Selected ProjectsI IS INEgypt
Information Technology Services
for Industrial Plants
Technical Capabiles in Egypt
The right people - Technical Services for Capital Investments
Planning
Engineering Erection andInstallation
Commissioning
On-CallService
Integral PlantMaintenance
Recycling
ProjectManagement
time
Costs
System designPlanningProjection
PlanningPhase
EngineeringProject managementInfrastructure servicesErectionCommissioningWorkshop services
Construction Phase
MaintenanceEngineeringProject managementErectionCommissioningWorkshop services
Operational/Production Phase
Engineering Project managementDisassemblyWorkshop ServicesRecycling
ShutdownPhase
Industrial Technical ServicesFor Plants in Egypt Life Cycle of a Plant
Projects Executed & Under Execution in EgyptBy Siemens Technologies S.A.E I IS IN.
Description Customer Name Work Description Location Value in LE Start / End
Polygon Construction Block 44- Westtown
Siac Electro-mechanical supply & Installation Package
6th of October 133,000,000 3/11 – 9/12
Spinneys Hypermarket
Spinneys Electrical Supply & Installation Package
6th of October 22,000,000 5/01 – 8/10
El- Salam Makro cash & carry
Makro cash & carrry Egypt
Electrical Supply & Installation Package
El –Salam City 8,100,000 01/10 – 05/10
Renovation of Old & New Cataract Hotel
Arabian Construction
Company
Electro-mechanical Works
Aswan 115,000,000 09/09 – 05/10
Saint Gobain Glass Factory
Saint Gobain Glass Factory
MCC/PCC Ain El- Sokhna 16,000,000 08/09 - 03/10
Pharoah Gold Mines
Electromechanical Package
E&I Installation Package
Marsa Alam, Red Sea 49,000,000 04/09 – 08/09
Description Customer Name Work Description Location Value in LE Start / End
Mena House Oberoi HotelPhase II B
EGOTH Turnkey Electro-mechanical Works
Giza 15,150,000 12/08 – 07/09
New Cairo-Alexandria Showrooms Project
Bonyan for Development and Trade
Electro- mechanical Works
6th of October City
55, 00,000 09/08 – 05/09
Shoubra El Kheima Water Treatment Plant
Cairo Alex. Potable Water Organization
(CAPWO)
Turnkey Electro-mechanical Works
Cairo 46,000,000 09/08 – 01/11
Cairo Regional Processing Center
HSBC Bank Turnkey Electro-mechanical Works
Smart Village 72, 000, 000 03/08 – 05/09
Arab Bank – Gameat El Dowal Branch
SIAC / Arab Bank Turnkey Electro-mechanical Works
Giza 55,000,000 2/08 – 6/09
Projects Executed & Under Execution in EgyptBy Siemens Technologies S.A.E I IS IN.
Description Customer Name Work Description Location Value in LE Start / End
Al Obour Shopping Mall (Carrefour)
MAF for Hypermarkets Turnkey Electro-mechanical Works Al Obour 32,000,000 2/08 – 07/08
Smart Village B145 Building
SIAC / Ministry of Communication
Turnkey Electro-mechanical, Finishing
Giza 27,000,000 10/07 – 10/08
Mena House Oberoi HotelWings D & E
EGOTH Turnkey Electro-mechanical & Civil Works
Giza 26,000,000
Cairo Water Intake Cairo Alex. Potable Water Organization
(CAPWO)
Turnkey Electrical Works Cairo 66,000,000 11/07 – 05/10
Heliopolis Ball Room Gulf Egypt for Hotels & Tourism
Turnkey Electro-mechanical, Finishing
HeliopolisCairo 18,500,000 09/07 – 09/08
Barclays Bank Call & Data Center
Barclays Bank Egypt SAE
Turnkey Electrical Works MaadiCairo 8,000,000 09/07 – 10/07
Savola United Sugar Co. Electrical Instrumentation Ein Sokhna 1,800,000 08/07 – 12/07
Cataract Hotel EGOTH Turnkey Electrical Works Aswan 4,150,000 09/06 – 09/07
Projects Executed & Under Execution in EgyptBy Siemens Technologies S.A.E I IS IN.
