draft report of the 3rd iaea steering committee meeting on ... reports/report sc nov_… · list of...

35
Page 1 of 35 Draft Report of the 3rd IAEA Steering Committee Meeting on Competence of Human Resources for Regulatory Bodies and Seminar on SARCoN (Systematic Assessment of Regulatory Competence Needs) Vienna, 28 November – 2 December 2011 [Type the document subtitle]

Upload: others

Post on 27-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Draft Report of the 3rd IAEA Steering Committee Meeting on ... Reports/Report SC Nov_… · list of participants are given in Appendix I and II. 33 participants attended the SC meeting

Page 1 of 35

Draft Report of the 3rd IAEA Steering Committee Meeting on Competence of Human Resources for Regulatory Bodies and Seminar on SARCoN (Systematic Assessment of Regulatory Competence Needs)

Vienna, 28 November – 2 December 2011

[Type the document

subtitle]

Page 2: Draft Report of the 3rd IAEA Steering Committee Meeting on ... Reports/Report SC Nov_… · list of participants are given in Appendix I and II. 33 participants attended the SC meeting

Page 2 of 35

Page 3: Draft Report of the 3rd IAEA Steering Committee Meeting on ... Reports/Report SC Nov_… · list of participants are given in Appendix I and II. 33 participants attended the SC meeting

Page 3 of 35

TABLE OF CONTENTS

BACKGROUND ............................................................................................................. 5

1 INTRODUCTION .......................................................................................................................................... 5

2 SUMMARY OF MEETING ............................................................................................................................. 6

2.1 PRESENTATIONS BY IAEA STAFF AND SC ‘M EMBERS ............................................................................... 6

2.2 PRESENTATION AND DISCUSSION OF THE SC’S WORK PLAN ...................................................................... 7

2.2.1 Safety Report ................................................................................................................................... 7

2.2.2 Basic Professional Training Course (BPTC), Regulatory Control Course and Other Training Materials ....................................................................................................................................................... 7

2.2.3 Seminar on SARCoN guidelines ...................................................................................................... 8

3 CONCLUSIONS AND FURTHER ACTIONS ..................................................................................................... 8

APPENDIX I. AGENDA ....................................................................................................................................... 11

APPENDIX II. LIST OF PARTICIPANTS ................................................................................................................ 19

APPENDIX III. OPENING REMARKS (MR. J. LYONS, DIR-NSNI) ....................................................................... 27

APPENDIX IV. WORK PLAN ............................................................................................................................... 31

Page 4: Draft Report of the 3rd IAEA Steering Committee Meeting on ... Reports/Report SC Nov_… · list of participants are given in Appendix I and II. 33 participants attended the SC meeting

Page 4 of 35

Page 5: Draft Report of the 3rd IAEA Steering Committee Meeting on ... Reports/Report SC Nov_… · list of participants are given in Appendix I and II. 33 participants attended the SC meeting

Page 5 of 35

Background

Following the conclusions of various IAEA Technical Meetings related to developing and ensuring regulatory competence in Member States with Nuclear Power Plants, the establishment of a Steering Committee (SC) to exchange information and advise the IAEA on how best to support the Member States’ systems for ensuring regulatory competence was strongly recommended. Terms of Reference for the Steering Committee were prepared and approved. The Steering Committee was established formally in 2009, and since then it has been successfully implementing its strategic work plan, which is revised annually.

Amongst the achievements of the Steering Committee on Competence of Human Resources of Regulatory Bodies, the following work can be noted:

• Revision and updating of the Guidelines on Systematic Assessment of Competence Needs (SARCoN), and its associated questionnaires and software based self-assessment tool

• Research on best systems to ensure and manage regulatory competence. A safety report collecting current knowledge and good practices on management systems for regulatory competence is under preparation

• Sharing training courses and documentation amongst its members and creating a compilation of websites and internet resources useful for training of regulatory bodies available from the Member States and the IAEA

• Promoting and giving advice on the IAEA safety standards related to developing, ensuring and managing regulatory competence.

In 2010, a limited number of Member States considering to embark on a Nuclear Power Programme joined the Steering Committee as observers. The strategic work plan of the Steering Committee was modified to include an additional objective in order to identify and support as possible and as appropriate the competence’s needs of regulators wishing to embark on a Nuclear Power Programme. Given the interest in sharing information amongst regulators in the process of embarking on a Nuclear Power Programme, it was agreed to expand the ToR of the SC in order to include members from the newcomer regulators. In 2011 the SC was then enlarged.

1 Introduction

The SC meets in plenary once a year. A limited group of SC Members known as Bureau meet twice during the year together with the IAEA secretariat in order to revise the implementation of the strategic work plan and to follow up on actions for the upcoming plenary meeting.

