drilling. and casing. check list

Upload: aderobaki-gbenga

Post on 14-Apr-2018

232 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/29/2019 Drilling. and Casing. Check List.

    1/24

    Menu List

    CkLst1

    CkLst2

    CkLst3

    CkLst4

    CkLst5

    CkLst6

    CkLst7

    CkLst8

    CkLst9

    CkLst10

    CkLst11

    CkLst12

    CkLst13

    CkLst14

    CkLst15

    CkLst16

    CkLst17

    CkLst18

    Drive Pipe

    NU Diverter

    Prepare to Spud

    Run Conductor

    Cement Conductor

    Install Conductor Spool

    Drill Surface Hole

    Run Surface Casing

    Cement Surface Casing

    ND Diverter / NU Stack

    Drill Inter. Casing Hole

    Run Intermediate

    Cement intermediate

    Install Inter. Casing

    Drill Out for Liner

    Running Liner String

    Cement Liner String

    Install liner Spool

  • 7/29/2019 Drilling. and Casing. Check List.

    2/24

    High Island 9

    CHECKLIST

    OPERATOR_PERENCO_________________

    HAMMER DRIVE PIPE MONTH/YEAR__March 04______ WELL NUMBER_EBOME KB-4

    ITEM DAY REMARKS G.M. SUPERVISOR OPERATOR

    Drive Pipe

    Measurement On Pipe

    Running Order

    Pipe Tongs

    Drivepipe Hammer & Unit

    Hammer Crew

    Drivepipe handling equip.

    Pick-up Slings

    Hammer Rig Up Slings

    Rotary Bushings

    Texas Deck

    RKB To Drivepipe Cut

    Drive Pipe Flange

    Oxy-Ace Torch or cold cut

    equip.

    Oxy-Ace Supply

    Drawworks Brakes

    Elmago Brake

    Bit sub for drill/drive assy.

    Bit breaker

    DC's (5x8")

    HWDP (7x4 1/2IF)

    XO (6 5/8RPx4 1/2IFB)

    LIFT CAPS

    7 5/8R

    6 5/8R

    4 1/2IF

    Hole opener if needed

  • 7/29/2019 Drilling. and Casing. Check List.

    3/24

    High Island 9

    CHECKLIST

    OPERATOR_____ADDAX_____________

    NIPPLE UP DIVERTER 29.5 MONTH/YEAR JULY 06_______ WELL NUMBER___OKW-4____________

    ITEM DAY REMARKS GSF. SUPERVISOR OPERATOR

    Diverter/Element

    Hydraulic Controll Lines choke control line and closed

    annular hose

    Overboard Lines/Valves

    Diverter Flange-Nuts&Bolts verify flanges are compatable

    Ring Gaskets/Spares R 73

    B.O.P. Hoist 3/8 allen key

    function test

    Pickup Slings/Shackles 1.5 60' slings for drawworks check

    shackles and slings rated for load

    Oxy-Ace Torch

    Bell Nipple Lenght

    Flow Line/Fill Line

    Impact Wrench&Sockets

    Hammer Wrenches

    Sledge Hammers

    B.O.P. Accumulator Unit

    B.O.P. Fluid

    Function Test Diverter

    Seals For Slip On Flanges 100PSI over expected working psi

    Verify flanges are compatable

    correct unions for fill up line

    chains and binders

    permits for manriding

    grease gun w/ psi gauge bucket ep2 (manual gun)

    radios

    rope 50' x 1/2"

    packing plate bell nipple 16-Sep

    1

  • 7/29/2019 Drilling. and Casing. Check List.

