![Page 1: The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551bccd8550346b9588b5235/html5/thumbnails/1.jpg)
![Page 2: The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551bccd8550346b9588b5235/html5/thumbnails/2.jpg)
The Future in BIM Integrated Project Delivery
![Page 3: The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551bccd8550346b9588b5235/html5/thumbnails/3.jpg)
Where’s the engagement in BIM gone??
BIM Proprietary
Design
CAMFabrication
• Perceived to be too complex and too difficult to use
• Lack of standardization / Model Sizes & Management
• Industry shortage of people with BIM skills and expertise
Expensive with no return on investment
![Page 4: The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551bccd8550346b9588b5235/html5/thumbnails/4.jpg)
BIM Proprietary
Design
CAD Construction and Detailing
CAMFabrication
CADAs-Installed
2D PDF CAD
CA
D-C
AM
Is this really BIM?Current Industry Practices
![Page 5: The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551bccd8550346b9588b5235/html5/thumbnails/5.jpg)
Federated Model => complexity
BIM-MEPAUS
Design
BIMConstruction
CADShop Detailing
BIMAs-Installed
CAMFabrication
Designers
Federated Model
BIM-MEPAUS
Shop Detailing
Architectural Component Model
Structural Component Model
Plumbing Component Model
Fire Component Model
Steel Fab Component Model
Other Sub - Component Model
Electrical Component Model
Mechanical Component Model
Sub-Contractors
![Page 6: The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551bccd8550346b9588b5235/html5/thumbnails/6.jpg)
IS THIS REALLYBIM
![Page 7: The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551bccd8550346b9588b5235/html5/thumbnails/7.jpg)
CAN IT BE MADE TO WORK
![Page 8: The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551bccd8550346b9588b5235/html5/thumbnails/8.jpg)
So what did we decide to do ?
BIM Proprietary
Design
CAD Construction and Detailing
CAMFabrication
CADAs-Installed
• Engage all levels of the supply chain
• Find and bring together the best software developers and service providers we could find
• Redefine model content scheduling for supply chain integration
• Work to resolve the technical issues and reduce complexity to create a productive work environment for all
• Test our theories
![Page 9: The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551bccd8550346b9588b5235/html5/thumbnails/9.jpg)
Step Change Innovation
![Page 10: The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551bccd8550346b9588b5235/html5/thumbnails/10.jpg)
Vendor independent - vendor specificCollaborative / inclusiveBuilt on Australian and International Best Practice
![Page 11: The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551bccd8550346b9588b5235/html5/thumbnails/11.jpg)
Step Change Innovation
![Page 12: The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551bccd8550346b9588b5235/html5/thumbnails/12.jpg)
BIM-MEPAUS WorkFlows: BIM All The Way
BIM-MEPAUS
Design
BIMConstruction
CADShop Detailing
BIMAs-Installed
FAB
-ME
PA
US
CAMFabrication
BIM-MEPAUS
ConstructionBIM-MEPAUS
Commissioned As-Built
BIM-MEPAUS
Fabrication
Duct Fabrication
Pipe Fabrication
Duct Fabrication
Commissioning
![Page 13: The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551bccd8550346b9588b5235/html5/thumbnails/13.jpg)
BIM-MEPAUS Workflows / BIM Asset Life Cycle Model
Design
Construction
Commissioning & As BuiltHandover
Facility Management
![Page 14: The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551bccd8550346b9588b5235/html5/thumbnails/14.jpg)
BIM-MEPAUS Workflows / BIM All The Way
BIM-MEPAUS
Design
BIMConstruction
CADShop Detailing
BIMAs-Installed
FAB
-ME
PA
US
CAMFabrication
BIM-MEPAUS
ConstructionBIM-MEPAUS
Commissioned As-Built
BIM-MEPAUS
Fabrication
Duct Fabrication
Pipe Fabrication
Duct Fabrication
Commissioning
![Page 15: The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551bccd8550346b9588b5235/html5/thumbnails/15.jpg)
BIM-MEPAUS Workflows / Efficiency2
BIM-MEPAUS
Design
BIMConstruction
CADShop Detailing
CAMFabrication
Designers
Federated Model
BIM – MEPAUS BIM / IPDEXECUTION PLAN
Architectural Component Model
Structural Component Model
BIM-MEPAUS
BIM ALL THE WAY
![Page 16: The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551bccd8550346b9588b5235/html5/thumbnails/16.jpg)
Federated Model => complexity
BIM-MEPAUS
Design
BIMConstruction
CADShop Detailing
BIMAs-Installed
CAMFabrication
Designers
Federated Model
BIM-MEPAUS
Shop Detailing
Architectural Component Model
Structural Component Model
Plumbing Component Model
Fire Component Model
Steel Fab Component Model
Other Sub - Component Model
Electrical Component Model
Mechanical Component Model
Sub-Contractors
![Page 17: The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551bccd8550346b9588b5235/html5/thumbnails/17.jpg)
BIM-MEPAUS Workflows / Efficiency2
BIM-MEPAUS
Design
BIMConstruction
CADShop Detailing
CAMFabrication
Designers
Federated Model
BIM – MEPAUS BIM / IPDEXECUTION PLAN
Architectural Component Model
Structural Component Model
BIM-MEPAUS
