  • Organisational ServicesMonthly Review

    > February 2019

  • Organisational Services Monthly Review > February 2019

    Contents 1.  EXECUTIVE SUMMARY ..................................................................................................................................... 1

    2.  SAFETY ............................................................................................................................................................ 2 2.1  Incidents and Injuries ....................................................................................................................................... 2 2.2  Key Activities ................................................................................................................................................... 3

    3.  CUSTOMER SERVICE ....................................................................................................................................... 4 3.1  External Customer Services ............................................................................................................................. 4 3.2  Aquatic Facilities .............................................................................................................................................. 7 3.3  IT Support ...................................................................................................................................................... 12 3.4  Key Activities ................................................................................................................................................. 14 3.5  Procurement Services .................................................................................................................................... 15 3.6  Property Services ........................................................................................................................................... 16

    4.  PEOPLE AND CULTURE ................................................................................................................................. 17 4.1  Key Activities ................................................................................................................................................. 17 4.2  Staff Contingent ............................................................................................................................................. 18

    5.  FINANCIAL PERFORMANCE ........................................................................................................................... 21 5.1  Key Activities ................................................................................................................................................. 21 5.2  Program Financial Position ............................................................................................................................. 22

    6.  BUSINESS IMPROVEMENT ............................................................................................................................. 24 6.1  Business Improvements ................................................................................................................................. 24

    7.  PROJECTS ..................................................................................................................................................... 25 7.1  Internal Projects ............................................................................................................................................. 25 7.2  Capital Projects .............................................................................................................................................. 25

    8.  REGULATORY COMPLIANCE .......................................................................................................................... 26 8.1  Financial Compliance ..................................................................................................................................... 26 8.2  Corporate Governance ................................................................................................................................... 26 8.3  Internal Audit ................................................................................................................................................. 29

    9.  LAND & BUILDINGS ....................................................................................................................................... 29 9.1 Building Maintenance ..................................................................................................................................... 29 9.2  Land & Tenure ................................................................................................................................................ 30 

  • Organisational Services Monthly Review > February 2019

    1

    1. EXECUTIVE SUMMARYThis report is for the Organisational Services Department for the month of February 2019.

    It is pleasing to advise that Organisational Services continues to report no major injuries orincidents for our staff for the year. The review and amendment of WHS procedures is continuing,as part of ‘THE HUB’ project.

    Our customer service standards are being met, and a majority of our targets being exceeded.

    The People and Culture team are progressing well on a number of strategies and initiatives.These include workforce planning, health and wellbeing and volunteer strategies.

    The MRC-RIN mentoring program commenced, and feedback has been excellent thus far. Thiscohort is due to end in June and a new cohort commences in July.

    Significant progress has been made on the 2019/20 budget with the initial drafts ready for reviewby the Strategy Leadership and Performance Team. Discussions with Council commence inApril.

    It is satisfying to see physical work commence on the Paget Workshop Extension project and thatthe capital project remains on track for delivery.

    February also saw the completion of the foyer refurbishment in Council's administration building.

    Kylie Lamb Director Organisational Services

  • Organisational Services Monthly Review > February 2019

    2

    2. SAFETY 2.1 Incidents and Injuries

    One injury to a MRC employee was reported in February:

    A worker cut their fingertip while re-installing a bolt on a piece of plant.

    One injury to a member of the public was reported in February:

    A student suffered a suspected dislocated shoulder on a water slide during a school carnival. Each incident is investigated, and appropriate corrective measures implemented to reduce future risks.

  • Organisational Services Monthly Review > February 2019

    3

    Department 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19

    LTI Days Lost LTI Days Lost LTI

    Days Lost LTI

    Days Lost

    LTI Days Lost LTI

    Days Lost

    Assets

    Finance 1 4

    SSC 1 4

    Procurement & Plant 1 17

    Property Services

    Governance & Safety 1 8

    Office of the Mayor & CEO

    Organisational Services 1 4 0 0 1 4 0 0 2 25 0 0

    2.2 Key Activities The review and amendment of WHS procedures is continuing, as part of ‘THE HUB’ project.

    The review of WHS aspects of contractor management continues; with legal opinion provided to ensure MRC is meeting is WHS legal duties to all workers.

