ( Meter )

    Air

    Flow Rates

    ( CFM )

    1 Ground Floor 1.1 Room - 01 3.5 x 3.5 3.0 5501.2 Room - 02 8.0 x 3.5 3.0 5801.3 Room - 03 8.0 x 7.0 3.0 10001.4 Room - 04 8.0 x 3.5 3.0 5801.5 Room - 05 3.5 x 3.5 3.0 5501.6 Corridor-1 3.0 x 3.0 3.0 2251.7 Corridor-2 3.0 x 3.0 3.0 225

    Sub-total Air flow 3,7102 First Floor

    2.1 Room - 06 3.5 x 3.5 3.0 5502.2 Room - 07 3.5 x 3.5 3.0 4502.3 Room 08 8.0 x 3.5 3.0 5802.4 Room 09 8.0 x 3.5 3.0 5802.5 Room 10 3.5 x 3.5 3.0 4502.6 Room 11 3.5 x 3.5 3.0 5502.7 Corridor-1 3.0 x 3.0 3.0 2252.8 Corridor-2 3.0 x 3.0 3.0 225

    Sub-total Air Flow 3,6103 Second Floor

    3.1 Room - 12 3.5 X 7.0 3.0 11403.2 Room 13 8.0 X 7.0 3.0 17403.3 Room 14 4.0 X 3.5 3.0 6003.4 Room - 15 3.5 X 3.5 3.0 6203.5 Corridor-1 3.0 X 3.0 3.0 3403.6 Corridor-2 3.0 X 3.0 3.0 340

    Sub-total Air Flow 4,780TOTAL AIR FLOW RATES 12,100

    STEP 1

  • 8/3/2019 Duct Design Final

    4/39

    Locate the supply air outlets, and then select the size and type required for

    proper air distribution.

    This task is a collaboration between the designing Architect which is in-charge for

    the type, also for the location of air outlets or terminals ( aesthetic point of

    view ) . While the HVAC engineer is to make sure that the selected type met the

    required factors as follows;

    1. Outlet airflow

    2. Discharge velocity and throw

    3. Air distribution pattern

    4. Pressure losses

    5. Sound level

    Its more appropriate to refer to Manufacturers of air terminals data catalog in the

    selection process.

    Terminology

    Grille : A louvered or perforated covering for an air passage

    opening which can be located on a wall, ceiling or floor

    Air Diffuser : A circular , square, or rectangular air distribution outlet,

    generally located in the ceiling and comprised of deflecting

    members discharging supply air in various directions and

    planes, and arrange to promote mixing primary of primary

    air with secondary room air.

    Register : A grille equipped with an integral damper.

    Damper : A device used to vary the volume of air passing through

    an air outlet, air inlet or duct.

  • 8/3/2019 Duct Design Final

    5/39

    Face Area : The total plane area of the portion of a grille bounded by a

    line tangent to the outer edges of the openings through

    which air can pass.

    Effective Area : The net area of an outlet or inlet device through which air

    can pass, equal to the free area times the coefficient of

    discharge.

    Face Velocity : The velocity obtained by dividing the air quantity by the

    component face area.

    Terminal Velocity : The maximum air stream velocity at the end of the

    throw.

    Throw : The horizontal or vertical axial distance an air stream

    travels after leaving an air outlet before the maximum

    stream velocity is reduced to specified terminal level.

    Drop : The vertical distance that the lower edge of a horizontally

    projected airstream drops between the outlet and the end

    of its throw.

    Noise Criterion Curves ( NC Curves ) : Curves that define the limits which

    octave band spectrum of a noise source must not exceed

    if a certain level of occupant acceptance is to be

    achieved.

    SMACNA : Sheet Metal and Air Conditioning Contractor National

    Association Inc.