This was the third meeting of this Steering Committee (SC). In preparation of this 3rd SC, two Bureau Meetings had been held in 2011 on 23-24 February in Vienna and on 11–12 October in Helsinki. The main aims of the two Bureau meetings were:

• to discuss the development of the safety report on managing regulatory competence, • to prepare the SARCoN seminar planned in connection with the next SC meeting, • to discuss progress on the implementation of the strategic work plan of the SC, • to prepare an Agenda for the SC meeting of December 2011 in Vienna

Page 6: Draft Report of the 3rd IAEA Steering Committee Meeting on ... Reports/Report SC Nov_… · list of participants are given in Appendix I and II. 33 participants attended the SC meeting

Page 6 of 35

2 Summary of Meeting The agenda for the Steering Committee and the Seminar on the SARCoN tool, as well as the list of participants are given in Appendix I and II. 33 participants attended the SC meeting and the SARCoN seminar during the week 28 November- 2nd December 2011. The meeting was chaired by Mr. Jean-Luc Lachaume of ASN (France) the first two days and by Mr. Pierre Mignot of Bel V (Belgium) the third day, both Members of the Bureau. Following the Steering Committee plenary meeting, a two days seminar on the updated tool for SARCoN was organised by the IAEA secretariat. The seminar as well as further discussion from the SC Members was chaired by Ms Koskinen (Finland), also member of the Bureau. The meeting was opened by the IAEA Nuclear Installations Division, Mr. Jim Lyons (NSNI). Mr Lyons opening remarks are in appendix III. The Scientific Secretary, Ms Moracho, introduced the background and previous work of the SC. Presentations from the IAEA staff followed the opening and covered various issues related to new developments in the IAEA, in particular, regulatory issues, competence and capacity building and the recent actions planned in response to the accident at the TEPCO Fukushima site. Mr. Pierre Mignot, as member of the Bureau gave a report on the work of the Bureau since the last SC meeting.

2.1 Presentations by IAEA staff and SC ‘Members The IAEA’s staff presented the following: “Developments after the accident at TEPCO Fukushima Nuclear Power Plant-Action Plan- Action “Capacity Building” by Mr Mallick. progress of IAEA safety report on Managing the Competence of a Regulatory Body’s staff, by Mr. H. Suman, IAEA Education and Training activities in radiation, transport and waste safety, by Mr. A. Luciani, Training in Emergency Preparedness and Response, by Mr. R. Salinas, IAEA Training in Security, by Ms. A. Braunegger-Guelich, the Global Safety Assessment Network (GSAN) and the Safety Assessment Education and Training (SAET) programme, by Mr P. Wells, Update on IRRS and related activities in the area of NPP, by Mr. S. Koenick, Status of the Regulatory Cooperation Forum (RCF), by Mr. R. Gibbs, Presentation of Asian Nuclear Safety Network (ANSN), by Mr. Y. Fukuda, Workforce Planning and new developments, by Mr. B. Molloy, the Global Nuclear Safety and Security Network (GNSSN) and REGNET, by Mr L. Guo, new training materials in safety culture, by Ms. M. Haage. National reports giving an update of the SC’s Members activities of interest were disseminated in the meeting. Some SC members volunteered to give specific presentations on: FANR Capacity Building Programme “From Newcomers to Experts”, by Mr. J. Bastos, Knowledge Management in the Russian TSO, by Ms. E. Sokolova,, An overview of the Management of Training in the Nuclear Safety Division of the Mexican Regulatory Body, by Mr. JL. Esquivel, Training approach and practices applied in the Belgian TSO Bel V, by Mr. P. Mignot and Information on ENSTTI and Training Activities by EC, by Mr. P. Mignot.x

Page 7: Draft Report of the 3rd IAEA Steering Committee Meeting on ... Reports/Report SC Nov_… · list of participants are given in Appendix I and II. 33 participants attended the SC meeting

Page 7 of 35

2.2 Presentation and discussion of the SC’s Work Plan

The Action Plan of the SC was presented briefly by Ms. K. Koskinen on the second day. The last day of the meeting Ms. M. Moracho reported on the IAEA progress on each of actions and the future Work Plan was discussed in detail. 2.2.1 Safety Report A revised draft of the safety report on managing regulatory competence was distributed to all participants at the beginning of the meeting. The revision is the result of an IAEA Consultants Meeting held in August 2011 in Vienna with the objective to complement the previous version in the area of radiation safety. This was requested in a Document Preparation Profile (DPP) issued at the end of 2010 by the IAEA Coordination Committee that oversees the production of safety standards and documents. This draft safety report was discussed by the Bureau Members in Helsinki and comments were made by the Bureau members, but not yet incorporated in the report. The main changes between old and new versions were presented by Mr. Suman in his presentation mentioned above. During the discussion at the SC meeting, another draft document related to the safety report entitled “Competence Building of RBs for new countries embarking on Nuclear Power Programme” was presented and disseminated. After discussion it was agreed the following: 1.- The Steering Committee Members shall comment to safety report and a second Consultants meeting shall take be organised by the IAEA in order to include the comments 2.- The safety report’s appendix/chapter related to the embarking countries needs to be expanded taking into account the work previously conducted in this area. The IAEA shall take action on this, SC Members were welcomed to cooperate 3.- It was pointed out by some SC members that, if the safety report is intended to supersede TECDOC 1254, it shall include a complete list of competencies in order to be self-supporting. This competence list should be the first level of competencies according to the quadrants in SARCoN 2.2.2 Basic Professional Training Course (BPTC), Regulatory Control Course

and Other Training Materials

The IAEA informed that the BPTC is held regionally in the Asian and Latin-American region. An update of the syllabus and supporting texts has been conducted and shall be made available during 2012. The regulatory Control book needs to start a revision, a first outline of contents in line with the new GSR PART 1 has been drafted. A Consultants meeting shall be arranged during next year. The SC was asked to cooperate as possible in this revision.

