D S T 2 0 1 7 / 1 8 A n n u a l P e r f o r m a n c e P l a n

31 May 2017Dr Phil MjwaraSelect Committee Briefing

PRESENTATION OUTLINE

2017/ 18 Planning contextNational alignment (NDP, MTSF, 9 Point Plan) APP 2017/ 18Strategic OverviewProgramme Performance InformationBudgetLinks to other plansEntity OversightBudget cut implications

Provincial reflections Conclusion

PLANNING CONTEXT

• National Treasury framework for APP and Strat Plans

• National Development Plan (NDP) – Medium Term Strategic Framework (MTSF)– 9 Point Plan

• MPAT Standards– evolving planning environment across government

• Alignment across Department planning documents (2015-2020 Strategic Plan; DST 2017/ 18 Annual Performance Plan; and ENE)

3

PREVAILING CONDITIONS…(1)

• The 2017/18 planning cycle wasundertaken with the following issues forconsideration:– Year three of strategic plan implementation. An evident ramp

up in performance is anticipated (marking progress towards attainment of 2020 targets i.e are there indicators that align to and contribute to all proxy indicators)

– Budget cuts and the implications these would bear on both the attainment of targets and concomitant HR resources needed for implementation

4

PREVAILING CONDITIONS…(2)

• The 2017/18 planning cycle wasundertaken with the following issues forconsideration:– Increased traction on implementation of government’s 9 point

plan and growing appreciation of the potential contribution of STI towards socio-economic transformation

– Growing appreciation of the Operation Phakisa methodology and DSTs participation in all to date

– A number of policy related initiatives underway (White Paper Review, STIIL Review etc)

5

STRATEGIC INTEGRATION

• National Development Plan–3 phases and STI contribution

• Support to several Government Outcomes

• STI in the Nine Point Plan

6

SOUTH AFRICA’S STI: WHERE TO GO? 

• Use of knowledge forefficiency gains in theeconomy- Drawing on progressachieved thus far, the NSI willexpand research capacity (humancapital development) and institutionbuilding, build on what it has learntabout commercialising ideas fromresearch, and continue to supportexisting economic sectors (such asagriculture, forestry, agroprocessing,aquaculture, manufacturing andmining) and emerging sectors (suchas minerals beneficiation, greenerenergy (hydrogen and fuel cells), andactive pharmaceutical ingredientmanufacturing) throughtechnological innovation.

Phase One

(2012-2017)

8

• Industrialisation enhanced byknowledge- the NSI will continue toaccelerate the transformation of theSTI sector (i.e. demographicrepresentivity) and enhance efficiencyin the economy through knowledge.The government will continue toincrease R&D investment andcommercialisation, and optimise theutilisation of inbound technology

Phase Two (2018-2023)

SOUTH AFRICA’S STI: WHERE TO GO? 

9

• knowledge-based economy-The number of knowledge workers and high-technology industries will have increased and boosted exports and increased the capacity to commercialise indigenous or local technologies. Efforts will be directed at sustaining and expanding this progress.

Phase Three

(2023-2030)

SOUTH AFRICA’S STI: WHERE TO GO? 

OVER THE 2014- 2019 MTSF, THE DEPARTMENT WILL HAVE CONTRIBUTED TO AND REPORTED ON THE FOLLOWING GOVERNMENT OUTCOMES:

Outcome 2: A long and healthy lifefor all South Africans.

Outcome 2: A long and healthy lifefor all South Africans.

Outcome 3: All people in South Africaare and feel safe

Outcome 3: All people in South Africaare and feel safe

Outcome 4: Decent employment through inclusive economic growth.

Outcome 4: Decent employment through inclusive economic growth. 10

The DST’s contribution to Government Outcomes (1)

OVER THE 2014- 2019 MTSF, THE DEPARTMENT WILL HAVE CONTRIBUTED TO AND REPORTED ON THE FOLLOWING GOVERNMENT OUTCOMES:

Outcome 5: A skilled and capable workforce tosupport an inclusive growth path

Outcome 5: A skilled and capable workforce tosupport an inclusive growth path

Outcome 6: An efficient, competitive andresponsive economic infrastructure network.

