VODOVOD I KANALIZACIJA d.o.o. SPLITFIGURES & FACTS
PROJECT PORTFOLIO
under the Sector for Investment and Development, ViK prepares and implements many projects.
There are 3 main groups of them:
1. ViK’s investments (financed mostly from develoment fee)2. EU-financed smaller projects; financed out of: INTERREG (4 research projects); RURAL DEVELOMENT (2 smaller infrastructure
projects) and CEF (financed out of INEA)3. Projects of agglomerations KAŠTELA-TROGIR and SPLIT-SOLIN
(EC-Cohesion fund)4. Drinking water conditioning plant (in preparation).
VODOVOD I KANALIZACIJA d.o.o. SPLITCHALLENGES - WATER SUPPLY
DRINKING WATER SOURCES TRANSMISSION EXISTING WASTER SUPPLY NETWORK
STATUS: Sensibility of Jadro and Žrnovnica; over-exploitation of water
source Jadro
STATUS: Losses in water delivery at Jadro, pollution risk, overflow at PS
Ravne Njive
STATUS: High apparent losses in distrubution system, high real losses
in system, low system autonomy
TARGET: Subterranean water protection, rationalisation of water
catchment at Jadro source.
TARGET: To improve water-body of Jadro, to minimize potential risk
pollution, to minimize the overflow losses.
TARGET: Reduction of apparent losses due to unappropriate
watermeters and unauthorised water consumption, progressive reduction
of real losses (short-term at app. 35% i long term at max. 25%.), leackage
reduction in network, improvement of operational stability, increase of
capacity of water tanks.
VODOVOD I KANALIZACIJA d.o.o. SPLIT
CHALLENGES - WASTE WATER
SEWERAGE IMPROVEMENT OF EXISTING SEWERAGE SYSTEMS
WASTEWATER TREATMENT
STATUS: Connection at WW system not compliant with Council Directive
91/271/EEC.
STATUS: Bad condition of part of existing network (14 km),
improvement of existing wastewater system aiming to reduce the
infiltration of subterranean waters and sea and discharge of WW in
underground.
STATUS: Existing WWT not compliant with Council Directive
91/271/EEC
TARGET: To achieve the compliance with 91/271/EEC by increase of
connection to public sewerage at 97%.
TARGET: To improve the existing network in order to minimize the a.m.
pollution risks.
TARGET: To achieve compliance with 91/271/EEC by upgrade of WWTP at II
grade.
Project implementation area:
Cities of KAŠTELA (59 %), TROGIR (13 %) and SPLIT(5 %)
and municipalities
OKRUG (12 %) and SEGET (11 %)
IMPROVEMENT of the WATER COMMUNAL INFRASTRUCTURE OF KAŠTELA-TROGIR AGGLOMERATION
Investment value of Project (eligible costs):
1.151.030.595,12 HRK/ € 151,451,394.10
whereof
- 69,95% amounting to 803.222.768,51 HRKwill be financed from EC-CF,
equal amounts of
- 139.123.130,64 HRK shall be ensured by national budget and Hrvatske vode and
residual 69.561.565,33 HRK by ViK as beneficiary.
Based of IQR approval from 31 July, Financing decision has been brought up by Ministry for environment and energy on 19
August 2019., and Contract for award of grant funds was signed on 3 October 2019.
PROJECTS’ INDICATORS:
PUBLIC WATER SUPPLY
- 59,86 km new water supply pipelines,
- reconstruction of 65,40 km existing water supply network;
- construction of 4 PS, 2 water reservoirs (500m³) and 1.640 new connctions.
PUBLIC SEWERAGE ANDWASTWATER TREATMENT
- 215 km new constructed pipelines,
- reconstruction of 4,04 km sewerage pipelines;
- construction of 6,03 km pressurized pipelines, 640 incident overflows, 13 PSand 8.613 new connections;
- upgrade of existing WWTP Divulje from I. to II. grade (mechanical tobiologicat treatment), increasing capacity from 40.000 PE to 100.000 PE;
- new construction of WWTP Čiovo II. grade treatment capacity 25.000 PE.
IMPROVEMENT of the WATER COMMUNAL INFRASTRUCTURE OF KAŠTELA-TROGIR AGGLOMERATION
IMPROVEMENT of the WATER COMMUNAL INFRASTRUCTURE OF KAŠTELA-TROGIR AGGLOMERATION
LOOKUP CARD of PROJECT
WWTP Divulje
CURRENT
CAPACITY: 40.000 PE
Currently are crude and fine impurities removed, aswell as percipitating and floating stuff. Extractedtechnological waste is haded over at sanitay landfillKarepovac.