Page 8: Draft Report of the 3rd IAEA Steering Committee Meeting on ... Reports/Report SC Nov_… · list of participants are given in Appendix I and II. 33 participants attended the SC meeting

Page 8 of 35

The IAEA web for training was presented and approved. A new page includes video lectures from all Section Heads of the nuclear installations safety division. These video presentations give an overview on line of all the IAEA requirements in the area of nuclear installations safety. http://www-ns.iaea.org/training/ni/train-on-ss.asp?s=100&l=102 http://www-ns.iaea.org/training/ni/materials.asp Also newsletters on training are regularly produced and disseminated in the SC. 2.2.3 Seminar on SARCoN guidelines The new software for applying the SARCoN guidelines was presented. Three working groups were established in order to test user interface and get feedback from the set of competencies. Overall the new software was found useful and it was agreed that an improved version shall incorporate the feedback from the working groups. An important discussion took place concerning the need to revise the set of competencies of SARCON questionnaires in line with the safety report. The safety report modified slightly the arrangement of the first level of competence areas within the fours quadrant model. An revision of SARCoN will therefore be needed in line with these modifications. More information about SARCoN is available at: http://www-ns.iaea.org/training/ni/sarcon.asp?s=100&l=103

3 Conclusions and Further Actions The SC meeting achieved its objectives in line with its mission and strategic work plan. The agenda allowed a comprehensive presentation and up to date of the Agency activities in the area of regulatory competence, particularly in the area of nuclear installations. The dissemination of national reports, presentations from some of the SC members and discussions fostered exchange of views, gave useful information about current systems in the Member States and provided advice to the IAEA on how best further support the Member States’ regulators in ensuring competent human resources. The participation of regulators from countries planning to embark on a nuclear power programme was very positive and fruitful for all country members and for the IAEA. The SARCoN seminar was most appreciated in terms of a better understanding of its principles and the improved software tool. SARCoN is one of the main achievements of the SC and shall continue to be enhanced in line with the activities of the SC and the Agency. An strategic work plan for 2012 was discussed and agreed. This strategic work plan is included in appendix IV. It shall be followed-up by the Bureau Members and the IAEA secretariat.

Page 9: Draft Report of the 3rd IAEA Steering Committee Meeting on ... Reports/Report SC Nov_… · list of participants are given in Appendix I and II. 33 participants attended the SC meeting

Page 9 of 35

The SC Members will be informed on further actions related to the work programme. They asked to send comments to the draft safety report under preparation as well as to feedback on the SARCoN seminar during the beginning of 2012. The IAEA secretariat shall continue to report the SC on new developments, sending newsletters and asking for comments and advice as appropriate during the year. Information on the conclusions of the Bureau meetings shall also be disseminated to the SC members. Next meeting of the SC shall take place during the first week of December 2012.

Page 10: Draft Report of the 3rd IAEA Steering Committee Meeting on ... Reports/Report SC Nov_… · list of participants are given in Appendix I and II. 33 participants attended the SC meeting

Page 10 of 35

Page 11: Draft Report of the 3rd IAEA Steering Committee Meeting on ... Reports/Report SC Nov_… · list of participants are given in Appendix I and II. 33 participants attended the SC meeting

Page 11 of 35

Appendix I. Agenda

Page 12: Draft Report of the 3rd IAEA Steering Committee Meeting on ... Reports/Report SC Nov_… · list of participants are given in Appendix I and II. 33 participants attended the SC meeting

Page 12 of 35

Page 13: Draft Report of the 3rd IAEA Steering Committee Meeting on ... Reports/Report SC Nov_… · list of participants are given in Appendix I and II. 33 participants attended the SC meeting

Page 13 of 35

Monday, 28th of November 2011 9:30 - 17:00 Opening remarks

J. Lyons, Division Director IAEA

Developments after the accident at TEPCO Fukushima Nuclear Power Plant- Action Plan- Action 9 “Capacity Building”

S. Mallick IAEA

Introduction of participants

All

Presentation and adoption of the agenda

J. Lachaume, Chairman

Coffee Break 10:30-11:00 Background information, review of previous activities, Terms of Reference

M. Moracho, Scientific Secretary IAEA

Lunch Break 12:30-14:00 Presentation on progress of IAEA Safety Report

H. Suman, M. Moracho IAEA

Brief update on IAEA Education and Training activities in radiation, transport and waste safety

J. Wheatley, A. Luciani IAEA

Brief update on training in Emergency Preparedness and Response

R. Salinas

3rd Meeting of the Steering Committee on Competence of Human Resources for Regulatory Bodies and Seminar on SARCoN

(Systematic Assessment of Regulatory Competence Needs) 28 Nov - 2 Dec 2011

Hall M, 1st Floor Austria Center Vienna (ACV)

Agenda

Page 14: Draft Report of the 3rd IAEA Steering Committee Meeting on ... Reports/Report SC Nov_… · list of participants are given in Appendix I and II. 33 participants attended the SC meeting

Page 14 of 35

IAEA Coffee Break

15:30-15:50

Brief update on training in Security

A. Braunegger-Guelich IAEA

Presentation on the Global Safety Assessment Network (GSAN) and the Safety Assessment Education and Training (SAET) programme

P. Wells IAEA

Discussion

All

End of the day

Tuesday, 29th of November 2011 9:30 - 17:00 Update on IRRS and related activities in the area of NPP (15m) And Presentation on SSG-16 IRIS (20m)

S. Koenick IAEA

Presentation on Regulatory Cooperation Forum (RCF)

R. Gibbs IAEA

Presentation on ANSN/ETTG

Y. Fukuda IAEA

Coffee Break 10:50-11:20 Presentation on workforce planning and new developments

B. Molloy IAEA

Lunch Break 12:30-14:00 Presentation on REGNET, GNSSN

L. Guo

Page 15: Draft Report of the 3rd IAEA Steering Committee Meeting on ... Reports/Report SC Nov_… · list of participants are given in Appendix I and II. 33 participants attended the SC meeting

Page 15 of 35

Presentation of experience in the UAE

J. Bastos UAE

Presentation from Russia

E. Sokolova Russian Federation

Coffee Break 15:00-15:30 Presentation from Mexico

J. Esquivel CNSNS

Presentation from Belgium

P. Mignot Belgium

Cocktail reception at the VIC

17:00

Wednesday, 30th of November 2011 9:30 - 17:00

Update on the IAEA web and new training materials, Presentation on Progress made with the IAEA Basic Professional Training Course (BPTC) and Discussion on the Regulatory Control Book.

• New materials in safety culture

M. Moracho, A. Holzinger

M Haage IAEA

Coffee Break

11:00-11:30

Presentation and discussion of the action plan for next year and the strategic long term plan

All

Lunch Break

12:30-14:00

Presentation and discussion of the action plan for next year and the strategic long term plan Cont.

All

Dates for next the 4rd Steering Committee meeting in 2012 All

Closure of the meeting

All

Page 16: Draft Report of the 3rd IAEA Steering Committee Meeting on ... Reports/Report SC Nov_… · list of participants are given in Appendix I and II. 33 participants attended the SC meeting

Page 16 of 35

Thursday, 1st of December 2011 Seminar on the use of SARCoN (Systematic Assessment of

Regulatory Competence Needs) 9:30 - 17:00

Opening and Introduction of SARCoN and the Bureau work

K. Koskinen, (chairperson) P. Mignot (Bureau Member)

Presentation of software and the hands-on exercise on SARCoN

A. Holzinger, M. Moracho,

Setup of working groups and selection of working group leader

Facilitators

Breakout session and all day work on the exercise

Facilitators

Lunch Break

12:30-14:00

End of the day

Friday, 2nd of December 2011 9:30 - 17:00 Presentations from the Working Groups

Working Group Leaders

Discussion

All

Presentations from the Working Groups

Working Group Leaders

Coffee Break

10:30-11:00

Discussion

Lunch

12:30-14:00

Presentations from the Working Groups and discussion

All

Coffee Break 15:00-15:30

Page 17: Draft Report of the 3rd IAEA Steering Committee Meeting on ... Reports/Report SC Nov_… · list of participants are given in Appendix I and II. 33 participants attended the SC meeting

Page 17 of 35

Presentation of feedback and conclusions

R. Revuelta, Rapporteur and IAEA consultant

Future actions

All

Closure of the meeting

Page 18: Draft Report of the 3rd IAEA Steering Committee Meeting on ... Reports/Report SC Nov_… · list of participants are given in Appendix I and II. 33 participants attended the SC meeting

Page 18 of 35

Page 19: Draft Report of the 3rd IAEA Steering Committee Meeting on ... Reports/Report SC Nov_… · list of participants are given in Appendix I and II. 33 participants attended the SC meeting

Page 19 of 35

Appendix II. List of Participants

Page 20: Draft Report of the 3rd IAEA Steering Committee Meeting on ... Reports/Report SC Nov_… · list of participants are given in Appendix I and II. 33 participants attended the SC meeting

Page 20 of 35

Page 21: Draft Report of the 3rd IAEA Steering Committee Meeting on ... Reports/Report SC Nov_… · list of participants are given in Appendix I and II. 33 participants attended the SC meeting

Page 21 of 35

Third Meeting of the Steering Committee (SC) on Competence of Human Resources for Regulatory Bodies in Member States with Nuclear Power Plants (NPPs) and Seminar on

Training Needs Assessment (TNA) based on Systematic Assessment of Regulatory Competence Needs (SARCoN) Guidelines

28 Nov. – 2 Dec. 2011 Vienna, Austria

List of Participants

COUNTRY /

ORGANIZATION

PARTICIPANT

OFFICIAL MAILING ADDRESS Name

Argentina Ms Larcher

Ana

Unidad de Capacitacion y Entrenamiento Autoridad Regulatoria Nuclear Av. del Libertador 8250 Ciudad Autonoma de Buenos Aires (C1429BNP) ARGENTINA Tel: +54 11 6323 1712 Email: [email protected]