    Provided support to WHSQ Inspector as they conducted audits of MRC swimming pools, conducted as part of a QLD wide compliance campaign.

    Arrangements were made for MRC to host the next Regional Safety Exchange (RSX) meeting over two half-days on 3 and 4 April at our Paget Depot. This is a gathering of safety teams from the councils in our immediate and wider region. The RSX enables teams to provide updates on what each are doing, to network, and to work through specific challenges and emergent issues being faced.

    Investigated and reported on critical incidents – including identifying appropriate corrective actions for implementation.

    Other activities include procedure reviews, safety observations and interactions, and attendance at pre-start meetings and toolbox talks

    Glossary Incident Any unplanned event resulting in or having a potential for injury or ill health. Lost Time Injury (LTI) Incidents that resulted in a fatality, permanent disability or time lost from work of one day / part of

    a day or more Total Recordable Injuries (TRI) Incidents that result in a Lost Time Injury (LTI), Suitable Duties Injury (SDI) and Medical

    Treatment Injury (MTI)

  • Organisational Services Monthly Review > February 2019

    4

    3. CUSTOMER SERVICE 3.1 External Customer Services

    KPI KPI Description Target 

    Result Red (Under KPI) 

    Green (Met KPI) 

    Blue (Exceed KPI) 

    First Contact Resolution (FCR)

    The percentage of external customer enquiries that are resolved at the first point of

    contact.

     60%  55%

    Grade of Service (GOS)

    The percentage of customer calls that are answered

    within 60 seconds across the SSC team.

     85%  89%

    Abandoned Calls The percentage of customers that abandon their call before

    being served. > 6%  4.5‐6% 

  • Organisational Services Monthly Review > February 2019

    5

    First Contact Resolution: FCR results remained consistent with 55% of customer queries resolved at first contact in February, and 53% in January.

    Grade of Service: A total of 8145 calls were received in February reporting period, averaging 407 calls per day, a slight increase from January's average of 366 per day.

    40%

    45%

    50%

    55%

    60%

    65%

    70%

    Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

    First Contact Resolution

    FY18‐19 3 year av Satisfactory Exceeded

    60%

    65%

    70%

    75%

    80%

    85%

    90%

    95%

    Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

    Grade of Service

    3 year av Satisfactory Exceeded FY18‐19

  • Organisational Services Monthly Review > February 2019

    6

    Abandoned Calls: Abandoned calls decreased from 3% in January to 2.3% (190 calls) in February across the combined queues. For the main MRC queue, the abandoned call rate was 1.3% (35 calls). The call back take-up rate continues to remain low at 0.04%, with an Average Speed of Answer at 93 seconds.

    External Customer Satisfaction: Survey volumes represent 3.8% of the overall contact centre calls received for the month of February (272 surveys).

    0.00%

    1.00%

    2.00%

    3.00%

    4.00%

    5.00%

    6.00%

    7.00%

    Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

    Abandoned Calls

    FY18‐19 3 year av Satisfactory Exceeded

    70%

    75%

    80%

    85%

    90%

    95%

    100%

    Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

    Customer Satisfaction Survey

    FY18‐19 2 year av Satisfactory Exceeded

  • Organisational Services Monthly Review > February 2019

    7

    Customer Request Completion: Lodged requests for SSC remain consistent averaging 37 per day and resolve times continue to exceed targets at 92% resolved within standard timeframes. Lodged requests for MRC have increased from 175 in January to 177 in February and with on-time resolution remained consistent at 73% in January and 73% in the February reporting period.

    MRC Top 5 Pathway requests Lodged February 2019 

    Volume  % of total requests 

    Replace Wheelie Bin  247 6.7%

    Change of mailing address  230  6.2% 

    Repair Wheelie Bin  189  5.1% 

    Roads – General  150 4.1%

    Water – Leak (Public Area)  147 4.0%

    3.2 Aquatic Facilities

    Attendance Figures:

    Note:

    All attendance figures are provided by operators except Bluewater Lagoon Bluewater Lagoon attendances in January were provided by the operator, attendances in February

    were extracted from the People Counter. The People Counter figures count persons entering the facility only.

