Transcript
Page 1: T r a c k Sheep Wash Pond - Nuneaton and Bedworthapps.nuneatonandbedworth.gov.uk/BT_NBBC_Planning/planning... · 2017-07-13 · progression of scheme on SK drawing sheets. Plot 006

Rev Date Drawn Note

A

B

C

D

E

F

G

H

J

23/11/16

23/11/16

02/06/17

05/06/17

13/06/17

28/06/17

28/06/17

29/06/17

29/06/17

JKG

JKG

JKG

JKG

JKG

JKG

JKG

JKG

JKG

Major changes to highway and plotpositions.

Junction for access to South amended,access on to 'The Long Shoot' shown,sheet size changed to A0.

Major changes to layout further toprogression of scheme on SK drawingsheets.

Plot 006 handed.

Access to numbers 160 & 164 The LongShoot added. Drawing status updatedto 'Planning'.

Amendments made to turning heads.

SUDS feature amended.

SUDS area amended and indicativeplay area shown.

Text on adjacent land removed.

Source File:J83-6 20 Site Model.pln

P03

Proposed residential development atCallendar Farm, The Long Shoot,Nuneaton

Jelson LtdClient

Project Title

Drawing Title

Drawing Status

DateDrawn By Checked By (File copy only)

Job No. Drawing No. Revision

Scale(s):

J83

Proposed Site Layout

1 Millers YardRoman Way

Market HarboroughLeicestershire

LE16 7PW

t : 01858 464986 brp-architects.com

Planning

J

Disclaimer: brp (arch) ltd. accept no responsibility for work notundertaken fully in accordance with the contents of this drawing andrelated specifications. This document and its design content iscopyright protected ©. It shall be read in conjunction with all otherassociated project information including models, specifications,schedules and related consultants documents. Do not scale fromdocuments. All scales noted correct at original paper size. Alldimensions to be checked on site. Immediately report anydiscrepancies, errors or omissions on this document to theoriginator. If in doubt ask.

1:500Original Paper Size:

A0

JKG 04.11.16

Lines denote existing bank feature, as per originaltopographical survey data. Area to be subject tofurther on-site investigations. Minimum distance of1,500mm to be maintained between edge of slopeand external perimeter of proposed unit to facilitatesuitable access during construction