Belgium Mr Bernard

Benoit

BelV Rue Walcourt, 148 B-1070 BRUSSELS BELGIUM Tel: +32 2 5280 354 Fax: +32 2 5280 101 Email: [email protected]

Belgium Mr Mignot

Pierre

Bel V Rue Walcourt, 148 B-1070 BRUSSELS BELGIUM Tel: 0032 2 5280234 Fax: 0032 2 5280102 Email: [email protected]

Brazil Ms Wieland

Patricia

National Nuclear Energy Commission (CNEN) Rua General Severiano 90 Botafogo 22294-900 RIO DE JANEIRO, RJ BRAZIL Tel: 0055 215462353 Fax: 0055 215462253 Email: [email protected]

Page 22: Draft Report of the 3rd IAEA Steering Committee Meeting on ... Reports/Report SC Nov_… · list of participants are given in Appendix I and II. 33 participants attended the SC meeting

Page 22 of 35

Bulgaria Ms Sabinova

Vera

Nuclear Regulatory Agency 69 Shipchenski prochod Blvd. 1571 SOFIA BULGARIA Tel: 00359 2 9406883 Fax: 00359 2 9406919 Email: [email protected]

Chile Ms Villalobos Pino

Belgica

Comisión Chilena de Energía Nuclear (CCHEN) Amunátegui 95 Casilla 188-D SANTIAGO CHILE Tel: 0056 2 3646282 Email: [email protected]

Czech Republic Mr Vesely

Jiri

State Office for Nuclear Safety (SÚJB) Senovazne námesti 9 110 00 PRAHA 1 CZECH REPUBLIC Tel: +420 562 402 901 Fax: +420 568 866 414 Email: [email protected]

Egypt Mr Awaise

Ahmed, Mostafa Sayed

Nuclear Power Plants Authority (NPPA) 4 El-Nasr Avenue Massaken El Nasr P.O. Box 8191 11371 Nasr City CAIRO EGYPT Tel: 0020 2 22616480 Fax: 0020 2 2616276 Email: [email protected]

Egypt Mr Hegazy

Hesham Nabil AbdelKhalek

Nuclear Power Plants Authority (NPPA) 4 El-Nasr Avenue Massaken El Nasr P.O. Box 8191 11371 Nasr City CAIRO EGYPT Tel: +2 02 2616480 Fax: +2 02 2616476 Email: [email protected]

Finland Ms Koskinen

Annakaisa

Radiation and Nuclear Safety Authority (STUK) Laippatie 4 P.O. Box 14 00881 HELSINKI FINLAND Tel: 00358 9 75988382 Fax: 00358 9 75988400 Email: [email protected]

France Mr Lachaume

Jean-Luc

Autorité de Sûrete Nucléaire (ASN) 6 place du Colonel Bourgoin 75572 PARIS Cedex 12 FRANCE Tel: +33140198617 Email: [email protected]

Page 23: Draft Report of the 3rd IAEA Steering Committee Meeting on ... Reports/Report SC Nov_… · list of participants are given in Appendix I and II. 33 participants attended the SC meeting

Page 23 of 35

Germany Ms Jelinski

Marianne

Gesellschaft fuer Anlagen und Reaktorsicherheit mbH Schwertnergasse 1 D-50667 Cologne Germany Tel: +49 221 2068 616 Fax: +49 221 2068 99 09 Email: [email protected]

Hungary Ms Petofi-Toth

Katalin

Hungarian Atomic Energy Authority (HAEA); Nuclear Safety Directorate Fényes Adolf u. 4 1036 BUDAPEST HUNGARY Tel: 0036 1 4364913 Fax: 0036 1 4364909 Email: [email protected]

Iran, Islamic Republic of Mr Movafeghi

Amir

Atomic Energy Organization of Iran (AEOI); Technology Center for Safety and Radiological Protection Northern Karghar 14155-4494 TEHRAN IRAN, ISLAMIC REPUBLIC OF Tel: +98 21 82 063 693 Fax: +98 21 88 221 224 Email: [email protected]

Iran, Islamic Republic of Mr Sebteahmadi

S.M.B.

National Nuclear Safety Department Iran Nuclear Regulatory Authority North Kargar Ave. P.O. Box 14155-4494 TEHRAN IRAN, ISLAMIC REPUBLIC OF Tel: +98 21 88-22-1089 Fax: +98 21 88 22-1091 Email: [email protected]

Italy Mr Madonna

Antonio

ITER-Consult Via. A. Poliziano, 51 00184 ROMA ITALY Tel: +39 06 770 72 888 Fax: +39 06 23328132 Email: [email protected]

Jordan Mr Alssabbagh

Moayyad

Jordan Nuclear Regulatory Commission P.O. Box 830283 AMMAN 11183 JORDAN Tel: 00962 79 5364686; 00962 6 5927124 Fax: 00962 6 5927144 Email: [email protected]