      Lodged  Resolved within SLA 

    MRC Total  3536 73%

    SSC    735 90%

    Facility   January 2019  February 2019 

    Bluewater Lagoon  32878  26008 

    Memorial Pool  3084  5220 

    Pioneer Pool   3850  6487 

    Mirani Pool   1551  3994 

    Sarina Pool   3330  3072 

  • Organisational Services Monthly Review > February 2019

    8

    Annual Attendances (Calendar Year) by Facility

    Attendances September to February, Monthly and Yearly Attendance Comparison

    Note:

    There were 23 wet days in December which may explain the fall in attendance between 2017 and 2018 Prior to February figures were supplied by operator. February figures have been obtained from the

    “People Counter”.

  • Organisational Services Monthly Review > February 2019

    9

    Note:

    Closed in September 2018 12 wet days in February resulted in reduced school swimming attendances

  • Organisational Services Monthly Review > February 2019

    10

    Note:

    Active growth of squad and club training driven by operators leading to higher facility use.

    Note:

    Facility closed Sept-Oct 2017 and September 2018

  • Organisational Services Monthly Review > February 2019

    11

    Number of Wet Days per Month

      September  October  November  December  January   February 2017‐2018  0  10 8 5  6  112018‐2019  0  0 0 23  6  12 Mirani Pool News (supplied by Operator)  

    Mirani Swimming Club recently travelled to the Championships in Brisbane on 16 -17 February 2019 with swimmers achieving personal bests and making the finals for 50 metre backstroke. 

    Mackay Triathlon Club held the Annual Sonya Brazil Memorial Women’s only Triathlon at Mirani Swimming Centre on Sunday the 17 February.

  • Organisational Services Monthly Review > February 2019

    12

    3.3 IT Support Internal Service Metrics

    KPI  KPI Description Target 

    Result Red (Under KPI) 

    Green (Met KPI) 

    Blue (Exceed KPI) 

    Incident Resolution Percentage of incidents

    resolved within corporate standard timeframes

    80%  80‐85%  85%  77%

    Service Request Resolution

    Percentage of service requests resolved within

    corporate standard timeframes

    80%  80‐85%  85%  80%

    Internal Customer Satisfaction Survey

    IT email survey - % of customers whose experience met or

    exceeded expectations

    75%  75‐84%  85%  97%

    Note: Resourcing levels within Information Services in support of service and incident requests are short of key resources and service desk skill sets due to natural attrition. Well established plans have halted slightly from unexpected challenges during the recruitment process. Despite these challenges backlog and WIP continues to be well maintained.

    Internal Customer Satisfaction: A total of 393 surveys completed in the month of February, achieving an overall rating of 97.2% that either met or exceeded expectation and representing 46% of the overall requests received.

    Information Services Satisfaction Survey – February 2019

    February 2019 Survey Rating %

    1 How would you rate the level of customer service received? (Timely updates, follow through, helpfulness, communication skills) 88%

    2 Was your request completed within a reasonable timeframe? (If not please state expectation in comments section please.) 85%

    3 Was your support request completed to your satisfaction? 84%

    February 2019 Survey Results

    Below Expectations

    Met Expectations

    Exceeded Expectations

    Not Assigned* Totals

    # of Responses 11 147 236 0 394

    * Not assignedexcluded

    Overall Rating 2.8% 37.4% 59.8% N/A 97.2%

  • Organisational Services Monthly Review > February 2019

    13

    Applications Availability

    KPI  KPI Description Target 

    Result Red (Under KPI) 

    Green (Met KPI) 

    Blue (Exceed KPI) 

    Tier 1 Systems Refer to the table under ‘KPI Commentary’

    section below for detail on which systems are included in each tier.

