www.voestalpine.com/railway-systems
At the Pulse of the Cities – We Create Connections
URBAN TRAFFIC: TRAMS
2
A pioneer in the consideration of economical (LCC) and technical (RAMS) customer benefit, we bring together cutting-edge technology with systems expertise right down the line. Our some 50 sites worldwide let us bundle our knowledge and supply customers with localized products and services tailored to their needs and offering added value. voestalpine Railway Systems stands for overall solutions with maximum efficiency – so helping customers get ahead in terms of technology and competition.
All over the world the trend towards urbanization draws more and more people to the big city, and the demand for public mobility is growing. Tram operators are constantly confronted with new challenges: ever-increasing interval times resulting in higher requirements, complex framework conditions for maintenance in the public sector, as well as the wish for environmentally friendly, comfortable and low-noise solutions. This background above all means we need functioning systems that guarantee safety while catering for today‘s demands on mobility.As the global market leader, voestalpine Railway Systems offers innovative and reliable products with the expertise of a provider as well as trendsetting concepts. We thus improve service life, availability, reliability and ease of maintenance for rails, turnouts and signal technology on all continents. Over 150 tram networks are supplied with our products all over the world, successfully coping with increased require-ments day in day out, thanks to first-class technologies.
LOW-NOISE AND AVAILABLE SYSTEM SOLUTIONS FOR PUBLIC TRANSPORT
3
4
Super Premium Rails
Elastic Track Support
Point Machine with Internal Locking
Point Heating Control System
Vehicle Communication
RETHINKING URBAN TRAFFIC SYSTEMSInnovative and Intelligent Products, System and Service Solutions
Options:
Rail Foot Clamp
Alternative Rail Fastening System
Axle Counter Manual Point Machine
5
Gauge Bar
Half Set of Switch Device with Wedge Clamp
Lattice Truss Sleeper
Earth Box
Check RailCrossing
Mass Detector
Signal Turnout Control System
Diagnostic and Monitoring Systems for Track, Fixed Assets and Rolling Stock
Asset Inventarisation
6
UNIQUE HEAT-TREATED GROOVED RAIL:R290GHT (-CL) AND R340GHT
Added Value for You:
» Maximum wear resistance for a significantly longer service life in
the track» Effective defense against rail
corrugation » Simple to weld – combined with
on-site welding advice provided by voestalpine‘s experts as a service to customers
» Available in all sections to EN as well as special customized sections
» Manufactured according to ben-ding plan and drilled for use with gauge bars
» Tightest tolerances» First-class surface quality
We are the global market leader for grooved rails and the only manufacturer of heat-treated qualities in this segment. Our customers include almost all major tram operators in Europe, as well as numerous other important companies based in North and South America, Australasia and Africa. The qualities R290GHT and R340GHT are both fine pearlitic, heat-treated grooved rails as per EN14811 and represent optimized rail solutions for all track maintenance strategies of our customers. Both qualities benefit from HSH® heat treatment technology. HSH® grooved rails with high wear resistance are mainly used for curves on tram tracks subject to heavy-duty service: R340GHT as a “put-in-&- forget” solution with maximum wear resistance. R290GHT, which offers optimum metallurgical conditions for the welding strategies of our customers (reprofiling in the track), is also available as 290GHT-CL with an extra-low carbon content of max. 0.50 %. As regards joint welding in the track, tried and tested standard processes and procedures are available for all grooved rail steel grades produced by voestalpine Schienen. With the aim of synergistically maximizing customer benefit, these rails are of course also used in voestalpine‘s turnouts.
The constant further development of grooved rail technology means we are not only able to offer customers innovative and efficient solutions, but also to optimize them in line with the ever-increasing demands on public infrastructure. If we are to meet the growing need for mobility, first and foremost in conurbations, to optimum effect, special high-performance, economical, environmentally compatible and convenient system solutions are required. We work hand in hand with customers to develop concepts which fulfill individual needs and circumstances to optimum effect. Our products, which are optimized in terms of life cycle costs, promise maximum availability, reliability, ease of maintenance (robust design), as well as short installation, replacement and track possession times due to the use of pre-assembled parts, in addition to efficiency and durability.
SUSTAINABLE TURNOUT SYSTEMS FOR URBAN TRAFFIC
Added Value for You:
» System responsibility / everything from a single source» Years of extensive experience on all continents» Wide-ranging design options, even for the most demanding applications» Integrated rail and welding expertise» Individual solutions for materials with high wear resistance» ‘Green’ lubrication-free components» Maintenance-optimized products» Expertise and in-house manufacture of rail encapsulation systems
(insulation against vagrant electric current)» Easy to weld for repair» Compatibility with all laying and fastening systems» Guaranteed industrial quality maintained from first to last day in the track» “Put-in-and-forget” solutions for grooved rails
Innovative Products and System Solutions for Maximum Requirements:
» Grooved rail system turnouts» Complex systems and special
solutions» Ladder track» Optimized switch blades» Welded design» Monoblock design» Cast design» Wide range of designs for crossings» Replaceable crossings» Expansion joints» Top-on-track turnouts» Rail encapsulation» Track guiding analysis and
safety studies» Extensive service package
8
Added Value for You:
» Compatible with a wide range of interlocking technologies
» Low noise levels» Minimized space requirement» Can be retrofitted» Extended inspection intervals and
optimized asset management» Modular diagnostic platform and
planning instrument» Integration in higher-level systems
possible
INNOVATIVE SETTING,SIGNALING & MONITORING TECHNOLOGIES
Innovative Turnout Setting Systems and Monitoring DevicesYears of experience and extensive knowledge about turnout systems allow us to offer innovative solutions for efficient, sustainable operation on urban traffic routes. » Electrical and manual turnout setting systems» Turnout control systems and point heating, axle counters and wheel sensors
Intelligent Monitoring and Diagnostic SystemsCutting-edge technologies allow voestalpine to offer fully digitized smart monitoring in the following areas:
» Monitoring of track systems and fixed infrastructure assets (incl. turnout diagnosis, monitoring of track movement or track circuit)
» Monitoring of rolling stock (incl. monitoring of wheel defects, weighing in motion or acoustic bearing detection)
The direct recording of the asset condition and assessment of targeted information through our Central Management Software, allows optimized asset management, efficient maintenance planning and to avoid unnecessary preventive maintenance.
9
SMART MAINTENANCE SOLUTIONS Maximizing availability, minimizing operating costs – those are the strategic objectives of our customers. Thanks to our combined product and service expertise we carry out preventive and corrective maintenance independently: Our service even includes processing scrap materials at the end of the life cycle.
TRACK MANAGEMENTYou want to concentrate on your business and ask capable partners to look after your railway infrastructure? We‘re the people for the job! Our Track Management with electronic diagnostic systems allows you to plan maintenance. So cutting costs – and guaranteeing high levels of availability.
TRACK SOLUTIONS – OUR EFFICIENT TRACK MANAGEMENT LEADS TO OPTIMIZED PERFORMANCE AND COSTSFrom the idea to implementation, from training to consulting, from products via logistics to maintenance – with our Track Management for URBAN TRAFFIC we offer an extensive portfolio of services. They can be realized in the shortest possible track possession times and so ensure maximum system availability.We stand for customized product and service solutions with minimized life cycle costs. We analyse the needs of our customers and recommend the best technical and most cost-effective solution for rails, turnouts and systems based on precise calculations.
CONSULTING, ENGINEERING & TRAINING150 engineers are hard at work all over the world, developing specific solutions for our customers – from the planning, development and engineering phase through assisting with installation to optimizing maintenance strategies. At our academies we share our knowledge with customers in the framework of seminars and in-house training programs.
SUPPLY, LOGISTICS & INITIAL SERVICEWith our customized availability concepts and just-in-time logistics chains we supply our customers with the railway construction materials they need. Our initial services not only guarantee maximum installation quality – they also pave the way for reduced follow-up costs and an increased service life.
RUN PERFORM
1220
2200
500
5000
2200
1040
5000
2200
3780
2200
1310
2200
1550 2200
1470
3450
400
800
c
a B3
B2aD1
b
C
c A
c
D1a B2
b
C
a B3
b
D2
B3a
B2
a
c
C
c
cD1B3
B2b
C
2200
1
Sensor(Gleiskasten)
Schmierstelle
Sensor
(Gleisk
asten)
Schmierstelle
Sensor(Gleiskasten)
Fettzentralstation
Schmierstelle
Schmierstelle
Sensor(Gleiskasten)
Regelquerschnitt 8
RQ 6a
RQ 2Regelquersc
hnitt 7
RQ 6a
RQ 6
Regelquerschnitt 8
RQ 6
RQ 2
RQ 3
Regelquerschnitt 5
Regelquerschnitt 5
RQ 2
RQ 3
RQ 3
RQ 3
RQ 1a
RQ 1a
Regelquerschnitt 4
RQ 1a
RQ 1
RQ 1a
RQ 2
RQ 1a
RQ 1a
Regelquerschnitt 2
RQ 1
RQ 2
RQ 1a
RQ 1a
RQ 1
RQ 1
RQ 3
Rege
lque
rsch
nitt
2
RQ 3
Rege
lque
rsch
nitt
2
Rege
lque
rsch
nitt
2b
RQ 2
b
Regelquerschnitt 2
RQ 1a
Regelquerschnitt 4
RQ 2
RQ 6a
RQ 2
RQ 6
RQ 6
RQ 2
RQ 6
RQ 7
RQ 7RQ 6a
RQ 6
WB +10
