Drive Beam transfer linesin the main tunnel

B.Jeanneret CERN/AB/ABP

CLIC Workshop , 16 Oct 2007

Page 2: Drive Beam transfer lines in the main tunnel B.Jeanneret CERN/AB/ABP CLIC Workshop, 16 Oct 2007

DB transfer lines, B.Jeanneret, CLIC w'shop 16oct07

2

Outline

• Long DB transfer line

• Issues related to turnaround

• Issues around the dump sections

Page 3: Drive Beam transfer lines in the main tunnel B.Jeanneret CERN/AB/ABP CLIC Workshop, 16 Oct 2007

DB transfer lines, B.Jeanneret, CLIC w'shop 16oct07

3

e+ injector, 2.4 GeV

e- injector2.4 GeV

CLIC 3 TeV

e+ main linace- main linac , 12 GHz, 100 MV/m, 20.85 km

BC2BC2

BC1

e+ DR365m

e- DR365m

booster linac, 9 GeV, 2 GHz or 4 GHz ?

decelerator, 24 sectors of 868 m

IP1

BDS2.75 km

BDS2.75 km

47.9 km

drive beam accelerator2.38 GeV, 1.0 GHz

combiner rings Circumferences delay loop 72.4 m

CR1 144.8 mCR2 434.3 m

CR1CR2

delayloop

326 klystrons33 MW, 139 s

1 km

CR2delayloop

drive beam accelerator2.38 GeV, 1.0 GHz

326 klystrons33 MW, 139 s

1 km

CR1

TAR=120m

TAR=120m

245m 245m

From H.Braun15-oct-07

Page 4: Drive Beam transfer lines in the main tunnel B.Jeanneret CERN/AB/ABP CLIC Workshop, 16 Oct 2007

DB transfer lines, B.Jeanneret, CLIC w'shop 16oct07

4

Long DB transfer line• Aim : transport the Drive Beam trains from

the central area of the site towards the head of the Main Linac

• Deflect a train in each turnaround, one after the other

24 times

Sector 870 m

~100mQD QF…

Decelerator

Kicker

Page 5: Drive Beam transfer lines in the main tunnel B.Jeanneret CERN/AB/ABP CLIC Workshop, 16 Oct 2007

DB transfer lines, B.Jeanneret, CLIC w'shop 16oct07

5

A combined magnet for the long TL - I

(borrowed w/o permission from P.Belochitskii, T.Eriksson and T. Zickler,CERN/AT/MEL/2007/TZ, oct 2007)

- Need- Q with GL = 0.25 Tm/m- B h & v for orbit correction- S for chromatic correction- Useful radius : 25 mm

- First pass Ansys for Q :- r_Q_coil_in = 30mm- I=30 A, nI=330 Aturn- wire 9mm^2

- Get (to be refined) :

This exemple contains : Bh, Bv, Q, Qs, S

Yoke diameter 150 mm

Weight 80 kg

Quad power 40 W

B + S power <50 W

Low fields allows for ‘cos(n)’ design

Many thanks to M. Bajko forexpertise and advice

Page 6: Drive Beam transfer lines in the main tunnel B.Jeanneret CERN/AB/ABP CLIC Workshop, 16 Oct 2007

DB transfer lines, B.Jeanneret, CLIC w'shop 16oct07

6

A combined magnet for the long TL - II

• Compact monolithic & low-weight object,for ceiling installation

• Thin power and cooling lines

• Remains to work-out :

– Detailed design, body field errors– Compensation of end-field errors– Powering ( I vs. V …)– Cooling (air, water)– Overall engineering (reliabilty, cost, …)

Page 7: Drive Beam transfer lines in the main tunnel B.Jeanneret CERN/AB/ABP CLIC Workshop, 16 Oct 2007

DB transfer lines, B.Jeanneret, CLIC w'shop 16oct07

7

Main tunnel cross-section

Main beamDrive beam

Conflictswith survey,Accesibility,maintenance

EnteringTurnaround

Page 8: Drive Beam transfer lines in the main tunnel B.Jeanneret CERN/AB/ABP CLIC Workshop, 16 Oct 2007

DB transfer lines, B.Jeanneret, CLIC w'shop 16oct07

8

Turnaround :A first look at integration issues

Page 9: Drive Beam transfer lines in the main tunnel B.Jeanneret CERN/AB/ABP CLIC Workshop, 16 Oct 2007

DB transfer lines, B.Jeanneret, CLIC w'shop 16oct07

9

Turnaround as of today , F. Stulle/PSI (this w’shop)

Shall we install these elementsin the Main tunnel ?Dipoles : length 1m, section .4x.4 m^2Weight ~ 1 ton

~ 27m

Page 10: Drive Beam transfer lines in the main tunnel B.Jeanneret CERN/AB/ABP CLIC Workshop, 16 Oct 2007

DB transfer lines, B.Jeanneret, CLIC w'shop 16oct07

10

Turnaround tunnel

• Is it reasonable to hang elements at the ceiling ?– Linear weight ~ 1ton / m– Restricted space for good survey

• Shall we consider a tunnel which is shifted upwards ?