     99%  99.92%

    Tier 2 Systems  99%  100%

    Tier 3 Systems  99%  100%

    KPI Commentary

    Incident and Service Request Metrics: The volume of incidents raised increased slightly this month, from 713 in January to 861 in February.

    The ICT Operations team continue to achieve good closure rates with 79% of service requests closed in February.

    The below graph identifies the Raised Vs Closed and Pending requests, along with WIP and backlog.

    Definitions:

    WIP – complex support requests that are within service level agreements and simple support requests open on day of raising.

    Backlog – complex support requests that have exceeded service level agreements and simple support requests remaining unresolved after day of raising.

  • Organisational Services Monthly Review > February 2019

    14

    Applications Availability: The below table shows which corporate applications are considered tier 1 and 2. All other systems not specifically noted are considered tier 3.

      Tier 1  Tier 2  Tier 3 

      ECM   Finance One 

     

      Email  GIS 

       Internet 

       Kiosk_Chris21 

       Pathway  

      Assetic 

     

      

    Aurora  Bruce   Mandalay 

     

    Manage Engine 

    3.4 Key Activities

    Activity Program Comments

    Productivity SSC 1. Virtual Documents: plans to convert existing physical files for initial licence types by end of March. 2. Regulated dog licence renewals workflow – On track for completion prior to renewal period.

    3. Online payment for drainage plan applications: On track

    Business Process Management

    SSC Process Governance Officer undertook expert training certification.

    BPM team attended regional user group.

    Both opportunities allowed the team to expand their network base and provided insight into how other councils are progressing and were able to share MRC journey to date.

  • Organisational Services Monthly Review > February 2019

    15

    3.5 Procurement Services Activity February 2018 February 2019

    Purchase Orders (PO) Raised 690 607

    Line Items in POs 1831 1654

    POs Received 802 735

    Line Items in POs Received 3304 2823

    Invoices Processed 3419 2908

    Request for Quotes Issued 15 9

    Tenders Issued 4 6

    Tenders Awarded 4 4

    Quotes Awarded 6 11

    Area Monthly Amount February 2019 Monthly %

    February 2019 FYTD Amount FYTD %

    Local Spend (Mackay region) $3,365,579 61% $103,613,833 79%

    Regional Spend (WROC area) $19,220 1% 278,510 1%

    External Spend $2,140,301 38% 26,541,173 20%

    0%

    10%

    20%

    30%

    40%

    50%

    60%

    70%

    80%

    90%

    100%

    Jul‐18 Aug‐18 Sep‐18 Oct‐18 Nov‐18 Dec‐18 Jan‐19 Feb‐19

    73% 72%82%

    87% 91%80% 81%

    61%

    26% 27%17% 12%

    8%19% 18%

    38%

    1% 1% 1% 1% 1% 1% 1% 1%

    Area Monthly Spend %

    Regional Spend(WROC Area)

    External Spend %

    Local Spend(Mackay Region)

  • Organisational Services Monthly Review > February 2019

    16

    3.6 Property Services

    Breakdown of Building Maintenance Requests Actioned – February 2019 

    Volume % of total requests 

    Miscellaneous 53 28.19%

    Electrical 44 23.40%

    Repairs 43 22.87%

    Plumbing 35 18.62%

    Air Conditioning 8 4.26%

    Safety & Legislation 5 2.66%

    0

    50

    100

    150

    200

    250

    300

    350

    400

    Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Jan Feb

    Pathways Requests

    Key & Padlock Requests

    Security Access Requests

    Building Maintenance Requests

    Actioned Property Services Requests

    Of the total number of Building Maintenance Requests received for the month of February (188), the top 3 requests related to; Miscellaneous (majority relating

    to cleaning, consumables and security)

    Electrical Repairs (majority relating to

    fixtures, fittings, doors, locks andhardware)

  • Organisational Services Monthly Review > February 2019

    17

    4. PEOPLE AND CULTURE4.1 Key Activities

    Activity Comments

    Organisational Culture

    Employee Engagement Survey results were presented to SLPT and for Directors topresent to Program Managers. Overall, engagement results improved however there areclear areas of the workforce where issues remain. Program Managers have until the endof April to present their Program results to their work groups and complete their actionplanning.