WB +10
Bpf
Bpf
Bpf
GA
GA
GA
GA
GA
GA
GA
GA
GA
WB ā 0
WB ā 0
WB
ā 0
WB
ā 0
GA
SBK 20 +3
SBK 20 +3
WB +24
WB +24
WB +10
WB +3
WB +3
WB
ā 0
WB
ā 0
WB
+10
WB
+10
WB ā 0
WB ā 0
WB + 3
WB + 3
WB + 10
WB + 10
GA
WB +10
RQ 2
0+225,438
0+29
2,78
0
0+000,000
0+01
1,78
8
0+40
3,77
6R=
∞
0+48
2,12
4
R=∞
R=∞
0+48
7,40
4R=
∞
0+128,301
0+243,643
0+111,822
0+225,088
0+236,429
0+01
4,56
8
0+111,670
0+105,045
0+125,602
1:51
4
u=25
1:51
4
u=10
u=0
u=0
u=0
u=0
1:51
4
u=25
1:51
4
u=10
u=0
u=0
u=0
u=0
u=0
u=0
u=0
u=0
u=0
u=0
u=0
u=0
u=0
u=0
u=0
u=0
1:500
1:500
1:644
1:520
BA
u=0 u=0
AA
AE
AA
AE
AA
AE
AA
AE
AA
AE
AE
AA
AE
AA
AE
AA
AE
AA
AE
AA
AE
AA
AA
AE
AA
AE
AA
AE
AA
AE
AA
AE
AA
AE
KM=0+000,000
TS=82,904 m
-6,00
0 %
83,97
9 m
f= 0,360 m T= 26,850 m
H= 1000 m
-6,00
0 %83
,979 m
-0,630 %
54,186 m
f= -0,016 m T= 5,600 m H= 1000 m
KM=0+138,166
TS=77,523 m
-0,630 %
54,186 m-1,750 %
72,198 m
KM=0+210,364
TS=76,260 m
-1,750 %
72,198 m
-2,600 %
42,746 m
KM=0+000,000
TS=82,900 m
-5,80
0 %
86,52
4 m
H= 1000 m
T= 25,850 m
f= 0,334 m
KM=0+086,524
TS=77,882 m
-5,80
0 %86
,524 m
-0,630 %
56,845 m
H= 1000 m
T= 5,600 m
f= -0,016 m
KM=0+143,369
TS=77,523 m
-0,630 %
56,845 m-1,750 %
69,168 m
-1,750 %
69,168 m
H= 1000 m
T= 12,000 m
f= 0,072 m
KM=0+253,110
TS=75,149 m
-2,600 %
42,746 m-0,200 %
29,590 m
H= 2000 m T= 10,300 m f= 0,027 m
KM=0+282,700
TS=75,089 m
-0,200 %29,590 m
0,830 %
20,109 m
f= 0,186 m T= 21,155 m
H= 1200 m
KM=0+259,919
TS=74,998 m
47,383 m
0,750 %
32,861 mKM
=0+292,780TS=75,244 m
0,750 %
32,861 m
KM=0+000,000
TS=77,588 m
0,617 %
43,740 m
f= -0,266 m T= 23,085 m
H= 1000 m
KM=0+043,740
TS=77,858 m
0,617 %
43,740 m
-4,000 %
62,107 m
f= 0,128 m
T= 16,000 m
H= 1000 m
KM=0+105,847TS=75,373 m
-4,000 %
62,107 m
-0,800 %51,674 m
KM=0+157,521
TS=74,960 m
-0,800 %51,674 m
KM=0+000,000
TS=77,559 m
0,630 %
44,878 m
H= 1000 m
T= 23,150 m
f= -0,268 m
KM=0+044,878
TS=77,842 m
0,630 %
44,878 m
-4,000 %
60,990 m
H= 1000 m
T= 16,000 m f= 0,128 m
KM=0+105,868TS=75,403 m
-4,000 %
60,990 m
KM=0+161,304
TS=74,959 m
-0,800 %55,437 m
KM=0+000,000
TS=74,630 m
-0,360 %
19,319 m
f= 0,018 m T= 8,600 m H= 2000 m
KM=0+019,319
TS=74,560 m
-0,360 %
19,319 m
0,500 %
62,724 m
f= 0,083 m
T= 15,750 m H= 1
500 m
KM=0+082,043
0,500 %
62,724 m
2,600
%
41,01
6 m
TS=75,941 m
KM=0+000,000
TS=74,630 m
-0,360 %
19,286 m
H= 2000 m
T= 8,600 m
f= 0,018 m
KM=0+019,286
TS=74,561 m
-0,360 %
19,286 m
0,500 %
68,146 m
H= 1500 m
T= 16,950 m
f= 0,096 m
KM=0+087,432
TS=74,901 m
0,500 %
68,146 m
2,760
%38
,170 m
TS=75,955 m
2,760
%38
,170 m
KM=0+403,912
TS=75,490 m
-0,200 %
19,263 m
f= -0,012 m
T= 7,000 m
H= 2000 m
KM=0+423,175
TS=75,451 m
-0,200 %
19,263 m -0,900 %19,841 m KNICK
-0,900 %19,841 m
KM=0+482,124
TS=74,960 m
-0,800 %39,107 m
TS=75,440 m
-0,550 %19,387 m
H= 8000 m T= 10,000 m f= -0,006 m
KM=0+440,612
TS=75,333 m
-0,550 %19,387 m -0,800 %
46,792 m
KM=0+487,404
TS=74,959 m
-0,800 %46,792 m
0+000,000
0+007,116
0+061,717
0+067,445
0+085,234
0+116,481
0+123,981
0+132,668
0+192,481
0+197,481
0+203,481
0+214,413
0+263,275
0+000,000
0+033,655
0+067,094
0+072,324
0+082,376
0+086,948
0+121,685
0+202,690
0+208,688
0+29
2,78
0
0+00
3,96
2
0+01
1,57
3
0+02
4,63
1
0+02
8,470
0+072,509
0+078,204
0+082,262
0+00
8,44
3
0+01
6,13
2
0+02
9,508
0+03
0,741
0+072,475
0+074,128
0+079,281
0+083,331
0+000,000
0+072,391
0+101,235
0+000,000
0+073,386
0+103,564
0+40
3,77
6
0+42
1,22
4
0+48
7,40
4
0+000,000
0+019,755
0+021,576
0+037,811
0+049,093
0+061,717
0+067,445
0+077,166
0+080,164
0+085,234
0+104,2810+104,481
0+115,9510+116,481
0+123,981
0+127,951
0+128,301
0+132,4810+161,4810+192,481
0+197,2810+197,481
0+203,4810+210,767
0+214,413
0+220,870
0+222,302
0+222,653
0+243,643
0+263,275
0+263,695
0+265,889
0+27
6,400
0+000,000
0+029,606
0+030,890
0+049,510
0+060,499
0+067,094
0+072,324
0+082,376
0+085,0140+086,948
0+109,4850+109,685
0+111,822
0+121,685
0+129,185
0+137,6710+137,6850+137,871
0+166,6850+202,4850+202,685
0+208,686
0+216,062
0+224,002
0+236,429
0+262,287
0+262,674
0+265,849
0+29
2,78
0
0+000,000
0+01
1,57
3
0+02
1,65
0
0+02
4,63
1
0+073,029
0+078,204
0+082,262
0+087,919
0+088,119
0+09
9,498
0+10
1,261
0+11
7,18
1
0+13
0,40
0
0+13
7,00
4
0+15
2,05
2
0+000,000
0+01
4,56
80+
016,
132
0+02
9,508
0+074,128
0+079,281
0+083,331
0+089,195
0+089,395
0+09
9,286
0+10
3,586
0+13
3,92
0
0+15
5,83
5
0+16
1,30
4
0+000,000
0+072,391
0+111,670
0+123,059
0+000,000
0+073,386
0+105,045
0+125,602
0+40
3,91
2
0+42
6,27
6
0+45
4,83
2
0+47
6,65
0
0+42
1,22
4
0+43
1,87
1
0+45
9,80
80+
460,
291
0+48
1,93
0
0+48
7,40
4
Bauanfang
Schnitt Achse 202, Rand Bahnhofstraße
Schnitt Achse 200, Bahnhofstraße
Schnitt Achse 201, Rand Bahnhofstraße
Schnitt Achse 214, Rand Radweg
Schnitt Achse 211, Rand Radweg
Schnitt Achse 216, Rand Gehweg
Schnitt Achse 212, Achse Gehweg
Schnitt Achse 217, Rand Gehweg
Gleisentwässerungsrinne
Schnitt Achse 502, Rand Überfahrt
Weichenende
Schnitt Achse 501, Rand Überfahrt
Anfang Haltestellenrampe
Anschluss Achse 103
Weichenanfang
Haltestellenanfang
GleisentwässerungskastenHaltestellenende
Gleisentwässerungsrinne
Ende Haltestellenrampe
Schnitt Achse 501, Rand Überfahrt
Schnitt Achse 420, Achse Zufahrt
Schnitt Achse 502, Rand Überfahrt
Schienenentwässerungskästen
Anschluss Achse 105
Weichenende
Bauanfang
GleisentwässerungskastenSchnitt Achse 202, Rand Bahnhofstraße
Schnitt Achse 200, Bahnhofstraße
Schnitt Achse 201, Rand Bahnhofstraße
Schnitt Achse 214, Rand Radweg
Schnitt Achse 211, Rand Radweg
Schnitt Achse 216, Rand Gehweg
Schnitt Achse 212, Achse Gehweg
Schnitt Achse 217, Rand Gehweg
Gleisentwässerungsrinne
Schnitt Achse 502, Rand Überfahrt
Weichenende
Schnitt Achse 501, Rand Überfahrt
Anfang Haltestellenrampe
Anschluss Achse 104
Haltestellenanfang
Weichenanfang
Gleisentwässerungskasten
Gleisentwässerungsrinne
Ende Haltestellenrampe
Schnitt Achse 501, Rand Zufahrt
Anschluss Achse 106
Weichenende
Gleisentwässerungskasten
Anschluss Achse 101
Schn
itt A
chse
501
, Ran
d Üb
erfa
hrt
Weic
hene
nde
Schnitt Achse 313, Rand Gehweg
Schnitt Achse 312, Rand Radweg
Schnitt Achse 310, Rand Radweg
Gleisentwässerungska
sten
Schnitt Achse 201, Fahrbahnrand
Schnit
t Ach
se 20
0, Bah
nhofs
traße
Schnit
t Ach
se 30
0, Ve
tscha
uer S
traße
Gleis
entw
ässe
rung
skas
ten
Gle
isent
wäss
erun
gska
sten
Wei
chen
ende
Zung
ensp
itze
ZFA
Baue
nde
Anschluss Achse 102
Wei
chen
ende
Schn
itt A
chse
501
, Ran
d Üb
erfa
hrt
Schn
itt Ac
hse 5
02, R
and Ü
berfa
hrt
Schnitt Achse 313, Rand Gehweg
Schnitt Achse 312, Rand Radweg
Schnitt Achse 310, Rand Radweg
Gleisentwässe
rungskaste
n
Schnitt Achse 201, Fahrbahnrand
Schnit
t Ach
se 30
0, Vets
chau
er Stra
ße
Schnit
t Ach
se 20
0, Bah
nhofs
traße
Zung
ensp
itze
ZFA
Baue
nde
Weichenende
Anschluss Achse 101
Gleisentwässerungsrinne
Baua
nfan
g
Schn
itt A
chse
200
, Bah
nhof
stra
ße
Gle
isent
wäss
erun
gska
sten
Ansc
hlus
s Ach
se 1
07
Baua
nfan
g
Schn
itt A
chse
200
,, Ba
hnho
fstra
ße
Wei
chen
ende
Ansc
hlus
s Ach
se 1
08
AA
AA
AE
Baua
nfan
g
Baue
nde
Baue
nde
Bauanfang
Bauanfang
Schn
itt Ac
hse
502,
Rand
Übe
rfahr
t
Bauanfang
Bauanfang
Schnitt Achse 300,
Vetschauer Straße
Schnitt Achse 502,
Rand Vetschauer Str.
Schnitt Achse 502, Rand
Vetschauer Str.
Regelquerschnitt 7
RQ 3
Achse 103
Achse 104
Entwässerungsrinneschräg zu den Gleisen DN 175 aus Stahlohne Anschluss an Schienen
0+15
7,83
2
0+48
2,43
4
0+15
4,31
1
RQ 1a
0+48
0,40
40+
145,
834
0+47
0,41
7
0+28
6,86
2
0+27
0,699
RQ 6a
RQ 6
RQ 6
RQ 6a
2 Reihen Natursteinpflaster
TB
TB
TB
TB
TB
TB
TB
TB
TBTB
405
406
411
412
413
414
WB +10
TB 10x25
TB 10x25
WB + 10
WB+10
TB 10x25
TB 10x25
WB+10
WB +10W
B +10
WB +10
WB +10
WB
+10
WB
+10
1:80
0
1:84
3
Baua
nfan
g
Achs
e 10
1
Schienen-entwässerungs-kästen DN 100
Gleisentwässerungskasten
KM=0+083,979
TS=77,865 m
Achs
e 10
2
Achs
e 10
1
Doppe
lteGlei
sentw
ässe
rungs
rinne
DN 35
0
Doppe
lte
Gleise
ntwäs
serun
gsrin
ne D
N 350
Regelquerschnitt 2a
Gleisentwässerungskasten
AE
Regelquerschnitt 2
Baue
nde
0+197,685Haltestellenende
Schnitt Achse 502, Rand ZufahrtSchnitt Achse 420, Achse Zufahrt
0+219,855
KM=0+212,536
TS=76,313 m
H= 1500 m
T= 7,693 m
f= -0,020 m
-2,776 %
0+225,4380+225,088
Weichenanfang
Schienenentwässerungskästen
KM=0+125,602
47,383 m-2,776 %
Schnitt Achse 300,
Vetschauer S
traße
0+27
2,061
0+30
2,80
9Ba
uend
e
Regelquerschnitt 2
0,830 %20,109 m
Weichenende
TS=74,874 m
Gleisentwässerungsrinne
1:2106
1:800
Achs
e 10
2
Achse 104
Achse 103
Gle
isent
wäss
erun
gska
sten
0+44
0,77
5
Wei
chen
ende
0+12
1,34
5
Weic
hene
nde
Gleis
entw
ässe
rung
skas
ten
Gle
isent
wäss
erun
gska
sten
Gle
isent
wäss
erun
gska
sten
KM=0+443,017
TS=75,273 m
39,107 m
-0,800 %
0+12
1,34
5
KM=0+421,224
0+42
1,22
4
-0,800 %55,437 m
Achse 112
Achse 111
Gle
isent
wäss
erun
gska
sten
Achse 106
Achse 105
Weichenanfang
KM=0+123,059
41,01
6 m2,600
%
RQ 3
Achse 102
Achse 101
KM=0+302,809
TS=75,256 m
H= 2250 m
T= 9,563 m
f= -0,020 m
WB +10
0+44
2,27
5
0+11
9,95
4
0+44
6,26
7
H
H
H
H
H
H
H
H
H
74.42
74.94
74.36
74.45
75.11
74.93
75.24
74.71
Tiefbord
Anzeige-tafel
Tiefbord
74.70
76.44
74.99
74.99
74.99
74.99
74.89
74.60
74.88
74.76
74.72
74.28
74.74
74.80
74.78
74.66
74.61
74.66
74.52
74.52
74.57
74.78
74.29
74.90
74.99
75.40
77.64
74.83
74.89 74.90
74.91
74.91
75.21
74.46
74.99
74.6374.54
74.17
74.68
74.67
74.57
74.25
74.6974.71
74.55
74.69
74.18
74.57
74.57
74.57
74.84
74.58
74.72
74.46
74.36
74.54
74.78
75.0
76.47
74.64
74.4
74.63
74.61
SD
Parkplatz
Werbetafel
74.26
74.74
74.67
74.79
Heizleitung
75.00
74.78
74.56
75.03
74.92
75.19
75.06
75.14
75.11
75.15
74.82
ehem. Pf%%246rtner
75.00
74.82
74.95
74.83
74.36
74.69
74.59
74.44
74.52
74.48
74.71
74.52
74.94
74.47
74.48
74.73
74.55
74.52
74.93
78.57
75.27
L%%252ftung
75.52 75.52
76.68
76.58
75.17
75.32
112
74.8
74.80
74.7
74.7
75.2
74.86
75.54
S
74.93
Tb
GE
GE
77.23
74.52
74.39
74.32
75.52
74.60
75.46
74.68
75.4
75.45
74.73
S
BP
75.24
75.96
Hinweistafel
75.62
75.42
75.03
75.47
75.47
74.86
74.57
74.64
74.65
74.89
75.27
75.02
75.58
76.5
76.24
74.12
76.44
76.03
74.31
74.39
75.06
74.70
74.85
75.56
75.7575.73
76.98
75.72
75.70
75.56
77.49
75.67
75.2
Tiefbord
82.48
75.63
75.51
75.33
76.28
76.02
75.59
76.8
Parkfl%%228che
Parkfl%%228che
75.43
75.31
75.68
75.41
74.87
74.79
74.87
74.91
74.81
75.43
74.83
74.79
74.89
74.80 74.84
74.83
74.87
76.53
74.79
76.53
74.54
74.54
75.95
75.94
76.48
75.09
74.76