    Attachments 01, shows the location of air outlets, sizes and type for Ground

    Floor . Selection basis are shown below;

  • 8/3/2019 Duct Design Final

    6/39

    For Ground Floor Room -02

    Length of Room : 8.0 meter ( 26.25 feet )

    Outlet Capacity Desired : 580 CFM

    Noise Level Requirement : Not to exceed 45 NC

    ( Refer to Attachment 02 ) for the given value of general offices room from

    SMACNA manual )

    Solution in Selecting the proper register and performance data;

    1. The distance from the outlet to the opposite wall is 26.25 feet . Assume the

    throw is being selected to equal of the distance or approximately equal

    to ; ( Refer to Attachment 03 )

    Throw = 26.25 feet x 0.75 = 19.68 feet say 19 feet

    2. Now using the performance data chart ( Refer to Attachment 04 )

    locate the 600 CFM ( go to the higher value as there is no 580 CFM ) on

    the vertical column marked CFM. Next moving horizontally using THROW

    of 19 feet , a 28 x 8 outlet with a 45 0 is selected. The selection will give

    a throw of 19 feet and a Total Pressure of 0.025 In. w.g. , while NC is

    given not to exceed 20 NC.

    3. Solving for the Static Pressure ( this datum is needed on the Total Static

    Pressure calculation ) ;

    Core Area = ( Nominal Length ) ( Nominal Width )

  • 8/3/2019 Duct Design Final

    7/39

    ---------------------------------------------------------------

    144 in2 / ft 2

    = ( 28 0.25 ) ( 8 0.25 ) / 144

    = 1.49 ft2

    Core Velocity = CFM / Core Area

    = 580 CFM / 1.49 ft2

    = 389 FPM

    From Table 1 in Attachment 05 , Velocity pressure @ 389 FPM is

    0.010 In. w.g. ( take the value of 400 FPM )

    Static Pressure = Total Pressure Velocity Pressure

    = 0.025 0.010

    = 0.015 In.w.g.

    4. Selected Supply Register is 28 x 8, double deflected

    Air Flow Rate = 580 CFM

    Static Pressure Drop = 0.015 In. w.g.

    Throw = 19 ft.

    NC = rated at 20 or less than 45

    Drop = Adjustable due to the selection of a double

    deflection register

    STEP 2

    Determine how many zones of temperature control will be required for both

    perimeter and interior zones.

    Its economical ( less route of ducts ) to separate the zone / supply of perimeter

  • 8/3/2019 Duct Design Final

    8/39

    areas and the interior. Like ZONE-1 supplies the perimeter at NE area from

    ground , first and second floor , while another ZONE supplies the opposite

    perimeter side. Other Zones for the interior . In total, Main Building has 8 ZONES

    or 8 AHUs.

    STEP 3

    Sketch the approximate path of the supply and return ducts on the plan,

    taking into account obstruction, clearances, architectural limitations, and

    all possible foreseeable contingencies.

    Attachment 6, 7 and 8 , are the final sketch of Zone -1 ( AHU-1 ) , supply and

    return ducts lay-out.

    STEP 4

    Size the main and all branch ducts by the following common adapted

    methodology by HVAC industry.

    The selection of methodology for the duct sizing is of utmost important as the

    first and operational costs are dependent on it.

    The method adapted in the duct sizing is the Modified Equal Friction Method.

    A method which combined the advantages of the equal friction and static regain

    methods. Static regain ( or loss ) due to velocity changes, has been added to the

    equal friction design procedure by using fitting pressure losses calculated with

    new loss coefficient in Chapter 14 SMACNA.

    Duct Sizing :

    Take friction loss at 0.08 in. w.g. per 100 feet of duct run ( ASHRAE &

    SMACNA recommended value ) .

  • 8/3/2019 Duct Design Final

    9/39

    Example :

    Consider the Ground Floor ducting at Room -01 , ( refer to Attachment -06)

    The Air Quantity is computed as 550 CFM, what will be the proper supply duct

    size?

    Refer toAttachment -07 , A ductculator or ductsizer gives a 14 x 8 duct size

    for a 550 CFM at 0.08 in. w.g. friction loss .

    Sizing the supply main duct of Ground Floor ( Attachment -06), add all the

    supply CFM which is 3,710 CFM at 0.08 in.w.g. gives a 30 x 16 duct size.

    ( Attachment -08 )

    Attachment 09, 10 and 11 , shows the duct lay-out and sizes at Ground, First

    and AHU-01 at Roof Deck Mechanical Room using the sizing method shown

    above.

    STEP 5

    Calculate Air Pressure losses and select the fan

    TABLE 2.1.3

    AHU -1 DUCT SIZING WORK SHEET

    A B C D E F G H I J

    I

    T

    E

    Duct

    Run

    S

    E

    C

    T

    ITEM FLOW FRICTION

    LOSS

    PER

    V Vp Loss

    Coef

    Rect.

