Atlanta BeltLine SW + SE Study
Group:
Southside Trail-West
Construction
January 16, 2020
@atlantabeltline
@atlantabeltline
@atlantabeltline
![Page 2: SW + SE Study · 16.01.2020 · Atlanta BeltLine SW + SE Study Group: Southside Trail-West Construction. January 16, 2020. @atlantabeltline. @atlantabeltline. @atlantabeltline](https://reader034.vdocuments.mx/reader034/viewer/2022051912/6002ef0613e34f111025d725/html5/thumbnails/2.jpg)
Southside Trail
Updates
• Southside Trail-West Construction Update
• Meet the Contractor
• Construction FAQ
• Southside Trail-West Groundbreaking Event
![Page 3: SW + SE Study · 16.01.2020 · Atlanta BeltLine SW + SE Study Group: Southside Trail-West Construction. January 16, 2020. @atlantabeltline. @atlantabeltline. @atlantabeltline](https://reader034.vdocuments.mx/reader034/viewer/2022051912/6002ef0613e34f111025d725/html5/thumbnails/3.jpg)
Meet the Contractor – Astra Group, Inc.
Jose Hasbun------
Project Manager
![Page 4: SW + SE Study · 16.01.2020 · Atlanta BeltLine SW + SE Study Group: Southside Trail-West Construction. January 16, 2020. @atlantabeltline. @atlantabeltline. @atlantabeltline](https://reader034.vdocuments.mx/reader034/viewer/2022051912/6002ef0613e34f111025d725/html5/thumbnails/4.jpg)
Southside TrailWest
Construction
FAQHighlights
• Q: What hours is the contractor allowed to work?
• A: M-F 7AM – 7PM; Sat & Sun 9AM – 5PM (at
ABI’s discretion).
• Q: Are there any areas of the Southside Trail-West
that will be open during construction?
• A: No, due to massive grading that will require
cutting through an existing 20+ foot high
banked slope at Pittsburgh Yards.
![Page 5: SW + SE Study · 16.01.2020 · Atlanta BeltLine SW + SE Study Group: Southside Trail-West Construction. January 16, 2020. @atlantabeltline. @atlantabeltline. @atlantabeltline](https://reader034.vdocuments.mx/reader034/viewer/2022051912/6002ef0613e34f111025d725/html5/thumbnails/5.jpg)
Southside TrailWest
Construction
FAQHighlights
• Q: Will community members be able to apply for
vacant positions on the construction project?
• A: Yes. Please contact Worksource Atlanta for
details.
• Q: Where will construction access points be
located?
• A: Construction vehicles will enter the corridor
from Allene Avenue and Pryor Road.
![Page 6: SW + SE Study · 16.01.2020 · Atlanta BeltLine SW + SE Study Group: Southside Trail-West Construction. January 16, 2020. @atlantabeltline. @atlantabeltline. @atlantabeltline](https://reader034.vdocuments.mx/reader034/viewer/2022051912/6002ef0613e34f111025d725/html5/thumbnails/6.jpg)
SST-W Construction Extents
![Page 7: SW + SE Study · 16.01.2020 · Atlanta BeltLine SW + SE Study Group: Southside Trail-West Construction. January 16, 2020. @atlantabeltline. @atlantabeltline. @atlantabeltline](https://reader034.vdocuments.mx/reader034/viewer/2022051912/6002ef0613e34f111025d725/html5/thumbnails/7.jpg)
SST-W Construction Closures
![Page 8: SW + SE Study · 16.01.2020 · Atlanta BeltLine SW + SE Study Group: Southside Trail-West Construction. January 16, 2020. @atlantabeltline. @atlantabeltline. @atlantabeltline](https://reader034.vdocuments.mx/reader034/viewer/2022051912/6002ef0613e34f111025d725/html5/thumbnails/8.jpg)
Westside Trail Access from University Ave
![Page 9: SW + SE Study · 16.01.2020 · Atlanta BeltLine SW + SE Study Group: Southside Trail-West Construction. January 16, 2020. @atlantabeltline. @atlantabeltline. @atlantabeltline](https://reader034.vdocuments.mx/reader034/viewer/2022051912/6002ef0613e34f111025d725/html5/thumbnails/9.jpg)
Detours along
University Avenue
[insert flyer]
![Page 10: SW + SE Study · 16.01.2020 · Atlanta BeltLine SW + SE Study Group: Southside Trail-West Construction. January 16, 2020. @atlantabeltline. @atlantabeltline. @atlantabeltline](https://reader034.vdocuments.mx/reader034/viewer/2022051912/6002ef0613e34f111025d725/html5/thumbnails/10.jpg)
Southside Trail West
ConstructionInfo -
Updates
For general construction concerns, email:
Construction Emergencies:
Jose Hasbun – 205.903.6460
General Construction Questions:
678.757.4932
Beltline.org/southsidetrail
![Page 11: SW + SE Study · 16.01.2020 · Atlanta BeltLine SW + SE Study Group: Southside Trail-West Construction. January 16, 2020. @atlantabeltline. @atlantabeltline. @atlantabeltline](https://reader034.vdocuments.mx/reader034/viewer/2022051912/6002ef0613e34f111025d725/html5/thumbnails/11.jpg)
Southside Trail-West Groundbreaking
Please join us!
![Page 12: SW + SE Study · 16.01.2020 · Atlanta BeltLine SW + SE Study Group: Southside Trail-West Construction. January 16, 2020. @atlantabeltline. @atlantabeltline. @atlantabeltline](https://reader034.vdocuments.mx/reader034/viewer/2022051912/6002ef0613e34f111025d725/html5/thumbnails/12.jpg)
OtherUpcoming
AtlantaBeltLinePublic
Meetings
• SW Study Group Meeting – January 23nd
o Design of an access point in Westview
and West End
o The Ke’nekto 1492 Ralph David Abernathy Blvd SW
• 1st Quarterly Briefing – February 20th
o All Saints’ Episcopal Churcho 634 W Peachtree Street NW
![Page 13: SW + SE Study · 16.01.2020 · Atlanta BeltLine SW + SE Study Group: Southside Trail-West Construction. January 16, 2020. @atlantabeltline. @atlantabeltline. @atlantabeltline](https://reader034.vdocuments.mx/reader034/viewer/2022051912/6002ef0613e34f111025d725/html5/thumbnails/13.jpg)
QUESTIONS?
Thank you!