Status update presentation #1 for
the Cayucos Sustainable Water Project
November 19, 2015
![Page 2: Status update presentation #1 for the Cayucos Sustainable ......2019/11/15 · Status update presentation #1 for the Cayucos Sustainable Water Project November 19, 2015 Presentation](https://reader034.vdocuments.mx/reader034/viewer/2022051823/5fee28fb2ab5d0302f18c2e1/html5/thumbnails/2.jpg)
Presentation– Phase 1 Overview– Cayucos Sanitary District
Wastewater Characterization– Treatment & Regulatory
Overview– Funding & Financing Evaluation– Next Steps
Slide 2
![Page 3: Status update presentation #1 for the Cayucos Sustainable ......2019/11/15 · Status update presentation #1 for the Cayucos Sustainable Water Project November 19, 2015 Presentation](https://reader034.vdocuments.mx/reader034/viewer/2022051823/5fee28fb2ab5d0302f18c2e1/html5/thumbnails/3.jpg)
Slide 3
![Page 4: Status update presentation #1 for the Cayucos Sustainable ......2019/11/15 · Status update presentation #1 for the Cayucos Sustainable Water Project November 19, 2015 Presentation](https://reader034.vdocuments.mx/reader034/viewer/2022051823/5fee28fb2ab5d0302f18c2e1/html5/thumbnails/4.jpg)
Scope– Determine historical and projected flows and constituent
loadings for the District’s wastewater
Purpose– Select design flowrates and mass loadings
• Evaluate flow equalization opportunities• Determine size of unit processes
Key – A Fresh Approach
Understand Previous Studies
Use existing data to develop Cayucos-
specific data
Identify Data Gaps
Provide recommendations to obtain additional Cayucos-
specific data
Update Wastewater
Characterization
IntroductionWastewater Characterization
![Page 5: Status update presentation #1 for the Cayucos Sustainable ......2019/11/15 · Status update presentation #1 for the Cayucos Sustainable Water Project November 19, 2015 Presentation](https://reader034.vdocuments.mx/reader034/viewer/2022051823/5fee28fb2ab5d0302f18c2e1/html5/thumbnails/5.jpg)
Characterization ApproachWastewater Characterization
![Page 6: Status update presentation #1 for the Cayucos Sustainable ......2019/11/15 · Status update presentation #1 for the Cayucos Sustainable Water Project November 19, 2015 Presentation](https://reader034.vdocuments.mx/reader034/viewer/2022051823/5fee28fb2ab5d0302f18c2e1/html5/thumbnails/6.jpg)
0.525 mgd0.325 mgd
0.232 mgd
1.17 mgd
Historic FlowsWastewater Characterization
![Page 7: Status update presentation #1 for the Cayucos Sustainable ......2019/11/15 · Status update presentation #1 for the Cayucos Sustainable Water Project November 19, 2015 Presentation](https://reader034.vdocuments.mx/reader034/viewer/2022051823/5fee28fb2ab5d0302f18c2e1/html5/thumbnails/7.jpg)
Wastewater Characterization
Water Quality Analysis
![Page 8: Status update presentation #1 for the Cayucos Sustainable ......2019/11/15 · Status update presentation #1 for the Cayucos Sustainable Water Project November 19, 2015 Presentation](https://reader034.vdocuments.mx/reader034/viewer/2022051823/5fee28fb2ab5d0302f18c2e1/html5/thumbnails/8.jpg)
Flow Monitoring and Water Quality Sampling Program– Strengthen results of preliminary wastewater characterization– Preliminary data updated after each phase
• Phase 1: November 2015 – March 2016• Phase 2: April 2016 – June 2016• Phase 3: July 2016 – August 2016
Flow Monitoring– Continuous instantaneous flow monitoring– Flow meters located at manholes upstream of Lift Station 2 and Lift
Station 5
Water Quality Sampling– Composite sampling upstream of Lift Station 5– Minimum of one (1) 7-day sampling event per month– TSS, BOD, COD, Nitrogen, TDS
Sampling PlanWastewater Characterization
![Page 9: Status update presentation #1 for the Cayucos Sustainable ......2019/11/15 · Status update presentation #1 for the Cayucos Sustainable Water Project November 19, 2015 Presentation](https://reader034.vdocuments.mx/reader034/viewer/2022051823/5fee28fb2ab5d0302f18c2e1/html5/thumbnails/9.jpg)
Characterization Next StepsWastewater Characterization
![Page 10: Status update presentation #1 for the Cayucos Sustainable ......2019/11/15 · Status update presentation #1 for the Cayucos Sustainable Water Project November 19, 2015 Presentation](https://reader034.vdocuments.mx/reader034/viewer/2022051823/5fee28fb2ab5d0302f18c2e1/html5/thumbnails/10.jpg)
Treatment and Regulatory Overview— Recycled water beneficial use alternatives— Treatment process overview— Regulatory and permitting requirements— Public outreach and stakeholder support
Treatment and Regulatory Overview
![Page 11: Status update presentation #1 for the Cayucos Sustainable ......2019/11/15 · Status update presentation #1 for the Cayucos Sustainable Water Project November 19, 2015 Presentation](https://reader034.vdocuments.mx/reader034/viewer/2022051823/5fee28fb2ab5d0302f18c2e1/html5/thumbnails/11.jpg)
Recycled Water Beneficial Use Alternatives