• Optics & layout to be reviewed with civil-engineering constraints

Page 11: Drive Beam transfer lines in the main tunnel B.Jeanneret CERN/AB/ABP CLIC Workshop, 16 Oct 2007

DB transfer lines, B.Jeanneret, CLIC w'shop 16oct07

11

~2 m

2.25 m

No big/heavy elements here

- Minimize disruptive impact on- main tunnel continuity- ensure turnaround stability- more easy installation ?

Much work ahead

Page 12: Drive Beam transfer lines in the main tunnel B.Jeanneret CERN/AB/ABP CLIC Workshop, 16 Oct 2007

DB transfer lines, B.Jeanneret, CLIC w'shop 16oct07

12

Drive Beam dumps :A first look at integration issues

Sector 870 m

~100mQD QF… Kicker

DUMP line

Page 13: Drive Beam transfer lines in the main tunnel B.Jeanneret CERN/AB/ABP CLIC Workshop, 16 Oct 2007

DB transfer lines, B.Jeanneret, CLIC w'shop 16oct07

13

NEW DECEL

View from side

View from top

Dump dipoles, +- 200 mm high

0 2 4 6 81 0-0.2

0.0

0.2

0.4

0.6

0.8

0 2 4 6 81 0-1.0

-0.5

0.0

0.5

1.0

OLD DECEL

NEW DB

Width of DB quads

2.5 GeV

0.25 GeV

SIDE VIEW

TOP VIEW

Spot ~2.5m at 20mon dump

A way to avoid alternating low and high Decelerators – now baseline

Page 14: Drive Beam transfer lines in the main tunnel B.Jeanneret CERN/AB/ABP CLIC Workshop, 16 Oct 2007

DB transfer lines, B.Jeanneret, CLIC w'shop 16oct07

14

Optics

• Regular FODO identical to DB same Quad/strength

• =2 between dipoles to allow for D=D’ =0 before and after

• Dipoles : – L = 0.6m – = 0.075 mrad– B=1.04 T

Page 15: Drive Beam transfer lines in the main tunnel B.Jeanneret CERN/AB/ABP CLIC Workshop, 16 Oct 2007

DB transfer lines, B.Jeanneret, CLIC w'shop 16oct07

15

Dump dipoles (with T. Zickler)-- preliminary --

g

c

c

b

ab

b

c

alfa 5.00E-02 radlen 6.00E-01 mp 2.50E+00 gevB 6.94E-01 T

full gap g 3.00E-02 mmuz 1.26E-06I 1.66E+04 wire 1.60E-05rho_i 1.20E+06 A/m2 (4x4 mm2)fill factor 7.00E-01 I wire 1.92E+01full coil_area 1.97E-02 m2coil_block 9.87E-03 m2 turns 8.63E+02coil_side c 9.93E-02 m turn/block4.32E+02

matrix 20.77822B_iron 1.10E+00 T

check 9.93E-02full aperture a 1.50E-01 m (matrix*4mm/sqrt_fill)b_yoke b 9.47E-02

full yoke width 3.44E-01 mfull yoke height 4.18E-01 m

H = 0.35m

V = 0.42m

L = 0.6m, = 0.05 radB = 0.7 TH = V =~ 0.4m

Page 16: Drive Beam transfer lines in the main tunnel B.Jeanneret CERN/AB/ABP CLIC Workshop, 16 Oct 2007

DB transfer lines, B.Jeanneret, CLIC w'shop 16oct07

16

Common section :Descending fresh DBExit line used DB

Last part ofturnaround

To dump

Page 17: Drive Beam transfer lines in the main tunnel B.Jeanneret CERN/AB/ABP CLIC Workshop, 16 Oct 2007

DB transfer lines, B.Jeanneret, CLIC w'shop 16oct07

17

Single height DB and dumps

• Two height Decelerator was abandonned

• Single height DB : Space taken from RF/dump : 8.0 m

• Along 10m of each sector, vertical superimposition of entering new DB and extraction of used one.

• Dump line to be designed / more beam simulation needed

• Dump proper must be better known– Container filled with aluminum balls and water– Built in-situ ? Delivered as a single unit ?

Page 18: Drive Beam transfer lines in the main tunnel B.Jeanneret CERN/AB/ABP CLIC Workshop, 16 Oct 2007

DB transfer lines, B.Jeanneret, CLIC w'shop 16oct07

18

Summary

• Long transfer line– Small compact combined magnet can be considered– Conflict services / beam line / survey must be resolved

• DB Turnarounds– Optics exists– Integration requires more attention and coordinated approach– Civil engineering not trivial

• DB Dump line– Single height decelerator is an overall simplification– But short 10m section with two lines must be studied– Dump line and dump tunnel still to be designed