Outcome 6: An efficient, competitive andresponsive economic infrastructure network.

Outcome 7: Vibrant, equitable and sustainable rural communities and food security for all.

Outcome 7: Vibrant, equitable and sustainable rural communities and food security for all.

Outcome 10: Environmental assets and natural resources that are well protected and continually

enhanced.

Outcome 10: Environmental assets and natural resources that are well protected and continually

enhanced. 11

The DST’s contribution to Government Outcomes (2)

GOVERNMENT’S NINE POINT PLAN

JOB DRIVERS• Oceans Economy• Higher impact IPAP• Revitalising Agriculture

• Advancing Beneficiation

• Unlocking SMME, co‐ops, township and rural enterprises’ potential 

JOB DRIVERS• Oceans Economy• Higher impact IPAP• Revitalising Agriculture

• Advancing Beneficiation

• Unlocking SMME, co‐ops, township and rural enterprises’ potential 

ENABLERS• Resolving the energy challenge

• Mediating workplace conflict

• Crowding in private sector investment

ENABLERS• Resolving the energy challenge

• Mediating workplace conflict

• Crowding in private sector investment

CROSSCUTTERS• Science, Technology and Innovation

• Transport Infrastructure

• State Owned Company Reforms

• Water and sanitation

• Broadband rollout

CROSSCUTTERS• Science, Technology and Innovation

• Transport Infrastructure

• State Owned Company Reforms

• Water and sanitation

• Broadband rollout

12

SUPPORTING THE 9 POINT PLAN (1)

STI supports the 9 Point Plan by:

Supporting and directing the National System of Innovation(NSI)

Mandating publicly funded science, technology andinnovation (STI) institutions to support government priorityoutcomes

Developing research capacity

Using knowledge and innovation for economicdevelopment

Using knowledge and innovation for inclusive development Using science to inform policy

13

SUPPORTING THE 9 POINT PLAN (2)

Strategic stand alone STI Commitments Improve the Gross Expenditure on Research and Development

(GERD) to Gross Domestic Product (GDP) ratio- 1.5% by 2019

Improve and optimise the usage of available resources forresearch and development (Budget coordination)

Develop a framework for the deployment of new locallydeveloped innovations

Accelerate the establishment of a sovereign innovation fund

Develop a plan of action to manage the current intellectualproperty (IP) leakages from South Africa

14

15

DST PROGRAMMES

165/25/2017

DST Administration (1)

Technology Innovation(2)

International Cooperation

and Resources (3)

Research Development Support (4)

Socio-Economic Innovation

Partnerships (5)

DST Strategic Outcome Orientated Goal 1

17

A responsive, coordinated and efficient NSI

DST Strategic Outcome Orientated Goal 2

18

Increased knowledge generation

DST Strategic Outcome Orientated Goal 3

19

Human capital development

DST Strategic Outcome Orientated Goal 4

20

Using knowledge for economic development

DST Strategic Outcome Orientated Goal 5

21

Using knowledge for inclusive development

Increased well-being and prosperity through

science, technology and innovation (STI).

Provide leadership, an enabling environment,

and resources for science, technology and innovation in support of

South Africa’s development

Professionalism; Innovation;

Ethical behaviour; and Knowledge sharing.

Vision, Mission, Values

VISION MISSION VALUES

STRATEGIC OVERVIEW (1)

The Department has prioritised the following policy initiatives for the 2017/18 fiscal year i.e.

• Establishment of a Sovereign Innovation Fund

• Expansion of the Sector Innovation Funds

• Review of the Intellectual Property Rights from Publicly Financed Research and Development Act

• Expansion of Hydrogen South Africa Programme

STRATEGIC OVERVIEW (2)

The Department has prioritised the following policy initiatives for the 2017/18 fiscal year i.e.

