Drilling / Workover Divisions personnel, EHS representatives and business partners attended Drilling & Workover EHS leadership meeting and presented talks focused on Hazard Identification, Risk Assessment and Control, and Mitigation Planning for risks created by hazardous conditions and/or behaviors. KDC Drilling Rigs No.16 and 17, and UPDC (Weatherford ) Rig#102 were recognized for commendable safety performance.
These Safety and Environment personnel joined EHS division and assigned to work for various divisions. They bring experience and knowledge to strengthen Joint Operations efforts to further improve EHS performance.
Joint Operations
Prepared & Published Monthly by EH&S, F&S GroupJO EHS BulletinJO EHS BulletinAPRILAPRIL 20102010
Hazard Reports 2007 – 2010
New EHS Personnel
Innovation in SafetyRoads and road intersections with lot of heavy equipment and truck movement pose serious traffic hazards. Flagmen who control traffic at such locations are always exposed to dust, noise, weather and traffic hazards. Some JO employees came up with an innovative idea to avoid exposing our business partners employees to such hazards.
KDC Rig # 17 UPDC (Weatherford)Rig # 102
Mr. Fahad M. Al-Dossari of Construction Division made flagmen of steel with all regular clothes, PPE and reflective jacket. These steel flagmen are posted near road junction leading to pit remediation project site to give traffic warning to drivers. The steel flagmen are clearly visible and can stay there continuously exposed to weather without any problem.MMD - Welding Supervisor Nasser Al-Dossari and Foreman Saad Al-Harbi helped to fabricate steel signalmen.
Managers and key personnel of Field Development Department visited new Rig # 172 before it started operation on 1st April, 2010
Suresh N.
Amarnath B.
Mike R. Lewis
Kyle Eastman
Project Title Projects Description & Objective
Starting -End Date
AWAZEL Remove contents of MGC pits 7 & 13 and remediate pits
2008- 2010
Zero Discharge Projects
Recycle Pit 28A Recover 600,000 bbl of oil in Pit 28A 2009- 2011
Pits Remediation and Restoration
Reclamation and Restoration of the evaporation pit areas including 2 million m2 of oily sand
2004- 2012
Water disposal projects
Install new 6 salt water disposal wells 2008- 2011
Industrial liquid waste management
Eliminate the discharge of secondary waste streams to the pits
2008- 2011
Central Gas Utilization
Eliminate routine flaring. To meet Zero Flaring
2005- 2014
Shuaiba Industrial Waste Disposal
Disposal of Wafra hazardous and non hazardous wastes
2008- 2011
Ambient Air Monitoring
To monitor ambient air quality in the Wafra Industrial area
2008 - 2010
Flare Upgrade Design, purchase and installation of 7 Nos. of HP Flares and 1 No. LP Flare including modifications at various Ratawi / Burgan / Eocene Sub-Centers
2007 - 2011
Sewage Treatment Plant
Purchase and install a 300 cubic meter per day sewage treatment unit to treat JO sewage waste and use treated wastewater for irrigation
2010- 2011
I Nyoman W. Naya
Yousef Al-
Najjar
Ibrahim Al-Kandari
Moh’d . Al-
Haider
Environmental ProjectsDrilling & Workover EHS Meeting
NEBOSH Training & CertificationJO organized NEBOSH ‘International General Certificate in Occupational Health and Safety’ training course for EHS personnel. This is part of our continued effort to update knowledge, skills and qualification of JO personnel.
Total Open & Closed Hazard Reports
Leadership Visit Behavioral Safety Observations
2009Improvement made in environment as a result of reclamation and restoration of evaporation pits (Pit Remediation & Restoration project) can be seen in the satellite photographs.
Improved Environment