AFTER PROJECT IMPLEMENTATION
CAPACITY: 100.000 PE and an upgrade from I. to II.grade treatment. After works within 2nd package ofworks has been completed, organic load expected is87.000 PE or 87% total capacity tending to raise at100.000 PE until 2030. and capacity for acceptancewastwater from Marina agglomeration.
PROCUREMENT PLAN KAŠTELA - TROGIR AGGLOMERATION
Contract TD Type of contractEstimated procurement value
(HRK)Published at EOJN
End of evaluation
bidsSigning of contract
A0Izgradnja dijela vodoopskrbe i odvodnje Grada Kaštela
(K.Sućurac, K.Gomilica, K.Kambelovac) i Grada Trogira (Plano) WORKS 108.828.400 11/19 04/20 05/20
A1Izgradnja dijela sekundarne kanalizacijske i vodovodne mreže na
području Grada Kaštela (južno od državne ceste D8 do mora)WORKS 199.885.100 08/19 04/20 05/20
A2Izgradnja sekundarne i kanalizacijske mreže na području Grada
Trogira WORKS 94.161.100 12/19 05/20 06/20
A3 UPOV Divulje WORKS 116.108.000 02/20 07/20 08/20
A4 SDNU SERVICE 1.500.000 02/19 05/20 06/20
A5 Nadzor nad izgradnjom (paketa ugovora A) SERVICE 21.288.000 11/19 04/20 05/20
A6 Upravljanje projektom (vanjski stručnjaci) SERVICE 5.677.054 12/19 05/20 06/20
A7 Vidljivost i promidžba SERVICE 2.395.000 11/19 10/20 12/20
B1Izgradnja sustava odvodnje i vodoopskrbne mreže podsustavi
Kaštela, Trogir Seget, Okrug i Slatine (4 grupe)WORKS 346.550.400 06/20 05/20 06/20
B2 UPOV Čiovo WORKS 62.809.267 07/20 12/20 01/21
B3 Nabava opreme GOODS 15.925.000 07/19 12/20 01/20
B4 Usluga izrade i poboljšanja baze podataka SERVICE 800.000 08/20 10/20 11/20
B5 Nadzor nad izgradnjom (paketa ugovora B) SERVICE 15.688.000 06/20 11/20 12/20
IMPROVEMENT of the WATER COMMUNAL INFRASTRUCTURE OF SPLIT-SOLIN AGGLOMERATION
Ugovor
A7
Investment value of Project (eligible costs):
1.419.408.482,10 HRK/ € 186,764,273.96
whereof
- 68,71% amounting to 975.315.032,88 HRKwill be financed from EC-CF,
equal amounts of
- 162.826.863,16 HRK shall be ensured by both national budget and Hrvatske vode and
residual 118.439.722,90 HRK by ViK as beneficiary.
Based of IQR approval from 30 September, Financing decision has been brought up by Ministry for environment and energy on 9 October 2019. Contracts for award of grant
funds shall be signed latest by 22 November.
PROJECTS’ INDICATORS:
PUBLIC WATER SUPPLY
- 60,65 km new water supply pipelines,
- reconstruction of 4,28 km existing water supply network;
- construction of 14 PS, 14 water reservoirs (20.350 m³) and 1.243 newconnections.
PUBLIC SEWERAGE ANDWASTWATER TREATMENT
- 93,55 km new constructed pipelines,
- reconstruction of 1,85 and rehabilitation of 13,61 km sewerage pipelines;
- construction of 14,76 km pressurized pipelines, construction of 26,69 km cabelsewerage (SDNU), construction of 4,28 km undersea discharge, 32 PS,reconstruction of 3 PS, 7 retention basins and 2.593 new connections;
- upgrade of existing WWTP Stupe from I. to II. grade (mechanical to biologicaltreatment), increasing capacity from to 275.000 PE.
IMPROVEMENT of the WATER COMMUNAL INFRASTRUCTURE OF SPLIT-SOLIN AGGLOMERATION
Ugovor
A7
Project implementation area:
Cities of SPLIT (67%) and SOLIN (12%);
municipalities
KLIS (9%), DUGOPOLJE (6%) and PODSTRANA (6%).
