![Page 1: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/1.jpg)
VETIVER SYSTEM FOR
BRIDGE APPROACH STABILISATION
Dr. Paul Truong - TVNI Technical Director, Brisbane, Australia .
All materials in this document remain the property of TVNI. Permission must be obtained for their use. Copyright © 2016
12/11/17 THEVETIVERNETWORKINTERNATIONAL 1
![Page 2: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/2.jpg)
.
Vetiver System • The Vetiver System (VS) is a new Bioengineering
technology based on the use of vetiver grass ( Chysopogon zizanioides L.) in various applications
• VS has been developed in the last 20 years through extensive research, development and applications worldwide.
• VS has been used successfully for flood erosion control and riverbank stabilisation in Australia, Asia Africa and Latin America.
• The main advantages of VS are that it is effective, practical and a low cost method of flood erosion control and riverbank stabilisation .
12/11/17 THEVETIVERNETWORKINTERNATIONAL 2
![Page 3: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/3.jpg)
Special Characteristics of Vetiver Grass The following characteristics make vetiver grass highly effective for flood erosion control and riverbank stabilisation:
• A deep, penetrating and extensive root system that binds the soil, and reinforces the soil structure which requires extraordinary force to dislodge.
• Erect and stiff stems forming a dense hedge which is very effective in retarding water flow and reducing the erosive power of the strong current.
• The top portion of the vetiver plant is flexible and bends over under strong flow. The bent tops act as an energy dissipater
• Vetiver is tolerant to drought, saline, sodic and acidic soil conditions. • Vetiver survives under prolonged and complete submergence and it resumes growth after emerging from the water. Under partial submergence conditions, vetiver can remain indefinitely, as it was originally a wetland species.
12/11/17 THEVETIVERNETWORKINTERNATIONAL 3
![Page 4: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/4.jpg)
Deep and Penetrating roots One year old plant with 3.3m deep root system in Thailand
Submergence Tolerance Growing vigorously in water
12/11/17 THEVETIVERNETWORKINTERNATIONAL 4
![Page 5: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/5.jpg)
Principles of the Vetiver System for River Bank Stabilisation
In flood erosion control and riverbank stabilisation the VS uses the deep and high tensile root system to reinforce the bank slopes and its dense and stiff stems to spread and Reduce current flow velocity .
• To stabilise the bank steep gradients, horizontal rows planted on approximate contour lines
• To reduce flow velocity of the strong current thus preventing scouring from the strong flow; planting of cross rows is needed.
• For maximum effect, the cross rows are orientated at right angle to the flow direction.
• The spacing of both horizontal and cross rows varies with slope gradient and length, soil type, flow velocity and depth .
12/11/17 THEVETIVERNETWORKINTERNATIONAL 5
![Page 6: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/6.jpg)
AUSTRALIAN APPLICATIONS
The followings are projected carried out in tropical and subtropical Australia
12/11/17 THEVETIVERNETWORKINTERNATIONAL 6
![Page 7: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/7.jpg)
12/11/17 THEVETIVERNETWORKINTERNATIONAL 7
![Page 8: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/8.jpg)
Approach was washed out after road realignment
12/11/17 THEVETIVERNETWORKINTERNATIONAL 8
![Page 9: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/9.jpg)
Severe erosion on the approach of the Coolumboola Creek bridge near Miles, Queensland. .
12/11/17 THEVETIVERNETWORKINTERNATIONAL 9
![Page 10: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/10.jpg)
Erosion was caused by the change in flow direction
Eroded area
Flow
12/11/17 THEVETIVERNETWORKINTERNATIONAL 10
![Page 11: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/11.jpg)
Vetiver was planted in contour rows to stabilise the batter and cross rows to reduce flow velocity
12/11/17 THEVETIVERNETWORKINTERNATIONAL 11
![Page 12: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/12.jpg)
12/11/17 THEVETIVERNETWORKINTERNATIONAL 12
![Page 13: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/13.jpg)
One month after planting
12/11/17 THEVETIVERNETWORKINTERNATIONAL 13
![Page 14: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/14.jpg)
Six month after planting
12/11/17 THEVETIVERNETWORKINTERNATIONAL 14
![Page 15: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/15.jpg)
18 months after planting (vetiver was frosted in winter but will resume growth in spring)
12/11/17 THE VETIVER NETWORK INTERNATIONAL 15
![Page 16: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/16.jpg)
18 months after planting, note the bare area between rows
12/11/17 THEVETIVERNETWORKINTERNATIONAL 16
![Page 17: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/17.jpg)
There were several big flows during the first summer and no damage occured. This approach is now well protected by the mature vetiver.