    4/24

    High Island 9

    CHECKLIST

    OPERATOR PERENCO

    PREPARE TO SPUD MONTH/YEAR March 04 WELL NUMBER_____EBOME KB-4

    ITEM DAY REMARKS G.M. SUPERVISOR OPERATOR

    DC/DP Elevators

    DC/DP Slips

    Rotary Bushings

    DC Safety Clamp

    Bit & Nozzles

    Bit Breaker

    Hole Opener

    DC Lifting Subs

    Stabilizers

    X/O Subs

    Drill Collars

    Heavy Weight Drill Pipe

    Drill Pipe

    Drill Collar/Drill Pipe Dope

    Float Valve

    Inside BOP

    TIW Valve

    Pipe Spinner

    Drill Pipe Tong/Jaws

    Drill Collar Tongs If Required

    Tong Sublines/Jerklines

    Mouse Hole

    Mud Bucket w/ Inserts

    Drawwork Break Bands

    Elmago Break

    Wireline Unit

    Single Shot Survey

    Totco Landing Ring

    Mud Pumps/SparesMud Mixed

    Desilter Unit

    Desander Unit

    Mud Cleaner & Screens

    Degasser If Required

    Shale Shaker Screens

    Bulk Mud System Checked

    Barite On Board

    Pressure Test Diverter

    Drill Water On Board

    Trip Tank Operational

  • 7/29/2019 Drilling. and Casing. Check List.

    5/24

    High Island 9

    CHECKLIST

    OPERATOR_________________

    RUN CONDUCTOR MONTH/YEAR_______________ WELL NUMBER_________________________

    ITEM DAY REMARKS G.M. SUPERVISOR OPERATOR

    Conductor Casing

    Measurements On Casing

    Running Sequence

    Shoe/Float Collar

    Thread Lock

    Barite & Wire Brushes

    Cap. & Disp. Of Casing

    Hydraulic Tongs & Unit

    Manual Casing Tongs

    Rotary Bushings

    Casing Slips & Spider

    Safety Clamp

    Casing Elevators

    Stabbing Board

    Pick-up Slings

    Casing Dope

    Solf Rope

    Oxy-Ace Torch

    Drawworks Brakes

    Elmago Brake

    Casing Fill Up Line

    Casing Cent. & Pins

    Casing Make Up Torque

  • 7/29/2019 Drilling. and Casing. Check List.

    6/24

    High Island 9

    CHECKLIST

    OPERATOR_________________

    CEMENT CONDUCTOR MONTH/YEAR_______________ WELL NUMBER_________________________

    ITEM DAY REMARKS G.M. SUPERVISOR OPERATOR

    Cement On Board

    Cement Additives

    Cement Unit

    Lines Pumped Through

    Chicksan Lines Required

    Cementing Head

    Bulk Cement System

    Cement Lines Purged

    Hopper Weight Indicator

    Air Compressors Checked

    Bulk Pod Fluffed

    Weight Scales

    Sample Containers

    Diverter Wash Tool

    Check For Cmt At Shakers

  • 7/29/2019 Drilling. and Casing. Check List.

    7/24

    High Island 9

    CHECKLIST

    OPERATOR_________________

    INSTALL CONDUCTOR SPOOL MONTH/YEAR_______________ WELL NUMBER_________________________

    ITEM DAY REMARKS G.M. SUPERVISOR OPERATOR

    RKB-LMF Measurement

    Conductor Pipe Spool

    Cross Over Swedge

    Double Studded Adapter

    Ring Gaskets For Same

    Flange Bolts & Nuts

    Diverter OVBD Lines

    BOP Hoist

    Impact Wrench & Sockets

    Hammer Wrenches

    Sledge Hammers

    Bell Nipple Lenght

    Oxy-Ace Torch

  • 7/29/2019 Drilling. and Casing. Check List.

