SOLAR PV DIESEL HYBRID POWER FOR MICRO/MINI GRIDS IN INDONESIA

JAKARTA, 15 SEPTEMBER 2017

TOHARI HADIAT

www.pln.co.id |

TABLE OF CONTENTS

• ELECTRIC POWER SYSTEM DEVELOPMENT PLAN 2017-2026

• ENERGY MIX in 2017-2026

• RENEWABLE ENERGY DEVELOPMENT PLAN

• NRE (NEW AND RENEWABLE ENERGY) DEVELOPMENT PLAN

• PV DIESEL HYBRID POWER FOR MICRO/MINI GRIDS

ELECTRIC POWER SYSTEM DEVELOPMENT PLAN

2017-2026

RUPTL 2017-2026

www.pln.co.id |

Estimation of Electric Power Developments in 2017-2026

KALIMAN

TAN

INDONESIA

TIMUR

INDONESIA

11,2%

35TWh

92T

W

h

SUMATERA

JAWA - BALI

7,2%

17

4TW

h

32

6TW

h 10,1%

NUSA TENGGARA

9,9

%

SULAW

ESI

11,7%

MALUK

U

12,1%

PAPUA

10,5%

10,8

%

26TWh

64TWh 480

TWh

234TWh

201

7

2026

8,3

%

Year 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026

Economic Growth (%) 5,20 5,10 5,50 6,10 6,50 6,48 6,46 6,44 6,42 5,40 6,35

Electrification Ratio (%) 90,65 93,41 95,89 97,32 98,8 99,53 88,82 99,99 100 100 100

www.pln.co.id |

Additional Development of Power Generation

Additional Power Plant:2017-2019 : 27,3 GW2017-2026 : 77,9 GW- PLTU : 31,9 GW- PLTGU : 18,8 GW- PLTG/MG : 5,6 GW- PLTA : 14,1 GW- PLTP : 6,3 GW- PLT Lain : 1,2 GW

Power Plant Porsion- PLN : 20.9 GW- IPP : 42.1 GW- Unalocated : 14.8 GW

Note: - 7 GW Program that

already operated until 2016 is 5.7 GW

MW

Renewable Energy

Development Plan

RUPTL 2017-2026

www.pln.co.id |

PLTG/PLTMG3,944 MW

8%

PLTGU11,262 MW

22%

PLTD5,771 MW

11%

PLTU24,883 MW

48%

PLTP1664.5 MW

3% PLTA4010 MW

8%

PLTM323.4 MW

1%

PLTBm/PLTBg/PLTSa

154.4 MW0,3%

PLTS13 MW0,03%

PLTG/PLTMG

PLTGU

PLTD

PLTU

PLTP

PLTA

PLTM

PLTBm/PLTBg/PLTSa

PLTS

Present Composition of RE in 1st semester of 2017

• New additional RE Plant in 1st semester 2017 is 165 MW (supplied from PLTP Sarulla I unit 1 : 110 MW and PLTP Ulubelu unit 4 : 55 MW)

• Total Power Plant : 51.860 MW• Total RE Power Plant : 6.165,3 W• RE Share of Total : 12 %

www.pln.co.id |

Potency of Renewable Energy Development(RUPTL 2017-2026)

SISTEM JAWA-BALI

PV 200 MW

HYDRO 5.837 MW

GEOTHERMAL 10.149 MW

WIND 250 MW

REGIONAL SUMATERA

PV 235 MW

HYDRO 5.916 MW

GEOTHERMAL 12.912 MW

WIND 0 MW

REGIONAL KALIMANTAN

PV 80 MW

HYDRO 1.910 MW

GEOTHERMAL 182,5 MW

WIND 150 MW

REGIONAL SULAWESI &

NUSA TENGGARA

PV 170 MW

HYDRO 7.244 MW

GEOTHERMAL 4.774 MW

WIND 170 MW

REGIONAL MALUKU &

PAPUA

PV 40 MW

HYDRO 268 MW

GEOTHERMAL 1.526 MW

WIND 45 MW

TOTAL INDONESIA

PV 725 MW

HYDRO 21.175 MW

GEOTHERMAL 29.543,5 MW

WIND 615 MW

www.pln.co.id |

Additional of RE Power Generation Plan

Based on RUPTL 2017-2026

No Pembangkit - EBT Kapasitas 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Jumlah