74.79
75.86
75.86
75.20
75.92
74.84 74.84
76.13
76.16
76.04
76.48
75.26
74.97
75.96
76.7
75.48
GT
GT
76.07
76.47
75.92
76.40
76.6
77.97
75.1
82.30
S
78.72
S
77.01
76.5
76.95
79.90
74.35
74.81
74.48
74.80
75.70
75.75
74.55
74.70
76.44
75.82
75.57
74.94
75.83
74.81
75.7
75.14
Stadtring
74.76
Werbung
74.71
74.72
74.52
74.44
74.66
75.5275.16
75.75
74.66
75.14
75.69
75.05
75.06
74.76
Radweg
75.7
75.60
74.63
74.70
75.07
74.57
74.75
74.74
74.85
74.87
74.70
74.69
74.49
74.63
74.77
74.54
74.64
76.74
76.83
75.47
75.34
74.55
74.93
74.85
74.74
76.34
74.69
75.12
74.95
74.9
74.64
74.50
75.01
BB
BB
75.85
76.62
74.82
74.65
75.03
75.18
75.06
74.96
Parkfl%%228che
75.25
76.45
74.85
74.67
75.79
74.66
74.24
74.72
74.7874.58
75.36
77.27
77.46
75.28
75.67
75.25
75.37
75.01
75.48
74.75
74.42
Fahrschein-automat
75.14
74.36
74.61
82.53
74.84
74.87
74.69
74.90
74.57
74.67
74.96
76.26
74.53
74.50
Apotheke
80.41
80.49
82.24
79.24
77.42
77.51
75.86
75.6675.64
77.56
77.4
77.61
78.71
78.79
79.93
81.20
81.90
81.25
74.64
74.66
74.66
74.58
74.71
81.56
78.52
74.53
74.68
74.49
74.75
74.72
75.41
75.27
WA
74.68
76.37
76.17
75.56
74.78
75.25
BP
74.80
76.39
74.4
74.8774.72
74.77
74.63
75.49
75.78
75.33
75.85
75.43
75.94
75.83
76.07
76.19
75.94
75.96
75.96
75.99
74.62
75.36
75.39
75.27
75.20
75.76
Anzeige-tafel
74.88
75.65
76.19
75.66
74.87
74.38
74.75
74.82
81.87
81.09
76.6
75.72
75.72
76.8
75.5
75.1
75.55
75.3 74.6
75.6
75.53
74.61
74.9475.62
205
101(Wegschäden)Papierkorb
75.33
75.52
75.22
75.18
75.50
74.96
73.88
74.11
74.3
74.12
74.05
73.88
73.73
76.25
73.79
73.93
75.65
75.68
S
76.24
76.38
74.75
74.42 75.42
Gerinne
74.99
74.99
74.50
74.61
74.61
74.68
74.71
74.57
74.81
Gully
74.98
GT
74.65
75.66
75.59
75.68
76.3
75.64
(hellgrau)
75.72
75.0575.18
75.21
Spiegel
74.96
76.42
74.83
74.95
74.80
75.10
75.48
75.24
75.13
75.38
76.15
75.9
76.3
76.476.4
76.2
74.82
75.56
76.5
76.03
75.28
(rot)
75.93
75.93
75.82
75.87
75.93
75.73
75.57
74.92
74.77
75.26
74.78
75.13
74.99
75.08
75.28
76.02
75.33
75.59
76.54
76.04
75.28
75.94
75.93
75.83
75.84
75.88
75.72
75.50
75.51
75.48
75.02
74.66
74.81
75.15
75.23
75.39
75.44
74.71
74.73
75.33
75.27
75.41
74.94
74.68
75.18
75.14
75.49
75.13
75.02
75.10
75.19
75.26
75.12
75.06
75.1775.06
76.2
75.35
75.50
75.54
75.72
82.1482.23
78.33
80.11
80.22
75.52
75.94
75.91
75.50
75.35
75.54
75.23
75.26
76.03
76.03
74.8474.86
74.72
74.7175.0274.81
74.6374.61
SB
74.54
74.80
74.61
75.0075.10
75.12
74.9075.01
74.94
74.79
74.91
75.06
74.74
74.82
74.72
75.24
75.10
74.60
74.83
74.88
75.01
75.11
75.12
75.09
75.12
74.92
74.8074.88
75.21
76.02
76.03
74.69
75.31
75.41
Tiefbord
74.37
74.22
74.44
74.55
74.64
74.53
74.64
74.66
74.42
%%220E
74.63
GT
GT
75.57
75.57
75.5775.55
74.73
74.66
75.05
74.65
75.26
74.55
76.08
74.60
74.79
74.82
74.73
74.43
74.91
74.28
74.56
Gerinne
74.72
74.80
74.71
74.72
74.90
74.94
SD
74.97
S
75.36
75.9974.55
74.93
74.69
74.70
74.00
73.97
75.57
75.50
75.22
75.95
75.12
76.39
BP
(Lichtgitter)
76.13
75.78
75.90
75.42
75.72
75.74
74.76
75.71
75.56
75.49
74.80
74.77
75.55
75.52
76.39
75.20
75.70
75.96
75.83
75.36
74.58
76.03
76.16
75.73
75.89
75.69
75.97
75.83
76.00
75.76
76.25
76.15
76.16
75.95
T%%252r
T%%252r
76.06
76.22
75.29
76.26
76.32
76.47
76.61
75.00
75.97
76.17
76.02
76.47
76.17
75.21
76.47
76.27
76.35
76.34
Tiefbord
74.98
76.65
76.52
76.76
76.65
76.80
76.36
76.38
76.37
76.96
76.94
77.03
77.09
77.10
77.91
77.40
77.4
76.44
77.54
74.88
74.98
75.02
75.31
76.20
76.28
75.98
(hellgrau)
77.01
74.65
74.78
74.68
74.64
74.63
551-22
74.76
74.63
76.42
76.49
75.04
74.95
74.92
BP
75.05
75.06
75.02
74.94
75.10
75.40
75.04
74.69
76.1
75.28
75.6
GT
82.61
81.8
81.4
79.7
76.0
76.31
78.3 79.5
77.4 78.2
74.71
76.56
76.03
PB
PB
76.71
82.42
75.42
74.63
75.10
74.82
74.97
75.73
76.97
75.5275.53
75.53
75.56
75.56
WE
WE
74.57
74.41
WE
75.66
75.73
75.52
WE
ZE
S
75.24
75.04
74.39
Vignolschiene
79.70
80.9
75.39
75.20
82.59
82.86
75.72
KA ZE
WA
75.05
Werbe-tafel BP
S
GT
76.55
74.80
76.25
VI
74.9
Pflanz-fläche
BP
BP
73.94
74.8
74.56
76.28
75.38
74.93
75.13
76.28
74.68
S
74.40
74.33
76.64
76.40
76.30
76.98
76.57
78.43
76.47
76.65
76.56
76.50
76.26
76.42
76.23
76.34
76.16
76.16
76.23
76.34
76.26
76.39
76.35
76.49
76.85
76.97
76.88
74.97
74.7
74.9
74.9
74.9
75.10
75.08
75.1975.27
75.29
Trasse Bahnstromversorgung 15kV
75.41
75.4
75.5
75.6
76.26
Trasse Bahnstromversorgung 15kV
76.82
77.01
75.58
75.49
75.25
76.92
76.88
79.34
76.49
75.30
76.2
77.43
77.31
77.23
77.13
77.20
76.06
75.66
77.06
77.18
77.11
77.20
79.8
74.82
76.71
75.91
76.53
77.20
74.84
77.1977.31 77.1377.25
77.37
77.26
75.77
75.68
75.05
75.11
75.12
75.12
75.13
77.27
75.17
75.15
77.36
I
75.24
75.25
75.24
75.24
75.20
75.26
anthrazit
75.2975.27
75.29
75.30
75.31
75.29
75.28
75.37
75.37
75.35
75.34
75.32
75.36
75.35
75.36
75.32
75.39
75.40
75.39
75.38
75.38
75.38
75.40
75.41
77.40
75.46
75.50
75.52
75.53
75.59
75.56
77.03
77.15
73.89
84.28
84.08
76.19
76.18
76.20
76.19
76.21
76.20
76.18
76.23
76.22
76.2276.22
76.23
76.2176.21
76.90
76.78
83.95
83.51
76.62
76.47
76.50
76.36
83.64
76.42
76.69
76.56
76.54
76.13
76.27
76.39
83.14
82.97
82.9682.74
76.45
77.19
76.40
76.24
76.82
76.69
76.67
76.80
76.81
76.92
81.62
77.02
77.32
77.46
77.25
77.39
77.20
77.44
77.27
77.40
76.14
76.24
76.43
76.31
76.13
76.39
76.55 76.58
76.58
76.55
76.41
76.25
82.87
82.83
82.86
S S
84.35
84.35
84.12
83.95
83.51
83.65
83.10
82.98
82.72
82.88
82.87
S
82.25
81.91
82.00
80.2780.18
Parkfl%%228che
BB
74.34
74.45
74.99
77.09
76.7876.94
76.92
76.56
76.48
76.33
76.26
76.71
75.42
76.18
74.94
74.51
74.62
74.81
74.70
75.31
S
74.70
75.24
75.51
75.58
75.4675.75
75.62
76.44
76.43
76.56
76.57
76.57
75.68
75.55
75.39
74.00
BP
75.2
79.1779.08
75.0
75.0
76.46
76.36
76.15
74.64
BP
75.11
75.02
74.82
74.67 74.7074.66
74.6374.50
74.32
74.52
74.26
74.11
74.95
75.93
75.16
74.90
74.93
74.93
74.88
74.87
74.84
75.04
74.95
74.90
74.75
76.42
ZA
ZE
WA ZA
75.32
75.34
75.20
75.38
Fahrplan
75.37
75.28
75.30
75.28
75.29
75.32
75.27
75.23
75.20
75.32
74.98
75.12
75.38
75.64
75.36
75.26
75.51
75.5375.41
75.27
75.23
75.30
75.55
77.3
76.3
75.40
75.30
75.31
75.21
75.80
75.88
75.48
75.40
75.29
75.38
75.57
75.60
75.63
75.29
75.16
75.39
75.44
75.33
74.7
74.90
74.73
74.65
74.31
74.67
74.34
74.49
74.34
74.56
74.73
74.64
74.63
74.4
74.3
74.70
74.38
74.52
GT
GT
74.41
74.21
74.58
74.18
74.42
74.20
74.17
74.19
76.49
75.36
76.13 76.06
76.17
76.00
75.96 76.14
76.28
76.61
76.69
76.50
76.59
76.5776.64
76.67
76.4176.3576.27
76.16
76.57
76.65
74.36
75.1
74.9
75.33
75.29
75.26
75.12
75.25
75.11
75.19
75.44
75.55
75.31
75.52
75.49
75.54
75.55
75.36
75.33 76.44
75.11
75.14
75.48 75.41
76.38
77.11
77.33
76.48
76.26
73.51
76.46
75.17
75.18
75.25
75.24
75.30
75.37
75.38
75.35
75.36
75.39
75.42
75.31
75.46
75.51
75.31
75.41
75.50
75.34
75.20
75.17
75.32
75.40
76.39
76.47
76.34
76.42
76.32
76.22
76.26
76.20
76.25
76.21
76.21
76.24
76.20
76.40
76.40
76.3876.36
76.41
76.29
74.23
76.22
76.21
76.30
76.28
76.47
76.10
76.23
76.09
76.42
76.48
76.76
76.83
76.67
76.77
76.84
74.80
76.90
77.09
77.16
77.05
76.56
76.68
75.25
74.76
76.47
74.86
74.83
76.08
S
74.3
74.71
74.70
74.81
75.06
74.79
74.82
76.56
76.37
74.99
74.86
75.19 Fahrplan
Werbefl%%228che
75.25
75.15
75.28
74.57
74.98
74.44
74.39
74.32
74.82
75.30
75.07
74.64
74.72
74.52
74.69
74.66
74.68
74.84
74.67
74.47
74.51
74.53
74.48
74.59
74.74
74.69
74.69
74.65
74.76
74.64
74.51
74.70
74.77
74.76
grau rot
76.06
Schp
H
75.63FH
75.50
H
74.90
75.28
75.21
Vetschauer Stra%%223e
76.6
75.8
76.4
75.7
75.25
75.8
76.1
77.01
77.50
76.50
BP
FF
Vetschauer Stra%%223e
V
18A
18B
18C
Vetschauer Stra%%223e
Wasserturm
(2)
R%%228schener Stra%%223e
III
46
IV
2
IV1
IV
14
75.98
13
II
12
XIII
11A
11B
VII
136
II
II
10
II
VII
135
VI
75.77
FH
H
FH
75.66
FH
74.43
74.39
74.67
74.47
H
75.85
Stadtring
Bahnhofstra%%223e
Bahnhofsgebäude
70
I
(3)
(4)
(5)
(6)
(7)
(2)
I
75.26H
Hauptpostamt
69
(4)(3)
(5)
17
III
(2)
(P874)
grau
BP
Umkleidekammer
BB
SB
SB
Aufzug
BB
74.63
75.65
BP
74.16
75.27
SD
W
74.57
BB
BP
75.54
SD
BB
SB
BB
GT
74.60
BB
SD
BP
BG
(grau)
W
75.51
BP
BP
W
W
PB
W
KP
W
(Rohbau)
SB
BB
Gummifahrbahn
BB
75.5
74.90
BB
KP
BB
75.50
PB
BB
F
F
F
Radweg
F
Radweg
S
Schaltschrank
76.42
BP
76.35
81.71
F
F
F
F
F
F
Bord
F
F
F
FF
F
F
F
F
F
F
F
F
F
F
BB
82.90
BB
BP
SB
PB
PB
F
Hinweistafel
F
F
F
PB
(rot)
F
F
74.88
74.89
75.07
S
S
75.00
75.00
75.12
74.67
74.77
74.80
75.08
74.95
74.95
S
S
75.01
74.95
75.01
75.08
75.08
74.78
74.95
75.12
F
74.60
74.66
PB
SB
75.52
75.49
BP
75.59
75.50
BB
Bahnsteig
PB
BP
BB
BB
10
F
F
F
82.90
Schotterbett
BB
Radweg
PB
W
74.79
Schilderbr%%252cke
SB
SB
W
BP
W
Fw
74.43
W
W
W
SB
PB
W
SB
BP
BP
FH
75.10
74.91
74.79
BP
PB
Bahnsteig
PB
W
BB
BB
PB
BB
Thiemstra%%223e
W
BP
W
BB
W
W
76.36
SB
Tiefbord
unbef.
W
SB
BP
BB
unbef.
Werbetafel
Anlagen der Deutschen Bahn AG
BB
BP
KP
74.81
PB
W
BB
unbef.
BP
BP
74.96
BP
BP BP
Fuge / Br%%252cke
grau
Haltestellenbereich
74.4
BP
S
BB
73.58
73.76
76.3
BP
BP
SB
BP
BP
W
BP BP BP
BP
BP
BP
PB
PB
BB
BB
PB
Thiemstra%%223e
W
PB
BB
BP
BB
75.05
BB
Thiemstra%%223e
74.34
BB
BB
KP
BP
PB
PB
BP
W
PB
PB
BP
PB
BP
BP
BB
W
W
BP
BP
PB
BP
G
W
W
BP
BP
BP
SB
PB
BP
SB
BP
PB
SB
PB
KP
W
W
W
G
SD
74.56
SB
BB
SB
unbef.
BP
SB
PB
Fu%%223weg
Radweg
PB
PB
BB
BB
Fu%%223weg
BP
PB
BP
PB
BB
Vetschauer Stra%%223e
BB
PB
PB
BP
PB
PB
PB
75.16
BP
BB
BB
W
PB
W
BP
BP
PB
BP
PB
BP
74.97
BP
76.43
Werbe-tafel
75.22
74.29
74.28
74.69
Radweg
BB
G
Radweg
BP
PB
PB
BP
Radweg
Radweg
Radweg
SB
PB
BP
Radweg
Radweg
Radweg
Bord
74.55
76.28
PB
75.70
74.14
74.33
74.27
Radweg
Radweg
Radweg
Radweg
Anlagen der Deutschen Bahn AG
SB
BP
BP
PB
Radweg
BB
W
75.11
BB
grau
BP
Hotel Radisson Blue
P%%252cklerpassage
Gerinne KP
BP
PB BP
PB
PB
PB
PB
KP
PB
BP
BP
BB
PB
PB
BP
KP
BP
BP
Radweg
BP
74.72
75.02
75.25
Werbefl%%228che
GT
75.03
75.00
SB
n.a.
Mo
Fuge / Br%%252cke
75.61
75.62
BP
BB
BP
SB
BP
BB
BB
BB
BB
BP
BP
BP
BP
BP
BP
75.14
BP
Vetschauer Stra%%223e
BP
W
76.03
unbef.
BP
BB
W
W
PB
BB
G
W
W
W
BB
PB
BB
PB
BP
PB
BB
BP75.20
75.84
BB
74.31
74.45
PB
PB
Werbetafel
75.64
75.62
75.15
81.071. Stufe
77.52
75.60
75.00
BP
PB
79.41
PBPB
PB
(grau)
BP
74.61
75.55
GE
GE
GE
74.80
GE
BB
Bahnsteig
PB
W
PB
W
SB
BP
BB
KP
BB
BP
BP
PB
BP
75.29
KP
PB
PB
PB PB
BP
PB
PB
WWW
W
GP
W
G
GW
W
BP
BP
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
W
76.46
PB
W
W
PB
PB
PB
PB
BB
BB
BB
BB
SB
SB
SB
SB
W
W
W
SB
BB
BP
75.02
Schilderbr%%252cke
G
W
n.a.