BS

BS

PInv

PInv

87.84

87.84

157

Sheep Wash

Track

188

222

169

164

176

200

152

179

Pond

194

D4/15

GS1

T2/02

T2/02

T2/02

D3/12/E

D4/1

1

GD1

GD1

D4/20

GD1

GS1

GS1

D3/13

GD1

S2/0

2S2

/02

T2/02

T2/02

T2/02

GD1

D4/11

GD1

D4/

10

D4/09

D3/13

D3/12/E

GS1

D4/20

GD1

D4/09

GD1

D4/09

D3/13/K

GS1

S3/04S3/04

D3/13

D4/22

GS1

S3/11

S3/11

S2/02S2/02

D3/12/E

GS1

GD1 D4/22

GS1

GS1

D4/09 GD1

GS1

D3/12/E

GS1

D4/21

GD

1

GP1

D4/21

D3/

19

GD

1

D4/22

GS1

D3/13

GD1

D4/21

GD1

GD

1

S2/02S2/02

D3/

13/K

GS1

D3/

13D

3/13

/K

GP1

S3/0

4S3

/04

T3/0

4T3

/04

T3/0

4D

3/19

S2/02S2/02

S2/02S2/02

S2/0

2S2

/02

S3/0

4S3

/04

D3/

11

T3/04T3/04

T3/04

GS1

D3/13

S3/11

S3/11

D3/11

D3/11

D3/10

T3/04

T3/04

T3/04

GS1T2/02

T2/02T2/02

D4/21

GD1

GP1

GD1

D4/20

GD

1

GD1

D4/11

D4/21

GD1

T2/0

1

T2/0

1

T2/0

1

D4/10

D4/11

D4/20

D4/08

GD1

D4/

10

GD

1

D4/21

D4/08

GD1

D4/11

D5/02

D4/15D4/15

S2/02S2/02

S3/11

S3/11

GS1

D3/13

GD1

D4/11

D4/10

GD1

D3/13/K

D3/12/E

GD1

GD1GD1

GD1

GD1

GD1

D4/08

GD1GD1

D4/11D4/09

GP1

GS1

D4/11

GD1

D3/19

GD1

D4/

09

D4/

11

GD1

D3/13GS1

D4/09

S3/04

S3/04

S2/02

S2/02

S3/04

S3/04

S2/02S2/02

S3/04S3/04

GD1

GD1

D3/13/K

GS1

GS1

T3/0

4T3

/04

T3/0

4

S3/0

4

S3/0

4

D3/

13/K

GP1

D4/09GD1

GD1

D4/21

GD

1

D4/20

D4/11

D4/15GD1

D5/02

D4/15

D4/21

D4/08

GD1

GD1 D4/11

D4/22

GS1

D4/11D3/19

D4/11

S3/04S3/04

GD1D4/11

GD1 GD1

D4/11

GD1D4/20

D4/11

GD1

D4/21

GD1

D5/02

001001

002002 003 003

004 004

005005

006006

007007008008

009009

010

010

011

011

012012

019

020

018018

017017

016 016015 015

014 014 013 013

021021

022022023

024025025

026027027

028 028

029029

030 030

031

032

033

032

033

034 034035

036036

037 037

038

038

039039

040040

041

042 042

043043

044 044

045045

046 046

047

047048 048

049 049

050 050

051 051

052 052

053053

054054

055

056056

057057

058

058

059060

060

061

061

062062

063 063

064

064

065

065

066

066

068 068

069 069

071

070

071

070

072072

073

073

074

074

075

075

077

079

078

078

079

080080

081081

082082

083083

084084

085085

086 086

087

088

089

089

090090

091

091

092

092

093

093

094

094

097097

098

098

096

096

095

095

107

107

108

108

109

109

111

111

110

110

112

112

113

113

114

114

115

115

116

116

117

117

118

118

119

119120

120

121

121

122

122

124124

123 123 150150

149149

148 148

146146

147 147

145 145

144144

143 143

142

141

140

138

138

139

139

041

137

137

136

136

134

134

135

135

133

132

131

131

125

130130

129129

128

128

127127

126126

125

106

106

105

105

104

103

103

103

102

102

101101

100100

99

99

035

031

026

067

067

160

076

076

077

Plot052

Plot053

Plot054

Plot055

Plot056

Plot057

Plot058

Plot059

Plot060

Plot063

Plot064

Plot065

Plot066

Plot067

Plot068

Plot069

Plot073

Plot074

Plot075

Plot076

Plot078

Plot079

Plot080

Plot081

Plot082

Plot083

Plot084

Plot085

Plot086

Plot087

Plot089

Plot090

Plot091

Plot092

Plot095

Plot096

Plot098

Plot116

Plot117

Plot124

Plot125

Plot126

Plot128

Plot129

Plot130

Plot131

Plot132

Plot133

Plot134

Plot135

Plot136

Plot137

Plot138

Plot139

Plot140

Plot141

Plot142

Plot143

Plot144

Plot145

Plot146

Plot147

Plot148

Plot149

Plot150

Plot061

Plot062

Plot097

Plot094

Plot093

Plot127

Plot123

Plot088

Plot001

Plot002

Plot003

Plot004

Plot010

Plot011

Plot012

Plot016Plot

017

Plot018

Plot019

Plot020

Plot021

Plot022

Plot023Plot

024Plot025

Plot026

Plot027

Plot028

Plot029

Plot030

Plot031

Plot032

Plot033

Plot034

Plot035 Plot

036

Plot037

Plot038Plot

040

Plot041

Plot042

Plot043

Plot044

Plot045

Plot046

Plot047

Plot048 Plot

049

Plot050

Plot051

Plot039

Plot070

Plot071

Plot072

Plot099

Plot100

Plot101

Plot102

Plot103

Plot104

Plot105

Plot106

Plot107

Plot108

Plot109

Plot110

Plot111

Plot112

Plot113

Plot114

Plot115

Plot118

Plot119

Plot120

Plot121

Plot122

Plot009

Plot013Plot

014Plot015

Plot005

Plot007

Plot008

Plot006

Plot077

TH

E

LO

NG

S

HO

OT

Indicativeattenuation / SUDS

feature

Indicativeswale feature

Indicativeswale feature

Indicativeattenuation / SUDS

feature

PlayArea

access drive / road

site boundary

existing context / buildings

site key

soft landscaping - public areas

footpaths

private drives

designated car parking spaces

primary site access

private garden areas

proposed tree planting

proposed hedgerow / shrub planting

proposed housing - private market

existing tree to be retained

proposed housing - affordable

side windows to prominent locations*

N

5020

Scale (m)

30 400

10

Proposed Site LayoutScale: 1:500 housetype

S2/02T2/01S3/04T3/04S3/11D3/10D3/11D3/12/ED3/13D3/13/KD3/19D4/08D4/09D4/10D4/11D4/15D4/20D4/21D4/22D5/02

sub-total

S2/02T2/02S3/04T3/04

sub-total

total

no. of beds

22333333333444444445

2233

no. of units

1034361358644841656943

112no. units

89129

38no. units

150no.

private market

affordable(25% across development)

schedule of accommodation

Top Related