Download - Tigard Greenways Trail System Master Plan
![Page 1: Tigard Greenways Trail System Master Plan](https://reader035.vdocuments.mx/reader035/viewer/2022070420/56815f66550346895dce6173/html5/thumbnails/1.jpg)
Tigard GreenwaysTrail System Master Plan
Prepared by Kittelson & Associates, Inc.and Alta Planning + Design
![Page 2: Tigard Greenways Trail System Master Plan](https://reader035.vdocuments.mx/reader035/viewer/2022070420/56815f66550346895dce6173/html5/thumbnails/2.jpg)
Contents of the Plan• Executive Summary• Planning Framework• Existing Conditions• Greenway Trails Classification System• Trail Design Guidelines• Evaluation Process• Recommended Projects• Implementation Plan• Appendices
– Public Input– Initial Alignment Feasibility Assessment– Initial Environmental Assessment
![Page 3: Tigard Greenways Trail System Master Plan](https://reader035.vdocuments.mx/reader035/viewer/2022070420/56815f66550346895dce6173/html5/thumbnails/3.jpg)
Vision & ObjectivesGreenway Trails are a key component of the non-motorized transportation network; these trails facilitate connections to local destinations, and connect Tigard residents to the region’s extensive trail network.
Plan Objectives:• Increase opportunities for walking, bicycling, and
accessing transit• Create a framework for implementing the
remaining sections of the greenway trail system• Identify locations for potential new greenway trails
![Page 4: Tigard Greenways Trail System Master Plan](https://reader035.vdocuments.mx/reader035/viewer/2022070420/56815f66550346895dce6173/html5/thumbnails/4.jpg)
Planning Process
• Project Website – Interactive Map &
Comment Tool
• Neighborhood Surveys
• Open Houses
• Stakeholder Advisory Committee (SAC)
![Page 5: Tigard Greenways Trail System Master Plan](https://reader035.vdocuments.mx/reader035/viewer/2022070420/56815f66550346895dce6173/html5/thumbnails/5.jpg)
Existing Greenway Trails
![Page 6: Tigard Greenways Trail System Master Plan](https://reader035.vdocuments.mx/reader035/viewer/2022070420/56815f66550346895dce6173/html5/thumbnails/6.jpg)
Trail Classification System
![Page 7: Tigard Greenways Trail System Master Plan](https://reader035.vdocuments.mx/reader035/viewer/2022070420/56815f66550346895dce6173/html5/thumbnails/7.jpg)
Design Guidelines Surface Options• Asphalt/concrete• Permeable
asphalt/concrete• Boardwalk• Bark chip/mulch• Natural surface
Greenway Alternatives• Sidepaths• Bike lanes• Bicycle
boulevards (shared lanes)
![Page 8: Tigard Greenways Trail System Master Plan](https://reader035.vdocuments.mx/reader035/viewer/2022070420/56815f66550346895dce6173/html5/thumbnails/8.jpg)
Design Guidelines
• ADA Compliance
• Crossings– Bollards– Curb ramps– RRFB
• Bridges
• Centerline striping
![Page 9: Tigard Greenways Trail System Master Plan](https://reader035.vdocuments.mx/reader035/viewer/2022070420/56815f66550346895dce6173/html5/thumbnails/9.jpg)
Design Guidelines
• Mileage markers• Directional signs
• Etiquette signs• Informational kiosks
![Page 10: Tigard Greenways Trail System Master Plan](https://reader035.vdocuments.mx/reader035/viewer/2022070420/56815f66550346895dce6173/html5/thumbnails/10.jpg)
Evaluation Process
• Connectivity• Safety and security• User experience• Topographical
Constraints• Environmental
Impacts• Cost• Right-of-Way
![Page 11: Tigard Greenways Trail System Master Plan](https://reader035.vdocuments.mx/reader035/viewer/2022070420/56815f66550346895dce6173/html5/thumbnails/11.jpg)
Recommended Trail Projects
Priority # of Projects Total Length (Miles) Total Cost
High* 9 2.2 $3.5 - $8.2 M
Medium 6 2.9 $3.4 - $5.7 M
Low 4 1.9 $2.7-$3.7 M
Total 19 7.0 $10-$18 M
* Includes currently funded Woodard Park to Grant and Grant to Main segments of Fanno Creek Trail
![Page 12: Tigard Greenways Trail System Master Plan](https://reader035.vdocuments.mx/reader035/viewer/2022070420/56815f66550346895dce6173/html5/thumbnails/12.jpg)
Recommended Trail ProjectsHigh-priority (0-10 years)
• Fanno Creek: • Woodard Park to Grant*• Grant to Main*• 74th Avenue Sidepath from Bonita to Durham Road• 85th Avenue Trail to Durham City/ Ki-A-Kuts
• Westside Trail (planned)• Tigard Street: Fanno Creek to Tigard Transit Center• Krueger Creek: Walnut Street to Jack Park• Summer Creek : On-street improvements, Fowler
Nature Education Trail• Pathfinder Genesis: 107th Court to Fanno Creek
* currently funded
![Page 13: Tigard Greenways Trail System Master Plan](https://reader035.vdocuments.mx/reader035/viewer/2022070420/56815f66550346895dce6173/html5/thumbnails/13.jpg)
Recommended Trail Projects
![Page 14: Tigard Greenways Trail System Master Plan](https://reader035.vdocuments.mx/reader035/viewer/2022070420/56815f66550346895dce6173/html5/thumbnails/14.jpg)
Recommended Projects
![Page 15: Tigard Greenways Trail System Master Plan](https://reader035.vdocuments.mx/reader035/viewer/2022070420/56815f66550346895dce6173/html5/thumbnails/15.jpg)
Implementation Strategies• Amend regulations– Redefine wayfinding; not an amenity– Adopt trail classifications and design
guidelines
• Seek opportunities to develop trails– Land acquisition and easements– Partnerships– Grant funding
![Page 16: Tigard Greenways Trail System Master Plan](https://reader035.vdocuments.mx/reader035/viewer/2022070420/56815f66550346895dce6173/html5/thumbnails/16.jpg)
Questions?