• Finalisation of the Innovation for Inclusive Development Strategy

• Development of a new White Paper on Science, Technology and Innovation (STI) and the finalisation of the STI Institutional Landscape Review

• Completion of 64 MeerKAT antennae commissioned for a single polarisation array

APP 2017/ 18 INDICATORS

2017/18 APP has 49 indicatorsProg 1= 6

Prog 2= 10

Prog 3= 10

Prog 4= 11

Prog 5= 12

25

INDICATORS OVER 3 YEARS

26

0 10 20 30 40 50 60

Administration

Technology Innovation

International Cooperation and Resources

Research Development and Support

Socio‐Economic Innovation Partnerships

Total

2017/18 2016/17 2015/16

275/25/2017

Programme Performance Information

Programme Performance Information

PROGRAMME 1 –6 PERFORMANCE INDICATORS

PERFORMANCE INDICATOR 5‐yeartarget

2016/17 2017/18

DST public entities’ annual performance plans and annual reports approved by the Minister and the CSIR shareholder compact signed by the Minister and the chairperson of the board.

by 31 March 2020

by 31 March 2017

by 31 March 2018

Vacancy rate reduced to a set rate. 6% Retained6%

Capped at 10%

Combined assurance annual report on the status of combined assurance presented to the Risk and Audit Committees

N/A (not a strategic indicator

2 1

PROGRAMME 1 –6 PERFORMANCE INDICATORS

PERFORMANCE INDICATOR 5‐year target

2016/17 2017/18

Number of media articles written to raise the DST’spublic profile.

104 16 24

Number of public participation programmes held. 50 10 10

Unqualified audit (clean audit) opinion with nofinancial matters in the audit report.

Unqualified audit opinion with no financial matters in the audit report

Unqualified audit opinion with no financial matters issued by AG

Clean audit opinion with no financial matters

TECHNOLOGY INNOVATION-10 PERFORMANCE INDICATORS

PERFORMANCE INDICATOR 5‐year target

2016/17 2017/18

Number of instruments funded in support ofknowledge utilisation

90 25 19

Number of knowledge outputs generated 683 119 148

Number of strategic policy directives in designatedareas in support of economic sectors

25 5 7

Number of new disclosures reported by publiclyfunded institutions

1 405 275 280

Number of regulatory recommendations for decisionsupport by government

108 27 27

TECHNOLOGY INNOVATION (2)

PERFORMANCE INDICATOR 5‐yeartarget

2016/17 2017/18

Number of trainees attending training initiativesin designated areas

1 180 280 240

Number of knowledge application productsfunded in designated areas

29 4 6

Number of commercial outputs in designatedareas

21 8 4

Number of decision support interventionsdeveloped or maintained

8 2 2

Number of postgraduate students (master’s anddoctoral) funded in designated areas

1 789 292 355

INTERNATIONAL COOPERATION & RESOURCE – 10 PERFORMANCE

INDICATORS

PERFORMANCE INDICATOR 5‐year target 2016/17 2017/18

Amount (expressed in rand millions) ofinternational funds directly invested inresearch, innovation and STI HCDprogrammes as well as researchinfrastructure investments in South Africa aspart of cooperation initiatives implementedby the DST

R2 120b R400m R420m

Amount (expressed in rand millions) of fundsinvested by international partners in theirown organisations and initiatives but targetedat cooperation in research, innovation andSTI HCD with South African partners as partof cooperation initiatives implemented by theDST

R1 280b R230m R250m

INTERNATIONAL COOPERATION & RESOURCE – 10 PERFORMANCE

INDICATORSPERFORMANCE INDICATOR 5‐year target 2016/17 2017/18

Number of South African students acceptedinto international training programmesoffering a postgraduate qualification as partof cooperation initiatives facilitated by theDST

