![Page 1: TEMPO Mission Project July 23, 2013tempo.si.edu/presentations/Jul2013/Little.pdf · July 23, 2013 Project Manager: Alan Little ! TEMPO&instrument&selected&under&EVI41& • AO#solicited#Science,#Instrument,#Operaons,#and#](https://reader035.vdocuments.mx/reader035/viewer/2022070904/5f6f03513276905304743aa2/html5/thumbnails/1.jpg)
TEMPO Mission Project
July 23, 2013 Project Manager: Alan Little
![Page 2: TEMPO Mission Project July 23, 2013tempo.si.edu/presentations/Jul2013/Little.pdf · July 23, 2013 Project Manager: Alan Little ! TEMPO&instrument&selected&under&EVI41& • AO#solicited#Science,#Instrument,#Operaons,#and#](https://reader035.vdocuments.mx/reader035/viewer/2022070904/5f6f03513276905304743aa2/html5/thumbnails/2.jpg)
Ø TEMPO instrument selected under EVI-‐1 • AO solicited Science, Instrument, Opera5ons, and associated project management, systems engineering, and safety and mission assurance
Ø NASA responsible for ge>ng TEMPO Instrument on orbit • NASA Earth Science Division directed NASA LaRC to implement a flight project for the TEMPO satellite host
TEMPO Mission Project
23 July 2013 2
![Page 3: TEMPO Mission Project July 23, 2013tempo.si.edu/presentations/Jul2013/Little.pdf · July 23, 2013 Project Manager: Alan Little ! TEMPO&instrument&selected&under&EVI41& • AO#solicited#Science,#Instrument,#Operaons,#and#](https://reader035.vdocuments.mx/reader035/viewer/2022070904/5f6f03513276905304743aa2/html5/thumbnails/3.jpg)
TEMPO Organization
ESSP PO
Coordina5on of Mission ac5vi5es
TEMPO PI: Kelly Chance
Deputy PI: Xiong Liu Program Administrator: Joseph Webber
Investigation Advisory Panel
Mission Management Mission Project Manager: Alan Little
Deputy Project Manager/Resources: Don Shick
Instrument Instrument PM: W. Pennington
Instrument DPM/COR: Craig Jones CE: Dave Rosenbaum
Project Scientist: David Flittner
Systems Engineering Mission Systems Engineer: TBN
Safety & Mission Assurance SMA Manager: Jose Caraballo
Science Team
Mission Operations
Lead: TBN
Science Advisory Panel
Ground System Lead: TBN
Host Satellite Lead: TBN
Management Support Schedule Lead: Ken Parkinson
Configuration Manager: Kennedy Delgado Resources: Linda Moore
Risk Manager: Craig Hutchinson
I&T Lead: TBN
Instrument Project
Mission Project
Color code
23 July 2013 3
![Page 4: TEMPO Mission Project July 23, 2013tempo.si.edu/presentations/Jul2013/Little.pdf · July 23, 2013 Project Manager: Alan Little ! TEMPO&instrument&selected&under&EVI41& • AO#solicited#Science,#Instrument,#Operaons,#and#](https://reader035.vdocuments.mx/reader035/viewer/2022070904/5f6f03513276905304743aa2/html5/thumbnails/4.jpg)
Concept of Operations
23 July 2013 4
![Page 5: TEMPO Mission Project July 23, 2013tempo.si.edu/presentations/Jul2013/Little.pdf · July 23, 2013 Project Manager: Alan Little ! TEMPO&instrument&selected&under&EVI41& • AO#solicited#Science,#Instrument,#Operaons,#and#](https://reader035.vdocuments.mx/reader035/viewer/2022070904/5f6f03513276905304743aa2/html5/thumbnails/5.jpg)
Ø HoPS: Hosted Payload SoluCons • Indefinite Delivery, Indefinite Quan5ty contract with “lanes” for LEO and GEO hosted payloads
• Implemented by USAF Space and Missile Systems Center (SMC) • Fixed price contracts for Hos5ng • RFP for Air Force contract will be released in Q4 FY13
Ø NASA/SMC collaboraCon • NASA is implemen5ng a Memorandum of Agreement with SMC for collabora5on on the HoPS contract
• NASA is suppor5ng the RFP development and proposal evalua5on
What is HoPS?