    8/24

    High Island 9

    CHECKLIST

    OPERATOR_________________

    DRILL SURFACE HOLE MONTH/YEAR_______________ WELL NUMBER_________________________

    ITEM DAY REMARKS G.M. SUPERVISOR OPERATOR

    D.P. Elevators

    D.C. Elevators

    Rotary Bushings

    D.P./D.C. Slips

    D.C. Safety Clamp

    Bit w/ Nozzles

    Bit Breaker

    Hole Opener

    D.C. Lift Nipples

    Stabilizers

    X-O Subs

    Drill Collars Torque to

    Heavy Weight Torque to

    Drill Pipe Torque to

    Drill Pipe Dope

    Float Valve

    Inside BOPStabbing Valve

    DP Tongs/Dies

    Tong Snublines/Chains

    Mouse Hole

    Mud Bucket

    Drawworks Brake Bands

    Elmago Brake

    Wire Line Unit

    Totco Angle Recorder

    Totco Landing Ring

    Mud Pumps/Spares

    Mud Mixed

    Mud Supply

    Desilter/DesanderDegasser

    Shale Shaker & Screens

    Bulk Mud System

    Pressure Test Divertor

    D.P./D.C. Disp & Cap

    Directional Equipment

    Minimum 1000 sx Barite

    Minumum 2000 bbl Water

    Minimum 500 bbl Diesel

  • 7/29/2019 Drilling. and Casing. Check List.

    9/24

    High Island 9

    CHECKLIST

    OPERATOR_________________

    RUN SURFACE CASING MONTH/YEAR_______________ WELL NUMBER___________________

    ITEM DAY REMARKS G.M. SUPERVISOR OPERATOR

    Surface Casing

    Measurements on Casing

    Running Sequence

    Shoe/Float Collar

    Thread lock Compound

    Casing Disp/Cap Cal.

    Hydraulic Tongs/Unit

    Jaws f/ Back up tongs to size csg.

    Manual Casing Bushings

    Manual Slips/Elevators

    Spider Slips/Elevators

    Casing Fill Up Line

    Stabbing Board

    Pick up Slings

    Casing Dope

    Solf Rope

    Quick Release Protectors

    Casing Cent. & Pins

    Casing Scratchers/Pins

    Drawworks Brake Bands

    Elmago Brake

    Casing Makeup Torque

    Casing Drifted

  • 7/29/2019 Drilling. and Casing. Check List.

    10/24

    High Island 9

    CHECKLIST

    OPERATOR_________________

    CEMENT SURFACE CASING MONTH/YEAR_______________ WELL NUMBER_________________________

    ITEM DAY REMARKS G.M. SUPERVISOR OPERATOR

    Class & Amt. of Cement

    Cement Additives

    Cement Unit

    Pump Through Cmt. Lines

    8 Hrs. Prior to Job

    Chicksan Lines

    Cementing Head & Plugs

    Bulk Cement System

    Purge Cement Lines

    Check Out Air Compressor

    Bulk Pods Fluffed

    Mud Scales

    Sample Containers

    Displacement Calculation

    Diverter Wash Tool

    Man to Dump Cmt. @ S.S.

  • 7/29/2019 Drilling. and Casing. Check List.

    11/24

    High Island 9

    CHECKLIST

    OPERATOR_________________

    ND DIVERTER/NU STACK MONTH/YEAR_______________ WELL NUMBER_________________________

    ITEM DAY REMARKS G.M. SUPERVISOR OPERATOR

    Surface Casing Spool

    Double Studded Adapter Psi Ratings

    Ring Gaskets # -

    Choke & Kill Wing Valves Ring Gaskets # -

    BOP Stack

    Bell Nipple Lenght

    Bell Nipple: Nuts & Bolts

    C & K Valve: Nuts & Bolts

    Wellhead: Nuts & Bolts

    Impact Wrench & Sockets

    Hammer Wrenches

    Air Hoist

    Stack PU Slings

    Oxy-Ace Torch

    Texas Deck

    C & K Lines to Floor

    BOP Hydralic Control Lines

    Casing Spool Testing Equip

    Bebe Winches

    Flowline/Fillup Line

    Rig Floor C & K Manifold

    Adjustable Chokes

    BOP Control Panel Rig Floor & Remote

    Accumulator System

    BOP Fluid

    "Poor Boy" Degasser

    BOP Test Tool/O Rings

    Bore Protector & R.T.

    RKB Measurements

    Test BOP & Manifold PSI Low: PSI High:

    SLINGS 60' 1.5 FOR BLOCK

    30' FOR MUD CROSS

    30' FOR CRANE WITH LONG STINGER

    KEEL HAUL FROM STARBOARD CRANE TO BLOCK

    PASS ROPE TO DRIVE PIPE DECK FROM SHAKER DECK (TO PULL SLINGS)2 11/16 WRENCH FOR NO WELD ADAPTER BOLTS

    28 STUDS TO BACK OUT DIES ENSURE THEY BACK BOLTS ALL THE WAY

    JUMP STARBOARD TUGGER TO PORT SIDE WITH SNATCH BLOCK TO HANDLE VENT LINE

  • 7/29/2019 Drilling. and Casing. Check List.