T%%252r
W
anthrazit
3 Behindertenstellplätze
SD
SB
S
BB
PB
KP
BP
KP
Bord ebenerdig
BP
BP
BP
Schilderbr%%252cke
G
BP
Mo
Mo
Mo
Mo
Sitzstein
74.82
GT
GE
80.75
76.90
79.07
80.74
79.06
Bord
OK75.95
PB
75.54
74.93
75.27
75.49
75.76
75.57
75.59
OK75.94
OK75.45
OK75.90
75.08
75.78
Radweg
BP
74.64
75.23
75.89
75.49
75.88
75.53
75.61
75.57
BB
75.65
75.65
75.66
PB
74.81
Verkaufseinrichtung
75.5
75.52
B%%252rogeb%%228ude
Radweg
Gerinne
76.34
74.51
anthrazit
anthrazit
anthrazit
73.92
anthrazit
73.97
75.68
74.45
Pflanzfl%%228che
SD
75.1
74.57
SD
BP
grau
75.9
BP
74.57
74.7
grau
Bahnhofstra%%223e
74.88
74.71
75.38
75.48
76.58
73.98
Bord
Werbetafel
anthrazitgrau
VI
74.60
SD
74.78
Parkfl%%228che
74.35
Tor
551-22
75.26
74.08
BP
Pflanz-fläche
75.15
75.08
75.22
BP
75.51
75.46
75.49
75.16
75.08
74.9074.89
74.6
74.8
74.93
74.89
74.75
74.77
74.73
74.8
Pflanz-fläche
Pflanz-fläche
74.62
74.43
74.1
grau
75.1
BP
76.03
75.89
BP
BP
KPWerbe-tafel
74.3
anthrazit
BP
73.93
73.79
73.66
73.7 73.8
73.94
73.87
74.50
BP
BP
grau
anthrazit
73.93
73.87
74.80
74.09
74.03
grau
grau
grauBP
rot
rot
grau
grau
anthrazit
Klingel-und Sprech-anlage
Pflanzfl%%228che
76.35
Bord
73.68
73.81
73.90
BP
74.95
grau
75.11
75.29
Pflanz-fläche
4 Stellpl%%228tze
4 Stellpl%%228tze
4 Stellpl%%228tze
Pflanz-fläche
75.11
grauBP
GE
74.71
grau
74.95
GE
GE
75.2875.12
75.11 75.15
75.16
75.16
75.15
GT
GT
75.19
75.20
75.25
75.25
75.24
GT
75.29
75.29
75.32
75.32
75.36
75.36
75.36
75.36
75.32
75.32
75.29
75.29
75.43
75.43
75.42
75.42
75.47
75.47 75.49
75.49
75.52
75.52
75.55
75.55
75.54
75.54
75.51
75.52
75.49
75.49
75.46
75.47
75.56
75.57
75.58
75.58
75.5775.56
75.56
75.56
75.57
75.57 75.58
75.58
75.58
75.58
75.58
75.58
75.58
75.57
75.58
75.57
75.58
75.58
75.58
75.58
Weichen-antrieb
Weichen-antrieb
GT
GE
GE
GT
Weichen-antrieb
Weichen-antrieb
GT GT
GT
75.4875.49
75.4975.49
75.49
75.48
75.49
75.50
75.50
75.50
75.49
75.49
75.50
75.50
75.50
75.51
75.55
77.47
77.44
77.6
75.55
75.55
75.56
75.53
75.51
75.42
75.49
75.49
75.50
75.51
75.57
75.57 75.57 75.54
75.56
75.56
75.48
75.48
75.46
75.46
KA
S
75.37
75.3775.33
75.33
75.33
75.32
75.46
75.45
75.46
75.47
75.48
75.48
75.5075.50
75.44
75.43
75.42
75.42
75.41
75.41
75.33
75.32
75.32 75.31
75.3175.32
75.32
75.3175.32
75.31 75.30
75.30
SS 75.2875.2875.27
HS
75.3475.33
75.3775.37
S
S
KE KE KE
75.3175.31
KA
S
75.31
S
75.33
75.33
75.3175.30
75.3075.30
75.32
S
WE
HS
75.31
75.31
75.19
75.0275.01
75.01
75.02
75.01
75.12
75.13
75.22
75.22
75.04
75.04
75.25
75.25
75.21
75.2175.33
75.33
75.3875.39
WA
ZA
WA
ZA
WE
WE
WE WE
%%220E
75.00 75.01
75.30
75.24
75.28
75.24
75.40
75.28
75.39
75.39
75.49 75.5075.49
75.49
75.55 75.5575.5575.55
75.49
75.49
SS
75.5075.50
75.45 75.45 75.45 75.45
GT GT
75.70
75.70
75.71
75.73
75.73
ZEZE
75.74
75.77
75.81
75.81
75.78
75.99 76.00 76.0076.00
76.2076.20
76.2176.21
76.47
76.48
76.5376.52
76.53
76.76
76.77
76.76
76.79
76.7476.75
76.76
76.76
77.0677.06
77.17 77.17
77.61
77.61
77.52
77.52
78.05
78.06 78.0478.04
78.51 78.52 78.52 78.52
GE
GE
GT
BB
75.85
75.73
77.4
KA
%%220A
HSHS
HS
HS
HS
HS HS
HS
HS
HS
HS
S
HS
HSHSHS
HS
77.4
76.31
76.5
76.6
76.57
76.2 76.3 76.62
76.86
Kamera
76.5
77.277.10
76.91
77.00
77.0277.22
76.28
76.90
77.01
76.9377.04
77.1777.07
77.1
76.94
76.6 78.4
76.6
76.8
76.8
78.2
77.1
81.50
79.1
78.2
SB
77.4
74.47
82.2
75.59
75.66
75.58
80.7
Tiefbord
74.49
74.61
74.53
74.49
77.42
75.9
76.0
75.8
76.2SD
BP
BP
BP
PB
Granitstufen
76.28
77.49
77.49
79.22
79.20
80.91
80.89
82.73
82.59
80.78
79.19
SB
OK 82.57
OK 80.94
OK 80.91
OK 79.34
OK79.21
OK77.70
OK 82.64
OK 80.95
OK 80.90
OK 79.26
OK 79.23
OK 77.74
OK 77.73
82.96
82.83
(hellgrau)
(rot)
75.5
75.5
75.4
75.90
75.52
75.62
75.63
75.58
75.77
75.52
75.29
75.15
74.89
74.80
74.89
74.9
74.94
74.73
74.63
74.46
74.41
74.26
74.36
75.65
75.0
75.0
74.6
74.57
74.40
74.16
73.98
74.13
74.00
73.85
74.02
74.21
74.4
74.2
73.96
74.15
74.25
74.49
74.32
75.61
74.32
74.49
74.03
74.14
74.36
74.19
75.8
74.18
74.38
Rillenschiene
GE
74.68
75.06
74.3
74.1
74.65
74.58
74.48
74.39
74.49
74.54
74.59
74.49
74.37
74.28
74.38
74.44
75.71
75.58
74.8
75.374.6
75.6
75.5
BB
BB
Parkfl%%228che
75.8
75.0
Parkfl%%228che
Parkfl%%228che
BB
76.74
74.8
75.575.55
75.66
75.56
74.70
74.83
74.60
74.80
74.7174.71
74.66
74.75
Anzeigetafel
Anzeige-tafel
74.48
74.56
74.29
74.40
74.59
74.59
74.95
74.89
74.86
74.89
74.72
74.72
74.71
74.71
74.89
74.85
74.98
74.71
74.80
75.00
75.05
74.88S
74.85
75.03
74.99
75.08
75.08
75.02
75.14
S
GE 74.61
74.60
75.05
75.09
75.19
75.08
75.15
75.08
74.97
75.14
75.02
75.03
75.15
75.05
75.06 75.06 75.01
75.09
75.08 75.07
75.28
75.26
75.36
75.45
75.3875.32
75.30
75.32
75.29
75.36
75.29
75.32
75.32
75.35
75.40
75.38
75.44
75.32
75.32
75.32
75.31
75.33
75.39
75.46
75.42
75.32
75.17
75.26
ZE
75.67
75.53
75.44
75.87
75.33
75.28
Tiefbord
75.58
75.60
75.62
75.41
74.95
74.99
74.86
75.50
75.57
75.75
75.19
75.22
75.24
75.31
76.2
75.50
76.1
75.46
75.48
75.45
75.41
75.45
75.47
75.39
75.40 75.38 75.29
75.30
75.29
75.35
75.61
75.77
75.52
75.23
75.4075.26
75.23
75.34
75.27
75.34
75.93
75.67
75.30
75.88
75.75
75.50
75.66
76.16
75.44
75.23
75.07 75.01
74.87
75.31
74.99
75.24
75.04
76.32
76.53
75.27
76.4
75.28
75.3475.20
75.15
76.0
75.16
S
75.23
Anzeige
Anzeige
75.30
74.94
(hellgrau)
(rot)
75.9
(hellgrau)
(hellgrau)
75.30
75.32
75.30
75.12
75.06
75.17
75.00
74.90
74.85
75.00
75.06
75.12
75.0
75.66
75.79
75.76
75.18
75.15
75.17
75.21
75.55
75.54
75.7
75.21
Ok 75.68
Ok 75.70
Ok 76.02
Ok 75.70
Ok 76.02
Ok 76.01
Ok 75.71
Ok 75.69
Ok 76.02
Ok 76.01Ok 76.04
Ok 75.69
74.92
74.86
75.05
74.96
74.78
74.88
74.93
Tiefbord
75.01
75.70
75.22
75.72
75.7
Ok 76.04
Ok 76.02
Ok 76.02
Ok 75.70
Ok 75.67
BP
(hellgrau)
75.63
74.71
74.71
75.82
75.74 75.68
75.74
75.80
75.67
75.76
75.73
75.78
75.75
75.75
75.79
75.76
75.72
75.66
75.66
75.36
75.28
75.27
75.60
75.69
75.48
75.5875.57
75.49
75.57
75.66
75.67
75.57
75.58
75.66
75.41
75.26
OK 76.01
(hellgrau)
75.47
75.49
75.46
(rot)
75.57
75.66
75.66
75.58
75.56
75.66
75.44
75.30
75.39
76.53
75.98
76.01
75.8
76.02
75.79
75.62
75.8676.00
75.76
75.60
75.43
75.35
75.39
75.40
75.45
75.33
PB
74.86
74.97
75.14
75.27
75.07
75.00
75.09
Werbetafel
BP
(grau)
76.12
79.24
75.98
79.15
Tb
75.83
75.68
(hellgrau)BP
(rot)
75.88
75.85
75.74
75.70 75.63
75.80
75.52
75.52
75.4874.78
75.88
75.87
76.05
76.16
76.26
76.27
76.74
76.6076.71
76.85
76.74
76.60
76.37
76.50
76.64
76.7
76.44
76.57
76.87
77.01
77.03
76.87
76.72
76.91
76.86
77.16
77.02
77.26
77.13
76.8977.01
77.16
77.04
76.89
77.02
76.60 76.74
76.5476.50
76.80
76.79
76.02
79.31
76.22
76.4
76.80
76.68
76.76
76.64
76.88
76.94
77.04
77.0076.96
76.96
76.83
76.82
77.2677.21
77.10
76.9076.89
76.79
76.76
76.71
76.63
76.51
76.50
76.38
76.44
76.35
76.46
76.55
76.43
76.66
76.56
76.2
76.27
76.1676.28
75.88
76.1476.17
75.99
76.25
76.35
75.94
76.10
76.20
75.97
76.1676.16
76.25
76.22
76.65
76.53
76.58
76.40
76.88
76.76
75.88
75.82
75.33
(hellgrau)
BP
OK 76.46
75.17
75.76
75.82
75.91
76.00
75.99
75.32
75.99
75.85
75.99
75.82
76.0876.04
76.12
BP
SB
74.81
74.88
76.02
76.0876.16
76.27
76.35
76.00
76.22
76.13
76.39
76.23
76.14
76.30
76.33
76.29
76.14
76.38
76.04
76.09
76.14
75.10
(hellgrau)
(hellgrau)
(hellgrau)
OK 76.68
76.36
76.39
76.04
76.19
76.32
76.07
76.21
76.19
76.02
76.24
76.35
76.49
76.48
76.32
76.37
76.52
76.30
76.11
76.06
76.21
76.25
76.08
76.44
76.54
76.55
76.53
76.5676.10
SD
76.12
76.23
76.17
76.46
76.3176.72
76.84
76.76
76.59
76.76
76.69
76.56
76.39
(hellgrau)
76.53
76.41
76.55
76.9376.3
76.8
(hellgrau)
BP
(anthrazit)
Fahrradst%%228nder
Fahrradst%%228nder
77.37
77.38
77.36
77.2
77.25
77.26
75.8
75.6
75.7
77.1
75.8
77.375.7
76.9
76.5
PB
BB
77.1676.95
77.08
76.08
76.18
75.67
75.69
76.80
77.08
77.11
77.0
77.11
77.07
Werbetafel
Werbetafel
Trasse Bahnstromversorgung 15kV
Trasse Bahnstromversorgung 15kV
%%220berdachung
75.7
76.0
75.7
76.3
75.8
76.3
75.8
75.4
75.5
75.5
75.6
76.9
76.9
75.5
75.6
76.5
76.51
76.68
Fahrradst%%228nder
76.27
76.31
75.5
75.7 76.0
76.2
UK 79.17
76.28
76.15
76.26
75.56
Dach 80,4
76.35
(hellgrau)
76.46
76.47
76.4176.36 76.23
76.40
76.47
76.36
OK 76.95
76.28
76.36
76.14
75.13
75.28
76.27
76.14
OKF 76.46
T%%252r
76.09
75.07
75.11
OK 76.68
OK 76.51
OK 76.43OK 75.98
OK 76.45
OK 76.63 OK 76.45OK 76.22
OK 76.22
OK 75.85
OK 75.86
75.19
75.35
75.21
75.68
75.53
75.99
75.85
Rollstuhlrampe
75.50
75.4575.44
75.56
PB
75.28
76.02
75.91
76.18
75.88
75.99
76.31
75.17
75.5
173
75.84
75.96
75.90
ZigarettenAutomat
(grau)
(grau)
(rot)
(rot)
75.09
75.16
75.27(hellgrau)
74.97
74.98
74.88
74.96
OK 75.57
OK 75.57
74.87
OK 75.56
74.98
74.98
74.93
74.88
OK 75.58
OK 75.58OK 75.58
75.1075.28
75.10
75.08
76.26
75.0274.90
BP
75.66
75.67
74.9
74.78
74.58
74.61
74.69
74.67
75.12
74.65
74.76
75.01
75.19
74.67
74.70
75.02Tiefbord
74.82
74.94
74.51
74.67
74.67
74.53
74.64
74.73
74.83
74.86
74.80
74.91
74.95
75.12
74.64
74.77
74.74
74.65
74.64
74.6474.65
74.76
74.75
74.6474.63
74.63
74.64
74.74
74.82
74.99
75.06
75.26
74.64
74.82
74.82
75.10
74.51
74.70
74.72
74.89
74.98
74.78