Lithuania Mr Daubaras

Rimantas

State Nuclear Power Safety Inspectorate (VATESI) A. Gostauto Street 12 01108 VILNIUS LITHUANIA Tel: 0037052661624 Fax: 0037052614487 Email: [email protected]

Page 24: Draft Report of the 3rd IAEA Steering Committee Meeting on ... Reports/Report SC Nov_… · list of participants are given in Appendix I and II. 33 participants attended the SC meeting

Page 24 of 35

Malaysia Ms Kostor

Monalija

Ministry of Science, Technology and Innovation; Atomic Energy Licensing Board (AELB) Batu 24, Jalan Dengkil 43800 DENGKIL, Selangor MALAYSIA Tel: +603 89225888; 0060389284163 Fax: +603 89223685 Email: [email protected]

Mexico Mr Esquivel Torres

Jose Luis

Secretaría de Energía; Comisión Nacional de Seguridad Nuclear y Salvaguardias (CNSNS) Dr José María Barragán 779, Colonia Narvarte. Deleg. Benit Juárez 03020 CIUDAD DE MÉXICO, D.F. MEXICO Tel: 0052 55 50953200 Email: [email protected]

Mexico Ms Fragoso Iñiguez

Selene

Secretaría de Energía; Comisión Nacional de Seguridad Nuclear y Salvaguardias (CNSNS) Dr José María Barragán 779, Colonia Narvarte. Deleg. Benit Juárez 03020 CIUDAD DE MÉXICO, D.F. MEXICO Tel: 0052 55 50953213 Email: [email protected]

Morocco Mr Barkouch

Rachid

Centre national de l'énergie, des sciences et des techniques nucléaires (CNESTEN) B.P. 1382 10001 RABAT, Agdal MOROCCO Tel: 00212 37 819761 Fax: 00212 37 803067 Email: [email protected]

Netherlands Mr Jansen

Robert

Top Inspector Inspectorate of Environment and Transport Department for Nuclear Safety, Security and Radiation Protection (KFD) Ministry of Infrastructure and the Environment De Nieuwe Uitleg 1 P.O. Box 90653 2509LR DEN HAAG NETHERLANDS Tel: +31 70 456 2186 Fax: +31 70 456 2645 Email: [email protected]

Pakistan Mr Sadiq

Muhammad

Pakistan Nuclear Regulatory Authority MAVU Area, Sector G-8 P.O. Box 1912 ISLAMABAD PAKISTAN Tel: 0092 51 9263029 Fax: 0092 51 9263007 Email: [email protected]

Page 25: Draft Report of the 3rd IAEA Steering Committee Meeting on ... Reports/Report SC Nov_… · list of participants are given in Appendix I and II. 33 participants attended the SC meeting

Page 25 of 35

Romania Mr Biro

Lucian

National Commission for Nuclear Activities Control (CNCAN) 14, Libertatii Bulevard P.O. Box 42-4 050706 BUCHAREST Sector 5 ROMANIA Tel: 0040 21 3162441 Fax: 0040 21 3162441 Email: [email protected]

Russian Federation Ms Sokolova

Elena

Federal Environmental, Industrial and Nuclear Supervision Service of Russia (Rostechnadzor); Scientific and Engineering Centre for Nuclear and Radiation Safety (SEC NRS) Malaya Krasnoselskaya ulitsa 2/8, dom 5 107140 MOSCOW RUSSIAN FEDERATION Tel: 007 495 2640352 Fax: 007 495 2642859 Email: [email protected]

Slovakia Mr Szabo

Viktor

Nuclear Regulatory Authority of the Slovak Republic (UJD SR) Bajkalska 27 P.O. Box 24 820 07 BRATISLAVA SLOVAKIA Tel: +421 2 5822 1120 Fax: +421 2 5822 1166 Email: [email protected]

Spain Mr Revuelta Lapique

Ramon

CSL C/Bueso Pineda 46, 2B 28043 MADRID SPAIN Tel: +34 91 3881087 Email: [email protected]

United Arab Emirates Mr Bastos

Jose Luis Ferraz

Federal Authority for Nuclear Regulations Crescent Towers, M Floor P.O. Box 112021 Abu Dhabi U.A.E. Tel: 971 5026 30098 Fax: 917 2651 6661 Email: [email protected]

United Kingdom Mr Stoddart

Richard

Office for Nuclear Regulation An agency of HSE 4S.3 Redgrave Court, Merton Road, BOOTLE L20 7HS UNITED KINGDOM Email: [email protected]

Vietnam Mr Le

Chi Dung

Ministry of Science and Technology (MOST); Vietnam Agency for Radiation and Nuclear Safety (VARANS) 113 Tran Duy Hung HANOI VIETNAM Tel: +84 4 3941 8142 Fax: +84 4 3822 0298 Email: [email protected]

Page 26: Draft Report of the 3rd IAEA Steering Committee Meeting on ... Reports/Report SC Nov_… · list of participants are given in Appendix I and II. 33 participants attended the SC meeting