    12/24

    High Island 9

    CHECKLIST

    OPERATOR_________________

    DRILL INTER. CASING HOLE MONTH/YEAR_______________ WELL NUMBER_________________________

    ITEM DAY REMARKS G.M. SUPERVISOR OPERATOR

    Trip Tank Operational

    DC & DP Elevators

    DC & DP Slips

    Spare Inserts/dies for Above

    Rotary Bushings

    DC Safety Clamp

    Bit w/ Nozzles

    Bit Breaker

    DC Lift Nipples

    Stabilizers

    X-O Subs

    Drill Collars Torque to:

    Heavy Weight Torque to:

    Drill Pipe Torque to:

    Drill Pipe Dope

    Float Valve

    Inside BOPTIW Valve

    Pipe Spinner

    DP Tongs & Jaws

    Tong Lines & Chain

    Mouse Hole

    Mud Bucket w/ Inserts

    Drawworks Brake Bands

    Elmago Brake

    Wireline Unit

    Totco Recorde-8/16

    Totco Landing Ring

    Mud Pumps Checked

    Mud Supply

    Desander/DesilterDegasser

    Shale Shaker Screens

    Bulk Mud System

    Pressure Test BOP PSI Low: PSI High:

    Disp/Cap Figures

    Directional Drilling Equip.

    Minimum 1000 Sx Barite

    Minimum 2000 bbls Water

    Minimum 500 bbl Diesel

  • 7/29/2019 Drilling. and Casing. Check List.

    13/24

    High Island 9

    CHECKLIST

    OPERATOR_________________

    RUN INTERMIATE CASING MONTH/YEAR_______________ WELL NUMBER_________________________

    ITEM DAY REMARKS G.M. SUPERVISOR OPERATOR

    Intermiate Casing

    Measurements on Casing

    Running Sequence

    Shoe/Float Collar

    Thread lock Compound

    Casing Disp/Cap Cal.

    Hydraulic Tongs/Unit

    Manual Casing Bushings

    Manual Slips/Elevators

    Spider Slips/Elevators

    Casing Fill Up hose & valve.

    Stabbing Board stab board insp. Check list

    Pick up Slings

    Casing Dope

    Solf Rope

    Quick Release Protectors

    Casing Cent. & Pins

    Casing Scratchers/Pins

    Oxy-Ace Torch

    Drawworks Brake Bands

    Elmago Brake

    Casing Makeup Torque

    Casing Drifted

  • 7/29/2019 Drilling. and Casing. Check List.

    14/24

    High Island 9

    CHECKLIST

    OPERATOR_________________

    CEMENT INTER. CASING MONTH/YEAR_______________ WELL NUMBER_________________________

    ITEM DAY REMARKS G.M. SUPERVISOR OPERATOR

    Class & Amount of Cement

    Cement Additives

    Cement Unit

    Pump Through Cmt Lines

    8 Hours Prior to Job

    Chicksan Lines

    Cement head & Plugs

    Bulk Cement System

    Check Out Air Compressor

    Bulk Pods Fluffed

    Weight Scales

    Sample Containers

    Displacement Calculations

    Man to Dump Cmt @ S.S.

  • 7/29/2019 Drilling. and Casing. Check List.

    15/24

    High Island 9

    CHECKLIST

    OPERATOR_________________

    INSTALL INT. CSG. SPOOL MONTH/YEAR_______________ WELL NUMBER_________________________

    ITEM DAY REMARKS G.M. SUPERVISOR OPERATOR

    Intermediate Casing Spool

    Casing Slips

    Double Studded Adapter PSI Rating:

    Ring Gaskets Ring #

    Bell Nipple Lenght

    Wellhead Flange & Bolts

    Impact Wrench

    Hammer Wrenches

    BOP Hoist

    Oxy-Ace Torch

    Texas Deck

    C & K Lines to Rig Floor

    Bebe Winches

    Flow Line/Fill up Line

    BOP Test Tools

    Bore Protector

    Distance to RKB

    Pipe Rams

    Test BOP Test Low: Test High:

    Casing Spool Test Equip.