Description Customer Name Work Description Location Value in LE Start / End
Gas Compression Station -EMG
Siemens Power Generation
Electrical Instrumentation & Equipment Installation
El Arish 8,000,000 04/07 – 08/07
Golden Pyramids Plaza –A7 Building
Golden Pyramids Turnkey Electro-mechanical, Finishing
Cairo 65,000,000 03/07 – 01/08
Grand Egyptian Museum Ministry of Culture Turnkey Electro-mechanical Works
Giza 84,000,000 10/06 – 12/07
Jolie Ville Summit Hotel Naama Golf for Touristic Investments
Turnkey Electro-mechanical, Finishing
Sharm El Sheikh 90,000,000 06/06 – 03/07
Post Office Building Ministry of Communication
Turnkey Electro-mechanical Works
Giza 18,000,000 02/05 – 09/07
Mena House Oberoi Hotel Energy Building
EGOTH Turnkey Electro-mechanical & Civil Works
Giza 40,000,000 01/06 – 07/07
Sharm El Sheikh International Congress Center
Naama Golf for Touristic Investments
Turnkey Electro-mechanical, Finishing
Sharm El Sheikh 103,000,000
07/05 – 04/06
Projects Executed & Under Execution in EgyptBy Siemens Technologies S.A.E I IS IN.
Description Customer Name Work Description Location Value in LE Start / End
Pepsi Cola Pepsi Cola Egypt Turnkey Electro-mechanical Works
Nasr City, Cairo Tanta
6,000,000 01/06 - 01/07
Dandy Mega Mall Carrefour Hypermarket
MAF Turnkey Electro-mechanical Works
Cairo-Alex Desert Road 33,000,000 02/05 – 07/05
United Gas Derivate Co. (UGDC)
UGDC Turnkey Electrical Works
Damietta 1,500,000 06/04 – 01/05
Arab Bank Gomhoria Branch
Arab Bank Turnkey Electro-mechanical Works
Cairo 30,000,000 05/04 – 12/05
Master Foods Plant Master Foods Turnkey Electro-mechanical Works
6th October 9,000,000 03/04 – 12/04
Children Oncology Hospital AFNCI Turnkey Electro-mechanical Works
Cairo 120,000,000 04/04 – 09/05
Egyptian LNG Project Bechtel Overseas Corporation
Electrical and Instrumentation Works
IDKU El Behaira 18,000,000 01/04 – 04/05
Projects Executed & Under Execution in EgyptBy Siemens Technologies S.A.E I IS IN.
Description Customer Name Work Description Location Value in LE Start / End
United Gas Derivate Co. (UGDC)
UGDC Turnkey Electrical Works
Port Said 2,200,000 01/04 – 01/05
Magic Planet MAF Supply & Erection ofElectro-mechanical
Alex. City Center 2,500,000 12/03 – 03/04
Abu Zaabal DSD Ferrometalco Electrical &Instrumentation Erection
Abu Zaabal 1,600,000 11/03 – 08/04
Cairo North Power Plant 220 KV GIS
Siemens PTD Electro-mechanical Works
Ismailia Canal 850,000 11/03 – 04/04
Smart Village A7 Building ADCOM Supply & Erection of Electro-mechanical Works
Smart Village, 15,000,000 10/03 – 08/04
Smart Village - Ministry of Communication Office Building B1
Ministry of Communication Electro-mechanical Works
Cairo 33,000,000 10/03 – 07/04
Airport Mall Cairo Airport Company Electro-mechanical& HVAC Systems
Cairo Airport 20,000,000 08/03 – 07/04
Projects Executed & Under Execution in Egypt By Siemens Technologies S.A.E I IS IN.
Description Customer Name Work Description Location
Value in LE Start / End
Jolie Ville Congress Victoria United Building Hotels Co.
Electrical Works SharmEl Sheikh
2,000,000 05/03 – 08/03
Villa 29 Golf Resort Naama Golf for Touristic Investments
Electrical Works SharmEl Sheikh
1,000,000 05/03 – 08/03
Steignberger Dahab Resort Misr for Tourism Development SAE
MEP Works for Buildings
Dahab 5,200,000 11/02 – 11/03
East Delta Agricultural Services Project Drinking water Components
World Bank, IFAD Electro-mechanical& Piping Works
Port Said 9,000,000 09/02 – 12/04
Alex. City Center Carrefour Hypermarket
MAF Turnkey MEP Works Alex. 13,000,000 06/02 – 12/02
Pfizer Office Building Pfizer Africa & Middle East Turnkey Electro-mechanical Works
Cairo 16,000,000 03/02 – 02/04
Borg El Arab Flour Mill Arabian Co. for Flour Milling & Food Industry
Turnkey MEP Works & Electromechanical Process Equipment Erection
Alex. 5,200,000 02/02 – 08/04
Projects Executed & Under Execution in EgyptBy Siemens Technologies S.A.E I IS IN.