Page 26 of 35

IAEA Staff J. Lyons, NSNI Dir. M. Moracho, NSNI-RAS A. Holzinger, NSNI-RAS P. Wells, NSNI-SAS S. Mallick, NS-SSCS H. Suman, NSRW A. Luciani, NSRW R. Salinas, NS-IEC A. Braunegger-Guelich, NS-NS S. Koenick, NSNI-RAS R. Gibbs, NSNI Y. Fukuda, NS-SSCS L. Guo, NS-SSCS B. Molloy, NE M. Haage, NSNI-OSS

Page 27: Draft Report of the 3rd IAEA Steering Committee Meeting on ... Reports/Report SC Nov_… · list of participants are given in Appendix I and II. 33 participants attended the SC meeting

Page 27 of 35

Appendix III. Opening Remarks (Mr. J. Lyons, DIR-NSNI)

Page 28: Draft Report of the 3rd IAEA Steering Committee Meeting on ... Reports/Report SC Nov_… · list of participants are given in Appendix I and II. 33 participants attended the SC meeting

Page 28 of 35

Page 29: Draft Report of the 3rd IAEA Steering Committee Meeting on ... Reports/Report SC Nov_… · list of participants are given in Appendix I and II. 33 participants attended the SC meeting

Page 29 of 35

Third meeting of the Steering Committee on Competence of Human Resources for Regulatory Bodies and Seminar on SARCoN (Systematic Assessment of Regulatory Competences Needs)

Vienna 28-30 November and December 1-2

Welcome to Vienna and thank you for being here in these busy and challenging times for nuclear safety. Since the second meeting of Steering Committee last December, important developments and dramatic events have taken place in the nuclear field. As you know, a major accident took place in Japan and the Agency has been entrusted an Action Plan intended to strengthen nuclear safety in the world. My division, Nuclear Installation Safety, is heavily engaged in these activities and I, myself had first-hand experience of the consequences of the accident as I participated in the Fact finding mission.

This Steering Committee (SC) deals with competence and knowledge. Adequate regulatory competence and human resources is vital for an effective regulatory and nuclear safety framework. This is included in the Nuclear Safety Convention, in the IAEA safety standards and it is an important element in our review services. It is also part of the Action Plan in the area of capacity building.

Ensuring the necessary competence and continuous improvement of safety knowledge in an organisation are signs of good leadership for safety which is also a main principle, principle 3 of our safety fundamentals. Results of IRRS 2006-2011 have produced more than 400 Recommendations, and 376 Suggestions. Amongst the top 10 Safety Requirements called upon by recommendations and suggestions, organization and staffing of the Regulatory Body, regulatory management system and training are quite high in the list. Improvement initiatives are undertaken by regulatory bodies for the identified issues. The increased number of countries wishing to embark on, expand or revive a nuclear power programme, underlines the need for further support on training, safety and regulatory competence as an essential part of capacity building in the Member States.

Let me tell you that promoting cooperation and exchange of information is one of our main functions as explained in article III of the IAEA’s statue. This Steering Committee was successfully established in 2008 following your advice from two technical meetings held in the IAEA. The Committee was expanded last year to include countries that are planning to embark on a nuclear power programme.

This Steering Committee (SC) is intended to foster co-operation amongst the Member States with similar needs and give advice to the IAEA on how better support safety regulatory competence and knowledge. It provides a valuable mechanism to better understand your needs and challenges in this area and therefore improve the effectiveness and efficiency of our activities.

You have a very interesting and important work programme under implementation, including the approved DPP for a safety report on managing regulatory competence in cooperation with our colleagues from NSRW, which you will discuss today.

Page 30: Draft Report of the 3rd IAEA Steering Committee Meeting on ... Reports/Report SC Nov_… · list of participants are given in Appendix I and II. 33 participants attended the SC meeting

Page 30 of 35

I also note that the SC meeting will be followed by a two days training on the IAEA tool SARCON (Systematic Assessments of Regulatory Competence Needs). These IAEA guidelines have been used in more than 20 countries and their use was recently stated by the European Commission as an obligatory condition to bid for EU’ training funded projects. I would like to thank this SC for its contribution and excellent work in the continuous improvement of SARCoN.

You have an important and busy agenda for this week. I am looking forward to see the results of your work programme. This will be of great value and guidance also for countries embarking in nuclear power who facing the difficult task of building up a competent regulator.

Let me finish these opening remarks by telling you that you have all my support and appreciation for the hard work conducted until now and also for the activities expected in the future.

I wish you a successful and fruitful meeting

J. Lyons

Page 31: Draft Report of the 3rd IAEA Steering Committee Meeting on ... Reports/Report SC Nov_… · list of participants are given in Appendix I and II. 33 participants attended the SC meeting

Page 31 of 35

Appendix IV. Work Plan

Page 32: Draft Report of the 3rd IAEA Steering Committee Meeting on ... Reports/Report SC Nov_… · list of participants are given in Appendix I and II. 33 participants attended the SC meeting

Page 32 of 35

Page 33: Draft Report of the 3rd IAEA Steering Committee Meeting on ... Reports/Report SC Nov_… · list of participants are given in Appendix I and II. 33 participants attended the SC meeting

Page 33 of 35

Rev 17 January 2012 IAEA Steering Committee on Competence of Human Reso urces for Nuclear Regulatory Bodies

ACTION

DETAIL

LEAD

TIMING

PROGRESS

AIM 1: Adequate tools are available for helping th e RB to establish and implement an adequate compete nce

management system 1.