    Size

    Loss

    Per

    Item

  • 8/3/2019 Duct Design Final

    10/39

    M

    N

    O.

    I

    O

    N(CFM)

    100 FEET

    w.g.(fpm) w.g.

    C (In.)

    w.g.

    1 Plenum B A1 - Damper 12,100 - 800 - - - 0.252 - do - A2 - Filter 12,100 - 400 - - - 0.30

    3 -do- A3 - C. Coil 12,100 - 500 - - - 0.404 Run B- K C - Transition 12,100 - 1,600 0.16 0.05 60 x 40

    30 x 40

    0.008

    5 -do- D 900 Elbow 12,100 0.08 1,600 0.16 0.16 30 x 40 0.025

    6 -do- D-E 8.20 Duct 12,100 0.08 1,600 - - 30 x 40 0.0065

    7 -do- E 450 Elbow 12,100 0.08 1,600 0.16 0.16 30 x 40 0.025

    8 -do- E-F 9.8 Duct 12,100 0.08 1,600 - - 30 x 40 0.0079 -do- F 900 Elbow 12,100 0.08 1,600 0.16 0.16 30 x 40 0.025

    10 -do- F-G 3.0 Duct 12,100 0.08 1,600 - - 30 x 40 0.00211 -do- H 900 Wye 12,100

    /7,320 0.08 1,600 0.16 0.40 30 x40 0.064

    12 -do- H-I 12 Duct-riser 7,320 0.08 1,318 - - 20 x 40 0.010

    13 -do- I 900 Wye 7,320 /

    3,710

    0.08 1,318 0.108 0.032 20 x 40

    24 x 20 0.003

    14 -do- I J 12 Duct-riser 3,710 0.08 1,113 - - 24 x 20 0.010

    15 -do- K 900 Elbow 3,710 0.08 1,113 0.858 0.17 24 x 20 0.14

    16 -do- L - Transition 3,710 0.08 556 0.019 0.86 24 x 20

    40 x 24

    0.008

    17 -do- M - Dovetail 1,855 0.08 954 0.056 0.30 20 x 14 0.01718 -do- M1 - Volume

    Damper

    0.08 954 0,056 2 20 x 14 0.112

    19 -do- P Elbow 550 0.08 707 0.031 0.15 14 x 8 0.004

    20

    -do- Q Air

    Terminal550 0.08 353 - - 28 x 8 0.015

    Sub- Total PRESSURE LOSS ( From Point A to Q ) 1.445Allowance for off sets fittings in field actual execution 0.455Building Pressure allowance range 0.05 to 0.1 in.w.g. 0.10

    Total Static Pressure in.w.g. ( air side ) 2.0

    5.1 Supply Fan Plenum

    The static pressure losses of mixed air dampers ( A1 ), Filters ( A2 ) and

    Cooling Coil ( A3 ) either be taken from SMACNA Tables or from

    manufacturers data sheets.

    5.1.1Mixed Air Damper Section ( A1 )

  • 8/3/2019 Duct Design Final

    11/39

    For mixed air damper ( A1 ) from SMACNA , HVAC DUCT DESIGN

    Manual , 1990 edition, page 9.4 (Attachment -12) is given at 0.25 in.w.g.

    Enter this figure in column J.

    Velocity of 800 fpm is taken from Attachment 17, recommended

    velocity

    5.1.2 Filter Section ( A2 )

    A high velocity cleanable viscous impingement , flat panel type filters is

    given at 0.30 in.w.g. design static pressure loss (Attachment 13 )

    5.1.3 Cooling Coil Section ( A3 )

    A 4 row wet- cooling coil gives a 0.40 in.w.g. static pressure loss (

    Attachment -14 ).

    Velocity of 500 fpm median value of 400-650 is taken fromAttachment

    17

    5.2 The run duct that has the remotest and most demanding air flow rates

    will be the reference of the total static pressure losses.

    From point A1 in the AHU to the Ground Floor , section K ( air terminal

    outlet ) , refer toAttachment 6 & 11.

    5.2.1 For Item 4, Transition Fitting

    Lets consider here a 0.08 in. w.g. friction loss per 100 feet.

    Solving for the transition fitting pressure loss

    TP = C x Vp ( Equation -1 )

    Where :

    TP : Total Pressure, in.w.g.

