Download - Siva sathibabu t resume
SIVA SATHIBABU TUPAKULA Mechanical Engineer- Execution of Turbines, Rotary Equipment and Piping
Skype: shiva.tupakula1 | LinkedIn: https://in.linkedin.com/in/shivatupakula
: [email protected] | : +91-9966533111
Looking for a Career Position where Professional Experience and expertise will be
regarded as asset of an Organization
OVERVIEW
Over 5 years of Experience in Erection, Pre-Commissioning & Commissioning
activities of Rotary Equipment and Piping
Currently working with M/s. Technical Development Company for Cont.
(TD)-KSA as a Senior Engineer, Had 3 Years of Experience with M/s. L&T-Power
Ltd as Mechanical Engineer- Execution.
Handled operations involving Erection and Commissioning works of Rotary
Equipment and Critical piping for 3 X 660 MW Thermal Power plant- Chattisgarh-
India.
Handled operations involving erection and commissioning of Turbines, Rotary
Equipment, LP and HP Piping for Turbine and its Auxiliaries for 2 X 800 MW
Thermal power plant- Nellore-India
Currently Handling the Engineering, Procurement and Construction Activities
of 1X 50 MW Gas Turbine Power Plant- Dammam-Kingdom of Saudi Arabia.
Well versed with the concepts of ASME B31.1, ANSI, API 650, NFPA,
HCIS, AWWA-D103 Codes and Standards and Certified with ASNT Level II.
KEY SKILLS
Strategic Planning: Establishing various implementation strategies for
achievement of the final schedule and plan sheet for Erection and Commissioning.
Project Management: Overseeing project activities from conceptualization to
execution including finalization of technical specifications, coordinating with Designer,
Material Finalization, Material attestation from Client, stage inspections, scheduling,
progress monitoring, and Sub contractors handling.
Erection and Alignment Operations: Studying drawings, plans or patterns of
equipment/piping to be erected as per drawing, preparing templates as per requirement.
Production Management: Planning for day-to-day productivity related
activities, Resource mobilization by maintaining Quality for achieving monthly
productivity targets.
Process Enhancement / Improvement: Deploying various methodologies to
analyze erection procedures, recommending modifications to minimize deviations.
Implementing Minimum two best practices per year that have huge impact on cost and
time factor.
Quality Control: Developing mechanical maintenance and operations
procedures to increase the efficiency; implementing standards and ensuring adherence
to quality standards.
Safety: Achieving Zero Accident by maintaining safety standards & Awareness
CONTACT ADDRESS
Door Number- 37/6/47, Tilak
Street, Kakinada-533001,
Andhra Pradesh.
TOTAL EXPERIENCE
Two years in Gulf as
a senior engineer in Site
Engineering.
Three years in India as
an Execution Engineer in Site
Engineering.
PASSPORT DETAILS
Passport no: J6386645
Place of Issue: Visakhapatnam
Date of Issue: 27/06/2011
Date of Expiry: 26/06/2021
HIGHER EDUCATION
Bachelor of Technology in
Mechanical Engineering with
68.2% of Aggregate in Avanthi
Inst. Of Engineering and
Technology
INTEREST AND PAST TIME
Sports- Basket Ball and
Swimming
Hectic travelling
PERSONAL DOSSIER
Marital Status: Single
Born: 29th Oct 1989
Sex: Male
Father: Physically Challenged
Mother: Home Maker
Languages: English, Hindi,
Telugu, Tamil, Arabic (Beginr.)
WORK EXPERIENCE
Since April’2011 to February’2013 with M/s L&T-power ltd, joined as Graduate Engineer Trainee and raised to the
position of Senior Engineer in Execution, Currently Joined M/s. Technical Development-KSA as a Senior Engineer
1. SENIOR ENGINEER
M/s. Technical Development Company- Saudi Arabia
April 2014 to Till date
Project profile:
Engineering, Procurement and Construction of 1*50 MW Trent 60 WLE Gas Turbine Power Plant at King Abdul
Aziz SeaPort, Dammam- Kingdom of Saudi Arabia.