23 July 2013 5
![Page 6: TEMPO Mission Project July 23, 2013tempo.si.edu/presentations/Jul2013/Little.pdf · July 23, 2013 Project Manager: Alan Little ! TEMPO&instrument&selected&under&EVI41& • AO#solicited#Science,#Instrument,#Operaons,#and#](https://reader035.vdocuments.mx/reader035/viewer/2022070904/5f6f03513276905304743aa2/html5/thumbnails/6.jpg)
Ø TEMPO accommodaCon studies solicited through HoPS contract • Solicita5on included with HoPS RFP • Up to four six-‐month studies to evaluate
• Accommoda5on of TEMPO instrument on GEO host satellites – Address contamina5on, ji\er – Ini5al dra] interface control document
• Iden5fy launch opportuni5es that poten5ally meet TEMPO requirements
Ø CoordinaCng with other NASA hosted payloads • Laser Communica5ons Relay Demonstra5on (LCRD) • Global-‐scale Observa5ons of the Limb and Disk (GOLD)
TEMPO Accommodation Studies
23 July 2013 6
![Page 7: TEMPO Mission Project July 23, 2013tempo.si.edu/presentations/Jul2013/Little.pdf · July 23, 2013 Project Manager: Alan Little ! TEMPO&instrument&selected&under&EVI41& • AO#solicited#Science,#Instrument,#Operaons,#and#](https://reader035.vdocuments.mx/reader035/viewer/2022070904/5f6f03513276905304743aa2/html5/thumbnails/7.jpg)
TEMPO Mission Overview Schedule
23 July 2013 7
![Page 8: TEMPO Mission Project July 23, 2013tempo.si.edu/presentations/Jul2013/Little.pdf · July 23, 2013 Project Manager: Alan Little ! TEMPO&instrument&selected&under&EVI41& • AO#solicited#Science,#Instrument,#Operaons,#and#](https://reader035.vdocuments.mx/reader035/viewer/2022070904/5f6f03513276905304743aa2/html5/thumbnails/8.jpg)
TEMPO Accommoda5on Mission Schedule Drivers
Ø Primary Mission Schedule Drivers (details for each follow) 1) Procurement of Host 2) Need for Early Design of Interfaces 3) SpacecraM Host Availability
23 July 2013 8
![Page 9: TEMPO Mission Project July 23, 2013tempo.si.edu/presentations/Jul2013/Little.pdf · July 23, 2013 Project Manager: Alan Little ! TEMPO&instrument&selected&under&EVI41& • AO#solicited#Science,#Instrument,#Operaons,#and#](https://reader035.vdocuments.mx/reader035/viewer/2022070904/5f6f03513276905304743aa2/html5/thumbnails/9.jpg)
TEMPO Accommoda5on Mission Schedule Drivers
Ø Primary Mission Schedule Drivers 1) Procurement of Host 2) Need for Early Design of Interfaces
3) SpacecraM Host Availability
Ø Procurement of Host • Assuming u5liza5on of HoPS (Air Force Hosted
Payloads Solu5on office) IDIQ for procurement of Host
• HoPS IDIQ SOW planning/work to start a]er SRR (~Oct) • Dra] IDIQ SOW for Host is submi\ed to HoPS ~April 2014. Final release by HoPS ~October
2014. Host Contract award March 2015 with Host ATP May 2015. • Can move right without affec5ng spacecra] 5meline (no more than spacecra] ATP -‐2
months) but with poten5al increased risk to instrument/spacecra] interface design.
23 July 2013 9
![Page 10: TEMPO Mission Project July 23, 2013tempo.si.edu/presentations/Jul2013/Little.pdf · July 23, 2013 Project Manager: Alan Little ! TEMPO&instrument&selected&under&EVI41& • AO#solicited#Science,#Instrument,#Operaons,#and#](https://reader035.vdocuments.mx/reader035/viewer/2022070904/5f6f03513276905304743aa2/html5/thumbnails/10.jpg)
Instrument
Ø Primary Mission Schedule Drivers 1) Procurement of Host 2) Need for Early Design of Interfaces
3) SpacecraM Host Availability
Ø Interfaces Designed Early • Current Schedule:
• Instrument PDR ~10/2014. CDR ~10/2015. Instrument complete ~5/2017.
• Host contract award ~3/2015. Spacecra3 award no5onally mid-‐2016 for 11/2018 launch.
• Original instrument assump5on included spacecra] selec5on by instrument PDR or as early as possible a]er PDR.
• Time period between Instrument PDR & Host award poses risk to instrument-‐to-‐spacecra] interface.
• Work currently underway to iden5fy interface bounding parameters and specific risks associated with later spacecra] ATP. Early TEMPO Host Accommoda5on studies will provide addi5onal input into risk assessment.
TEMPO Accommoda5on Mission Schedule Drivers
23 July 2013 10
![Page 11: TEMPO Mission Project July 23, 2013tempo.si.edu/presentations/Jul2013/Little.pdf · July 23, 2013 Project Manager: Alan Little ! TEMPO&instrument&selected&under&EVI41& • AO#solicited#Science,#Instrument,#Operaons,#and#](https://reader035.vdocuments.mx/reader035/viewer/2022070904/5f6f03513276905304743aa2/html5/thumbnails/11.jpg)
Ø Primary Mission Schedule Drivers 1) Procurement of Host 2) Need for Early Design of Interfaces
3) SpacecraM Host Availability
Ø SpacecraM Host Availability • Assuming a ~30 month spacecra] development cycle with payload need/instrument
delivery 12 months prior to launch. Assuming earliest possible launch for planning purposes.
• Ini5al 18 months of spacecra] development cycle occur prior to instrument delivery, driving spacecra] ATP to ~6/2016.
TEMPO Accommoda5on Mission Schedule Drivers
23 July 2013 11
![Page 12: TEMPO Mission Project July 23, 2013tempo.si.edu/presentations/Jul2013/Little.pdf · July 23, 2013 Project Manager: Alan Little ! TEMPO&instrument&selected&under&EVI41& • AO#solicited#Science,#Instrument,#Operaons,#and#](https://reader035.vdocuments.mx/reader035/viewer/2022070904/5f6f03513276905304743aa2/html5/thumbnails/12.jpg)
Ø Key dates • Spacecra] vendor known: between 5/15 and 6/16 • Spacecra] loca5on known: ~5/15 • Spacecra] integra5on begins: 11/17 • Earliest launch: 11/18
Key Dates
23 July 2013 12
![Page 13: TEMPO Mission Project July 23, 2013tempo.si.edu/presentations/Jul2013/Little.pdf · July 23, 2013 Project Manager: Alan Little ! TEMPO&instrument&selected&under&EVI41& • AO#solicited#Science,#Instrument,#Operaons,#and#](https://reader035.vdocuments.mx/reader035/viewer/2022070904/5f6f03513276905304743aa2/html5/thumbnails/13.jpg)
Ø Backup
23 July 2013 13