12/11/17 THEVETIVERNETWORKINTERNATIONAL 17
![Page 18: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/18.jpg)
Five years after planting (Summer)
12/11/17 THEVETIVERNETWORKINTERNATIONAL 18
![Page 19: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/19.jpg)
12/11/17 THEVETIVERNETWORKINTERNATIONAL 19
![Page 20: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/20.jpg)
12/11/17 THEVETIVERNETWORKINTERNATIONAL 20
![Page 21: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/21.jpg)
NEW GATTON BYPASS
SANDY CREEK BRIDGE APPROACH
(Under Old Bridge)
12/11/17 THEVETIVERNETWORKINTERNATIONAL 21
![Page 22: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/22.jpg)
Flash flood undercut approach
12/11/17 THEVETIVERNETWORKINTERNATIONAL 22
![Page 23: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/23.jpg)
Planting on 3 Dec 2002
12/11/17 THEVETIVERNETWORKINTERNATIONAL 23
![Page 24: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/24.jpg)
One month after planting
12/11/17 THEVETIVERNETWORKINTERNATIONAL 24
![Page 25: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/25.jpg)
Seven weeks after planting, more than 30 cm growth
12/11/17 THEVETIVERNETWORKINTERNATIONAL 25
![Page 26: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/26.jpg)
Three months after planting
12/11/17 THEVETIVERNETWORKINTERNATIONAL 26
![Page 27: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/27.jpg)
One year after planting and through several flash floods
12/11/17 THEVETIVERNETWORKINTERNATIONAL 27
![Page 28: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/28.jpg)
NEW GATTON BYPASS
SANDY CREEK BRIDGE ABUTMENT
(Under New Bridge)
12/11/17 THEVETIVERNETWORKINTERNATIONAL 28
![Page 29: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/29.jpg)
Undercut shotcrete and unprotected batter
12/11/17 THEVETIVERNETWORKINTERNATIONAL 29
![Page 30: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/30.jpg)
New approach under new bridge built parallel to the old bridge
12/11/17 THEVETIVERNETWORKINTERNATIONAL 30
![Page 31: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/31.jpg)
Planting on 24 November 2003
12/11/17 THEVETIVERNETWORKINTERNATIONAL 31
![Page 32: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/32.jpg)
12/11/17 THEVETIVERNETWORKINTERNATIONAL 32
![Page 33: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/33.jpg)
Four months after planting
12/11/17 THEVETIVERNETWORKINTERNATIONAL 33
![Page 34: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/34.jpg)
Four months after planting
12/11/17 THEVETIVERNETWORKINTERNATIONAL 34
![Page 35: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/35.jpg)
One year after planting
12/11/17 THEVETIVERNETWORKINTERNATIONAL 35
![Page 36: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/36.jpg)
12/11/17 THEVETIVERNETWORKINTERNATIONAL 36
![Page 37: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/37.jpg)
Bridge Abutment Coomera Creek,
Brisbane – Robina Rail line
12/11/17 THEVETIVERNETWORKINTERNATIONAL 37
![Page 38: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/38.jpg)
Coomera Creek, Queensland Rail, Brisbane – Robina line
12/11/17 THEVETIVERNETWORKINTERNATIONAL 38
![Page 39: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/39.jpg)
Mangrove seedlings
12/11/17 THEVETIVERNETWORKINTERNATIONAL 39
![Page 40: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/40.jpg)
Bridge abutment of a tidal creek
12/11/17 THEVETIVERNETWORKINTERNATIONAL 40
![Page 41: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/41.jpg)
Bridge Approach
ASSAM, INDIA
By
Shantanoo Bhattacharyya Executive Engineer, PWD, Assam
TVNI Coordinator, Eastern India Vetiver Network
12/11/17 THEVETIVERNETWORKINTERNATIONAL 41
![Page 42: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/42.jpg)
Doria bridge, Assam, India (2008)
Doria Bridge approach , before and after vetiver
planting , note grid pattern
12/11/17 THEVETIVERNETWORKINTERNATIONAL 42
![Page 43: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/43.jpg)
Doria Bridge approach , six months
after planting, note grid pattern
12/11/17 THEVETIVERNETWORKINTERNATIONAL 43
![Page 44: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/44.jpg)
Doria Bridge approach, two years after planting
(2010)
12/11/17 THEVETIVERNETWORKINTERNATIONAL 44
![Page 45: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/45.jpg)
Doria Bridge approach, two years after planting
(2010)
12/11/17 THEVETIVERNETWORKINTERNATIONAL 45
![Page 46: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/46.jpg)
Doria Bridge approach, three years after planting (2011 )
Most of the approach was covered by native vegetation, Vetiver remained on the area where native species could not grow.
12/11/17 THEVETIVERNETWORKINTERNATIONAL 46
![Page 47: VETIVER SYSTEM FOR BRIDGE APPROACH STABILISATION · (Under Old Bridge) 12/11/17 THE VETIVER NETWORK INTERNATIONAL 21 Flash flood undercut approach 12/11/17 THE VETIVER NETWORK INTERNATIONAL](https://reader035.vdocuments.mx/reader035/viewer/2022071014/5fcce335a39a556e6847aec3/html5/thumbnails/47.jpg)