1.1 Finalise Safety Report on Competence Management and issue to SC for their consideration for endorsement

This Safety Report provides guidance for regulatory bodies on their competence management systems. It is a successor to TECDOC 1254 and will give consideration to and reference the SARCON document.

SC/IAEA SC comments before 15/03/2012 CS Mtg before Bureau Mtg 27-28 March 2012

It is anticipated that the Safety Report will be ready for SC endorsement in April 2012.

1.2 Issue Revision 16 of SARCON guide to SC for their consideration for endorsement

SARCON is self-assessment of competence needs of the regulatory body.

SC/IAEA Target for completion after the Safety Report is finalised

It is anticipated that the SARCON, rev 16 will be ready for SC endorsement in December 2012.

1.3 Provide training for Training Co-ordinators on application of the ‘Guidelines for Competence Needs Self Assessment for the Regulatory Body’

It is anticipated that this will be provided on a workshop/seminar basis.

IAEA Training targeted for December 2011

OK Action completed.

1.4 Set up system for the provision of examples of good practice on competence management and its continual updating.

It is expected that initial work will concentrate on information thought to be available in IRRS reports. In due course it may be possible to include examples provided by MS’s in the standing agenda item for this at SC meetings.

IAEA

Information targeted for SC meeting in December 2011. Selected developments will be reported at the Steering Committee in December 2011.

Permanent Action at SC

1.5 Analyse questionnaires on training systems and practices.

Approximately 20 questionnaires have been received to date.

Bureau

Progress report at SC meeting in December 2010. Difficulty in allocating resource to this task.

OK Action completed at a first stage

Page 34: Draft Report of the 3rd IAEA Steering Committee Meeting on ... Reports/Report SC Nov_… · list of participants are given in Appendix I and II. 33 participants attended the SC meeting

Page 34 of 35

ACTION

DETAIL

LEAD

TIMING

PROGRESS

AIM 2: A system is in place for sharing knowledge, training materials and exchanging information on

training events 2.

2.1 Establish an IAEA continuous improvement process for sharing relevant training information.

This should include obtaining, ‘capturing’ and making available training information from regional centres and other agencies eg NEA, in particular for use by embarking countries. It will also include an IAEA website location for accessing training information and capturing MS practice.

IAEA IAEA will report developments at each Steering Committee. Much progress has been made on improvements to the IAEA website and these have been demonstrated in December 2010.

Permanent Action at SC

2.2 Analyse questionnaire on web links.

Approximately 20 questionnaires have been received to date.

Bureau

Progress report at SC meeting in December 2010

OK Action completed at this stage, no further actions

2.3 Identify barriers to exchange of information on training and competence management.

This action has been raised to follow up and explore feedback on language barriers raised in December 2009. There may be other barriers to communication other than language.

Steering Committee

To be discussed at SC meeting in December 2010.

OK Action completed. No further actions

2.4 Complete revision of BPTC.

Develop syllabus Revise textbook Organise course at international level

IAEA Progress and future intentions are reported at SC meeting.

Permanent Action at SC

2.5 Revision of the Regulatory control course

Develop syllabus Revise textbook

IAEA Progress and future intentions are reported at SC meeting.

Permanent Action at SC

AIM 3: To incorporate the outcome of the Steering Committee’s work into the development of IAEA safet y

standards which deal with competence of the regulat ory body3

. 3.1 IAEA to establish and implement a process to keep SC members advised of developments of all safety standards and other relevant activities that deal with the competence of the regulatory body.

This is intended to complement existing IAEA processes for the development of standards and guides.

IAEA The effectiveness of this will be a standing review item at the SC meeting.

Permanent Action at SC

3.2 Training Co-ordinators in Member States to comment on relevant standards as appropriate and to report on any issues of concern to Bureau.

The IAEA will ensure that MS feedback will be taken into consideration as standards are developed.

MS Standing review item at the December Steering Committee.

Permanent Action at SC

Page 35: Draft Report of the 3rd IAEA Steering Committee Meeting on ... Reports/Report SC Nov_… · list of participants are given in Appendix I and II. 33 participants attended the SC meeting

Page 35 of 35

ACTION

DETAIL

LEAD

TIMING

PROGRESS

3.3 New Safety Guide on competence, compatible with existing Safety Report.

Objective is to produce a Safety Guide based on safety report and SARCON

IAEA This remains under consideration as a potential long term action

No progress

AIM 4: Mutual support and sharing of experience, i n the area of regulatory competence, to meet the ne eds of Embarking Countries. 4.1 Develop assistance proposals specific to the needs of embarking country.

Development of information exchange with Regulatory Cooperation Forum for embarking countries and other similar activities. Identification of additional steps needed that are not covered by other actions in this plan. Involve in CS and Bureau a representative from an embarking country which is at a sufficiently stage of development

IAEA

Further actions to be discussed at the SC meeting in December 2011 Briefing from IAEA at each Bureau and SC meeting A CS shall be organised

Safety report will include information for embarking countries. Further actions need to be identified