Description Customer Name Work Description Location Value in LE Start / End
Ezz Flat Steel Ezz Heavy Industries Water Pumping Stations
Suez 1,000,000 11/01 – 05/02
Egyptian Automobile & Touring Club
Egyptian Automobile & Touring Club
Electrical Works Cairo 400,000 08/01 – 04/02
Hebi Pharmaceutical Plant Hebi Raw Turnkey Electro-mechanical Works
Qena 50,000,000 08/01 – 08/03
Ministry of Construction Ministry of Construction Renovation of Power House
Cairo 600,000 07/01 – 08/03
White Cement Factory ASA – ASEC Electrical Works and Low Current Systems
Al Arish –Sinai 900,000 07/01 – 11/01
Quena Cement Factory ASA – ASEC Electrical Works and Low Current Systems
Quena 1,500,000 06/01 – 10/01
Flour Mill Wadi El Melouk Electromechanical installation
6th October Giza
1,300,000 03/01 - 07/01
Projects Executed & Under Execution in EgyptBy Siemens Technologies S.A.E I IS IN.
Description Customer Name Work Description Location Value in LE Start / End
Ministry of Finance Ministry of Finance Fire Fighting Works Cairo 1,500,000 02/01 – 04/02
Electro-George Metals Factory
Electro-George Metals Factory
Electrical Works and Low Current Systems
Ismailia 1,800,000 07/00 – 03/01
Steignberger Dahab Resort Misr for Tourism Development SAE
Turnkey for External Utilities Networks
Dahab 5,100,000 05/00 – 11/00
Grey Cement Factory ASA – ASEC Electrical Works andLow Current Systems
Al ArishSinai 2,200,000 03/00 – 09/00
Gas Turbine Power Plant Siemens AG and Flow Waste GmbH
Electrical Erection Works
Al Amerya Free Zone Alex.
3,100,000 02/00 – 08/00
Johnson Wax Factory Johnson Wax Egypt Electromechanical and Industrial Works
Belbais Desert Road 2,700,000 02/00 – 08/03
Midelec Power Station Midor Electrical & Instrumentation Works
Alex.Free Zone 1,101,600 02/00 - 08/00
Projects Executed & Under Execution in EgyptBy Siemens Technologies S.A.E I IS IN.
Description Customer Name Work Description Location Value in LE Start / End
Midor Refinery TECHNIP TTIL – SNC Electrical works and Commissioning
Al Amerya Free Zone Alex.
3,200,000 01/00 - 09/00
DSD - Ferrometalco - New Factory in Belbeis
DSD Ferrometalco TurnKey Electrical Works Belbeis 2,500,000 05/99 - 09/99
Suez Fertilizer Plant Krupp Uhde TurnKey Works for HVAC Ain Sukhna 3,800,000 02/99 - 12/99
Siemens New Head-Quarters
Siemens Ltd. Turnkey MEP Works Mohandessin Cairo
7,000,000 10/99 - 06/00
Alex. National Iron and Steel Making Plant & Hot Strip Rolling Mill
Alex. National Iron & Steel Co.
E & I Works Alex. 11,900,000 11/98 -10/99
Procter & Gamble - Various Packages
Procter & Gamble Egypt
Electromechanical Works for Buildings and Process Area
6th of October City
2,700,000 11/98 - 12/99
Alex. National Iron & Steel -220 Kv Substation
Contrasteel /Alex. NationalIron & Steel
Co.
E & I Works Alex. 3,000,000 11/98 - 08/99
Projects Executed & Under Execution in EgyptBy Siemens Technologies S.A.E I IS IN.
Description Customer Name Work Description Location Value in LE Start / End
East Quantara-220 Kv Substation
E.E.A. Complete Electro-mechanical Installation& Commissioning
East Quantara 1,000,000 01/98 - 11/98
Neweiba - 220 Kv Station E.E.A Complete Electro-mechanical Work
Neweiba 1,000,000 01/98 - 11/98
Taba - 220 Kv Station E.E.A Complete Electro-mechanical Work
Taba 1,000,000 01/98 - 11/98
Sharm El Sheikh 220 Kv Substation
E.E.A Complete Electro-mechanical Work
Sharm El Sheikh 1,000,000 01/98 - 11/98
Oyoun Mousa T.P.P 2 x 330 MW
E.E.A Turbine Island Oyoun Mousa 98 - 00
Sidi Kerair T.P.P 2 x 330 MW
E.E.A Turbine Island E & I Works 97 - 98
Projects Executed & Under Execution in EgyptBy Siemens Technologies S.A.E I IS IN.
