ProjectIntroduction
LifeCycleFlowofInformation
ChangeManagement
TrimbleProject
Control
StructuralSurvey
FloorFlatness
Field
Verifications
ummary
-
7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas
3/33
KAISER OAKLAND MEDICAL CENTER
REPLACEMENT HOSPITAL PROJECT
VIRTUAL DESIGN & CONSTRUCTION
-
7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas
4/33
CONTROL&LAYOUT
CHANGEMANAGEMENT
FABRICATION FIELD VERIFICATIONS
MODELREPOSITORY
(2D,3D,
4D,
5D,
6D)
VIRTUALTRADE
COORDINATIONMODEL
ASBUILTSURVEYING
COMMISSIONING
(IFC,COBie,Models,Database)
VIRTUALDESIGNMODEL
CAFMCMMS
-
7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas
5/33
CONTROL&LAYOUTCONTROL&LAYOUT
CHANGEMANAGEMENTCHANGEMANAGEMENT
FABRICATION FIELD VERIFICATIONSFIELD VERIFICATIONS
MODELREPOSITORY
(2D,3D,
4D,
5D,
6D)
VIRTUALTRADE
COORDINATIONMODEL
ASBUILTSURVEYING
COMMISSIONING
(IFC,COBie,Models,Database)
VIRTUALDESIGNMODEL
CAFMCMMS
-
7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas
6/33
ModelingtheIdealProcesstoensure
op m ze
wor
ow
or
a
par es
Providesuniversalconfidenceincurrentstate
-
7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas
7/33
Hospitalsarecontinuallychanging
Essentialtoplanforchanges
Owner
expectations
of
incorporating
changes
Minimizeimpactstoscheduleandcosts
pro ects avet mecomponenttoevo v ng a r cat on
models
-
7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas
8/33
Realigned expectations across project participants
Better informed and timely decisions
Prioritization of changes/scope
Smoother production cycle work flow Incor oration of chan es as the ha en
Balance limited resources, production and field installation
-
7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas
9/33
Originalanges
anges
TeklaConstructionManagementModule
-
7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas
10/33
Aligninteresttoonecommonoutcome
Providestandardizedtrainingforall,
addressedrisks
and
concerns
MBCparticipationandsupport,skininthe
game,garnere rus w su s
Clear
path
of
transition
-
7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas
11/33
AbsoluteonSite,RelativeonFloor
-
7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas
12/33
Pointsfrom
the
sight
plans
and
buildingmodelsaregeneratedinTekla
Standardizedprogram,GCleadandperformed
-
7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas
13/33
Standardizedprogram,GCleadandperformed
-
7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas
14/33
Providementoring,training,support
, , ,
betteraccuracy
Backcheck subtrades layout,avoidconflict
FieldverificationsandAsBuilts
Expandon
capabilities
-
7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas
15/33
StructureSurvey
PrePour,PostPour,andPostShoringRemoval
Monitors dis lacement not
originalrequirement
FloorProfileTestin
ASTM1155M
FloorFlatness
FloorLevelness
-
7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas
16/33
Schedule Constructionwellunderway,andcouldnotdelayprogress
Costs
Additionalsurveying
not
originally
budgeted,
exceeded
contractedscope
Qualityofsurvey
Hadto
be
equal
or
greater
than
traditional
methods
Experiencelimitedtotraditionalmethods
-
7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas
17/33
TrimbleRealworks todevelopsteelmeasurements
-
7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas
18/33
Accuracyisachievedbyintegrationoftechnologywithprocess
-
7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas
19/33
PrePourandPostPourSurve
Accuracyisachievedbyintegrationoftechnologywithprocess
-
7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas
20/33
Beamcamber,preandpostplacementofconcrete
-
7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas
21/33
-
7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas
22/33
ProjectminimumFFof28,ASTM1155M
Desi n ConstructionConsiderations
Slabthickness,
overloading
during
pour
Grind/FillConsiderations,flooringsubtrade
Framinganddoorheaderplacement,fixtureplacement
Qualityof
final
conditions
OwnerSatisfaction
-
7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas
23/33
LocationofTestRuns
-
7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas
24/33
Exceededprojectrequirements,great!Right?
-
7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas
25/33
Createtopo plansofconcrete,exporttoCAD
-
7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas
26/33
Topo WithArchitecturalOverlay
-
7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas
27/33
Interiorbuildoutimpacts
-
7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas
28/33
Qualityofsurveyvalidated
c e u e re uc onover ra ona
Traditional3xmoreforPrePour,1.5xPostPour
Fieldconflict
mitigation,
better
planning
Enhancedcustomersatisfaction
Netresult eliminationofwasteincostandschedule,hi hersatis action
-
7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas
29/33
A3ofFieldConflictandResolution BuildingtotheModel
-
7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas
30/33
ASBUILTSURVEYING
Capturesuper
accurateAs
Builts during
construction
remodel
-
7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas
31/33
Capturein
wallconditions
for
follow
on
facilitiesuse,
. .
location
-
7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas
32/33
Change Management
Optimized management of changes
Control and Layout
Control of schedule and accuracyFloor Monitoring Program
Enhanced QC program, higher satisfaction
Field Verifications Building to model plan, build, verify
-
7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas