Surface TreatmentSurface Treatment

Multi Agencies CollaborationMulti Agencies Collaboration

Page 2: Surface Treatment

Participating AgenciesParticipating Agencies

Oregon Department of Transportation Ona Beach Maintenance Section

Rose Lodge Maintenance Section

Benton County Department of Transportation

Private Contractors

Page 3: Surface Treatment

2010 Surface Treatment Projects2010 Surface Treatment Projects

Highway 34 From Milepost 7.0- Milepost 14.0

Highway 226 From Milepost 13.5-Milepost 16.0

Page 4: Surface Treatment

Oregon Department of Oregon Department of Transportation Responsibilities Transportation Responsibilities

• Materials Contracts

• Iron Mountain Chip Seal Rock 3/8-1/4,

• Liquid Asphalt-HFRS-1P

• Testing of Materials

Page 5: Surface Treatment

Oregon Department of Oregon Department of Transportation ResponsibilitiesTransportation Responsibilities

• Stockpile Site Preparation

• Stockpile Chip Seal Rock

• Monitor Stockpile Moisture Content

• Stockpile Location Cleanup

Page 6: Surface Treatment

Oregon Department of Oregon Department of Transportation ResponsibilitiesTransportation Responsibilities

• Front End Loader and Operator

• Three Roller Operators

• One Pneumatic Roller (Rental/within ODOT)

• Six Ten Yard Trucks and Drivers

• 2000 gal. Water Truck

• Open Air Broom and Operator

• Broom Shadow Vehicle and Operator

Page 7: Surface Treatment

Oregon Department of Oregon Department of Transportation ResponsibilitiesTransportation Responsibilities

• VMS Boards placed for advanced warning

• Stick and Stomps and Setter Prior to start of Project

• Work Zone Signage and Set up

• Pilot Cars and Operators

• Stick and Stomp Tab Cover Removal

Page 8: Surface Treatment

Benton County Department of Benton County Department of Transportation Responsibilities Transportation Responsibilities

• Materials Contract (Freight/Distributors)

• Daily Ordering of Materials

• Material Samples for Testing

Page 9: Surface Treatment

Benton County Department of Benton County Department of Transportation ResponsibilitiesTransportation Responsibilities

• 2000 Gallon Liquid Asphalt Distributor and Operator ( as needed for chip seal and fog seal)

• Chip Spreader with Operator and Dump Boss/Belt Operator

• Pneumatic Roller and Steel Wheel Single Drum• Ten Yard Dump Trucks( as needed)• Open Air Broom ( as needed)• Specialty Signs ( Loose Rock, Fresh Oil)

Page 10: Surface Treatment

Contractor ResponsibilitiesContractor Responsibilities

• 4400 Gallon Liquid Asphalt Distributor (Chip Seal and Fog Seal, Albania)

• Traffic Control Flaggers ( St Vincent's )

Page 11: Surface Treatment

Surface Treatment Multi Agency Surface Treatment Multi Agency CollaborationCollaboration

• Benton County Chip Spreader

• ODOT Ten Yard Truck

Page 12: Surface Treatment

Surface Treatment Multi Agency Surface Treatment Multi Agency CollaborationCollaboration

Contractor 4400 Gallon Liquid Asphalt Distributor

Page 13: Surface Treatment

Surface Treatment Multi Agency Surface Treatment Multi Agency CollaborationCollaboration

• Benton County Rollers

• ODOT Roller

• ODOT Operators

Page 14: Surface Treatment

Surface Treatment Multi Agency Surface Treatment Multi Agency CollaborationCollaboration

• ODOT Pilot Vehicle

Page 15: Surface Treatment

Surface Treatment Multi Agency Surface Treatment Multi Agency CollaborationCollaboration

• ODOT Pilot Vehicle controlling traffic speeds through the work zone.

Page 16: Surface Treatment

Estimated Costs for Hwy 34Estimated Costs for Hwy 34

• Cost per mile $37,200

• Cost per sq yd $2.65