74.69
74.8774.52
74.48
75.20
75.01
75.01
75.20
74.79
74.98
75.21
75.16
74.77
75.25
75.29
75.20
75.15
74.99
74.99
74.86
75.02
74.90
75.06
74.83
74.93
74.86
74.85
74.72
74.99
74.87
74.86
74.74
74.92
75.05
75.12
75.11
75.25
75.29
75.34
75.50
75.55
75.32
76.2
75.68
L%%252ftung
L%%252ftung
75.17
Kettenabsperrung
Kettenabsperrung
Kettenabsperrung
Rampe
Rampe OK 76.43
OK 76.45
OK 75.50 Zaunsockel
OK 75.45 Zaunsockel
OK 75.46 Zaunsockel
OK 75.50 Zaunsockel
OK 75.14 1. Stufe
74.97
75.33
75.37
75.24
75.34
75.24
75.22
75.24
75.30
74.94
74.67
PB
75.27
74.68
74.87
74.76
74.77
74.64
74.62
74.8
75.3
75.2
75.17
74.92
74.7874.8474.88
75.04
75.04
PB
BP
74.94
75.03
74.98
Poller
74.74
74.77
75.1
75.2
75.19
75.11
75.02
75.1775.21
75.1275.25
75.56
75.53
75.41 75.37 75.34
75.32
75.28
75.29 75.20 75.30
75.25
75.32
75.37
75.30
75.41
75.44 75.40
75.34
75.45
76.42
76.68
75.44
75.46
75.2875.3775.4375.50
75.47
75.43
75.46
75.6
75.66
76.61
76.31
76.59OK 78.60 76.70
76.66
75.34
75.64Ok 76.64
Ok 76.58
Ok 76.56
Ok 76.36
75.88
Trasse Bahnstromversorgung 15kV
75.19
75.31
75.32
75.37
75.36
75.35
75.34
75.35
75.34
75.37
75.36
75.35
75.38
75.36
75.37
75.37
75.36
75.36
75.36
75.37
75.38
75.40
75.40
75.32
75.31
75.35
75.33
75.33
75.33
75.31
75.32
75.29
75.1
75.2
75.2
75.3
75.2
75.4
75.3
75.3
75.3
75.1
75.2
75.1
75.2
75.2
75.3
75.2
75.1
75.2
75.2
75.2
75.2
75.2
75.2
75.2
75.4
76.43
75.31
76.44
76.44 76.46
75.32
76.46
76.46
76.45
75.36
75.37
76.45
76.44
75.34
76.47
76.44
75.38
75.38
76.45
76.44
75.3476.47
76.44
76.44 76.46
76.44
75.5
75.6
75.5
75.7
SB
SB
SB
SB
Rampe
76.34
76.17
76.17
76.16
76.17
76.34
Trasse Bahnstromversorgung 15kV
75.1
74.68
74.55
74.52
74.60
74.68
74.65
74.48
74.67
74.78
74.9
74.6
74.7
74.66
OK 75.02
OK 75.03
74.76
74.80
PBOK 75.01
74.4
74.71
74.72
74.60
74.70
74.66
74.63
74.3
74.2
Fallrohr
Fallrohr
Fallrohr
74.8374.82
74.8274.82
74.8274.8174.8274.82
74.81 74.81
74.82
OK 74.841.Stufe
Eingang
74.80
74.9
74.48
74.92
UK 74.71 Kellerfenster
74.45
74.48
UK 74.71 Kellerfenster
74.31
74.35
UK 74.70 Kellerfenster
74.85
UK 74.71 Kellerfenster
74.42
74.47
UK 74.72 Kellerfenster
74.2774.60
(H%%246he Kellerfenster 0,46m)
(H%%246he Kellerfenster 0,46m)
(H%%246he Kellerfenster 0,46m)
(H%%246he Kellerfenster 0,46m)
(H%%246he Kellerfenster 0,46m)
74.78
74.61
74.59
74.62 74.64
Schacht
Schacht
Schacht
74.67
75.22
74.58
74.62
74.69
75.2375.0574.87
74.7274.8975.0675.23
74.64
SB
74.60
74.66
74.52
74.52
74.48
74.48
74.49
74.49
74.52
74.51
74.51
74.51
74.51
74.51
74.49
74.49
74.49
74.53
74.49
74.49
74.49
74.52
74.52
74.71
74.71
74.71
74.71
74.85
74.85
74.84
74.85
74.51
74.22
74.15
74.31
74.38
74.48
74.51
74.47
74.33
74.52
74.61
74.62
74.51
74.52
74.62
74.34
74.28
74.44
74.47
74.50
74.62
74.50
74.58
74.55
74.66
74.674.8
74.9
74.77
74.58
74.49
74.56
74.7
74.63
74.56
74.53
74.47
74.14
74.28
74.23
74.56
74.57
74.58
74.57
74.54
74.54
74.54
74.53
Parkhaus
Kettenabsperrung
74.84
75.3
74.79
74.88
74.92
74.76
75.12
75.22
75.12 75.14
75.27
75.22
75.11
PB
75.0
75.0
75.29
75.37
75.5
75.6
75.44 75.30
75.23
75.25
75.14
75.20
75.06
75.10
75.21
75.22
75.35
75.36
75.22 75.14
75.18
75.32
75.19
75.22
75.11
75.58
75.45
75.51
75.38
75.46
74.50
75.43
75.57
75.44
74.60
75.28
75.43
75.42
75.32
75.44
W
75.21
75.34
75.25
PB
75.0
75.0
75.0
SB
75.02
74.43
74.87
74.70
74.59
74.59
74.60
74.60
S
S
S
S
74.63
74.62
74.62
74.61
74.63
74.63
74.63
74.63
74.58
74.38
74.52
74.47
74.53
74.68
74.62
74.69
74.70
74.61
74.59
74.69
74.69
74.59
74.81
74.74
74.62
74.55
74.50
74.56
74.52
74.48
74.64
74.52
75.09
75.04
74.44
74.56
74.79
74.67
74.7
74.7
74.7
74.63
74.63
74.66
74.66
GE
GE
BE/%%220A
S
74.75
74.65
74.66
74.68 74.64 74.74
74.65
74.73
74.64
74.65
74.74
74.80
74.66
74.69
74.8074.79
74.82
74.66
74.72
74.63
74.60
74.64
74.7
74.62
74.63
74.54
74.54
74.68
74.86
74.7274.7
74.8
74.9
74.9
74.87
74.67
74.96
74.82
Tb
74.70
74.71
74.56
74.71
74.72
74.80
74.67
74.73
74.75
74.64
74.79
74.76
74.71
75.23
75.01
75.08
75.27
75.50
75.32
75.89
75.9
75.9
75.88
75.78
76.0
BB
79.391. Stufe
77.661. Stufe
Gerinne
Gerinne
Gerinne
Bord
Bord
75.1
BP
OKF 76.46
Gerinne
74.76
74.80
Gerinne
Gerinne
Gerinne
Gerinne
Gerinne
Gerinne
76.61
76.34
S
S
S
S
S
S
S
S
GE
GE 74.47
74.46
S
S
S
S
74.48
74.49
74.50
74.49
74.51
74.50
74.51
74.51
74.48
74.48
74.48
74.48
74.52
74.52
74.51
74.52
74.58
74.58
74.58
74.58
74.63
74.64
74.63
74.64
74.51
74.49
GE
GE
S
S
S
S
74.50
74.51
74.50
74.51
74.52
74.52
74.52
74.53
74.52
74.52
74.53
74.53
74.53
74.53
74.53
74.53
S
S
S
S
S
S
S
S
74.54
74.55
74.55
74.55
74.55
74.55
74.54
74.54
74.58
74.58
74.58
74.58
74.56
74.56
74.56
74.56
74.56
74.56
S
S
S
S
GE
GE
S
S
S
S
74.57
74.57
74.58
74.58
74.59
74.59
74.60
74.60
74.60
74.60
74.60
74.60
74.61
74.61
74.61
74.61
74.58
74.60
GE
GE
SchaltschrankBahnstrom
SchaltschrankLSA
74.61
74.60
74.74 74.62
74.62
74.62
74.62
74.63
74.63
74.62
74.63
74.63
74.64
74.63
74.63
BA
S
S
S
S
BA
GE
GE
74.64
74.63
74.64
74.64
74.66
74.67
74.66
74.66
74.65
74.64
74.65
74.65
74.65
74.65
74.64
74.63
74.64
74.64
74.64
74.64
74.63
74.64
S
S
S
S
GE
GE
74.63
74.67
74.63
74.63
74.66
74.68
74.67
74.67
74.64
74.64
74.64 74.64
74.6474.64
74.65
74.66
74.64
74.64
S
S
S
S
S
S
S
S
S
S
S
S
74.63
74.63
74.62
74.6274.59
74.59
74.63
74.6374.63
74.62
74.63
74.60
74.60
BE/%%220A S
S
S
74.63
74.64
74.62
74.63
74.62
74.62
74.62
74.63
74.59
74.59
74.58
74.58
74.55
74.55
74.55
74.56
74.55
74.56
74.56
74.57
74.57
74.62
74.62
74.61
74.61
S
S
S
S
GE
GE
74.64
74.63
74.64
74.67
74.67
74.66
74.66
74.63
74.63
%%220E
74.71
74.71
74.70
74.69 S
S
S
S
74.81
74.81
74.81
74.81
74.94
74.94
74.93
74.93
S
S
S
S
75.05
75.05
75.05
75.05
S
S
S
S
S
S
S
S
75.26
75.26
75.26
75.26
75.25
75.20
75.20
75.15
75.16
75.14
75.15
75.35
75.35
75.36
75.36
75.45
75.45
75.46
75.46
S
S
S
S
S
S
S
S
S
S
S
S
75.53
75.53
75.52
75.52
ZA
ZEGE 75.51
75.5175.52
75.41
75.41
75.41 75.33
75.34
S
SS
S
S
S
S
S
KA
75.46 75.44
75.44 75.40
75.40
75.34
75.35
75.34
75.34
HS
S
75.48
75.48
S
S
S
S
S
SS
S
75.50
75.5275.53
75.54
ZA
ZE
75.52
75.52
75.57
75.53
75.50
75.50
S
S
75.45
75.4575.44
75.44
75.43
75.42SS
S
S
S
S
75.48
75.46
75.4275.42
75.45
75.47
75.50
75.43
75.43
75.43
75.43
75.42
75.43
S
S
75.4175.39
75.27
75.37
75.37
75.38
SS
75.3575.35
75.3375.34
75.29
75.36
75.32 75.33
75.3275.32
WE75.32
75.32
75.32 75.32
75.32 75.32
75.3275.32
75.30
75.31
75.31
Gully
KA KA
KA
75.32
75.33
75.32
75.32
75.32 75.32
75.33
WEWE/KA
WE/KA
HS
HS
HS HS
HS
HS
75.32 75.32
75.3175.31
75.32
75.31
75.31
75.31
75.31
75.32
75.31
75.3175.31
WA
ZA
ZE
GT
GT75.29
75.2975.2975.2975.30
75.28
75.31 75.3075.3175.31
75.2875.29
ZE
ZA
WA
GT75.22
75.20
75.2175.21
75.20
75.1875.18
75.13 75.13
75.42
75.27
75.20
75.16
75.35
75.07
75.22
75.26
75.14
75.08
75.16
75.24
75.26
75.18
75.17
75.30
75.31
75.31
S S75.3075.31
KE
S
S
S
75.29
75.28
75.27
75.26
75.23
75.24
75.26
75.27
75.28
75.29
75.28
75.28
75.31
75.30 75.30
75.30
75.29
75.30
75.32
75.32
75.32
75.32
S
75.20
75.20
75.21
75.21
75.22
75.22
75.23
75.24
75.25
75.25
75.27 75.27
HS
HS
HS
WE
WE
S S
ZE
ZA
BA
BB
75.32
75.32
75.32
75.31
75.32
75.31
75.31
75.31
75.31
75.32 75.3175.32
75.32
75.32
75.30
75.3275.31
75.3275.30
75.3075.3075.3075.2975.29 75.29
75.2675.2675.2575.26S S75.2575.25
75.2575.25
S S
75.2275.21
WA
GT
ZA
GT
75.1875.21
75.17
75.2275.22 75.2275.22
75.21
75.23
75.2075.20 75.2075.20
75.13
75.13
75.00
75.08
75.14
75.06
75.26
75.4375.20
75.38
75.20
75.07
75.10
75.25
75.13
Tiefbord
Tiefbord
75.26
75.36
75.26
75.29
Automat
75.06
74.94
74.77
74.84
Werbefl%%228che
Werbefl%%228che
Schaltschrank
74.69
74.80
74.68
74.69
74.64
74.76
74.65
74.75
74.64
74.64
Bord ebenerdig
Tiefbord
Tiefbord
74.78
74.65
74.7174.71
74.87
74.72
74.94
74.93
74.79
74.99
75.11
74.9674.98
75.15
75.06
75.23
75.18
75.03
75.02
74.8574.80
74.64
75.0775.24
75.0075.13
75.13
74.95
74.95
74.78
74.96
74.94
74.80
75.02
74.75
74.60
74.86
74.76
74.94
74.88
74.79
74.70
74.74
74.66
74.75
74.69
74.63
74.66
Tiefbord
Tb
74.76
74.76
74.82
74.78
74.71
74.75
S
WA
S
S
74.67
74.67
74.68
74.67
74.65
74.65
74.6574.66
74.6974.69
74.6774.67
74.72 74.72 74.72
S
GE GE
S
BA
S74.76
74.73 74.73 74.73
74.75
74.75
74.78
74.77
74.76
74.78
74.83
74.81
74.80
74.8274.82
74.8374.83
74.84 74.84
BE
GT
S
74.8874.88
74.8774.86
74.9074.90
SBA
74.94
74.94
74.9474.94
74.9674.96
74.9774.98
74.97
75.00
75.00
GE
BE
GT
GT
GT
GT
GT
GT
GT
WA
ZA
75.00 ZE
74.96
74.96
74.9574.95
74.97
74.96
74.96
74.9374.96
75.01
75.0175.01
75.04 75.03
75.02
S S
75.08
75.08 75.0675.06
75.07
75.07
75.12
75.11
75.11
75.09
GE GE
S S
75.1575.14
S S
83.08
83.08 83.1083.10
82.89 82.89
83.3583.35
83.4683.46
83.61 83.61
83.9383.93 83.94
83.95
84.13 84.13
84.3484.34
84.3384.33
84.5384.53
82.56 82.56
82.35
82.35
82.08 82.07
81.50 81.49
81.55 81.55
81.04 81.04
81.1281.13
80.60 80.61 80.61 80.61
S S
S S
S S
GT
S S S S
BE BE
80.1680.16
80.1680.16
79.9779.97
79.6879.67
79.2679.26
79.2879.29
79.67
79.68
79.9879.98
79.82
Anmerkung:Auf der Rampe der Bahnhofsbrücke sind dieSchienenströsse auf Grund der Oxidationschlecht bzw. nicht zu identifiziren.