    Formal unconscious bias training was introduced for the first time in MRC. Feedback fromthe workshops was positive, in particular the interactive discussions between participants.Further information will be provided to Program Managers from the workshops. Theseworkshops will be an annual activity.

    The White Ribbon Violence Against Women baseline survey data was presented to SLPT.Directors and Program managers are delivering the results to their work groups by theend of March 2019. The results are informing specific actions in the accreditation projectplan.

    Health and Wellbeing

    The Fitness Passport program has been opened for registration. MRC needs ~290primary registrations for the program to be activated. Registrations close in late March2019.

    The focus of February was on physical health which is concluding with free physical healthchecks under a Queensland Government initiative. The focus for March is on social health.

    Diversity and Inclusion

    SLPT approved the Inclusive Leadership workshop series for MRC leaders as an annualactivity commencing in April 2019.

    Harmony Day is planned for 21 March 2019 across Council with a focus on the Value forthe month of March, which is Teamwork and is a great way to “appreciate our differences”.

    MRC participated in Australian Workplace Equity Index survey for the first time. Whilst itis expected that the rating will be low, it will set a baseline for further work in the diversityand inclusion initiatives.

    Workforce Relations

    P&C staff and HR staff from the Whitsunday and Isaac Regional Councils participated ina free IR update on general protection claims delivered by McCullough Robertsonlawyers.

    Learning and Development

    The 2019 primary intake of apprentices and trainees was booked for Monday 11 March. SLPT approved a number of nominations, both individual and collective, for the 2019

    Queensland Training Awards.

    Leadership Development

    The Elev8 Leadership Series – Module Two – Operational Leadership has had anexternal provider selected.

    The MRC-RIN mentoring program commenced, and feedback has been excellent thusfar. This cohort is due to end in June and a new cohort commences in July.

  • Organisational Services Monthly Review > February 2019

    18

    4.2 Staff Contingent

    OMC ECI DS CCS OS CW TOTALPrev. Month

    Full Time 7 287 167 110 168 83 822 810 Part Time 0 5 5 33 39 0 82 81

    Apprentice/Trainees 1 0 4 2 9 0 16 26 Temp 0 10 10 13 21 9 63 64

    Casual 1 4 12 83 2 3 105 102 TOTAL EMPLOYED 9 306 198 241 239 95 1088 1083 Active Recruitment 1 26 25 18 20 8 98 93

    TOTAL 10 332 223 259 259 103 1186 1176

    *Stats current as of 28 February 2019

    Workforce Capability

    The PILOT for workforce capability framework was delivered for P&C, Transport and Drainage Planning, and Health and Regulatory Services Programs. All other Program Managers have now been scheduled for the roll out to their Programs.

    Volunteers The DRAFT Volunteer Management Strategy is scheduled to be briefed to Council on 27 March.

    PROJECT: Mackay Regional Skills Investment Strategy

    Project on schedule and meeting KPIs. RSIS Performance meeting held 25 February with DESBT. Positive feedback received on project progress.

    Key feedback from local businesses (RSIS relevance): o Employers in the region are having difficulty focusing on Vocational Education

    and Training (VET) as immediate solution to the skills shortage. Their ability to workforce plan greater than 6-12 months is lacking.

    o Small business find understanding and accessing VET funding difficult. o RTO capability to meet local industry need is lacking.

    Key feedback from local businesses (Councillor relevance):

    o Businesses setting the path for innovation expect more support from Local and State government to promote their achievements, i.e. Linked Group Services -off grid energy consumption).

    o RTO capability to meet local industry need is lacking (scope offered and flexibility to support business delivery needs). Consistent message of local business not utilising CQU for these reasons.

  • Organisational Services Monthly Review > February 2019

    19

    Total vacant positions: 110 Total number of positions filled in February 14.

    As of 28 February, there were 98 positions across Council that were actively being recruited to eitherthrough external or internal recruitment and selection processes. The total current vacant positions are110. Total vacant positions may differ from active vacancies due to positions on hold, higherduties/secondments or requisitions yet to be received by Recruitment.