1 PLTP MW 305 165 315 186 365 790 345 1,015 2,510 294 6,290

2 PLTA MW 18 87 323 154 1,800 1,555 2,035 1,697 3,675 1,000 12,342

3 PLTMH MW 68 112 163 198 388 326 178 30 150 81 1,694

4 PLT Surya MWp 20 13 24 - - - - - - - 57

5 PLT Bayu MW - - 215 280 120 - - - - - 615

6 PLT Biomass/Sampah MW 43 76 243 93 91 6 - - - - 552

7 PLT Kelautan MW - - - - - - - - - - -

8 PLT Bio-Fuel Ribu Kilo Liter 930 731 331 263 197 108 112 116 123 129 3,041

MW 453 453 1,282 911 2,764 2,676 2,557 2,742 6,335 1,375 21,549 Jumlah

www.pln.co.id |

PLTG/PLTMG 3,944 MW

8%

PLTGU 11,262 MW

22%

PLTD 5,771 MW

11%

PLTU 24,883 MW

48%

PLTP 1664.5 MW

3% PLTA 4010 MW

8%

PLTM 323.4 MW

1%

PLTBm/ PLTBg/PLTSa

154.4 MW 0,3%

PLTS 13 MW 0,03%

PLTG/PLTMG

PLTGU

PLTD

PLTU

PLTP

PLTA

PLTM

PLTBm/PLTBg/PLTSa

PLTS

Present Composition of RE in 1st semester of 2017

• New additional RE Plant in 1st semester 2017 is 165 MW (supplied from PLTP Sarulla I unit 1 : 110 MW and PLTP Ulubelu unit 4 : 55 MW)

• Total Power Plant : 51.860 MW• Total RE Power Plant : 6.165,3 W• RE Share of Total : 12 %

www.pln.co.id |

Potency of Renewable Energy Development(RUPTL 2017-2026)

SISTEM JAWA-BALI

PV 200 MW

HYDRO 5.837 MW

GEOTHERMAL 10.149 MW

WIND 250 MW

REGIONAL SUMATERA

PV 235 MW

HYDRO 5.916 MW

GEOTHERMAL 12.912 MW

WIND 0 MW

REGIONAL KALIMANTAN

PV 80 MW

HYDRO 1.910 MW

GEOTHERMAL 182,5 MW

WIND 150 MW

REGIONAL SULAWESI & NUSA TENGGARA

PV 170 MW

HYDRO 7.244 MW

GEOTHERMAL 4.774 MW

WIND 170 MW

REGIONAL MALUKU & PAPUA

PV 40 MW

HYDRO 268 MW

GEOTHERMAL 1.526 MW

WIND 45 MW

TOTAL INDONESIA

PV 725 MW

HYDRO 21.175 MW

GEOTHERMAL 29.543,5 MW

WIND 615 MW

www.pln.co.id |

Additional NRE Estimation per Sept 2107

For PLTP Additional Estimation Based on RUPTL

STRATEGY TO DEVELOPHYBRID POWER SYSTEM

www.pln.co.id |

Development of Hybrid Powerplant

Hybrid

Power

Plant

ONGRID ??

OFFGRID

www.pln.co.id |

Strategy to develop Hybrid Power

1. The development of RE plant remains concerned with supply-

demand balance, system readiness and economy.

2. Maximizing the potential of local RE resources to rise electrification

ratios in Eastern Indonesia

3. Develop hybrid power system for areas that have been supplied

from diesel with under 12 operation hours/day and for unserves

areas.

4. Centralized PV is developed to enable remote communities that far

from the grid in underdeveloped areas, the foremost islands

bordering with neighboring countries and other outer islands.

5. Micro grid development for isolated areas, which have not been

planned to be developed for distribution lines or small thermal

generators, it is proposed to use PV.

