Some thoughts on the cost of wind energy
Andrew GarradGarrad Hassan and Partners
Cost effectiveness of wind energy
EWEC Milan May 2007
Job number/BT/ serial number/ page number 008 BA003 2
Economics
• Cost• Price• Value ?
Job number/BT/ serial number/ page number 008 BA003 3
Cost drivers
• Politics• Engineering• Competition• Volume• Reliability • Grid integration• Financing
Wind speed!
Job number/BT/ serial number/ page number 008 BA003 4
Cash flow in 2006 € billions per annum
4.5
BoP
O and M
1.6
Finance1.6
PowerPurchaser
8.6
Turbines
10.5
Component
7
70,000 MW installed15,000 MW new
New
capita
l12.75
Owner
Others
1.6
Developers
1.6
Services
Who’s who in the wind industry
€21 billion
Without M and A
Job number/BT/ serial number/ page number 008 BA003 5
Project model
Development Construction Operations
Turbine supply
BoP Installation
Operations & Maintenance
Power Purchase
Site Selection and Design
Equity Financing
Debt Financing
Who’s who in the wind industry
Job number/BT/ serial number/ page number 008 BA003 6
Project development
Development
Site Selection and Design
Who’s who in the wind industry
Construction Operations
• High demand• High profit• High cost• Project pipelines exchanging hands at high margins• Increased supply will reduce costs• Country dependent• Long lead items
•PPA•Wind resource assessment•Permitting•Grid connectionScope for cost reduction?
Time scale?
5 Years
Job number/BT/ serial number/ page number 008 BA003 7
Turbine and BoP supply
Development Construction
Turbine supply
BoP Installation
Who’s who in the wind industry
Construction
Job number/BT/ serial number/ page number 008 BA003 8
0
2000
4000
6000
8000
10000
12000
14000
1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
Annual world capacity (MW)
Maxim
um
exis
tin
g c
ap
acit
y?
Job number/BT/ serial number/ page number 008 BA003 9
Commercial price development (from price list)
0
500
1000
1500
2000
2500
3000
3500
1975 1980 1985 1990 1995 2000 2005
year
pric
e [E
uro/
kW]
History of wind
Reduction through
technology and
volume
Job number/BT/ serial number/ page number 008 BA003 10
The growth of commercial machines….
1980 1990 2000
Will it continue?
15m20m
40m50m
124m
History of wind
Bigger &
big
gerBetter & better
“Commodity machines”
Job number/BT/ serial number/ page number 008 BA003 11
0%
20%
40%
60%
80%
100%
120%
0 20 40 60 80 100 120 140
Rotor Diameter [m]
No
rmal
ised
wei
gh
t (V
52=1
00%
)
… or hidden disparity? Normalised tower head mass
Similar technology
Concensus not achieved
Tower head mass
normalised to 52m
Job number/BT/ serial number/ page number 008 BA003 12
GE 3.6 MW turbine – typical configuration
Enercon turbine – direct drive
Winwind – a hybrid
The jury is still out!
Permanent magnets?
Superconductors?
Job number/BT/ serial number/ page number 008 BA003 13
Turbine and BoP supply
Development Construction
Turbine supply
BoP Installation
Who’s who in the wind industry
Construction
• High demand• Both turbine and BoP• High cost• Increased supply will reduce costs
•Key components•New large suppliers•Volume•Technology
Scope for cost reduction?
Time scale?
3 Years
Job number/BT/ serial number/ page number 008 BA003 14
Operations and maintenance
Operations
Operations & Maintenance
Who’s who in the wind industry
• Neglected area• No global supplier• Present costs optimistic?
Scope for cost reduction?
Time scale?
X
- Years
Job number/BT/ serial number/ page number 008 BA003 15
Power purchase and incentives
Operations
Power Purchase
Who’s who in the wind industry
Job number/BT/ serial number/ page number 008 BA003 16
Characterisation of incentives – Annual MW
0
500
1000
1500
2000
2500
3000
3500
19801982198419861988199019921994199619982000200220042006
Spain
USA
Germany
UK
Mad!
Highly political
Political cum
commercial
Renewable obligation effective!
Competitive market -
Hopeless!
Job number/BT/ serial number/ page number 008 BA003 17
Characterisation of incentives – Annual MW
0
500
1000
1500
2000
2500
3000
3500
19801982198419861988199019921994199619982000200220042006
Spain
USA
Germany
UK
The philosophy of the incentive does not m
atter
If it is consistent and produces adequate returns
It will w
ork!
Job number/BT/ serial number/ page number 008 BA003 18
Power purchase and incentives
Operations
Power Purchase
Who’s who in the wind industry
• Not a cost• Area of substantial change• Manifestation of political will• Long term PPAs reduce price • Move to merchant?• Tradable credits
Scope for cost reduction?
Time scale?
X
- Years
Job number/BT/ serial number/ page number 008 BA003 19
Project model
Equity Financing
Who’s who in the wind industry
• Plenty of equity• Is it the “right sort”?• Speculative or utility?
Scope for cost reduction?
Time scale?
3 Years
Job number/BT/ serial number/ page number 008 BA003 20
Project model
Debt Financing
Who’s who in the wind industry
• Fast evolution• Area of substantial change• Individual project to portfolio• Capital markets• Re-finance to keep client• Plenty of competition
Scope for cost reduction?
Time scale?
0 Years
Job number/BT/ serial number/ page number 008 BA003 21
Summary
Development Construction Operations
Turbine supply
BoP Installation
Operations & Maintenance
Power Purchase
Site Selection and Design
Equity Financing
Bank Financing
Who’s who in the wind industry
But what about time scale?
Job number/BT/ serial number/ page number 008 BA003 22
Cost index
90
92
94
96
98
100
102
104
106
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
(or guess!)
Job number/BT/ serial number/ page number 008 BA003 23
The myth of intermittency is a cost!
Job number/BT/ serial number/ page number 008 BA003 24
Example of portfolio forecasting…
• Results for a portfolio of 7 wind farms.• Portfolio capacity 250 MW• Max wind farm separation ~ 800 km
24 hoursahead
Aggregation through the grid!
Job number/BT/ serial number/ page number 008 BA003 25
Explosion of a myth
• Wind is variable
• Wind is predictable
• Intermittency is binary – on or off
• Conventionals are intermittent
• Renewables are not
Job number/BT/ serial number/ page number 008 BA003 26
The grid is the key!
Job number/BT/ serial number/ page number 008 BA003 27
Ridicule
+ Security of supply+ Least cost
Environmental
Animosity
Co-operation
3 st
ages
of
win
d e
ne
rgy’
s r
ela
tio
ns
hip
wit
h t
he
TS
O’s
3 main arguments for wind energy
Wind energy’s path to respectability
1980
2003
2005
2012?Transmission system operator
Respectability trajectory!
Job number/BT/ serial number/ page number 008 BA003 28
Thank you!