1 880 150 350

Number of international partnerorganisations (i.e. legal entities) collaboratingwith South African partners within theformalised framework of collaborativeresearch, innovation or STI HCD projectscounted as part of cooperation initiativesfacilitated by the DST

2 500 450 500

INTERNATIONAL COOPERATION AND RESOURCES (2)

PERFORMANCE INDICATOR 5 year target 2016/17 2017/18

Number of dedicated international technicalexchanges such as workshops, seminars ortraining programmes to reinforce SouthAfrica’s capacities in key STI domainsspecifically referenced in the DST StrategicPlan, undertaken with the support ofinternational partners and facilitated by theDST

100 15 20

Number of research, innovation and STI HCDcooperation projects, co-funded or supportedin kind by the DST and at least one otherAfrican partner

300 30 50

Amount (expressed in rand millions) ofinternational funds directly invested in Africanregional and continental research, innovation,STI HCD or research infrastructureprogrammes as a result of DST facilitation

R380m R70m R80m

INTERNATIONAL COOPERATION AND RESOURCES (3)

PERFORMANCE INDICATOR 5‐year target

2016/17 2017/18

Number of AU or SADC STI initiatives,including programmes, projects or governanceframeworks, endorsed at AU or SADCministerial level supported (financially or inkind) by the DST

70 10 16

Number of formally recorded decisions madein intergovernmental STI forums, such asmultilateral organisations, with a direct bearingon resource allocation to support priorities ofgovernment’s Programme of Action followingspecific DST intervention

20 4 4

Number of leadership positions occupied bySouth Africa in international STI governancestructures relevant to influencing resourceallocation to support priorities of government’sProgramme of Action following specific DSTintervention

18 4 4

RESEARCH DEVELOPMENT AND SUPPORT – 11 PERFORMANCE INDICATORS

PERFORMANCE INDICATOR 5‐year target 2016/17 2017/18

Total number of PhD students awardedbursaries annually as reflected in thereports from the NRF and relevantentities

15 840 3 136 No fewer than 3 100

Total number of pipeline postgraduatestudents awarded bursaries annually asreflected in the reports from the NRF andrelevant entities

54 392 10 996 No fewer than 10 800

Total number of graduates and studentsplaced in DST-funded work preparationprogrammes in SETI institutions

3 440 840 800

Number of research infrastructure grantsawarded per award letters annually

220 70 30

RESEARCH DEVELOPMENT AND SUPPORT (2)

PERFORMANCE INDICATOR 5 year target 2016/17 2017/18

Total number of researchers awardedresearch grants through NRF-managedprogrammes as reflected in the NRF projectreports

22 578 4 539 No fewer than 4 500

Number of research articles published byNRF-funded researchers and cited in theThomson Reuters Web of Science CitationDatabase as reflected in the NRF projectreports

35 000 7 000 No fewer than 7 000

Number of antennas commissioned for asingle polarisation array

64 32 64

RESEARCH DEVELOPMENT AND SUPPORT (2)

PERFORMANCE INDICATOR 5 year target 2016/17 2017/18

A climate change research network in place A climate changeresearch network in place by 31 March 2018 (MTSF target)

Submission to the DDG of a report on existing climate research initiatives and networks by 31 March 2017

A climate changeresearch network formalised in SA through an MoU by 31 March 2018

RESEARCH DEVELOPMENT AND SUPPORT (3)

PERFORMANCE INDICATOR 5 year target 2016/17 2017/18

Number of biennial reports on the state of climate change S&T in South Africa submitted to Cabinet

Two biennialreport on the state of climate change S&T in South Africa for Cabinet approval

1st biennialreport on the state of climate change S&T in South Africa finalised and submitted to Cabinet approval by 31 March 2017

A plan for compiling the second biennial report on the state of climate change S&T in South Africa approved by Excoby 31 March 2018

RESEARCH DEVELOPMENT AND SUPPORT (4)

PERFORMANCE INDICATOR 5 year target 2016/17 2017/18

Approximate number of participants in science awareness and engagement programmes annually as reflected in the project reports of the NRF and other service providers.