Detailed Engineering, supply, installation & commissioning of all the electromechanical works:
Children Oncology Hospital
Power Supply, Distribution System & Lighting.
Building Management System.
HVAC System
Plumbing Works
.Fire Alarm, Nurse Call, CCTV, Clock system
Detailed engineering.Supply & installation works Testing, pre-commissioning, Commissioning & start up
Services Supplied:
Contract Description:
Detailed Engineering, supply, installation & commissioning of all the electromechanical works:- Energy Building- Guest Building B&C
Power Supply, Distribution System & Lighting.
Building Management System.
HVAC System
Plumbing Works
Telephone, Fire Alarm, Public Address, CCTV, Clock
Detailed engineering.Supply & installation works Testing, pre-commissioning, Commissioning & start up
Mena House Cairo – Oberoi Hotels
Contract Description:
Services Supplied:
Basic & Detailed Engineering, Supply, Installation & Commissioning of all the Electromechanical Works:Power Supply, Distribution System & Lighting.
Building Management System.
HVAC System / Plumbing Works
Fire Fighting System
Fire Alarm, Security, Access, Telephone & Audio Visual
Systems.
Basic & detailed engineering.Project management & coordinationSupply & installation works.Testing, pre-commissioning, commissioning& start up.
National Post Authority - B146 Smart Village
Services Supplied:
Contract Description:
Detailed Engineering, supply, installation & commissioning of all the electromechanical works:
Power Supply, Distribution System & Lighting.
Building Management System.
HVAC System
Plumbing Works
Fire Fighting System
Fire Alarm, Security, Access, Telephone & Data,
CCTV & Audio Visual Systems.
Detailed engineering.Supply & installation works.Testing, pre-commissioning, commissioning & start up.
Ministry of Telecommunication - (Smart Village)
Contract Description:
Services Supplied:
Contract Description:
Basic & Detailed Engineering, Supply, Installation & Commissioning of all the Electromechanical Works, together with Finishing Works:
Services Supplied:
Power Supply, Distribution System & Lighting.
Building Management System.
HVAC System
Plumbing Works
Fire Fighting System
Fire Alarm, Security, Access, Telephone & Data,
CCTV, Clock, Intrusion, Sound Conference & Audio Visual Systems.
Basic & detailed engineering.Project management & coordinationSupply & installation works.Testing, pre-commissioning, commissioning & start up.
Sharm El Sheikh International Conference Complex (SICC)
Contract Description:
Services Supplied:
Cairo International Airport Mall
Detailed Engineering, supply, installation & commissioning of all the electromechanical works:
Power Supply, Distribution System & Lighting.
Building Management System.
HVAC System
Plumbing Works
Fire Fighting System
Fire Alarm, Telephone & Data, CCTV, Audio
Visual & Clock Systems.
Detailed engineering.Supply & installation works.Testing, pre-commissioning, commissioning & start
up.
Detailed Engineering, supply, installation & commissioning of all the electromechanical works:
Pfizer Africa & Middle East New Office Building
Power Supply, Distribution System & Lighting.
Building Management System.
HVAC System
Plumbing Works
Fire Fighting System
Low Current, Security, Audio Visual, Telephone & Data Systems.
Detailed engineering.Supply & installation works Testing, pre commissioning, commissioning
& start up
Services Supplied:
Contract Description:
Detailed Engineering, supply, installation & commissioning of all the electromechanical works:
Power Supply, Distribution System & Lighting.
Building Management System.
HVAC System
Plumbing Works
Telephone, Fire Alarm, Public Address, CCTV, Clock,
Intrusion & Burglary Alarm, Access Control Systems.
Detailed engineering.Supply & installation works Testing, pre-commissioning, Commissioning & start up
Arab Bank – Gomhouria Branch
Contract Description:
Services Supplied:
Detailed Engineering, supply, installation & commissioning of all the electromechanical works:
w Power Supply, Distribution System & Lighting.w Building Management System.w HVAC Systemw Plumbing Worksw Telephone, Data, Intercom, CCTV & Access Control Systems
Services Supplied:w Detailed engineering.w Supply & installation works w Testing, pre-commissioning, commissioning
& start up
Contract Description:
Grand Egyptian Museum – Phase II
HSBC Regional Off ice, Smart Village
Basement, Ground and three Typical Floors
Total area of the building is 21,000 m2
Detailed engineering.Supply & installation works Testing, commissioning & start up
Building Description:
MV Power solutions (Transformers, MDB)
Bus Duct and cabling Systems
LV Cables, Power Supply, Distribution &
Lighting Systems
Plumbing and Fire Fighting System
HVAC and BMS
Voice & Data, Intercom, CCTV, Access Control, MATV
Contract Description
Services Supplied:
Detailed Engineering, supply, installation & commissioning of all the electromechanical works regarding the execution of the Maadi Call & Data Center
Barclays Bank Maadi Call & Data Center
Power Supply, Distribution System & Lighting.