Treatment and Regulatory Overview
![Page 12: Status update presentation #1 for the Cayucos Sustainable ......2019/11/15 · Status update presentation #1 for the Cayucos Sustainable Water Project November 19, 2015 Presentation](https://reader034.vdocuments.mx/reader034/viewer/2022051823/5fee28fb2ab5d0302f18c2e1/html5/thumbnails/12.jpg)
Primary Treatment
—Includes headworks for large material and grit removal
—Followed by primary clarification or settling
Treatment and Regulatory Overview
![Page 13: Status update presentation #1 for the Cayucos Sustainable ......2019/11/15 · Status update presentation #1 for the Cayucos Sustainable Water Project November 19, 2015 Presentation](https://reader034.vdocuments.mx/reader034/viewer/2022051823/5fee28fb2ab5d0302f18c2e1/html5/thumbnails/13.jpg)
Secondary TreatmentTreatment and Regulatory Overview
![Page 14: Status update presentation #1 for the Cayucos Sustainable ......2019/11/15 · Status update presentation #1 for the Cayucos Sustainable Water Project November 19, 2015 Presentation](https://reader034.vdocuments.mx/reader034/viewer/2022051823/5fee28fb2ab5d0302f18c2e1/html5/thumbnails/14.jpg)
Tertiary TreatmentTreatment and Regulatory Overview
![Page 15: Status update presentation #1 for the Cayucos Sustainable ......2019/11/15 · Status update presentation #1 for the Cayucos Sustainable Water Project November 19, 2015 Presentation](https://reader034.vdocuments.mx/reader034/viewer/2022051823/5fee28fb2ab5d0302f18c2e1/html5/thumbnails/15.jpg)
Full Advanced TreatmentTreatment and Regulatory Overview
![Page 16: Status update presentation #1 for the Cayucos Sustainable ......2019/11/15 · Status update presentation #1 for the Cayucos Sustainable Water Project November 19, 2015 Presentation](https://reader034.vdocuments.mx/reader034/viewer/2022051823/5fee28fb2ab5d0302f18c2e1/html5/thumbnails/16.jpg)
Treatment and Regulatory Overview
![Page 17: Status update presentation #1 for the Cayucos Sustainable ......2019/11/15 · Status update presentation #1 for the Cayucos Sustainable Water Project November 19, 2015 Presentation](https://reader034.vdocuments.mx/reader034/viewer/2022051823/5fee28fb2ab5d0302f18c2e1/html5/thumbnails/17.jpg)
Potential Outfall Discharge Requirements
– California Ocean Plan identifies for brine discharge receiving water limit of 2 pptabove natural background (no greater than 100 meters from discharge point)– Recycled water system brine concentrations are significantly lower than the
salinity of seawater and thus should easily comply with this requirement
Anticipated NDPES Discharge Requirements1
Parameter BOD TSSAverage Monthly (mg/L) 30 30Average Weekly (mg/L) 45 4530-Day Average Percent
Removal (%)>85% >85%
Treatment and Regulatory Overview
1Morro Bay Cayucos Facilities Master Plan Amendment 2 (MWH 2010), Clean Water Act (133.102)
![Page 18: Status update presentation #1 for the Cayucos Sustainable ......2019/11/15 · Status update presentation #1 for the Cayucos Sustainable Water Project November 19, 2015 Presentation](https://reader034.vdocuments.mx/reader034/viewer/2022051823/5fee28fb2ab5d0302f18c2e1/html5/thumbnails/18.jpg)
Public Outreach for Beneficial Reuse
CommunityParticipation
Independent Advisory Panel
Press and Media Support
Newsletters and Factsheets
Social Media and Events
PublicComment
Stakeholder Support
Treatment and Regulatory Overview
![Page 19: Status update presentation #1 for the Cayucos Sustainable ......2019/11/15 · Status update presentation #1 for the Cayucos Sustainable Water Project November 19, 2015 Presentation](https://reader034.vdocuments.mx/reader034/viewer/2022051823/5fee28fb2ab5d0302f18c2e1/html5/thumbnails/19.jpg)
Funding & Financing StrategyIdentifyAvailable Funding Opportunities
Screen for Programs Relevant to Project
Prepare Capture Plan
Submit Funding Application
— Water Recycling Funding Program (WRFP)— Clean Water State Revolving Fund (CWSRF)
Grants and Financing— U.S. Bureau of Reclamation WaterSMART Water
and Energy Efficiency Grant— U.S. Bureau of Reclamation Title XVI Water
Reclamation and Reuse Program— Integrated Regional Water Management (IRWM)
Grants— Prop 1
Track additional financing and funding opportunities continuously
Funding & Financing
![Page 20: Status update presentation #1 for the Cayucos Sustainable ......2019/11/15 · Status update presentation #1 for the Cayucos Sustainable Water Project November 19, 2015 Presentation](https://reader034.vdocuments.mx/reader034/viewer/2022051823/5fee28fb2ab5d0302f18c2e1/html5/thumbnails/20.jpg)
Funding and Financing OpportunitiesFunding Opportunity Grant/
LoanFunding Availability Schedule/
Deadlines
WRFP Construction Funding Program
Grant and low-interestFinancing
Available grant funds limited to the lesser of 35% of eligible construction costs or $5 million.20 year financing term at interest rate set to half of the most recent General Obligation (GO) bond rate.
