Win Theikdi Turbine
Presentation by: U Khun Aung Myo – Founder and Owner
Member: Renewable Energy Association of Myanmar (REAM)
COMPANY BACKGROUND:
• Small-Scale Hydropower developer and operator and machine repair / servicing company for other sectors (i.e.agriculture)
COMPANY TRACK RECORD:
• 4 pico-hydro plants (<5kW).• 11 micro-hydro plants (<100kw)• 80 percent of these projects are still in operation• 1 project has the central grid
BUSINESS MODEL
• Short term: Fabrication, installation, operation, maintenance• Long term: Grid inter connectivity• Different models: village-owned, private sector owned, and jointly
owned by the company and the VECs
1. Kakku Micro Hydropower Plant (Kyauk Ta Lone Gyi Township)
Year of InstalledHeadDischargeTurbine TypeFabricated ByCapacityDistributionUse
2004/2005 (TPA, Japan Fund)115 ft50000 Gal/h + Storage tankPeltonKyaw Soe Win Hydro-Electric25 KW400 Households (Still Uses)Lighting/TV
2. Hti Ta Mg Micro Hydropower Plant (Hsihseng Township)
Year of InstalledHeadDischargeTurbine TypeFabricated ByCapacityDistributionUse
2006 (Village Fund)50 ft30000 Gal/hFrancis (Radial Type)U Khun Aung Myo3.5 KW150 Households (No Water Now)Lighting/TV
3. Pha Yart Hydropower Plant (Nyaung Shwe Township)Year of InstalledHeadDischargeTurbine TypeFabricated ByCapacityDistributionUse
2006 (Village Fund)18 ftResevoirFrancis (Radial Type)U Khun Aung Myo0.5 KWOne Monastay (Now not use because Dam broke)Lighting/TV
4. Ta Maw Plant (Pin Laung Township)
Year of InstalledHeadDischargeTurbine TypeFabricated ByCapacityDistributionUse
2007 (Village Fund)8 ftMinimum in Summer (230000 Gal/h), In Raining >>>QPropeller (Design Q=230000 Gal/h)U Khun Aung Myo5 KW50 House Holds (Now half connected to national grid)Lighting/TV
Year of InstalledHeadDischargeTurbine TypeFabricated ByCapacityDistributionUse
2008/2009 (TPA, Japan Fund)235 ft60000 Gal/hPeltonU Khun Aung Myo30 KW600 House Holds (Now Villages Connected to National Grid)Lighting/TV
5. Kyauk Su (Naung Kar, Taung Gyi Township)
6. Loi Yein Taung Chak, Pe Gon Township)
Year of InstalledHeadDischargeTurbine TypeFabricated ByCapacityDistributionUse
2009 (Village Fund)14 ft360000 Gal/h)PropellerU Khun Aung Myo13 KW150 House Holds (Still use)Lighting/TV
7. Li Mee (Nyaung Shwe Township)
Year of InstalledHeadDischargeTurbine TypeFabricated ByCapacityDistributionUse
2009/2010 (Village Fund)11 ft200000 Gal/h)PropellerU Khun Aung Myo6 KW60 House Holds (Still use)Lighting/TV
8. Warran ( Pinlaung Township)
Year of InstalledHeadDischargeTurbine TypeFabricated ByCapacityDistributionUse
2011 (Village Fund)50 ft150000 Gal/hFrancisU Khun Aung Myo20 KW260 House Holds (Still use)Lighting/TV
9. Kaung Hot (PinLaung Township)
Year of InstalledHeadDischargeTurbine TypeFabricated ByCapacityDistributionUse
2013 (Village Fund)50 ft200000 Gal/h)FrancisU Khun Aung Myo25 KW100 House Holds (Still use)Lighting/TV
10. Nann Pun (PinLaung Township)
Year of InstalledHeadDischargeTurbine TypeFabricated ByCapacityDistributionUse
2014 (Na Ta La, Government Fund)50 ft250000 Gal/h)FrancisU Khun Aung Myo35 KW250 House HoldsLighting/TV
11. Pan Lyam (Ho Pone Township)
Year of InstalledHeadDischargeTurbine TypeFabricated ByCapacityDistributionUse
2014 (Village Fund)18 ft250000 Gal/h)FrancisU Khun Aung Myo12 KW80 House HoldsLighting/TV
12. Pa CharCaLo (Hisheng Township)
Year of InstalledHeadDischargeTurbine TypeFabricated ByCapacityDistributionUse
2014 (Village Fund)95 ft370000 Gal/h)FrancisU Khun Aung Myo95 KW (Estimate)Just Finished InstallationJust Finished Installation
13. Naung Pee (PinLaung Township)
Year of InstalledHeadDischargeTurbine TypeFabricated ByCapacityDistributionUse
2014 (Village Fund)28 ft30000 Gal/h + Storage tankFrancisU Khun Aung Myo6 KW150 House HoldsLighting
14. Saung Dvee (PinLaung Township)
Year of InstalledHeadDischargeTurbine TypeFabricated ByCapacityDistributionUse
2014 (Village Fund)8 ft156000 Gal/h)PropellerU Khun Aung Myo4 KW110 House HoldsLighting/TV
15. Kaung Mee (PinLaung Township)
Year of InstalledHeadDischargeTurbine TypeFabricated ByCapacityDistributionUse
2014 (Village Fund)6 ft370000 Gal/hPropellerU Khun Aung Myo15 KW130 House HoldsLighting/TV
16. On Fabrication (50 KW Propeller One No. and 100 KW Francis Two Nos.)
Propeller (1)/ Francis (2)
50 KW & 100 KW x2
U Khun Aung Myo
Challenges and Opportinities
• Technical
• Financial
• Grid – Interconnectivity Framework– How to sell micro/mini hydro to national grid