draft procurement joe collins july 31, 20121. draft function support the lab’s mission of...
TRANSCRIPT
![Page 1: DRAFT Procurement Joe Collins July 31, 20121. DRAFT Function Support the Lab’s mission of advancing the understanding of the fundamental nature of matter](https://reader036.vdocuments.mx/reader036/viewer/2022082817/56649da15503460f94a8d20f/html5/thumbnails/1.jpg)
DRAFT1
Procurement
Joe Collins
July 31, 2012
![Page 2: DRAFT Procurement Joe Collins July 31, 20121. DRAFT Function Support the Lab’s mission of advancing the understanding of the fundamental nature of matter](https://reader036.vdocuments.mx/reader036/viewer/2022082817/56649da15503460f94a8d20f/html5/thumbnails/2.jpg)
DRAFT2
Function
Support the Lab’s mission of advancing the understanding of the fundamental nature of matter and energy by providing subcontracting services in a helpful, effective, and timely
manner.
This includes a strong emphasis on advance acquisition planning for projects and large complex procurement actions.
July 31, 2012
![Page 3: DRAFT Procurement Joe Collins July 31, 20121. DRAFT Function Support the Lab’s mission of advancing the understanding of the fundamental nature of matter](https://reader036.vdocuments.mx/reader036/viewer/2022082817/56649da15503460f94a8d20f/html5/thumbnails/3.jpg)
DRAFT
Procurement
3
Joanne Hall - Procurement Office AssociateJoyce Serritella - Admin Support Asst III
Julie Wiley - Admin Support Asst III
G. BagbySr. Procurement Admin.
R. EvansSr. Procurement Admin.
S. CozzensProcurement Associate
S. GaugelSr. Procurement Admin.
S. EfstathiouProcurement Admin.
T. PowersSr. Procurement Admin.
Construction/Fabrication Services
Bob Cibic - Procurement Supervisor
B. ClarkSr. Procurement Admin.
B. NiccolaiProcurement Admin.
G. DavisProcurement Admin.
P. NoyesProcurement Admin.
N. YackleProcurement Associate
Computing / Services
Bill Koncelik - Procurement Supervisor
M. GraczykProcurement Admin.
R. JohnsonProcurement Admin.
Electronics / MRO
Joe Morgan - Sr. Procurement Admin.
Joe CollinsProcurement Manager
Staff = 20 FTEs
July 31, 2012
![Page 4: DRAFT Procurement Joe Collins July 31, 20121. DRAFT Function Support the Lab’s mission of advancing the understanding of the fundamental nature of matter](https://reader036.vdocuments.mx/reader036/viewer/2022082817/56649da15503460f94a8d20f/html5/thumbnails/4.jpg)
DRAFT4
Procurement• An independent assessment – Procurement Evaluation and Reengineering Team (PERT) review – was
conducted April 23-27, 2012. Team led by Mark Waite, J Lab Procurement Director, comprised of five contractor and three federal procurement employees. Evaluation included:
• Transactional reviews• Results examination• Overall process evaluation• Review of quality assurance of procurement processes and data collection methodologies
• Results: “We believe the procurement system and existing controls are adequate and no observations of a significant nature exist that would warrant disapproval of the contractor purchasing system.”
• Team recognizes the positive spirit, responsiveness of the staff, and notes that Procurement is “well integrated and supportive of FNAL projects and departments”.
• Team recommends structured buyer training in cost/price analysis, contract administration, and sole source documentation.
• Team recognizes that staffing is lean and is concerned that additional workload would require the addition of staff to the Procurement effort.
• Team believes Fermilab would significantly benefit from the implementation of an e-catalog system.• Action Plan
• An ‘in house” training program that addresses cost/price analysis, contract administration, and sole source documentation will commence in October.
• Staffing concerns are currently being addressed within Business Operations, and in particular through this Procurement Readiness Review.
• The implementation of an e-catalog system is being evaluated and considered as a new laboratory project.
July 31, 2012
![Page 5: DRAFT Procurement Joe Collins July 31, 20121. DRAFT Function Support the Lab’s mission of advancing the understanding of the fundamental nature of matter](https://reader036.vdocuments.mx/reader036/viewer/2022082817/56649da15503460f94a8d20f/html5/thumbnails/5.jpg)
DRAFT5
Procurement
• The DOE Procurement Balanced Scorecard (BSC) self-assessment tool is used annually to measure system performance from four perspectives:
• Internal• Customer• Learning & Growth• Financial
• Annual BSC results under the FRA contract have ranged from 93-97 on a 100 point scale. Fermilab has one of the lowest cost/spend ratios (FY11 = $0.012) of all the DOE laboratories. While this can point to efficiencies, it may also be a harbinger of problems that lie ahead.
• Estimated procurement obligations for FY2012 are $170,000,000.00
July 31, 2012
![Page 6: DRAFT Procurement Joe Collins July 31, 20121. DRAFT Function Support the Lab’s mission of advancing the understanding of the fundamental nature of matter](https://reader036.vdocuments.mx/reader036/viewer/2022082817/56649da15503460f94a8d20f/html5/thumbnails/6.jpg)
DRAFT6
Procurement
• Other Activities:• Contractor Supply Chain Council (CSCC)—a contractor led, DOE
sponsored group that is charged with leveraging supply chain functions in support of the DOE Program Mission, and providing focused communication between the DOE Procurement Executive, and the Department’s Contractor Procurement Managers. Fermilab is one of the two Science Lab CSCC representatives.
• Procurement Evaluation and Reengineering Team (PERT)—a joint DOE/Contractor working group that conducts peer reviews, promotes training, and procurement studies in support of the DOE complex. Fermilab is represented on the PERT steering committee, and actively participates as a team lead or member.
• Center for Advanced Procurement and Supply (CAPS) Research, a global research organization sponsored by the W.P. Carey School of Business at Arizona State University, and the Institute for Supply Management (ISM). Benchmarking activities are ongoing, and include DOE/NNSA and cross-industry exercises. Fermilab is represented on the DOE/NNSA CAPS benchmarking committee.
July 31, 2012
![Page 7: DRAFT Procurement Joe Collins July 31, 20121. DRAFT Function Support the Lab’s mission of advancing the understanding of the fundamental nature of matter](https://reader036.vdocuments.mx/reader036/viewer/2022082817/56649da15503460f94a8d20f/html5/thumbnails/7.jpg)
DRAFT7
Procurement• Other Activities, Continued:
• Science Lab (SC) Procurement Managers—a network of SC Procurement managers that continuously exchange information and meet biannually for training and sharing. There is an increased amount of information exchanged between the Argonne National Lab and Fermilab Procurement Departments. This mutual relationship is especially centered upon issues unique to both Labs.
• Fermilab Procurement is always working to ensure an effective relationship with the DOE site office, and all other levels of DOE. Monthly meetings with the DOE Contracting Officers, plus daily dialogue and correspondence are important aspects that help in promoting our relationship with the government.
• Procurement liaisons assigned to a dozen projects.• Procurement 101 training to projects , divisions/sections, and other
interested groups .
July 31, 2012
![Page 8: DRAFT Procurement Joe Collins July 31, 20121. DRAFT Function Support the Lab’s mission of advancing the understanding of the fundamental nature of matter](https://reader036.vdocuments.mx/reader036/viewer/2022082817/56649da15503460f94a8d20f/html5/thumbnails/8.jpg)
DRAFT
Project Liaisons
July 31, 2012 8
Computing Bill KoncelikDES Byron ClarkIARC Sandra EfstathiouLBNE Tom PowersMicroBooNE Byron ClarkMINERvA Joe MorganMu2e Ron EvansNOvA Bob CibicProject X Bob CibicSLI Utility Upgrade Steve GaugelSRF Ron EvansFESS Operations Gordon BagbyWDRS Byron Clark
![Page 9: DRAFT Procurement Joe Collins July 31, 20121. DRAFT Function Support the Lab’s mission of advancing the understanding of the fundamental nature of matter](https://reader036.vdocuments.mx/reader036/viewer/2022082817/56649da15503460f94a8d20f/html5/thumbnails/9.jpg)
DRAFT9
PROJECT LIAISONS
Project liaisons are primary points of contact for the project management team. The Mu2e and LBNE liaisons are responsible for most critical project procurements, and will know the status of procurements assigned to other procurement administrators. The liaisons attend project management group and other project based meetings. They routinely meet with the senior procurement staff and procurement manager. It is estimated, as projects ramp up, that the Mu2e and LBNE liaisons will devote 75 to 100 percent of their time to these projects.
July 31, 2012
![Page 10: DRAFT Procurement Joe Collins July 31, 20121. DRAFT Function Support the Lab’s mission of advancing the understanding of the fundamental nature of matter](https://reader036.vdocuments.mx/reader036/viewer/2022082817/56649da15503460f94a8d20f/html5/thumbnails/10.jpg)
DRAFT10
Procurement
July 31, 2012
08 09 10 11 12 (est)
Pur-chase Order
106000000 117407000 246801000 163027000 146000000
PCard 8558000 9516000 7182000 9025000 9000000
Order-ing Agree-ment
11000000 14100000 14939000 16261000 15000000
25,000,000
125,000,000
225,000,000
Procurement Obligations ($) by Method and FY
![Page 11: DRAFT Procurement Joe Collins July 31, 20121. DRAFT Function Support the Lab’s mission of advancing the understanding of the fundamental nature of matter](https://reader036.vdocuments.mx/reader036/viewer/2022082817/56649da15503460f94a8d20f/html5/thumbnails/11.jpg)
DRAFT11
Procurement
July 31, 2012
08 09 10 11 12 (est)
Con-struction
6993000 11247000 41121000 13402000 40000000
Other Services
55132000 58138000 93416000 80913000 60000000
Educa-tional
15135000 14619000 26127000 30045000 22000000
Foreign 14537000 9373000 22103000 20289000 10000000
Gov't/Non Profit
15355000 15118000 24019000 15362000 13000000
Goods 18406000 32528000 62136000 28302000 25000000
25,000,000
125,000,000
225,000,000
Procurement Obligations ($) by Type and FY