    0

    20

    40

    60

    80

    100

    120

    140

    Jul 18 Aug 18 Sep 18 Oct 18 Nov 18 Dec 18 Jan 19 Feb 19

    Monthly Recruitment Statistics

    Total Vacant Positions Positions Filled Departures

    67

    78

    91

    122

    39

    89

    105110

    39

    58

    76 7669

    93 9398

    3643

    63

    39 36 3645 44

    16 1928

    16 14 14 14 170

    20

    40

    60

    80

    100

    120

    140

    July August September October November December January February

    Monthly Position Occupancy 

    Total Vacancies Advertised Vacancies Secondment Higher Duties

  • Organisational Services Monthly Review > February 2019

    20

    12 month moving average turnover was 17.91% as at 28 February 2019.

    Monthly turnover 1.15% as at 28 February 2019

    A total of 13 employees departed MRC in the month of February 2019.

    Jul Aug Sept Oct Nov Dec Jan Feb2018‐2019 0.94% 1.90% 1.60% 1.61% 1.60% 1.23% 2.63% 1.15%12 month moving average 14.85% 16.17% 16.63% 17.32% 17.80% 17.56% 18.60% 17.91%

    0.00%

    2.00%

    4.00%

    6.00%

    8.00%

    10.00%

    12.00%

    14.00%

    16.00%

    18.00%

    20.00%

    % Tu

    rnover Rate

    76

    SEPERATIONS FOR FEBRUARY 2019

    Resignations (incl left withoutnotice)

    Contract Finished

    Retired

    Death / Invalidity

    Termination of Employment

  • Organisational Services Monthly Review > February 2019

    21

    5. FINANCIAL PERFORMANCE5.1 Key Activities

    Activity Program Timeframe Comments

    Budgets & LTFF Finance The 2019/20 budget and long term financial forecast processes are proceeding in accordance with planned timelines.

    Statutory Reporting Finance The monthly Strategic Financial Report for January was presented to Council in February.

    Valuations Asset Management Valuation Inspections Complete. Report due to be finished in March.

  • Org

    anis

    atio

    nal S

    ervi

    ces

    Mon

    thly

    Rev

    iew

    > F

    ebru

    ary

    2019

    5.2

    P

    rog

    ram

    Fin

    an

    cia

    l P

    os

    itio

    n

  • Org

    anis

    atio

    nal S

    ervi

    ces

    Mon

    thly

    Rev

    iew

    > F

    ebru

    ary

    2019

  • Organisational Services Monthly Review > February 2019

    24

    6. BUSINESS IMPROVEMENT 6.1 Business Improvements

    Description Program Comments

    Enterprise Risk Management (ERM) Review

    G&S Consideration of operational risks and how these are managed across Council is progressing. A review will be underway in the coming months.

    Corporate Performance Planning Project

    G&S Draft Business Plans for 2019-2021 were reviewed by SLPT this month. A key outcome of the review is the development of corporate priorities for the key functions of Safety, Finance and People. These priorities will be placed in all Business Plans with supporting actions developed for inclusion in each Action Plan.

    Councillors will be provided an opportunity to review Business Plans and Action Plans in March, prior to being presented with the draft 19/20 Operational Plan.

    This month SLPT undertook a further review of the draft policy and supporting decision tree for the corporate approach to the development, implementation, monitoring and review of strategies. An outcome of the review is to include in both the Policy and Decision Tree, steps that will engage council in all phases of Council Strategy development and implementation.

    Safety Systems Streamlining Project G&S

    Loading of safety documents to The Hub from individual work areas continues.

    IS have engaged with Governance & Safety this month to discuss the transition of The Hub from the existing Bruce site to Share point online. The intended outcome is improved accessibility to safety information in the field from a mobile device.

    Contractors’ safety performance monitoring and reporting

    G&S Research into current contractor safety performance monitoring and reporting and industry benchmarking was complete this month.

    In acknowledgement of the organisations desire to improve contractor safety performance monitoring and reporting, gaps are being considered as are the likely resource implications.

    It is anticipated that an approach for the way forward will be discussed at SLPT next month.

    Insurance Review Project G&S

    The evaluation of tenders for MRC’s Insurance Coverage (except workers compensation) has now been completed with discussions being held with tenderers.

    Authorised Persons Project G&S

    Corporate Governance identified a business improvement option in relation to the processing of Authorised Persons. A full review of the current process is being undertaken with improvements identified in the authorised persons register and processing of applications. The project is expected to be finalised by the end of the current year.

  • Organisational Services Monthly Review > February 2019

    25

    7. PROJECTS 7.1 Internal Projects OPEX Projects

    7.2 Capital Projects

    Refurbished Foyer Level 1 ‐ Administration Building  

    Project Program Comments

    Maintenance Management System

    AM Maintenance Workshops were held with Civil Operations to understand the operational needs to inform configuration.

    Project Phase Project % Completion Comments

    Plant Replacement Program

    Construction 64% On target for ordering all items requiring replacement. Figure includes committals.

    Paget Depot Workshop Extension

    Construction 20% This project commenced mid-February with the installation of drainage and pouring of the footings. All steel scheduled to arrive 11 March. Concrete pad pouring during the same week. Part A – New Shed to be completed end of March.

    Bluewater Quay Café- new amenities and storage.

    Construction 100% The new toilets were handed over for use on the 21

    December 2018. The variation works (extra storage and grow wall) were completed on the 7 March 2019.

    Administration Building Refurbishment

    Construction 100% The foyer works were completed on the 22 February except for some signage. The signage (MRC logo) is in the process of being designed.

  • Organisational Services Monthly Review > February 2019

    26

    \C

    8. REGULATORY COMPLIANCE 8.1 Financial Compliance Description Program Timeframe

    Manage capital and operational budgets to achieve the benchmark Local Government financial sustainability ratios, including the operating surplus, net financial liabilities, and asset sustainability ratios.

    Measure: Completion of Long Term Financial Forecast including applicable ratios

    Finance

    Provide relevant and useful information to Council, stakeholders and clients. Measure: Production of monthly strategic financial reports

    Finance

    Provide relevant and useful information to Council, stakeholders and clients. Measure: Number of high risk audit issues

    Finance

    8.2 Corporate Governance

    Renewable Energy – Small Scale Solar

    Installation 35% Six (6) sites are fully connected, with some minor details due to weather for some others which were to be connected in February but will be finalised in March.

    MECC Fire Panel Integration

    Completed 100% Fire Panel integration is completed which passed testing. As built drawing submitted. Certification documents to be provided mid-March.

    MECC Lighting Upgrade

    Completed 100% New lights fitted and in operation.

    Dome Chiller Replacement

    Construction 90% Chiller is operational. Some minor pipe lagging works required once weather clears.

    Activity  Program  Comments 

  • Organisational Services Monthly Review > February 2019

    27

     

    Policies  New Policy’s Processed for February 2019 

    Existing Policies Reviewed and Processed for February 2019 

    Council Policy Policies will be presented to Council for Adoption in March.

    099 - Sponsorship Policy

    005 - Procurement Policy

    Administrative Policies Policies will be presented to SLPT on 13 March for approval.

    003 - Recruitment and Selection Policy

    069 - Security Requirements for Afterhours Meeting Functions

    083 - Asset Disposal Policy.

     

    10

    72

    9

    0 0 02

    0

    Insurance Claims Received ‐February 2019

    Motor Vehicle ‐ 10 Public Liability Personal Injury ‐ 7 Public Liability Plant  ‐ 2

    Public Liability ‐ 9 Theft ‐ 0 Professional Indemnity ‐ 0

    Malicious Damage ‐ 0 Other ‐ 2 Water Damage ‐ 0

    Corporate Governance Investigations G&S

    8 administrative action complaints were received and forwarded to the relevant programs for investigation in February;

    Corporate Governance undertook 2 PIN Reviews in February and 1 second review administrative action complaint.