Design Consultant: M/s. Radicon Gulf Consult- Al-Khobar
Material: Rolls-Royce Energy System, Nesma-Havtek
Client: King Abdul Aziz Sea Ports Authority- Dammam
Areas Working Currently:
Engineering, Procurement & Erection, Commissioning of of 50 MW Gas Turbine- Liquid Fuel Fired, Fuel Tanks-
1200 M3- 2 Nos., DM Water Plant- GLS Tanks 2 x 1200 M3, RO Plant, Black Start Generators, Inter Skid and Off Skid
Piping and Fire Fighting network- Foam and water.
2. SENIOR ENGINEER
M/s. L&T-ECC, TPPC-BU
July 2012 to Feb 2014
Project profile:
Erection and commissioning of 2*800 MW Turbine and Turbine Auxiliaries (Ultra Super Critical Turbine) at
Krishnapatnam, Nellore, Andhra Pradesh- India.
Consultant: M/s L&T-MHI Ltd.
Client: M/s AP GENCO.
Areas Worked:
Erection and Commissioning of piping for Turbine, CEP’s (Condensate Extraction Pumps), BFP’s-Turbine drive
and Motor drive, Condensate Evacuation Pumps and Ammonia and Hydrazine Dosing system, CCW and Lube oil lines.
3. GRADUATE ENGINEER
M/s. L&T-ECC, TPPC-BU
April 2011 to July 2012
Project profile:
Construction and commissioning of 3*660 MW Boiler (India’s first super critical Boiler) at sipat, Bilaspur,
Chattisgarh- India.
Consultant: M/s Doosan Heavy Industries Ltd.
Client: M/s NTPC Ltd.
Areas Worked:
Erection and Commissioning activities of Pulverizes, Raw Coal Feeders, FD, PA & ID Fans, Seal Air Fans, HRH /
CRH / Main steam Piping, and CCW lines, Lube oil and other miscellaneous piping like Instrument air, Service air,
Equipment On-skid piping.
RESPONSIBILITIES IN SITE/PROJECT ENGINEERING
Studying and interpretation of P&ID and ISO Drawings, Material Inspection with packing list in presence of Quality.
Extraction of scope (Tonnage and Inch dia / Inch Meter) of work from Drawings and planning accordingly for material
and manpower prior to the preparation of Site Plan and Schedule.
Coordinating with all related departments and planning consequently for 3-Month look ahead plan for manpower, Tools
and Tackles, Consumables and Machinery. Maintaining DTS (Daily task sheets) with Man-hours v/s Productivity.
Planning and scheduling for achieving daily, weekly and monthly targets without compromising in Quality and Safety.
Fabrication and Erection, Ensuring the elevation and Centre line checks as per RFC / IFC drawings.
Alignment (Rim face or Rotalign Laser) for the all the Rotary equipment prior to Preliminary and Final grouting.
Trail Runs for the Turbine and other Rotary Equipment, Lube Oil Flushing / Sand Blasting / Hydro test / Pneumatic or
Soap Leak test for air Piping.
Erection of Temporary Steam Blowing pipes for LP and HP pipes, Performing and Monitoring the Steam blowing.
Ensuring the Latest revision of drawings from client and preparation of AS-BUILT drawings.
Carrying out Commissioning activities of piping such as Flushing and Chemical cleaning with coordination of Lead
Commissioning teams.
Preparation for Inspection reports / Protocols stage by stage.
Fit-Up and welding activities for Piping and Taking appropriate measures when welding to be carried out on equipment.
Achieving Project milestones as per company norms without compromising on Safety and Quality.
Gathering the Process Information and Control Philosophies of Pumps, Piping, and Utility Consumption details etc.
Receiving and Studying the Data Sheets, Calculation Sheets, Product Catalogs with respective to the Consultant
Standards.
Scheduling the Turbine-TA Presence as per the Installation activities.
Coordinating with Procurement Department for the Purchase of Project Material with Company’s Protocol
Hands-on approach with Sub- Contractors related to Erection Activities to achieve the Productivity as per the Company
Norms.
PROFESSIONAL SKILL SET
DECLARATION
I do declare myself the above statements are true to the best of my knowledge and belief.
Place : Kakinada-AP- India Signature (T.S.Sathi babu)
Date :