6. Develop Smart Grid and Control System to increase RE

penetration level in PLN system.

www.pln.co.id |

Types of Hybrid Power Development

1. PV Diesel hybrid power system developed by PLN (off grid)

2. Hybrid power projects proposed by IPPs though MOU with PLN

www.pln.co.id |

Definition Hybrid

Grid which has embedded and synchronized generation facilities of dispatchable and non-dispatchablen nature.

www.pln.co.id |

Proposal Hybrid Power Project (MOU with IPPs)

No. Company NameHybrid Technology

Type

Power Generation Location Installed

Capacity

(MW)Province City

1 PT. SUMBERDAYA SEWATAMA

Tenaga Hybrid

(PLTS + PLTD /

PLTMG)

a. Nusa Tenggara Barat Sumbawa 10

Bima / Sape 9

b. Maluku Poka Ambon 10

c. Jawa TimurMadura (Kangean) 5

d. Papua Waena 20

e. Sulawesi Bombana 10

f. Sumatera

Bangka 5

Belitung 5

Nias 10

2PT. ARSARI ENVIRO INDUSTRI AND

SUNPOWER SYSTEMS SARL

Tenaga Hybrid

(PLTS + PLTD /

PLTMG)

b. Bangka Belitung Bangka 20

3

PT. UPC RENEWABLES INDONESIA

DAN

PT. BINATEK ENERGI BARU

TERBARUKAN

Wind + Solar PV

a. Sulawesi Selatan Pulau Selayar 10.1

b. Maluku

Pulau Kei. Kecil 10.1

Ambon 16.8

Solar PV + Mini

HidroPulau Buru 10

www.pln.co.id |

Proposal Hybrid Power Project (MOU with IPPs)

4 PT. AKUO ENERGY INDONESIA

Wind + Solar PV

Kalimantan Selatan Tanah Laut 80

Jawa Barat Cirebon 100

Jawa Tengah Tegal & Brebes 70

Jawa Timur Tuban 80

Sulawesi Barat Majene 75

Solar PV + Diesel

Nusa Tenggara Sumbawa

3+3

Bima 4

Sumba 8

Larantuka 8

Labuan Bajo 4

Sumatera Belitung 15

5 PACE ENERGY PTE. LTDTenaga Hybrid

(PLTS + PLTB)

a. Nusa Tenggara

Sumba 10.1

Sumbawa 10

b. Kalimantan Selatan Tanah Laut 70

No. Company NameHybrid Technology

Type

Power Generation Location

Installed

Capacity

(MW)Province City

www.pln.co.id |

Proposal Hybrid Power Project (MOU with IPPs)

6 Arya WatalaPLTS+PLTD/PLTM

G

NTT

Alor (Kalabahi) 1.2

Rote Ndao 1.2

Sabu Raijua 0.9

Lembata

Adonara 0.9

Aesesa 0.7

Betun 0.6

Bajawa 1.3

Waikabubak 1

NTB

Empang 2

Lunyuk 1.5

Sape 2

Dompu 2

Pekat 2

7 PT AKA SINERGI GROUPPLTS+PLTD/PLTM

G/StorageMadura Isolated

Ra'as 1

Sepanjang 2

Sapudi 2

Kangean (Kec.

Arjasa)2

Gili Iyang 1

No. Company NameHybrid Technology

Type

Power Generation Location

Installed

Capacity

(MW)Province City

www.pln.co.id |

Summary

Total Location Estimated Capacity

46 716.4 MW

Proposal Hybrid Power Project (MOU with IPPs)

THANK YOU

ENERGY MIX in 2017 - 2026

RUPTL 2017-2026

www.pln.co.id |

Target of Energy Mix

2

4

BAURAN ENERGI PRIMER(Listrik dan Non Listrik)

(Kebijakan Energi Nasional, PP No.79/2014)

BAURAN ENERGI PEMBANGKIT LISTRIK (Draft RUKN 2015-2034)

30%

41%

EBTMinyak BumiGasBatubara

23%

30%

25%

22%

53%

11%

24%

50% 24%

25%

6%

23%

12%

1%

REALISASI 2013

TARGET 2025

TARGET 2025

REALISASI 2014

www.pln.co.id |

Bauran


Top Related