Page 1: SOUTHWEST SCHOOLS PROJECT

BFOCMarch 5, 2009

SOUTHWEST SCHOOLS PROJECT

Page 2: SOUTHWEST SCHOOLS PROJECT

200

450 over capacity

150 over capacity

400 over capacity

300 over capacity

150 over capacity

150 under capacity

Page 3: SOUTHWEST SCHOOLS PROJECT

Now at capacity with new additions

150 over capacity

150 over capacity

Pistor

Hohokam

Valencia

150 under capacity

Maxwell

Page 4: SOUTHWEST SCHOOLS PROJECT

Proposed Site

Proposed Site

Page 5: SOUTHWEST SCHOOLS PROJECT

Top Sites for the Southwest Schools

Ajo Way

Cam

ino

Ver

de

Valencia

Irvington

Mis

sio

n

Wad

eIrvington

Car

din

al

Valencia

LYNN-UProposed Site

Proposed Site

Page 6: SOUTHWEST SCHOOLS PROJECT

Site #9

Proposal #3 CB Richard Ellis

Page 7: SOUTHWEST SCHOOLS PROJECT

Via Ingresso Site(Site #9)Approximately 24 acres

2 utility easements; one 7 acre drainage easement

May be able to use 2-3 acres of drainage easement

K-5 or K-8

Flat and out of floodplain

Located between Lynn-Urquides and Grijalva Elementary Schools

.6 miles from Lynn-Urquides

Access onto Mission Road

Utilities are adjacent

Many students could walk

Page 8: SOUTHWEST SCHOOLS PROJECT

Via Ingresso Tasks

December 9 Board decision and authorization to execute of trade agreements

Mar Hire broker to put site W and 125 (and others?) on the markethire architect

June Time to sell sites to others ends

August Complete trade with executed contract and at least $1.5M in escrow to help fund the school

Page 9: SOUTHWEST SCHOOLS PROJECT

Site #1

Proposal #1 Pomegranate Farms

Page 10: SOUTHWEST SCHOOLS PROJECT

Pomegranate Development Agreement(Site #1)1. Trade of approximately 45 acres of TUSD property at the corner of Valencia and Cardinal for 15 acres within the Pomegranate Farms Development at approximately 9000 W Valencia Road. As an additional consideration for the trade, Pomegranate Farms will provide $3,000,000 for the construction of the school.

2. TUSD will construct a K-8 school of approximately 70,000 square feet, which could open in August of 2011.

3. CC&Rs will include an assessment on properties in the development to support the school and provide incentives for teachers.

Page 11: SOUTHWEST SCHOOLS PROJECT

Pomegranate Site(Site #1)Approximately 15 acres

Shared use for playfields

Utilities and infrastructure to be installed by developer

K-8

Flat and out of floodplain

Located centrally in a planned 3000-unit development

Page 12: SOUTHWEST SCHOOLS PROJECT

Questions/Comments

Page 13: SOUTHWEST SCHOOLS PROJECT
Page 14: SOUTHWEST SCHOOLS PROJECT

Site #2

Note: Though Site #2 is offered Site #3is preferred.

Proposal #2 Broadway Realty and Trust

Page 15: SOUTHWEST SCHOOLS PROJECT

Site #13

Proposal #4 Gran Tierra

Page 16: SOUTHWEST SCHOOLS PROJECT

Final Proposal and Valuations

Site Size (acres)Southwest Appraisers

MJN Appraisers

DeGrazia Company Status

TUSD #71 9.4 $860,000 $700,000 $675,000 trade

TUSD X 18.5 $1,600,000 $1,200,000 $1,200,000 trade

TUSD W 20 $1,800,000 $1,000,000 $1,000,000 hold

TUSD #125 8.7 $900,000 $650,000 $500,000 hold

Total TUSD   $5,160,000 $3,550,000 $3,375,000  

Trade Site #917-20

useable $700,000 $1,950,000 $1,850,000 trade

Funds for Escrow   $4,460,000 $1,600,000 $1,450,000  

Page 17: SOUTHWEST SCHOOLS PROJECT

Pomegranate Site(Site #1)Approximately 15 acres

Shared use for playfields

Utilities and infrastructure to be installed by developer

K-8

Flat and out of floodplain

Located centrally in a planned 3000-unit development

Page 18: SOUTHWEST SCHOOLS PROJECT

Students in the Area

Proposed Site