75.1
79.0079.00 79.00
78.99
BA
BA
78.59
78.6078.60
78.5678.57 78.57
78.3478.34
78.39 78.39
77.4277.42 77.43
77.42S S S S
76.69 76.69 76.68
76.69
SS SS
S76.19
76.19 76.1776.17
KA
KA
S S
75.3475.34 75.32
75.32
75.33
75.33
S S
75.59
75.5975.6075.60
75.6675.66 75.6675.66
ZA
75.80
75.80 75.76
75.76S S
ZE ZE
75.60
75.60 75.6075.60
75.5475.5475.5475.54
75.4075.40
75.4375.43
KEKE KE75.32 75.30 75.29 75.28
HS
HS
KA
75.41 75.41
75.38
75.3575.34
75.32
S
74.31
74.31
74.30
74.30
74.31
74.31
74.33
74.33
74.38
74.38
74.38
74.36
74.46
74.46
74.45
74.45
S
GT
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
Vignolschiene
GTGT GT
74.38
74.20
S
S
S
S
S
S74.59
74.58
74.58
74.59 74.53
74.54
WA
Rillenschiene
%%196nderung Schienenprofil
S
SS
S
S
S
S
S
%%196nderung Schienenprofil
74.82
GE
GT
74.6074.57
74.55
74.56
74.5874.59
74.59
S
74.49
74.49
74.44
74.58GTZA
GE ZE
S
S
SGT
GT
GT
74.64
74.64
74.6474.64 74.63
74.63
74.63
74.63
74.57
74.60
74.5974.60
74.60
74.60
74.6174.6274.68
74.74
74.74
74.7474.74
74.69
74.69
74.60
74.60
74.71
74.72GT
GT GT GT
GT
GT
GT
GTGT
GT
GT
GT
GT
GT
ZA
WA
ZA
S
SS
S
S S
S
S
SHS
S
HS
HS
HSHS
HS
HS
S
WE
S
SS
S
S
ZE
ZA S
S
S
S74.78
74.7874.79
74.82
74.81
74.87
74.86
74.85
74.86
74.8574.85
74.85
74.92
74.92
74.92
74.92
74.9074.90
74.90
74.90
75.00
75.00
75.00
74.99
75.0175.01
75.02
75.0275.01 75.02
75.0175.01
75.03
S
75.0475.05
75.05
ZA
ZA
75.06
75.13
75.13
75.10 75.08
75.09
75.07 75.06
75.06
75.0875.08
75.12
75.14
75.08
75.11
HS
HS
HS
75.16
75.13
75.1275.11
75.12
75.09S
S
75.08
75.18
75.18
75.17
75.16
75.15
75.15
75.16
75.18
S
S
S
KE
S
S
75.22
75.20
75.17
75.16
75.1775.17
75.20
75.22
KA
KA
KE
KE
75.31
75.32
75.22
75.22
75.21
75.21
75.17
75.17
75.30
75.30
75.10
KE
S75.23
75.21
75.22
75.19
75.19
75.21
75.16
HS
HS
HS
HS
75.16
75.14
75.14
S S
S
WE
WE
KA
75.1775.14
75.15
75.10
75.10
75.10
75.10
75.12
75.13
75.14
75.12
75.14
75.15
HS
HS
HSHS
S
S
75.18
75.17
75.17
75.19
75.24
75.24
75.29
75.28
75.3375.34
75.29
75.26
75.15
75.16
WE
75.08
75.06
74.96
74.96
74.96
74.96 S
S S
S
74.8974.90
74.90
74.90
74.84
74.85
74.8574.85
74.76
74.85
74.86
74.77
74.77
74.7774.77
74.87
Anmerkung:Die Geraden in Richtung Vetschauer Straße und dieBögen in Richtung Bahnhofsbrücke werden zur Zeit nichtbefahren. Die Schienenströsse sind deshalb auf Grund derOxidation schlecht bzw. nicht zu identifiziren.
KP
74.27
74.38
74.62
74.50
74.30
74.13
76.29
74.02
74.01
73.95
73.91
73.86
73.7073.70
73.81
73.91
74.01
74.32
74.36
74.32
74.31
74.31
74.28
74.17
74.25
74.01
73.98
74.08
Parkfl%%228che
75.66
74.5
75.5
74.56
74.47
74.34
74.21
74.34
74.37
74.41
74.32
74.32
74.36
Verkehrspiegel
74.3
74.2
74.2
74.45
74.79
74.68
74.73
Tiefbord
76.07 76.21
76.07
76.06
76.20
75.08
76.0776.17
76.17
76.1876.31
76.30 76.17
76.15
76.34
76.34
76.50 76.37
76.45
76.34
75.24
76.39
76.18
76.32
76.16
76.05
75.93
76.05
76.06
75.89
75.76
75.72
75.84
75.91
76.1
75.8
75.83
76.04
74.7874.96
74.81
76.2776.13
76.12
76.06
76.18
Tiefbord
74.85
75.5
Tiefbord
75.63
75.62
75.75
75.61
75.58
75.53
75.57
75.73
75.61
75.66
75.67
BP
75.71
74.83
Tiefbord
76.06
Tiefbord
75.93
75.93
76.03
75.90
75.89
76.00
Tiefbord
75.4175.39
75.6275.47
75.45
75.59
75.46
75.41
75.60
Tiefbord
75.59
75.50
75.50
75.54
75.53
75.67
75.57
75.55
75.24
75.14
75.33
75.23
75.44 75.34
75.32
75.25
75.12
75.15
75.06
SB
74.77
75.07
74.9074.90
74.94
75.03
74.90
75.24
BP
74.71
74.57
74.61
74.57
Tiefbord
74.63
74.59
74.74
74.60
Tb
74.69
74.71
74.70
74.88
74.76
74.70
74.68
KP74.95
74.84
74.67
74.70
74.70
74.62
74.6674.76
74.63
74.98
75.02
75.15
74.96
75.00
75.08
74.94
75.76
75.91
76.00
76.02
76.02
76.03
76.04
76.02
76.04
76.03
76.02
76.02
76.04
74.98
75.08
Tiefbord
76.6
74.88
75.01
74.89
75.20
75.03
75.22
75.07
75.04
Tiefbord
74.98
75.10
74.9775.17
75.21
75.36
SB
76.00
75.88
75.72
75.78
Tiefbord
75.29
75.24
75.41
75.27
75.46
75.30
75.43
75.29
75.42
Tiefbord
75.64
75.50
75.62
75.73
Tiefbord
Tiefbord
75.39
75.24
75.28
75.25
76.51
75.37 75.40
76.37
75.55
75.39
75.43
75.29
75.31
75.30
75.46
75.32
TiefbordSB
76.4
76.2
75.64
75.5
75.5 75.5
Tiefbord
Tiefbord
76.7
75.51
75.50
75.61
75.46
75.58
75.40
75.40
76.5
75.31
75.40
75.3275.32
75.42
75.32
75.48
75.31
75.6
76.3
75.6
75.6 75.50
BP
BP
75.72
75.74
75.60
75.60
75.46
75.6
75.5
75.6
76.0
Tiefbord
Tiefbord
75.70
75.61
75.57
75.35
75.45
75.36
75.27
75.17
75.17
75.2075.32
75.21
75.35
75.51
75.6
75.80
75.9
75.9
75.9
75.8
76.55
76.63
76.39
76.57
76.42
76.15
76.25
76.31
Parkfl%%228che
BB
76.5
76.4
76.6
76.44
76.61
76.58
77.2
78.176.5
77.38
76.5276.37
77.3
77.8
Parkfl%%228che
Parkfl%%228che
BB
BB
BB
BB
76.8
77.6
79.3
77.5
437
77.1
79.5
76.8
76.9
76.79
76.65
76.89
76.92
77.1
77.2
77.4
77.3
78.5
77.3
77.1
77.277.01
77.14
77.14
77.28
Parkfl%%228che
Parkfl%%228che
Parkfl%%228che
Parkfl%%228che
Parkfl%%228che
BB BBBB
BB
BB
77.3
77.1
77.0
76.8
76.977.1
77.0
76.8
76.7
76.7
76.8
76.9
77.0
76.6
76.676.6
Parkfl%%228che Parkfl%%228che
BBBB
81.57
81.69
76.64
76.6
76.5
76.1
76.5 76.4
76.6 76.7
76.6
77.6
76.3
76.8
Tiefbord
79.48
79.58
79.5679.47
79.47
79.57
79.58
79.49
80.6880.58
80.48
80.58 80.78
80.88
80.92
80.81 80.84
80.93
80.95
80.86
80.2
80.30
81.62
81.72 81.82 81.6
79.5
76.6
80.69
80.79 80.88 75.7675.6475.9
76.478.480.9
79.578.1
76.3 75.8
75.7975.65
79.5079.39
79.30
79.21
76.90
75.93
78.07 77.95
77.86
78.00 78.19
78.2878.1978.10
78.10
78.20
78.26
78.1878.2
78.277.0
76.0
75.00
76.0
75.8175.71
75.49
78.06
77.96
75.18
75.20
Tb
74.96
76.95
76.8676.66
76.7576.85
75.43
76.9 76.2
75.8
Elt
75.84
75.7875.55 75.51
76.41 76.5
76.1
75.86
75.63
Tiefbord
75.99
75.89
75.84
75.67
75.56
75.52
75.62
75.78
Tiefbord
Tiefbord
75.91
76.0276.16
76.06
76.0175.89
75.80
75.71 75.76
75.83
75.7475.69
75.78
Tiefbord
Tiefbord
74.87
75.88
75.93
76.02
75.75
75.68
75.78
75.66
76.06
75.97
75.93
75.76
75.70
75.68
75.77
74.93
75.08
Tiefbord
74.82
74.74 74.72
74.62
74.70
74.61
74.94
TiefbordBP
74.97
74.98
74.88 74.86
74.79 74.78
74.87
74.82
74.96
Tiefbord
75.00
75.04
75.15
75.0775.05
75.02
75.00
75.10
75.01
74.99BP 75.08
74.52
74.47
74.60
BP
Tiefbord
74.43
74.57
74.45
74.48
74.53
74.51
74.48
74.46
74.60
SB
SBTiefbord
PB74.54
74.44
74.46
74.44
74.46
74.4474.56
74.44
Tiefbord
74.43
74.29
74.34
74.30
74.39
74.33
74.35
74.49
Tiefbord
74.18
74.3074.18
74.2274.20
74.20
74.34
74.23
Tiefbord
74.32
74.44
74.31
74.34
74.34
74.35
74.34
74.46
PB
KP
Tiefbord
74.27
74.29
74.41
74.27
74.28
74.24
74.40
74.25
KP
Tiefbord
74.43
74.53
74.40
74.48
74.52
74.50
74.64
Anschluss Blatt 2Anschluss Blatt 1
Anschluss Blatt 2
Anschluss Blatt 2Anschluss Blatt 3
Anschluss Blatt 4
Anschluss Blatt 4
Anschluss Blatt 3
84.63
84.63
74.8
74.9
74.9
74.8
74.6
74.5
74.8
74.4
74.4
74.7
74.7
74.674.6
74.6 74.4
75.6
75.9
75.2
75.8
75.0
74.74
75.5
75.6
75.8
75.4
75.4
AchtungPersonendurchgangfreihalten
75.31
75.43
3061002-10
2061002-11214
74.83
74.74
74.8
74.67
74.72
74.80
74.8
74.9
74.8
74.8
74.7
74.8
1011006-34286
2051002-21
286
2411000-31
437
138
2143061002-20
363(Polizei450m)
286241
Metall-poller
76.2
76.1
283-20
76.2
209-20
206209-10274Hier gilt StVO
Granit-Poller
Granit-Poller
Granit-Poller
Granit-Poller
Granit-Poller
Metall-poller
Metall-poller
Metall-poller
2862741052-35(12,5t)
Granit-Poller
283-10
Privat-grundstück
209-31206
283
214-10206
437
267
286-20274.2-50
209-31206
241-30
101(Gehwegschäden)
214-20306
205
267
241-30
286-101024-114
2671026-32222-20605-20
Parkhaus
205
1024-114286
290
1024-114286
101(Gehweg-schäden)
290101 (Gehwegschäden)209314-201040-32 (1Std)
205720
222-20605-24
283-10
306
101(Gehweg-schäden)
1311000-20209
267314-101040-32 (1Std)
283-20286-101042-33 (15-18h)
2861042-33 (15-18h)
222-20605-20
214-10
214-10306
75.9
75.5
75.5
Tiefbord
Tiefbord
Tiefbord
222-20
314-501048-10
241-31
267
292-50
267
2901040-33
2901040-33
75.8
76.0
76.0
76.3
76.3
76.376.2
75.8
76.2
267
3141044-101000-10
283-30
267
267
Infotafel(Wegweiser)
283-10
2291012-31
224
224
2291012-31267
209-30
209-10267
229
229
220-10
220-10
3141044-10
2501024-14
220-10
76.2
76.3
76.6
76.5
76.1
76.7
224 220-10
2901040-33
2901040-33292
3141048-10
439
81.4
80.8
2051000-21
1011006-34
306
272
306
239
437
432
239
76.7
76.5
76.3
Schildhochgeklapptnicht lesbar
Werbetafel
437
Parkhaus
1011006-34
2501026-32
205
1011006-34
439439
2861042-33(15-18h)
2861052-39
2861052-39
Parkhaus
3141040-32(1Std)
3141040-32(1Std)
306
306
222605
237
205
205
224
432
423
438438
Schilderbr%%252cke
438438438
432438438
237239
222
286
2371012-31
306
521-30
69
61
140
189
165
113
Flur 146
74.52
96
191
186
179
167
163
157
100,85Esche
Flur147
194
174
60
187
533
82
534
5215
186
158
153
169
135
Flur 145
Flur 152
172
170
169
173
166
51
13
24
44
94
144
144
159
184
156
155
171
176
137
202
145
491
128
179
147
145
180
183
149
148
98
108
150
107
104
181
177
146
204
203
201
115
111
142
109
105
102
178
103
106
151
100
99
97
171
172
173
174
176
Flur 143
175
Flur 146
149
147
123
167
182
16
92
73
95
91
Flur 144
178
15
179
Flur 14323
47
116
154
Flur 146
Flur 145
74
96
93
Flur 142
193
130
129
177
185
148
196
175
171
81
115365
180
532
541
200
180
176
Flur 152
Flur 145
Flur 146
Flur 143
Flur 146
93
149
129
181
186
146
Flur 141
Flur 142
191
43
170
168
164
172
140
75
176
190
191
197
70
92
205
143
144
135
189
136
139
138
140
141
133
51
193
180
Tb
Baustelle
144
491
23
74.69
74.83
40,4Eiche 40,35
Linde
30,4Ahorn
50,7Ahorn
60,6Eiche
76.1
76.0
60,2
70,55Ahorn
60,6Ahorn
50,45Eiche
Pla50,35
Pla80,65
Pla80,75
Pla80,60
Pla70,5
Ah70,60
Pla80,7
110,8Platane
80,65Platane
110,8Platane
100,85Platane
4 Pappeln
Ah11
0.85
Ah10
0.70
Ah90,60
Ah10
0.80
Ah6
0.45
Ah17
1.30
Ah8
0.50
Ah6
0.50
Ah6
0.35
2 Pappeln
70,5Ahorn
40,35Linde
50,5Ahorn
40,3Linde
60,5Linde
70,6Linde
70,65Esche
100,8Platane91,05
Linde
100,7Platane90,75
Platane
40,2Eiche
60,6Linde
70,75Kastanie
80,75Linde
60,6Linde
91,05Esche
80,6Linde
80,7Linde
80,9Esche
60,4Linde
70,5Linde
50,4Linde
30,3Eiche
40,45Eiche
70,55Eiche
70,55Eiche
80,45Ahorn
70,7Ahorn
70,65Ahorn
70,8Esche
70,85Esche
70,7Ahorn
60,85Kastanie
Naturdenkmal
203,30Eiche
40,2Linde 70,7
Robinie
70,5Robinie
60,15Linde
40,15Linde
50,3Eiche
76.5
40,35Linde
40,45Ahorn
50,6Ahorn
50,35Ahorn
77.4
76.2