IMPROVEMENT of the WATER COMMUNAL INFRASTRUCTURE OF SPLIT-SOLIN AGGLOMERATION
Ugovor
A7
Systematic construction of sewerage system Split- Solin started
1997. with puting in function following facilities:
Part of plant Katalinića Brig with crude and fine grid and
undersea discharge (L= 1.300 m; DN 800 mm);
Part of WWTP Stupe with mechanical pre-treatment (crude
and fine grid, aerated sand- and grease catcher, and undersea
discharge (dužine L= 2.750m; DN 1000 mm);
Hydrotechnical tunnel Stupe, (L= 2.512 m , 2 pipes: DN 1200
mm).
Main PS wastewater systems within this agglomeration are:
o Dujmovača (kapaciteta Qmax= 595,0 l/s)
o Šine (kapaciteta Qmax= 240,0 l/s)
o Solin (Qmax= 280,0 l/s).
Entire wastewater system od Split-Solin agglomeration consists of
8 catchment areas.
WWTP STUPE – now
Ugovor
A7
CAPACITY: 138.000 PE
DETAILS: Built and operatonal I st
stage; basic equipment for pre-
treatment mixed watewaters installed:
crude and fine grid, aerated sand-
catcher, building for accaptance of
septics discharge and bio-filter.
WWTP STUPE
Ugovor
A7
After project implementation
275.000 PE
12. PS for primary percipitation pits
13. Primary percipitation pits
14. Aeration basins
15. Secundary percipitation pits
16. Exit control shaft
17. Equalizing basin of septics acceptancespot
17a. Building for compressor of egalizingbasins
18. Pump site of sludge surplus
19. Pump site of reversible sludge
20. Primary sludge adsorption with PS
20a. PS for acceptance of sludge fromDivulje and Čiovo
21. Machinery space of decomposition spotand CHP
22. Heated decomposition
23. Vertical Scrubber
24. Dehydration of condensated sludge
25. Sludge drying device
26. Biogass cleaning
27. Gass storage
28. Gass torch
29. Air-commpresoor building
30. Administrative building
31. Technological water
32. Entrance
PROCUREMENT PLAN SPLIT - SOLIN AGGLOMERATION
Ugovor
A7
Contract TD Type of contract
Estimated
procurement value
(HRK)
Published at EOJN End of evaluation Signing of contract
0A Radovi na izgradnji sekundarne kanalizacijske mreže naselja Srinjine WORKS 13.310.000 11/19 01/20 02/20
0BStručni nadzor nad radovima izgradnje sekundarne kanalizacijske
mreže naselja SrinjineSERVICE 341.000 11/19 01/20 02/20
1Spoj sustava odvodnje južnog sliva na UPOV Stupe i dogradnja
podmorskog ispusta StobrečWORKS 222.654.842 05/20 10/20 11/20
2 Odvodnja i vodoopskrba dijela grada Splita (Žrnovnica, Korešnica) WORKS 113.205.669 04/20 09/20 10/20
3
Optimalizacija spoja sustava odvodnje sjevernog sliva sa
rekonstrukcijom i dogradnjom sustava vodoopskrbe i odvodnje Grada
Splita
WORKS 190.757.059 12/19 04/20 05/20
4Rekonstrukcija i dogradnja sustava odvodnje i vodoopskrbe Grada
Solina i općina Podstrana, Klis i DugopoljeWORKS 267.767.381 12/20 05/20 06/20
5 SDNU i regulacija dovoda vode izvorište Jadro – CS Ravne Njive SERVICE 22.242.000 09/20 03/21 04/21
6 Projektiranje i dogradnja UPOV-a Stupe 275.000 ES WORKS 445.500.000 12/19 06/20 08/20
7 Nabava opreme za održavanje mreže GOODS 25.723.500 12/19 05/20 06/20
8 Nadzor nad izgradnjom za Ugovore 1-6 SERVICE 47.635.500 11/19 03/20 04/20
9 Promidžba i vidljivosti SERVICE 2.702.700 11/19 02/20 02/20
10Tehnička pomoć za pripremu programa smanjenja gubitaka u
vodoopskrbnoj mrežiSERVICE 9.075.000 06/20 12/20 01/21
11 Upravljanje projektom (Vanjski stručnjaci) SERVICE 7.678.058 12/19 05/20 06/20