Download - Today’s (12.7) Report
Today’s (12.7) Report
LIU Qian
East EC is ready, we are going to install the EC TOF next Monday.
Move the main bundles
The breakout is protected
The common end is protected
By TOF Tricycle
The upper distribution boxThe main bundle
New position,Direction: west to east(safer, and easier to connect with fibers)
Old position,Direction: North to south
The extra length of fibers areover-under coiled.
Close look of fiber management
The fibers’ heads
They are all hidden in the shelter.
The rack
Moon box
UH Module
Height: 1.20 m
The ruler starts from 1.50 m
Height: 1.60 m
Common end
The common end of east.
We didn’t remove the protective tube yet.
Conclusion• We only finished the 12 bundles installation. (since the
people who helped me install the fibers are employed temporarily, for now only one IHEP employee and I are installing the bundles. But that’s OK, since we don’t want to push it in a hurry.)
• The bottom box has been installed. We’ll try to finish the rest bundles in this weekend.
• Next Monday we’ll begin to install the EC TOF of east side.