    C : Coefficient of fitting loss

  • 8/3/2019 Duct Design Final

    12/39

    Vp : Velocity Pressure, in.w.g.

    A1 = 60 x 40 = 2400 sq.in.

    A = 30 x 40 = 1200 sq.in.

    A1/A = 2400 /1200 = 2

    Consider angle of 15 400 , Table 14-12, Attachment -19 , Figure A,

    gives C value as 0.05.

    Vp = ( 1600 / 4005 )2

    = 0.16 in.w.g.

    Pressure loss of transition = C x Vp

    = 0.05 x 0.16

    = 0.008 in.w.g.

    5.2.2 For Item 5, Elbow, 900

    A 12,100 CFM at 0.08 in.w.g. friction loss ductculator will give a 1,600

    fpm velocity and a 30 x 40 duct rectangular size. ( within the

    recommended velocity range given in Attachment - 17, having a

    maximum of 2000 fpm for general offices application.

    InAttachment 16, Figure F, having a R/W ratio = 2, ( 80/ 40 ) and

    H/W = 0.75 ( 30 x 40 ), gives loss coefficient of 0.16 . While Velocity

    pressure ( Vp) for 1600 fpm is 0.16 in.w.g. taken from Table 14-6 ,

    Attachment 18. Or can be solved by ;

    Velocity = 4005 ( Vp )0.5 or

    Vp = ( Velocity / 4005 )2

    = ( 1600 / 4005 )2

    = 0.16 in.w.g.

    Pressure Loss of Elbow = C x Vp

    = 0.16 x 0.16

    = 0.025 in.w.g.

    5.2.3 For Item 6, Duct section D-E

    The static pressure loss for duct is;

  • 8/3/2019 Duct Design Final

    13/39

    SP = 8.20 ft. x 0.08 / 100 feet = 0.0065 in.w.g

    5.2.4 For Item 7, Elbow, 450

    As this is no 450 elbow given in available tables of coefficient , consider

    the value of a 90 0 elbow pressure loss at 0.025 in.w.g.

    5.2.5 For item 8 , duct section E-F

    The static pressure loss for duct is;

    SP = 9.80 ft. x 0.08 / 100 ft. = 0.007 in.w.g.

    5.2.6 For item 9, Elbow 900

    Pressure Loss = 0.025 in.w.g.

    5.2.7 For Item 10, Duct section F-G

    SP = 3.0 ft. x 0.08 /100 ft. = 0.0024 in.w.g.

    5.2.8

    For Item 11, a 900

    Wye , ( in riser not shown in drawing )

    Attachment 15, Figure W, solving for ;

    Qb/Qc = 4.780 cfm ( air supply to whole 2nd floor )/ 12,100 ( main )

    = 0.40

    Ab/Ac = 30 x 18 / 40 x 30 = 540 in2 / 1200 in2

    = 0.45

    Plot these value in the Table 14-14 , gives C in main = 0.40

    Velocity at Ac = 1600 fpm ( 40 x 30 )

    Vp = 0.16 in.w.g.

    Pressure Loss = C x Vp

    = 0.40 x 0.16

    = 0.064 in.w.g.

    5.2.9 For item 12, duct ( not shown riser )

  • 8/3/2019 Duct Design Final

    14/39

    SP = 12 x 0.08 / 100 = 0.010 in.w.g.

    5.2.10 For item 13, 900 Wye ( in riser not shown in drawing )

    Qb/Qc = 3,710/7,320 = 0.50

    Ab/Ac = 24 x 20 / 30 x 40

    = 0.40

    As theres no value 0.40 Ab/Ac ( from 0.25 then 0.50 ) , by interpolation;

    0.25 / 0.40 = 0.02 / x

    X = 0.40 ( 0.02 ) / 0.25 = 0.032

    Vp = ( 1318 / 4005 )2

    = 0.108 in.w.g.

    Pressure Loss = C x Vp

    = 0.032 x 0.108

    = 0.003 in.w.g.

    5.2.11 For Item 14 , Duct riser ( drawing not shown )

    SP = 12 x 0.08 / 100 = 0.009 in.w.g.