76.1
40,5Ahorn
76.8
76.0
76.3
76.2
76.2
76.376.3
76.3 76.1
77.3
Eiche
40,6Kiefer 40,45
Kiefer
70,4Birke
60,55Kiefer
50,3Kiefer
40,5Kiefer
40,4Kiefer
40,4Kiefer
80,45Birke
40,4Kiefer
40,5Kiefer
40,4Kiefer
30,3Kiefer
30,3Kiefer
60,5Kiefer
60,6Kiefer 50,5
Kiefer
50,5Kiefer
50,5Kiefer
40,6Kiefer
40,3Kiefer
40,4Kiefer
50,45Kiefer
50,3Kiefer
60,6Kiefer50,4
Kiefer
50,45Kiefer
50,4Kiefer
60,5Kiefer 50,45
Kiefer
70,45xBirke
70,45Birke
60,4Eiche
80,62xBirke
110,8Birke
80,5Birke
30,3Kiefer
70,254xBirke
80,33xBirke
60,35Birke
70,352xBirke60,5
3xBirke
100,85Linde
100,85Linde
100,85Linde
100,85Linde
100,85Linde
100,85Linde
100,85Linde
74.7
70,45Pappel
121,3Pappel
70,5Linde
70,5Linde
222,2Pappel
40,45Linde
190,8Pappel
60,4Pappel
50,34xRobinie
30,4Esche
130,72xBirke
70,5Linde
110,7Linde
111,1Linde
70,5Esche
100,83xLinde
70,55Linde
70,7Linde
231,9Pappel
50,6Linde 80,95
Linde
132,15Eiche
152,7Eiche
30,45Linde
50,45Linde
50,45Linde
40,35Linde
50,5Linde
40,35Linde40,35
Linde40,35Linde
40,35Linde
40,35Linde
40,35Linde
40,35Linde
40,35Linde
40,4Linde
40,35Linde
40,35Linde
40,35Linde
50,4Linde
40,35Linde
40,35Linde
40,5Linde
40,4Linde
40,4Linde
30,35Linde
30,4Linde
30,5Linde
50,6Linde
40,45Liinde
40,34xLinde
30,15Linde 40,5
Linde
50,5Linde
40,55Linde
50,45Linde
60,6Linde
50,5Linde
30,4Linde
30,3Linde
50,45Linde
50,5Linde
50,45Linde
50,5Linde
50,45Linde
30,3Linde
131,45Esche
40,4Linde
50,5Linde
40,5Linde
40,4Linde
40,4Linde
40,4Linde
50,5Linde
50,5Linde
30,4Linde
40,5Linde
40,45Linde
30,4Linde
50,4Eiche
60,65Eiche
30,35Linde
30,25LInde
60,6Eiche
60,8Eiche
40,4Linde
30,4Linde
30,4Linde
60,65Eiche
50,5Eiche
80,75Eiche
80,95Esche
60,6Eiche
40,45Linde
40,45Linde
40,45Linde
60,5Linde
100,9Esche
80,75Esche
40,35Linde
40,35Linde
40,35Linde
40,35Linde
40,35Linde
40,35Linde
40,35Linde
40,35Linde
40,35Linde
90,85Ahorn90,8
Ahorn
151,05Pappel
171,65Pappel
161,2Pappel
100,6Pappel
80,7Ahorn
70,55Ahorn
70,45Ahorn
60,55Linde
80,55Ahorn
50,6Linde
40,55Ahorn
90,9Ahorn
76.0
30,4Hainbuche
30,4Hainbuche
30,4Hainbuche
30,4Hainbuche
30,4Hainbuche
40,35Linde
40,35Linde
40,35Linde40,35
Linde
40,35Linde
40,35Linde
40,35Linde
40,35Linde
40,35Linde
100,9Linde
80,8Linde
40,2Linde
50,75Linde
121,2Esche
50,4Linde
50,4Linde
50,4Linde
50,4Linde
50,4Linde
50,4Linde
50,4Linde
50,4Linde
50,4Linde 50,4
Linde
50,4Linde
50,4Linde 50,4
Linde
50,4Linde
50,4Linde
50,4Linde
50,4Linde
50,4Linde
75.26
1. Stufe
vorh. Kastenrinnenicht aufgemessenDarstellung informatorisch
Litfaßsäule
Telefonsäule
Werbetafel
283-201024-14
283-50
292-50
2901040-33
Streugut
2xInfotafel
Zigaretten-automat
209-10
Litfaßsäule
267
222-20605-20
222-20605-20
239
Litfaßsäule
Werbetafel
Thiemstraße
Mast ohneSchild
P%%252cklerpassage
Litfaßsäule
B
U
S
Spiegel
Findlinge
3141000-102xEinsatzfahrzeuge
Senftenberger Straße
Blumenkübel
77.13
75.26
77.0
74.83
A=55.612+
0+0.000
Y=3453367.752
X=5733411.715 A=55.612R=�
+0+15.153
Y=3453382.871
X=5733412.712
R=�A=27.386
+0+51.549 Y=3453419.215 X=5733414.655
A=27.386R=50.000
+0+66.549 Y=3453434.120 X=5733416.202
R=50.000A=27.386
+0+81.558 Y=3453448.148 X=5733421.378
A=27.386R=�
+0+96.558 Y=3453460.485 X=5733429.884
A=30.000+0+0.000 Y=3453645.806 X=5733537.861
A=30.000
R=70.000+0+12.857 Y=3453645.668 X=5733525.010
R=70.000
A=30.000+0+22.273 Y=3453644.362 X=5733515.692
A=30.000R=�
+0+35.130 Y=3453640.962 X=5733503.298
R=�
A=16.000+0+54.166 Y=3453635.366 X=5733485.103
A=16.000
R=32.000+0+62.166 Y=3453632.700 X=5733477.566
R=32
.000
A=25
.958
+0+8
6.64
0 Y=3
4536
15.4
72 X
=573
3461
.026
A=25
.958R=
�+0
+107
.696
Y=3
4535
94.7
95 X
=573
3457
.622
R=�
A=
12.0
00+0
+202
.854
Y=3
4534
99.7
74 X
=573
3452
.524
A=
12.0
00R=
24.0
00+0
+208
.854
Y=3
4534
93.8
05 X
=573
3451
.954
R=24
.000
R=50
.000
+0+21
8.365
Y=34
5348
5.019
X=57
3344
8.478
R=� R=50.00
0
+0+22
2.302
Y=3453
481.8
02 X=57
3344
6.210
R=50.000R=28.000
+0+228.143 Y=3453477.357 X=5733442.426
R=28.000
A=
17.111+0+285.119
Y=3453487.291 X=5733395.831
A=
17.111R=�
+0+295.576 Y=3453497.483 X=5733393.565
R=�
+0+302.809 Y=3453504.627 X=5733392.437
R=�+0+0.000 Y=3453648.807 X=5733537.851
R=�A=30.000
+0+2.010 Y=3453648.847 X=5733535.842
A=30.000
R=70.000+0+14.867 Y=3453648.708 X=5733522.990
R=70.000
A=30.000
+0+24.283 Y=3453647.402 X=5733513.672
A=30.000
R=�
+0+37.140 Y=3453644.002 X=5733501.278
R=�A=17.295
+0+54.926 Y=3453638.774 X=5733484.278
A=17.295
R=35.500
+0+63.352 Y=3453635.982 X=5733476.333
R=35
.500
A=16
.852
+0+9
8.40
8
Y=34
5360
9.40
1
X=57
3345
5.70
2
A=16
.852R=
�+0
+106
.408
Y=3
4536
01.4
38 X
=573
3454
.974
R=�
R=50
0.00
0
+0+1
97.6
24 Y
=345
3510
.353
X=5
7334
50.0
87
R=50
0.00
0A=
12.2
99+0
+206
.068
Y=34
5350
1.92
6
X=57
3344
9.56
4
A=12
.299
R=24
.000
+0+2
12.0
68
Y=34
5349
5.97
0
X=57
3344
8.86
9
R=24
.000
R=50
.000
+0+22
0.916
Y=34
5348
7.819
X=57
3344
5.559
R=50.00
0R=�
+0+22
5.088
Y=3453
484.4
05 X=57
3344
3.163
R=�R=50
.000
+0+22
5.438
Y=3453
484.1
27 X=57
3344
2.950
R=50.000R=24.000
+0+230.488 Y=3453480.279 X=5733439.682
R=24.000
A=12.000
+0+281.018 Y=3453490.050 X=5733399.142
A=
12.000
R=�
+0+287.018 Y=3453495.929 X=5733397.962
R=�
+0+292.780 Y=3453501.620 X=5733397.063
R=100.000
+0+0.000 Y=3453570.220 X=5733453.300
R=100.000
R=43.500+0+7.035 Y=3453577.252 X=5733453.429
R=43.500
R=35.000+0+22.202 Y=3453592.068 X=5733450.563
R=35.000 A=20.917+0+50.022 Y=3453611.653 X=5733431.842
A=20.917 A=26.444+0+62.522 Y=3453615.240 X=5733419.886
A=26.444 R=53.500+0+75.593 Y=3453618.757 X=5733407.307
A=35.568R=53.500
+0+104.417 Y=3453635.384 X=5733384.188
A=35.568
R=113.500+0+116.917 Y=3453645.816 X=5733377.329
R=113.500
R=200.000+0+150.409 Y=3453677.066 X=5733365.621
R=200.000+0+161.304 Y=3453687.776 X=5733363.631
R=50.000
+0+0.000 Y=3453574.570 X=5733456.537
R=50.000
R=38.500+0+12.805 Y=3453587.305 X=5733455.587
R=38.500 A=22.466
+0+49.991 Y=3453614.985 X=5733432.953
A=22.466 A=25.000
+0+63.101 Y=3453618.716 X=5733420.403
A=25.000 R=50.000
+0+75.601 Y=3453622.094 X=5733408.377
R=50.000
A=33.850
+0+103.579 Y=3453638.518 X=5733386.177
A=33.850
R=110.000
+0+116.079 Y=3453649.148 X=5733379.634
R=110.000
R=200.000
+0+142.614 Y=3453674.000 X=5733370.517
R=200.000
R=�
+0+157.521 Y=3453688.624 X=5733367.648R=�
+0+157.832 Y=3453688.932 X=5733367.599
A=54.772+
0+0.000
Y=3453368.047
X=5733407.625
A=54.772 R=�+0+15.000 Y=3453383.013 X=5733408.613
R=�A=32.290
+0+49.327 Y=3453417.291 X=5733410.446
A=32.290R=54.000
+0+68.635 Y=3453436.449 X=5733412.620
R=54.000A=29.011
+0+83.597 Y=3453450.350 X=5733418.024
A=29.011R=�
+0+99.183 Y=3453463.154 X=5733426.887
R=� +0+125.602 Y=3453484.128 X=5733442.951
R=�
+0+403.776 Y=3453611.216 X=5733379.744
R=�+0+482.434 Y=3453688.914 X=5733367.488
R=�+0+421.224 Y=3453622.387 X=5733373.831
R=�+0+487.404 Y=3453687.759 X=5733363.519
R=�
+0+123.409 Y=3453481.802 X=5733446.210
(3) 1
5000
60R2
-L R2
60V
KR 7
587
KL 7
413
(5) 1
5000
60R2
-L R2
60V
KL 5
491
G 95
09
(6) 1
4983
60R2
-L R2
60V
KL 5
474
G 95
09
(7) 1
5000
60R2
-L R2
60V
G 95
27
KL 54
73
(8) 1
4941
60R2
-L R2
60V
G 95
27
KL 5
414
(11) 15000 60R2-L R260V
KR 14873
KL 127
(12) 14531 60R2-L R260V
KR 14408
KL 123(13) 15000 60R2-L R260V
KL 15000
(14) 14698 60R2-L R260V
KL 14698(19) 15000 60R2-L R260V
G 15000
(20) 15000 60R2-L R260V
G 15000
(21) 15000 60R2-L R260V
G 15000
(22) 15000 60R2-L R260V
G 15000
(23) 15000 60R2-L R260V
G 15000
(24) 15000 60R2-L R260V
G 15000
(25) 15000 60R2-L R260V
G 14753KL 247
(26) 15000 60R2-L R260V
G 14753KL 247
(27) 7304 60R2-L R260V
KL 5690
KR 1614
(28) 7500 60R2-L R260V
KL 5817KR 1683
(33) 14466 60R2-L R260V
KR 14466
(34) 15000 60R2-L R260V
KR 15000
(35) 14477 60R2-L R260V
KR 11985
KL 2491
(36) 15000 60R2-L R260V
KR 12428
KL 2572
(37) 7391 60R2-L R260V
KL 7391
(38) 7500 60R2-L R260V
KL 7500
(4) 1
4814
60R2
-L R2
60V
KR 7
478
KL 7
336
(30) 12005+200+0 60R2-L R260V
KR 8029
KR 3976
(29) 11593+200+0 60R2-L R260V
KR 7696
KR 3896
(39) 7712+0+200 60R2-L R260V
G 7233KL 480
(40) 7713+0+200 60R2-L R260V
G 7233KL 480
(43)
1500
0 60R
2-L R
260VKR
948
4
KL 5
402
KL
114
(44)
1480
0 60R
2-L R
260V
KL
112
KR 9
348
KL 5
340
(45)
1500
0 60R
2-L R
260V
KL 7
502
G 74
98
(46)
1496
8 60R
2-L R
260V
KL 7
470
G 74
98
(47)
1500
0 60R
2-L R
260V
G 10
288
KL 4
712
(48)
1496
3 60R
2-L R
260VG
1028
8
KL 46
75
(49) 1
0500
60R2
-L R2
60V
KL 37
74
KR 67
26
(50) 1
0227
60R2
-L R2
60V
KL 3
691
KR 65
36
(53) 15000 60R2-L R260V
KR 15000
(54) 14577 60R2-L R260V
KR 14577
(55) 7500 60R2-L R260V
KL 4843 KR 2657
(56) 7329 60R2-L R260VKL 4747 KR 2582
(61) 15000 60R2-L R260V
G 15000
(62) 15000 60R2-L R260V
G 15000
(63) 15000 60R2-L R260V
G 15000
(64) 15000 60R2-L R260V
G 15000
(65) 15000 60R2-L R260V
G 14953KR 47
(66) 15000 60R2-L R260V
G 14953KR 47
(67) 14828 60R2-L R260V
KR 8388EI 5933KR 506
(68) 15000 60R2-L R260V
KR 8405
KR 528EI 6067
(73) 14379 60R2-L R260V
KR 14379
(74) 15000 60R2-L R260V
KR 15000
(75) 13500 60R2-L R260V
KR 13500
(76) 14083 60R2-L R260V
KR 14083
(41) 14800+0+200 60R2-L R260V
G 2010
KL 1
2790
(42) 14708+0+200 60R2-L R260V
G 2010
KL 1
2698
(70) 12721+200+0 60R2-L R260VKR 4215
KR 8507
(69) 12284+200+0 60R2-L R260VKR 4130
KR 8154
(77) 13279+0+200 60R2-L R260V
G 5762
KR 1580KL 5937
(78) 13474+0+200 60R2-L R260V
G 5762
KR 1649KL 6063
(81) 7500 60R2-L R260V
G 7128KL 372
(82) 7500 60R2-L R260V
G 7128KL 372
(83) 7719 60R2-L R260V
G 7719
(84) 7719 60R2-L R260V
G 7719
(85) 15000 60R2-L R260V
G 15000
(86) 15000 60R2-L R260V
G 15000
(87) 14952 60R2-L R260V
G 6549KL 8403
(88) 15000 60R2-L R260V
G 6549KL 8451
(89) 14727 60R2-L R260V
KL 6521
KR 8206
(90) 15000 60R2-L R260V
KL 6626
KR 8374
(91) 14743 60R2-L R260V
KR 6650
KL 8093(92) 15000 60R2-L R260V
KR 6787
KL 8213
(93) 10500 60R2-L R260V
KL 6831
G 3669
(94) 10532 60R2-L R260V
KL 6863
G 3669
(79) 14800+200+0 60R2-L R260V
KL 14800
(80) 14762+200+0 60R2-L R260V
KL 14762
(99) 15000 60R2-L R260V
G 14781KL 219
(100) 15000 60R2-L R260V
G 14781KL 219
(101) 7500 60R2-L R260V
G 7500
(102) 7500 60R2-L R260V
G 7500
(103) 7719 60R2-L R260V
G 7719
(104) 7719 60R2-L R260V
G 7719
(105) 14945 60R2-L R260V
G 4327KL 10618
(106) 15000 60R2-L R260V
G 4327KL 10673