  • 7/29/2019 Drilling. and Casing. Check List.

    16/24

    High Island 9

    CHECKLIST

    OPERATOR_________________

    DRILL OUT FOR LINER MONTH/YEAR_______________ WELL NUMBER_________________________

    ITEM DAY REMARKS G.M. SUPERVISOR OPERATOR

    Trip Tank Operational

    DC & DP Elevators

    DC & DP Slips

    Spare Inserts/dies for Above

    Rotary Bushings

    DC Safety Clamp

    Bit w/ Nozzles

    Bit Breaker

    DC Lift Nipples

    Stabilizers

    X-O Subs

    Drill Collars Torque to:

    Heavy Weight Torque to:

    Drill Pipe Torque to:

    Drill Pipe Dope

    Float ValveInside BOP

    Pipe Spinner

    DP Tongs & Jaws

    Tong Lines & Chain

    Mouse Hole

    Mud Bucket w/ Inserts

    Drawworks Brake Bands

    Elmago Brake

    Wireline Unit

    Totco Recorde-8/16

    Totco Landing Ring

    Mud Pumps Checked

    Mud Supply

    Desander/DesilterDegasser

    Shale Shaker Screens

    Bulk Mud System

    Pressure Test BOP PSI Low: PSI High:

    Disp/Cap Figures

    Directional Drilling Equip.

    Minimum 1000 Sx Barite

    Minimum 2000 bbls Water

    Minimum 500 bbl Diesel

  • 7/29/2019 Drilling. and Casing. Check List.

    17/24

    High Island 9

    CHECKLISTOPERATOR_________________

    RUNNING LINER STRING MONTH/YEAR_______________ WELL NUMBER_________________________ITEM DAY REMARKS G.M. SUPERVISOR OPERATOR

    Liner Casing

    Measurements on Casing

    Running Sequence

    Shoe/Float Collar

    Thread lock Compound

    Liner Hanger/Running Tool

    DP Landing String

    Casing Disp/Cap Cal.

    Hydraulic Tongs/Unit

    Manual Casing Bushings

    Manual Slips/Elevators

    Spider Slips/Elevators

    Casing Fill Up Line

    Stabbing Board

    Pick up Slings

    Casing Dope

    Solf Rope

    Quick Release Protectors

    Casing Cent. & Pins

    Casing Scratchers/Pins

    Oxy-Ace Torch

    Drawworks Brake Bands

    Elmago Brake

    Casing Makeup Torque

    Casing Drifted

    BOP Rams

    Mill(Tie Back)

  • 7/29/2019 Drilling. and Casing. Check List.

    18/24

    High Island 9

    CHECKLIST

    OPERATOR_________________

    CEMENT LINER STRING MONTH/YEAR_______________ WELL NUMBER________________________

    ITEM DAY REMARKS G.M. SUPERVISOR OPERATOR

    Class & Amount of Cement

    Cement Additives

    Cement Unit

    Pump Through Liner 8 Hour

    Prior to Job

    Rabbit Landing String

    Chicksan Lines

    Cement Head &n Plugs

    Bulk Cement System

    Check Out Air Compressor

    Bulk Pods Fluffed

    Weight Scales

    Sample Containers

    Displacement Calculations

  • 7/29/2019 Drilling. and Casing. Check List.

    19/24

  • 7/29/2019 Drilling. and Casing. Check List.

