Transcript
Page 1: Upgrade Quality Center to ALM v12.x Today!

Unleash Cross-Project Reporting, Master Planning, and Scorecards

Free 1 Hour Consultation

Duration: 1 Day

Target Audience

• QA Manager

Materials Provided

• Cost/Benefit Analysis

• RecommendationRoadmap

• Job Aides to ALM 12

Goals:

• Prepare your team to upgrade from

Quality Center to ALM

• Provide you with a cost/benefit analysis

of on-premise vs. cloud

• Guide you with an upgrade

recommendation roadmap.

You’ve seen the demos about ALM 12 and realize how dynamic scorecards, cross-project

reporting, and scorecards can benefit your company. From accelerated development to

improve enterprise-wide reporting, ALM 12 is your ticket to project transparency.

ResultsPositive, a Platinum HP Partner, has been working with organizations just like yours

since ALM 12 was released to coach, mentor, and advice on how to best leverage the

features to achieve operational efficiency. Imagine having finger-tip control over all of your

projects, at the PMO level, within one centralized platform. Even better, what if you could

deploy a simple extension that helps you integrate with your favorite IDEs, such as

Microsoft Test Foundation Server or JIRA? Not only is it possible today, but it’s a reality

that many of your competitors have fully realized.

Our Upgrade Assessment is a pre-requisite to our RapidStart Upgrade. We provide

highly qualified and certified consultants with an average of 10 years of real-world

experience to:

Briefly demo of HP ALM 12.20 new features, enhancements, and benefits

Confirm that your existing architecture and configuration align with the minimumrequirements of HP ALM 12.20

Provide a streamlined cost/benefit analysis of on-premise versus SaaS offering

Recommend and discuss best practices to installing and upgrading existing projects

Analyze and review your existing Quality Center patch level and recommend anupgrade path.

Provide proven techniques to minimizing loss in productivity

Delivery Style: All of our upgrade assessments are delivered remotely to keep costs at a minimum to

your organization. If you would like to purchase our RapidStart Upgrade services, wecan either travel on-site to your organization or also delivery remotely.

[email protected].

Top Related