ContinuousApplication Process
Clean Water State Revolving Fund (CWSRF)
Low-interest financing
No funding limit. 20 year financing term at interest rate set to half of the most recent GO bond rate.
ContinuousApplication Process
USBR WaterSMART Water and Energy Efficiency Grant Grant
Funding Group I: Up to $300,000 (project completed within 2 years)Funding Group II: Up to $1,000,000 (project completed within 3 years)No more than $500,000 in Federal funds provided to one applicant in a given Federal fiscal year.
FY 2016Applications due January 20, 2016
USBR Title XVI Feasibility Studies
Grant
Funding Group I: Up to $150,000Funding Group II: Up to $450,000Maximum Federal cost share of 50%
FY 2016 Applications due December 10, 2016USBR Title XVI Construction
and Implementation Lesser of 25% of project costs or $4 million
Integrated Regional Water Management Plan Grant Dependent on amount of Prop 84 money available for funding area
($4.94 million remaining for the Central Coast Funding Area).
Applicationstypically due in summer.
Funding & Financing
*Prop 1 funds anticipated to be available through CWSRF and WRFP programs
![Page 21: Status update presentation #1 for the Cayucos Sustainable ......2019/11/15 · Status update presentation #1 for the Cayucos Sustainable Water Project November 19, 2015 Presentation](https://reader034.vdocuments.mx/reader034/viewer/2022051823/5fee28fb2ab5d0302f18c2e1/html5/thumbnails/21.jpg)
Sample Capture PlanFunding & Financing
![Page 22: Status update presentation #1 for the Cayucos Sustainable ......2019/11/15 · Status update presentation #1 for the Cayucos Sustainable Water Project November 19, 2015 Presentation](https://reader034.vdocuments.mx/reader034/viewer/2022051823/5fee28fb2ab5d0302f18c2e1/html5/thumbnails/22.jpg)
Sample Capture PlanFunding & Financing
![Page 23: Status update presentation #1 for the Cayucos Sustainable ......2019/11/15 · Status update presentation #1 for the Cayucos Sustainable Water Project November 19, 2015 Presentation](https://reader034.vdocuments.mx/reader034/viewer/2022051823/5fee28fb2ab5d0302f18c2e1/html5/thumbnails/23.jpg)
Next Steps
![Page 24: Status update presentation #1 for the Cayucos Sustainable ......2019/11/15 · Status update presentation #1 for the Cayucos Sustainable Water Project November 19, 2015 Presentation](https://reader034.vdocuments.mx/reader034/viewer/2022051823/5fee28fb2ab5d0302f18c2e1/html5/thumbnails/24.jpg)
Comparative Analysis
– Engineering, Environmental and Permitting evaluation of conceptual WRRF locations and beneficial use alternatives
![Page 25: Status update presentation #1 for the Cayucos Sustainable ......2019/11/15 · Status update presentation #1 for the Cayucos Sustainable Water Project November 19, 2015 Presentation](https://reader034.vdocuments.mx/reader034/viewer/2022051823/5fee28fb2ab5d0302f18c2e1/html5/thumbnails/25.jpg)
Upcoming Presentation• December 3rd BOD Presentation
– Water Resource Recovery Facility (WRRF) Siting Evaluation
• Site Evaluation– Archeological– Biological– Geologic
• Collection System Re-configuration Alternatives
![Page 26: Status update presentation #1 for the Cayucos Sustainable ......2019/11/15 · Status update presentation #1 for the Cayucos Sustainable Water Project November 19, 2015 Presentation](https://reader034.vdocuments.mx/reader034/viewer/2022051823/5fee28fb2ab5d0302f18c2e1/html5/thumbnails/26.jpg)
Questions?
![Page 27: Status update presentation #1 for the Cayucos Sustainable ......2019/11/15 · Status update presentation #1 for the Cayucos Sustainable Water Project November 19, 2015 Presentation](https://reader034.vdocuments.mx/reader034/viewer/2022051823/5fee28fb2ab5d0302f18c2e1/html5/thumbnails/27.jpg)
Wastewater Treatment and Reuse Process Flow
Treatment and Regulatory Overview