8 179 000 1 200 000 Approx. 2 millionparticipants

Total available broadband capacity providedby SANReN per annum

3 500 Gbps 3 500 Mbps 3 200 Gbps totalavailable broadbandcapacity

SOCIO-ECONOMIC INNOVATION PARTNERSHIPS – 12 PERFORMANCE

INDICATORSPERFORMANCE INDICATOR 5‐year target 2016/17 2017/18

Number of learning interventions(seminars, briefs, policy papers) generated

45 9 9

Number of honours, master’s and doctoralstudents fully funded or co-funded indesignated niche areas

375 55 90

Number of knowledge and innovationproducts (patents, prototypes, technologydemonstrators or technology transferpackages) added to the IP portfoliothrough fully funded or co-funded researchinitiatives

22 4 4

SOCIO-ECONOMIC INNOVATION PARTNERSHIPS – 12 PERFORMANCE

INDICATORS (2)PERFORMANCE INDICATOR 5‐year target 2016/17 2017/18

Number of high-level research graduates(master’s and doctoral students) fullyfunded or co-funded in designated nicheareas (advanced manufacturing, aerospace,chemicals, mining, advanced metals, ICTsand sector innovation funds (SIFs)

1 454 290 288

Number of interns fully funded or co-funded in R&D related to design,manufacturing and product development

590 200 100

SOCIOECONOMIC INNOVATION PARTNERSHIPS (3)

PERFORMANCE INDICATOR 5 year target 2016/17 2017/18

Number of knowledge and innovationproducts (patents, prototypes, technologydemonstrators or technology transferpackages) added to the innovation productportfolio through fully funded or co-fundedresearch initiatives

22 4 4

Number of instruments funded in support ofincreased localisation, competitiveness andR&D-led industry development in aerospace,advanced manufacturing, chemicals, mining,advanced metals and ICTs

9 9 6

Number of innovation-support interventionsfunded or co-funded that strengthen provincialor rural innovation systems

12 2 2

SOCIOECONOMIC INNOVATION PARTNERSHIPS (4)

PERFORMANCE INDICATOR 5 year target 2016/17 2017/18

Turnaround time for providing preapprovaldecisions on applications for the R&D taxincentive

90 days 120 days 90 days

Number of knowledge products oninnovation for inclusive developmentpublished

26 4 6

Number of decision-support interventionsintroduced and maintained

10 7 8

Number statistical reports and policy briefssubmitted to Cabinet

29 6 6

LONG-TERM INFRASTRUCTURE PLANS

Name of theproject

Municipality Outputs Project cost

SKA Kareeberg LocalMunicipality (partof the Pixley kaSeme DistrictMunicipality)

The completionof 64 MeerKATantenna

R3,67bn by 2018/19

MTEF ALLOCATION (1)

Economic classification

R'000 2017/18 2018/19 2019/20

Current payments 575 769 611 337 584 257 Compensation of employees 315 527 327 690 352 671

Goods and services 260 242 283 647 231 586 Transfers and subsidies 6 960 482 7 292 494 7 604 421 Payments for capital assets 20 978 12 194 2 673

Total 7 557 229 7 916 025 8 191 351

MTEF ALLOCATIONS (2)

Programmes R’000

MTEF ALLOCATIONS

2017/18 2018/2019 2019/2020

Administration 383 720 401 613 349 267

Technology Innovation 1 073 621 1 129 364 1 195 030

International Cooperation and Resources 128 705 135 169 144 425

Research Development and Support 4 348 859 4 467 126 4 756 959

Socio-Economic Innovation Partnerships 1 622 324 1 782 753 1 745 670

Total 7 557 229 7 996 025 R8 191 351

ENTITY OVERSIGHT (1)