    20/24

    High Island 9

    CHECKLIST

    OPERATOR_________________

    INSTALL LINER SPOOL MONTH/YEAR_______________ WELL NUMBER_________________________

    ITEM DAY REMARKS G.M. SUPERVISOR OPERATOR

    Liner Casing Spool

    Casing Slips

    Double Studded Adapter PSI Rating:

    Ring Gaskets Ring #

    Bell Nipple Lenght

    Wellhead Flange & Bolts

    Impact Wrench

    Hammer Wrenches

    BOP Hoist

    Oxy-Ace Torch

    Texas Deck

    C & K Lines to Rig Floor

    Bebe Winches

    Flow Line/Fill up Line

    BOP Test Tools

    Bore Protector

    Distance to RKB

    Pipe Rams

    Test BOP Test Low: Test High:

    Casing Spool Test Equip.

  • 7/29/2019 Drilling. and Casing. Check List.

    21/24

    High Island 9

    CHECKLIST

    OPERATOR_________________

    Skidding Operations MONTH/YEAR_______________ WELL NUMBER_______________________

    ITEM DAY REMARKS GSF SUPERVISOR OPERATOR

    Skidder Control Test emergency stop prior to use - motorman to stand by breakers in scr room

    Handrails Handrails inboard of skid beam removed to allow bop setback area to clear

    Handrails outside skid beam swung inward for teeth rack to pass

    Walkway - stairs All stairs removed or lifted up & secured

    Items secured or removed from both walkways under cantilever

    Walk along upper cantilever walkways to ensure nothing attached

    Skid beams Fittings greased - located along inside of skid beam - EP2

    Bottom & outside edge of beam lubricated w/ pipe dope

    Bronze wear strips lubricated w/ pipe dope

    Teeth rack cleaned & doped w/ pipe dope

    Mud return trough Ensure small pipe extension removed - located on end of trough going into

    shakers - extension usually left inside trough when removed

    Electrical umbilical cord Man to watch constantly to ensure trolley system operating properly

    BOP control lines Men to watch when going over the fire station to ensure no hang ups

    Watch when going over handrails & drive pipe deck

    Supply & drain hoses Completely removed prior to skid - Note air line has bleed off line by 30" diverter

    Accumulator unit Check height of anything in hwdp bay because the accumulator unit skids in over it

    Skid in location Skid in to were end of cantilever & end of skid beam are flush

    Jumper hoses - C & K hose Always hang in proper rack prior to skidding

    Small 4" co-flex hose hang off at drill floor level next to v-door stairs

    Derrickman escape cable Connects port side monkey board to padeye on aft walkaround on port leg

    Skid motors Check for obstructions on teeth - remove outside covers

    Hi -pressure washer Ensure electrical supply cable disconnected and clear

  • 7/29/2019 Drilling. and Casing. Check List.

    22/24

    High Island 9

    CHECKLIST

    change annular element OPERATOR_________________

    MONTH/YEAR_______________ WELL NUMBER_______________________

    ITEM DAY REMARKS GSF SUPERVISOR OPERATOR

    Verify JRA

    Verfiy new element on board long life hydri l

    make and type p/n 3131189

    Verfiy seals are on board head gasket= 38150

    upper u seal= 38151

    verfiy lifting eyes for element

    verfiy lifting eyes for annular

    head

    wrench for lock down bolt 1 1/2"

    torque= 100 ft/lb

    function bop hoist

    sheaves for tuggers

    sling for block 1 1/2 x 60'

    shackle for block 20 ton

    safety belts

    check sala lines

    rags 1 box

    soap three buckets

    wrenches for bell nipple

    slings for bell nipple 2 x 30' x 7/8

    shackles for bell nipple 2 x 7/8

    pull mouse hole

    weight of equipment

    screw head 3445 lb

    element 480 lb

    total annular 14800 lb

  • 7/29/2019 Drilling. and Casing. Check List.

    23/24

    High Island 9

    CHECKLIST

    OPERATOR_________________

    MONTH/YEAR_______________ WELL NUMBER_______________________

    ITEM DAY REMARKS GSF SUPERVISOR OPERATOR

  • 7/29/2019 Drilling. and Casing. Check List.

    24/24

    High Island 9

    CHECKLIST

    OPERATOR_________________

    MONTH/YEAR_______________ WELL NUMBER_______________________

    ITEM DAY REMARKS GSF SUPERVISOR OPERATOR