(107) 14757 60R2-L R260V
KL 8599
KR 6158
(108) 15000 60R2-L R260V
KL 8725
KR 6275 (109) 14743 60R2-L R260V
KR 8664
KL 6079
(110) 15000 60R2-L R260V
KR 8829
KL 6171
(111) 7500 60R2-L R260V
KL 7500
(112) 7552 60R2-L R260VKL 7552
(98) 14762+200+0 60R2-L R260V
KL 14762
(97) 14800+200+0 60R2-L R260V
KL 14800
(117) 15000 60R2-L R260V
KR 15000
(118) 14571 60R2-L R260V
KR 14571
(119) 12000 60R2-L R260V
KR 6146
KL 5854
(120) 11695 60R2-L R260V
KR 5971
KL 5725
(123) 14749 60R2-L R260V
KL 6546
KR 8203
(124) 15000 60R2-L R260V
KL 6639
KR 8361
(125) 14718 60R2-L R260V
KR 14718
(126) 15000 60R2-L R260V
KR 15000
(127) 7500 60R2-L R260VKR 5629
EI 1871
(128) 7642 60R2-L R260VKR 5737
EI 1905
(135) 15000 60R2-L R260V
KR 13914
KL 1086
(136) 14611 60R2-L R260V
KR 13552
KL 1059
(137) 7500 60R2-L R260V
KL 7500
KL 7376
(141) 14733 60R2-L R260V
KL 6551
KR 8182(142) 15000 60R2-L R260V
KL 6650
KR 8350
(143) 14698 60R2-L R260V
KR 14698(144) 15000 60R2-L R260VKR 15000
(145) 7500 60R2-L R260V
KR 4814
EI 2686
(146) 7651 60R2-L R260V
KR 4912
EI 2738
storno
(147) 8648 60R2-L R260V
(148) 8770 60R2-L R260V
(149) 10500 60R2-L R260V
KR 9426
EI 1074
(150) 10598 60R2-L R260V
KR 9514
EI 1084
(153) 3275 60R2-L R260V
G 3275
(154) 3275 60R2-L R260V
G 3275
(155) 15000 60R2-L R260VG 15000
(156) 15000 60R2-L R260VG 15000
(157) 9000 60R2-L R260VG 9000
(158) 9000 60R2-L R260V
G 9000
(159) 11224+200+0 60R2-L R260VG 11224
(160) 11224+200+0 60R2-L R260V
G 11224
R=�R=�
+0+123.059 Y=3453481.525 X=5733445.998
R=�R=50
.000
+0+22
2.652
Y=3453
481.5
25 X=57
3344
5.998
750
750
1500
1500
1500
1500
1500
1500
1500
1500
1500
1500
1500
1500
943
943
750
750
6796
6796
1000
1000
723750
14471500
14461500
14471500
1447
1500
14461500
14471500
14461500
1447
1500
1446
1500
531550 723750
1447
1500
14461500
14471500
14471500
14461500
14471500
14461500
14471500
14461500 724750 723750 14471500 14461500 14471500 14471500 14461500 14471500 14461500 1447
1500 14521500
729750
731750
14661500
14751500
14821500
14901500
747750
750750
15001500
15001500
15001500
15001500
962963
719
750143
81500
143815
0014
371500
143815
0014
381500
14381500
14381500
14381500
1438
1500
527550 719
75014381500
1438
1500
1437
1500
1438
1500
14381500
14381500
14381500
14381500
14381500 719750 719750 14381500
14381500 14371500 14381500 14381500 14381500 14381500 14381500 828
864450
469719
7501439
15001451
15001467
15001482
15001497
15001500
15001500
15001500
1500724
724
52395250
14971500
14971500
14911500
14761500
14621500
14471500
719750
719750
14381500
14381500
14371500
14381500
14381500
14651500
14691500
692706
750765
97509750
15001500
15001500
15001500
750750
747750
14811500
14671500
14511500
14391500
719750
719750
14381500
14381500
14371500
14381500
14431500
14701500
14701500
740755
750750
15001497
15001495
15001492
1500
1490
1500
1488
1500
1485
1500
1482
1500
1480
15001478
550542
750739
15001479
15001478
15001478
15001479
15001478
15001481
15001483
15001486
15001488
750745
750746
15001493
1496
1500
1498
1500
15001500
150015
0015
001500
150015
0015
001500
150015
0075
0750
75075
015
001500
150015
0015
001500
15001500
150015
0015
001500
150014
9415
001486
150014
7675
0735
75073
315
001459
150014
5415
001453
1500145
3150
01453
1500145
3
1500145
3867
840464
450750
727150
01453
1500145
3
15001453
15001453
15001453
15001453
15001454
15001453
15001453
750726
750727
15001457
15001460
15001463
15001466
15001470
15001473
15001476
15001480
15001483
750743
750744
15001489
15001493
15001497
15001499
15001500
15001500
15001500
15001500
850851
750750
750750
15001500
15001498
15001496
15001493
15001491
1500
1488
1500
1486
1500
1483
15001481
550542
750739
15001479
15001478
15001478
15001479
15001478
15001479
15001480
15001482
15001485
750743
750744
15001490
1492
1500
1495
1500
15001498
15001499
150015
0015
001500
150015
0015
001500
75075
075
0750
150015
0015
001500
150015
0015
001500
15001500
150015
0015
001498
150014
9215
001484
75073
975
0737
150014
6915
001462
150014
5715
001458
1500145
8150
01457
750
729750
729150
01458
1500145
7
1500145
8
1500145
8
1500145
7
15001458
961934
463450
750729
15001458
15001457
15001458
15001458
15001457
15001458
15001458
15001457
15001458
750729
750729
15001458
15001459
15001468
15001475
750740
750742
15001491
15001499
15001500
15001500
11281128
750750
3705
3750
1476
1500
14731500
14721500
14721500
14721500
14721500
14711500
736750 736750 14721500
14711500
14721500
14721500
14721500
14721500
14711500
14721500
14721500 736750 736750 14721500 147115001500
1472
1500
1472877892
3703
3750
1475
1500
1471
1500
14701500
14701500
14701500
14701500
14701500
734750 735750 14701500
14701500
14691500
14701500
14701500
14701500
14701500
14701500 14701500 734750 7357501500
1470
1500
1470
1500
147014711500 884901 750
73715001475
15001478
15001479
15001481
15001483
520515
750743
15001486
14861500 14861500 1486
1500 14871500 1486
1500 840848
743750 1486
1500 14871500 1486
1500 14861500 1486
1500 14861500
9921001
750757
750733
15001465
15001465
15001466 1500
1465 15001463 1500
1457 15001457 15001457 15001457 550534
750729
1425013842
750730 15001461 15001461 15001461 15001461
80507841
750750
15001500
15001500
15001500
15001500
15001500
15001500
10241024
450450
750750
15001500
15001500
15001500
15001500
15001500
750750
750750
15001500
15001500
15001500
15001500
15001500
15001500
15001500
15001500
15001500
750750
750750
15001500
10251025
(2) 1
4679
+0+2
00 60
R2-L
R26
0V
KL 1
2810
KR 1
869
(1) 1
4800
+0+2
00 60
R2-L
R26
0V
KL 1
2904
KR 1
896
storno(163) 9267 60R2-L R260V(164) 9267 60R2-L R260V
750750
15001500
15001500
15001500
15001500
15001500
15001500
15001500
15001500
15001500
550550 750
75015001500
15001500
15001500
15001500
15001500
567567 450
450
(161) 14800+200+0 60R2-L R260V
G 14800
(162) 14800+200+0 60R2-L R260V
G 14800
KR 5629
KR 5737
(129) 11620 60R2-L R260V
EI 10542
KR 1079
(130) 11770 60R2-L R260V
EI 10682
KR 1088
737750 14761500 14781500 14791500 14811500 14831500 14851500 14861500 515520
743750 14871500 11001110
Bauphase2.1 1.2
Bauphase2.1 1.2
Bauphase2.2 2.1
Bauphase2.2 2.1
Achse 105
Achse 106
Bauphase
2.1 1.1
Bauphase
2.1 1.1
Bauphase1.1
2.2
Bauphase
1.1 2.2
Bauphase
1.1
2.1
Bauphase
1.1
2.1
Montagerichtung
(95) 11443 60R2-L R
260V
G 11443(96) 11443 60R2-L R
260V
G 11443
(114) 7798 60R2-L R260V
KL 1936
G 5862
(113) 7796 60R2-L R260V
KL 1934
G 5862
Mon
tage
richt
ung
Montagerichtung
Montagerichtung
(71)
1418
7 60R
2-L R
260V
KR 1
4187
(72)
1480
0 60R
2-L R
260V
KR 1
4800
(31) 14273 60R2-L R260VKR 14273
(32) 14800 60R2-L R260VKR 14800
(17) 14800 60R2-L R260V
G 14800
(18) 14800 60R2-L R260V
G 14800
750750
15001500
15001500
1105011050
(60) 14800 60R2-L R260V
G 14800
(59) 14800 60R2-L R260V
G 14800
Montagerichtung
Montagerichtung
(15) 14350 60R2-L R260V
KL 6096G 8255
(16) 14323 60R2-L R260V
KL 6068G 8255
(58) 8610 60R2-L R260VG 5414 KL 3196
(57) 8628 60R2-L R260VG 5414 KL 3214
(133) 14800 60R2-L R260V
KR 14800(134) 14415 60R2-L R260V
KR 14415
(115) 14800 60R2-L R260V
KR 7723
KR 7077
(116) 14419 60R2-L R260V
KR 7545
KR 6874
(9) 12
581+
200+
0 60R
2-L R
260V
KL 2
591
KR 99
90
(10) 1
2201
+200
+0 60
R2-L
R260
V
KL 25
22
KR 96
78
(52) 10
859+20
0+0 60
R2-L R260
VKR 10859
(51) 11
174+20
0+0 60
R2-L R260
V
KR 11174
Montagerichtung
(121) 13200+0+200 60R2-L R260V
KL 6737
KL 6463
(122) 13178+0+200 60R2-L R260V
KL 6685
KL 6494
(139) 10496+0+200 60R2-L R260V
KL 4610
KL 5885
(140) 10503+0+200 60R2-L R260V
KL 4589
KL 5914
(151) 11402 60R2-L R260V
KR 11402
(152) 11508 60R2-L R260V
KR 11508
(138) 7376 60R2-L R260V
(131) 3330 60R2-L R260V
KR 3330(132) 3360 60R2-L R260V
KR 3360
Montagerichtung
(165) 15000 60R2-L R260V
G 15000
(166) 15000 60R2-L R260V
G 15000
750750
15001500
15001500 1500
15001500
15001500
15001500
15001500
15001500
15001500
1500750
750
rev03
(201) 10629+0+200 60R2-L R260V
KR 908
EI 9721
(202) 10770+0+200 60R2-L R260V
KR 916
EI 9854750
737
1500
1475
1500
1478
1500
1479
1500
1481
1500
1483
520
515
750
743
493
488
757
750
G 14800
G 14800
rev03(203) 12267 60R2-L R260V
G 12267
(204) 12267 60R2-L R260V
G 12267
750
750
1500
1500
1500
1500
1500
1500
1500
1500
1500
1500
567
567
450
450
750
750
1500
1500
750
750
+0+0.000
+0+14.740
+0+29.647
+0+44.638
+0+59.609
+0+72.000
+0+8
6.76
6
+0+
101.
615
+0+
115.
951
+0+
128.
301
+0+
143.
101
+0+
158.
101
+0+
173.
101
+0+
188.
101
+0+
203.
101
+0+
210.
503
+0+22
2.302
+0+243.643
+0+258.179
+0+272.912
+0+287.650
+0+
295.096
+0+
302.809
+0+0.000
+0+14.754
+0+29.654
+0+44.638
+0+59.620
+0+69.983
+0+81
.000
+0+9
5.789
+0+
103.
203
+0+111.822
+0+
137.
871
+0+
152.
671
+0+
167.
671
+0+
182.
671
+0+
197.
671
+0+
212.
585
+0+22
5.088
+0+236.429
+0+250.922
+0+265.612
+0+279.403 +0+
292.780
+0+
0.000
+0+
14.781
+0+
22.281
+0+
30.000
+0+
45.000
+0+
59.976
+0+74.840
+0+89.711
+0+100.227
+0+111.670
+0+
0.000
+0+
14.781
+0+
29.781
+0+
37.281
+0+
45.000
+0+
59.972
+0+
74.851
+0+89.722
+0+97.248
+0+105.045
+0+
14.568
+0+29.178
+0+43.963
+0+55.811
+0+69.000
+0+83.875
+0+98.734
+0+106.305
+0+21.650
+0+36.258
+0+51.063
+0+58.501
+0+69.000
+0+83.867
+0+98.716
+0+106.291
+0+
115.000
+0+125.549
+0+
137.004
+0+442.275
+0+439.000
+0+
424.000
+0+
415.000
+0+
403.776
+0+
421.224 +0+
436.024
+0+
445.291
+0+106.305
+0+118.000
+0+121.345
+0+
445.291 +0+
460.291
+0+106.291
+0+106.291
+0+
116.991
+0+
436.024
+0+
448.291
PREPARE START
RUN PERFORM
www.voestalpine.com/railway-systems
Disclaimer:The information published in this document, in particular but not limited to, procedures, processes and any other information is subject to explicit confidentiality. Any manner of reproduction, processing, distribution, storage or any manner of utilization shall require the prior written consent of voestalpine Schienen GmbH and voestalpine VAE GmbH. The information in this document was created with the greatest possible care and to the best of our knowledge and belief. voestalpine Schienen GmbH and voestalpine VAE nevertheless accept no guarantee for the applicability, completeness and correctness of any information contained in this document.