  • Organisational Services Monthly Review > February 2019

    28

    69

    4

    17

    19

    0 02

    0

    Governance General Inquiries ‐February 2019

    Insurance Advice ‐ 69

    Policies ‐ 4

    General Governance Advice ‐ 17

    Delegation Requests/Authorised Persons ‐ 19

    SAI Global Standards Requests ‐ 0

    Administrative Action Complaints ‐ 0

    RTI/IP General Inquiries ‐ 2

    Local Laws ‐ 0

  • Organisational Services Monthly Review > February 2019

    29

    8.3 Internal Audit

    Internal Audit Reviews Underway  Status  Comments 

    Water Charges Concessions for Concealed Leaks

    In Progress Fieldwork complete – report being drafted.

    Cyber Security – Follow Up Review In Progress This review is ongoing during 2018/19 in that a periodic check is undertaken during the year to monitor progress to address audit recommendations.

    Electronic Signatures Scoping Scoping stage has commenced.

    Other Internal Audit Activity  Comments 

    Audit Committee The next Audit Committee is scheduled for 11 April 2019.

    Preparation of Internal Audit Plan for 2019/2020

    Work is progressing to assess and identify reviews for next year’s plan.

    9. LAND & BUILDINGS 9.1 Building Maintenance

    Description  

    Pump out of septic tank at Calen Depot completed.

    Sarina Depot Workshop burst poly pipe repairs, 4 meters in length.

    Foot valve repair on Calen Depot bore pump.

    New toilet suite installed at Mirani Administration Building.

    Burst gal pipe repaired at Ness Street Depot.

    Willis Street council house has received a new 7kw split system installed into lounge room.

    Zip filter replacement completed for Jubilee Community Centre staff kitchen.

    Insurance work relating to Tenancy 9 at The Dome is now complete following the water leak over the Christmas break.

    Scheduled gutter cleans due in February were completed by contract plumbers.

    Ceiling tile replacement at Mirani Museum completed.

    Various carpark and depot lights have been replaced at Paget Depot.

  • Organisational Services Monthly Review > February 2019

    30

    9.2 Land & Tenure

    Description

    Available tenure for community organisations: -

    Promotion of sharing facilities and grounds with likeminded organisations are always recommended in the first instance.

    Vacant Land: -

    o Bovey Street, North Mackay o Heaths Road, Glenella (low lying)

    Rural land of various sizes, average of 20kms distance from Mackay city centre.

    Encroachments:

    Agreements being negotiated: -

    Ocean Avenue, Slade Point

    Edmunds Avenue, Bucasia

    Grasstree Beach Road, Grasstree Beach

    Investigation into new encroachment identified in North Mackay

    Freehold properties currently listed for sale, as a result of the freehold land investigations:

    Lot 1 Vellas Road, Mirani - in negotiation

    Lot 3 Vellas Road, Mirani - in negotiation

    Weekly meetings established with The Dome Property Managers to discuss marketing, prospective tenants and maintenance issues.

    Current Status:

    Tenancies occupied – 2, 5, 6, 8, 11,12,13 and 14

    Tenancies that have proposals by interested parties – 4, 9, 10 & 6c

    Tenancies vacant – 3 and 7

    Temporary agreement put in place for Tenancy 3.

    As the management agreement for the current Property Owners will cease on 13 March, staff are preparing for the hand-over.

    The Land & Road Use Committee agenda included the following requests for comments -

    3 x road issues

    3 x land issues.

    Property Matters

    Working with Finance in relation to lease information due to change in accounting standard. Discussions commenced with related programs regarding Delachantos Road Park Hampton. Native Title - commencing discussions regarding the possible conversion of USL to Reserve.

    Lease Matters

  • Organisational Services Monthly Review > February 2019

    31

    Interviews held for Commercial Lease & Property Officer, with new staff member commencing 18 March.

    Council approved a new lease for Mackay & District Senior Citizens Association

    Grazing lease enquiry received

    Enquiry received regarding possible lease on Temple Island

    Telecommunication enquiries:

    o No new enquiries, dealing with existing queries