The following is a brief description with photos for the Vine Trail – Oak Knoll Section project listing activities performed from 10-05-15 – 10-09-15 • Ghilotti Bros. working on excavation of the new retaining wall footings
• RM Harris working on the Box Culvert at Wine Country; slab and formwork.
• Atlas Tree working along Solano Ave, between Hoffman and Carrell Lanes.
• RM Harris working on Hinman Bridge on footings and installing Helical Piles
PROJECT PROGRESS PHOTOS
Excavation of the new retaining wall footings
RM Harris installing formwork at the Wine Country Culvert.
RM Harris pouring slab and footings at the Wine Country Culvert.