ZNE adaptive lighting retrofits for Recreation Center & Offices and future plans at UCSB
Student Affairs
![Page 2: Sub-metering : Demonstrated the need for advanced controls](https://reader035.vdocuments.mx/reader035/viewer/2022062410/568161cd550346895dd1bac4/html5/thumbnails/2.jpg)
Sub-metering: Demonstrated the need for advanced controls
![Page 3: Sub-metering : Demonstrated the need for advanced controls](https://reader035.vdocuments.mx/reader035/viewer/2022062410/568161cd550346895dd1bac4/html5/thumbnails/3.jpg)
With LED (18K Lumen) and Advanced Controls
![Page 4: Sub-metering : Demonstrated the need for advanced controls](https://reader035.vdocuments.mx/reader035/viewer/2022062410/568161cd550346895dd1bac4/html5/thumbnails/4.jpg)
Energy Saving Approaching 80% in areas with LED Fixtures and Advanced Controls
![Page 5: Sub-metering : Demonstrated the need for advanced controls](https://reader035.vdocuments.mx/reader035/viewer/2022062410/568161cd550346895dd1bac4/html5/thumbnails/5.jpg)
Effectiveness of retrofit highlights need to control Emergency fixtures
Usage Prio
r to Retro
fit (P2S Audit)
Combined Usa
ge Post Retro
fit
Controlle
d Fixtures U
sage (6
9x)
Emergency Fixt
ures Usa
ge (7x)
010002000300040005000600070008000
Electrical Consumption Detail - Pre and Post Retrofit of the MAC Gymnasium - February 2014
KWH
![Page 6: Sub-metering : Demonstrated the need for advanced controls](https://reader035.vdocuments.mx/reader035/viewer/2022062410/568161cd550346895dd1bac4/html5/thumbnails/6.jpg)
Solar efficiency improved over prior years with energy efficiency gains
2009 2010 2011 2012 2013 2014 -
50,000
100,000
150,000
200,000
250,000
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
Solar Generation compared to total consumption from Jan-uary through April
Total KWH Use PV Generation Net KwH Balance % Solar
![Page 7: Sub-metering : Demonstrated the need for advanced controls](https://reader035.vdocuments.mx/reader035/viewer/2022062410/568161cd550346895dd1bac4/html5/thumbnails/7.jpg)
Portfolio of SA Buildings
![Page 8: Sub-metering : Demonstrated the need for advanced controls](https://reader035.vdocuments.mx/reader035/viewer/2022062410/568161cd550346895dd1bac4/html5/thumbnails/8.jpg)
Portfolio of Buildings - plans
![Page 9: Sub-metering : Demonstrated the need for advanced controls](https://reader035.vdocuments.mx/reader035/viewer/2022062410/568161cd550346895dd1bac4/html5/thumbnails/9.jpg)
Future plans• Air or Ground Source Heat Pumps for Pool Heating• Expanding lighting retrofits to take advantage of SEP incentive cycle• HVAC - Roof top units such as catalyst – partnership with SPEED and
SCE• Sub-metering to ensure gains achieved remain• Increased solar PV presence on rooftops to complement energy
efficiency measures – requires another 423kW to be ZNE on electrical consumption