    5.2.12 For Item 15, 900 Elbow

    H/W = 20 / 24 = 0.83

    R/W = 48 / 24 = 0.50

    From Attachment 16 , Figure F , as theres no direct value for 0.83 H/W

    , interpolate ;

    .75/0.16 = 0.83 / x

    X = 0.16 x 0.83 / 0.75

    C = 0.17

    Vp = ( 3,710 / 4005 )2

    = 0.858 in.w.g.

    SP = C x Vp

    = 0.17 x 0.858

    = 0.14 in.w.g.

  • 8/3/2019 Duct Design Final

    15/39

    5.2.13 For item 16, transition fitting, as the required velocity for the branches

    is 800 to 1000 fpm, we will reduce the end riser velocity of 1,310 fpm by making a

    converging fitting, 24 x 20 & 30 x 16 outlet area. Thus ;

    As / A = 30 x 16 / 24 x 20 = 1

    From Attachment 20, Figure D, say at 300 , theres no value for

    As/A = 1 , hence , assume C = 0.43 ( half value of 0.86 )

    V = 3,710 / 40 x 24 / 144

    = 556 fpm ( now its reduce from 1,310 to 556 fpm )

    Vp = ( 556 /4005 )2

    = 0.019 in.w.g.

    TP = C x Vp

    = 0.43 x 0.019

    = 0.008 in.w.g.

    5.2.14 For Item 17 , Dovetail Fitting ,Attachment 15, Figure X,

    A1b / Ac = 20 x 14 / 30 x 16

    = 0.58

    C = 0.30

    Velocity = Qs / A = 1,855 cfm / 20 x 14/144

    = 954 fpm

    Vp = ( 954/4005 )2

    = 0.056 in.w.g.

    TP = C x Vp

    = 0.30 x 0.056 = 0.017 in.w.g.

    5.2.15 For Item 18 , Volume Damper , Attachment 21, Figure E, parallel

    blades ;

    L/R = NW/ 2 ( H + W )

    Where :

    N : number of blades ( say 4 pc )

    W : duct dimension parallel to blade axis

    L : sum of damper blades length

  • 8/3/2019 Duct Design Final

    16/39

    R : perimeter of duct

    H : duct dimension perpendicular to blade axis

    = 3 ( 20 ) / 2 ( 14+ 20 )

    = 0.88 say 1

    C = 2 ( say a 200 deflection of blade )

    Velocity = 1855 cfm / 20 x 14 /144

    = 954 fpm

    Vp = 0.056

    TP = C x Vp

    = 2 x 0.056

    = 0.112 in.w.g.

    For item 19 , elbow, same method presented above, while item 20 air terminal

    pressure drop calculation is presented earlier .

    ATTACHMENTS

  • 8/3/2019 Duct Design Final

    17/39

  • 8/3/2019 Duct Design Final

    18/39

    Attachment - 01

  • 8/3/2019 Duct Design Final

    19/39

    Attachment - 02

  • 8/3/2019 Duct Design Final

    20/39

    Attachment 03

  • 8/3/2019 Duct Design Final

    21/39

    Attachment 04

  • 8/3/2019 Duct Design Final

    22/39

    Attachment 05

  • 8/3/2019 Duct Design Final

    23/39

    Attachment - 06

  • 8/3/2019 Duct Design Final

    24/39

    Attachment - 07

  • 8/3/2019 Duct Design Final

    25/39

    Attachment - 08

  • 8/3/2019 Duct Design Final

    26/39

    Attachment - 09

  • 8/3/2019 Duct Design Final

    27/39

    Attachment - 10

  • 8/3/2019 Duct Design Final

    28/39

    Attachment - 11

  • 8/3/2019 Duct Design Final

    29/39

    Attachment - 12

  • 8/3/2019 Duct Design Final

    30/39

    Attachment - 13

  • 8/3/2019 Duct Design Final

    31/39

    Attachment - 14

  • 8/3/2019 Duct Design Final

    32/39

    Attachment 15

  • 8/3/2019 Duct Design Final

    33/39

    Attachment - 16

  • 8/3/2019 Duct Design Final

    34/39

    Attachment 17

  • 8/3/2019 Duct Design Final

    35/39

    Attachment 18

  • 8/3/2019 Duct Design Final

    36/39

    Attachment 19

  • 8/3/2019 Duct Design Final

    37/39

    Attachment 20

  • 8/3/2019 Duct Design Final

    38/39

    Attachment 21

  • 8/3/2019 Duct Design Final

    39/39