BIM ALL THE WAY
![Page 18: The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551bccd8550346b9588b5235/html5/thumbnails/18.jpg)
BIM-MEPAUS Workflows / BIM All The Way
BIM-MEPAUS
Design
BIMConstruction
CADShop Detailing
BIMAs-Installed
FAB
-ME
PA
US
CAMFabrication
BIM-MEPAUS
ConstructionBIM-MEPAUS
Commissioned As-Built
BIM-MEPAUS
Fabrication
Duct Fabrication
Pipe Fabrication
Duct Fabrication
Commissioning
![Page 19: The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551bccd8550346b9588b5235/html5/thumbnails/19.jpg)
BIM-MEPAUS Workflows / BIM All The Way
BIM-MEPAUS
Design Model
BIMConstruction
CADShop Detailing
BIMAs-Installed
FAB
-ME
PA
US
CAMFabrication
BIM-MEPAUS
Construction Model
BIM-MEPAUS
Commissioned As-Built Model
BIM-MEPAUS
Estimating and Fabrication
D&P Fabrication
Pre-Fabrication
BIM-MEPAUS Managed
Content Site
SUPPLIER B
MA M
ODELS
Duct FabricationScheduling
Commissioning
Site Positioning
FAB MODELS Duct FabricationB2B Procurement
![Page 20: The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551bccd8550346b9588b5235/html5/thumbnails/20.jpg)
BIM-MEPAUS Workflows / BIM All The Way
BIM-MEPAUS
Design Model
BIMConstruction
CADShop Detailing
BIMAs-Installed
FAB
-ME
PA
US
CAMFabrication
BIM-MEPAUS
Construction Model
BIM-MEPAUS
Commissioned As-Built Model
BIM-MEPAUS
Estimating and Fabrication
D&P Fabrication
Pre-Fabrication
BIM-MEPAUS Managed
Content Site
SUPPLIER B
MA M
ODELS
Duct FabricationScheduling
Commissioning
Site Positioning
FAB MODELS Duct FabricationB2B Procurement
BIM-MEPAUS Execution Plan / BIM Model Management System
![Page 21: The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551bccd8550346b9588b5235/html5/thumbnails/21.jpg)
BIM-MEPAUS
BIM-MEPAUS
Design Model
BIMConstruction
CADShop Detailing
BIMAs-Installed
FAB
-ME
PA
US
CAMFabrication
BIM-MEPAUS
Construction Model
BIM-MEPAUS
Commissioned As-Built Model
D&P Fabrication
Pre-Fabrication
BIM-MEPAUS Managed
Content Site
SUPPLIER B
MA M
ODELS
Duct FabricationScheduling
Commissioning
Site Positioning
BIM-MEPAUS Execution Plan / BIM Model Management System
FAB MODELS Duct FabricationB2B
BIM-MEPAUS
Estimating and Fabrication
Education and Training / Best Practice Guidelines
![Page 22: The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551bccd8550346b9588b5235/html5/thumbnails/22.jpg)
BIM-MEPAUS Models: Managed Content
BIM-MEPAUS
Design Model
BIMConstruction
CADShop Detailing
BIMAs-Installed
CAMFabrication
BIM-MEPAUS
Estimating and Shop Detailing
D&P Fabrication
Duct Fabrication
Duct Fabrication
Built to defined standards and strict data management protocols – including ANZRS
Integrate with to the BIM-MEPAUS software to support IPD to provide a range of value added functions:
B2B ProcurementEstimating and TenderingManufacturer interfaces
Independently Certified
![Page 23: The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551bccd8550346b9588b5235/html5/thumbnails/23.jpg)
BIM-MEPAUS Models
![Page 24: The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551bccd8550346b9588b5235/html5/thumbnails/24.jpg)
BIM ALL THE WAY / BIM-MEPAUS REVIT
MEP AUS MANAGED CONTENT
BIM-MEPAUS BEST PRACTICE INTRANET
![Page 25: The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551bccd8550346b9588b5235/html5/thumbnails/25.jpg)
Federated Model => complexity
BIM-MEPAUS
Design
BIMConstruction
CADShop Detailing
BIMAs-Installed
CAMFabrication
Designers
Federated Model
BIM-MEPAUS
Shop Detailing
Architectural Component Model
Structural Component Model
Plumbing Component Model
Fire Component Model
Steel Fab Component Model
Other Sub - Component Model
Electrical Component Model
Mechanical Component Model
Sub-Contractors
![Page 26: The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551bccd8550346b9588b5235/html5/thumbnails/26.jpg)
Step Change Innovation
![Page 27: The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551bccd8550346b9588b5235/html5/thumbnails/27.jpg)
BIM-MEPAUS OUR MISSION STATEMENT
BIM-MEPAUS
Design Model
BIMConstruction
CADShop Detailing
BIMAs-Installed
FAB
-ME
PA
US
CAMFabrication
BIM-MEPAUS
Construction Model
BIM-MEPAUS
Commissioned As-Built Model
D&P Fabrication
Pre-Fabrication
BIM-MEPAUS Managed
Content Site
SUPPLIER B
MA M
ODELS
Duct FabricationScheduling
Commissioning
Site Positioning
BIM-MEPAUS Execution Plan / BIM Model Management System
FAB MODELS Duct FabricationB2B
BIM-MEPAUS
Estimating and Fabrication
Education and Training / Best Practice Guidelines
![Page 28: The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551bccd8550346b9588b5235/html5/thumbnails/28.jpg)
BIM-MEPAUS Workflows / BIM All The Way
BIM-MEPAUS
Design
BIMConstruction
CADShop Detailing
BIMAs-Installed
FAB
-ME
PA
US
CAMFabrication
BIM-MEPAUS
ConstructionBIM-MEPAUS
Commissioned As-Built
BIM-MEPAUS
Fabrication
Duct Fabrication
Pipe Fabrication
Duct Fabrication
Commissioning
![Page 29: The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex](https://reader035.vdocuments.mx/reader035/viewer/2022062511/551bccd8550346b9588b5235/html5/thumbnails/29.jpg)
Simplicity is the ultimate sophistication