Name of the Entity Budget Institutional Review

South African National Space Agency R131 226m None

Academy of Science of South Africa R25 261m 2016

National Research Foundation R925 964m 2016

Council for Scientific and Industrial Research

R915 645m 2009

Human Sciences Research Council R304 656m 2010

Technology Innovation Agency R396 732m 5-year economic impact assessment of TIA in 2013

ENTITY OVERSIGHT (2)

Non- scheduled entities

National Advisory Council on Innovation

19 506 N/A

South African Council for Naturaland Scientific Professions

4 200 N/A

NIPMO 46 824 2017

INDICATOR 2016/17 TARGET

2017/18 TARGET

Research Development and Support

Number of research infrastructure grants awarded as per award letter annually

70 30

Socio-Economic Innovation Partnerships

Number of innovation products added to the IP innovation product portfolio through fully funded or co-funded research initiatives

35 17

High level graduates fully funded or co-funded in designated niche areas

290 288

50

IMPLICATIONS OF BUDGET CUTS (1)

Budget cuts have affected the department in 2 ways:Vacancies (moratorium on hiring)= 42 vacanciesReduction of targets in a number of indicators (compared to

2016/17)

INDICATOR 2016/17 TARGET

2017/18 TARGET

Technology Innovation

Number of postgraduate students (master’sand doctoral) funded in designated areas

392 355

Number of instruments funded in support ofknowledge utilisation

25 19

Number of trainees attending traininginitiatives in designated areas

280 240

51

IMPLICATIONS OF BUDGET CUTS (2)

INDICATOR 2016/17 TARGET

2017/18 TARGET

Socio-Economic Innovation Partnerships

Number of instruments funded in support ofincreased localisation, competitiveness andR&D led industry development

9 6

Number of knowledge and innovationproducts (patents, prototypes, technologydemonstrators or technology transferpackages) added to the innovation productportfolio through fully funded or co-fundedresearch initiatives

35 17

Number of interns fully funded or co-fundedin R&D related to design, manufacturing andproduct development

200 100

52

IMPLICATIONS OF BUDGET CUTS (3)

PROVINCIAL REFLECTIONS

National Department with no concurrent functions

National footprint established through:Entities

Project implementation

Innovation integration into regional plans

53

PROVINCIAL FOOTPRINT (SOME EXAMPLES)

54

• Installation of five energy solutions at five schools (three 5kW hydrogen fuel cell units at three schools and two 3kW Solar PV systems at two schools) in Cofimvaba district through public private partnerships

• IK-based Food and Nutraceuticals Platform

• Implementation and validation on m-health solutions to assist the Department of Health

• A skin-tone candidate product, between a cosmeceuticals consortium and the community of Kubandakazi

• Regional Innovation Forum (RIF) aims to stimulate, support and promote innovation

PROVINCIAL FOOTPRINT (SOME EXAMPLES)

55

• The South African San Institute- hosts the Northern Cape IKSDC

• Broadband For All (BB4All) Initiative in the JT GaetseweDistrict

• Carnavon Science Centre

• Square Kilometre Array

• Students supported for undergraduate Science studies

PROVINCIAL FOOTPRINT (SOME EXAMPLES)

56

• Southern Gauteng Regional Innovation forum (SGRIF)

• mLab Southern Africa (SA)

• Establishment of a plant processing facility in a community of Mamelodi, Pretoria for IK-based Cosmeceuticals

• Installation of a 5kW hydrogen fuel cell at Windsor East Clinic in Randburg, in collaboration with Anglo Platinum, Air Products and Gauteng Provincial Department of Health.

PROVINCIAL FOOTPRINT (SOME EXAMPLES)

57

• Establishment of a plant processing facility at the Nkomazi District for IKS based tech transfer

• Broadband For All (BB4All) Initiative

CONCLUSION

2017/18 is three years into the DST Strategic Plan 2015- 2020

2017/18 APP has 49 indicatorsReduction from 2016/17

Increased appreciation for the role of S & T across government9 Point PlanOperations Phakisa

Changing Policy contextNew White Paper Decadal Plan