HVAC System
Fire Fighting Works
Low current Networks
Detailed engineering.Supply & installation works Testing, pre-commissioning, Commissioning & start up
Services Supplied:
Contract Description:
Carrefour Hypermarket – Alex. City Center
Detailed Engineering, supply, installation & commissioning of all the electromechanical works:
Power Supply, Distribution System & Lighting.
Building Management System.
HVAC System
Plumbing Works
Fire Fighting System
Low Current, Security & Telephone Systems, including
Wiring Duct System
Detailed engineering.Supply & installation works.Testing, pre-commissioning, commissioning & start up.
Services Supplied:
Contract Description:
Carrefour Hypermarket – Dandy Mega Mall
Basic Detailed Engineering, Supply, Installation & Commissioning of all the Electromechanical Works:
MV & LV Power Supply, Distribution System & Lighting.
Building Management System.
HVAC System
Plumbing Works
Fire Fighting System
Fire Alarm, Security, Access, Sound & Telephone Systems.
Basic & detailed engineering.Supply & installation works.Testing, pre-commissioning,
commissioning & start up.
Contract Description:
Services Supplied:
Carrefour Hypermarket – El Obour City
Basic Detailed Engineering, Supply, Installation & Commissioning of all the Electromechanical Works:
MV & LV Power Supply, Distribution System & Lighting.
Building Management System.
HVAC System
Plumbing Works
Fire Fighting System
Fire Alarm, Security, Access, Sound & Telephone Systems.
Basic & detailed engineering.Supply & installation works.Testing, pre-commissioning, commissioning & start up.
Contract Description:
Services Supplied:
Fairmont Heliopolis New Ballroom, Cairo
Detailed Engineering, supply, installation & commissioning of all the electromechanical works:
Power Supply, Distribution System & Lighting.
Building Management System.
HVAC System
Plumbing Works
Fire Fighting System
Low Current, Security, Audio Visual, Telephone & Data Systems.
Detailed engineering.Supply & installation works Testing, pre commissioning, commissioning & start up
Services Supplied:
Contract Description:
United Gas Derivate Company (UGDC), Port Said Plant
Turnkey CCTV System Project, including the following items:
Interactive video management system.
Pan & till monitoring units.
Certified zone 1, Gas group IIA, Hazardous area.
Fiber optic transmitter/receiver units.
Control unit management center.
Design Detailed engineering.Manufacturing & fabrication, factory test.Supply, testing, commissioning & start up
Services Supplied:
Contract Description:
United Gas Derivate Company (UGDC), Damietta Plant
Turnkey CCTV System Project, including the following items:
Interactive video management system.
Pan & till monitoring units.
Certified zone 1, Gas group IIA, Hazardous area.
Fiber optic transmitter/receiver units.
Control unit management center.
Design Detailed engineering.Manufacturing & fabrication, factory test.Supply, testing, commissioning & start up
Services Supplied:
Contract Description:
Saint Gobain Glass Egypt – Sokhna Plant
LV Package, MCCs, PCCs
Cable Networks / Cable Ways
Step down transformers
Profibus Network
Fibre Optics Network
Design Detailed engineering.Manufacturing & fabrication, factory test.Supply, testing, commissioning & start up
Services Supplied:
Contract Description:
Gold Mine SUK_180Gold Mine SUK_190
Detailed Engineering, supply, installation &commissioning of all the electromechanical Works.
Equipments
Control
PLCs
LV Panels
MV Panels
Transformers
Diesel Generator
Mechanical System Piping
Instrumentation
Detailed engineering.Supply & installation works.Testing, pre-commissioning, commissioning & start up.
Services Supplied:
Contract Description:
MAKRO Cash and Carry Hypermarket
Detailed Engineering, supply, installation & commissioning of all the electromechanical works:
Power Supply, Distribution System & Lighting.
Low Current, Security & Telephone Systems, including
Wiring Dect System
Detailed engineering.Supply & installation works.Testing, pre-commissioning, commissioning & start up.
Services Supplied:
Contract Description:
Our Security Solut ions
Video surveillanceAccess control Intrusion detectionFire Alarm System
Fire Fighting SystemSiteI surveillanceCommand & Control
Security Solut ions offers a wide range of Security Solut ions
Our Integrated Security Solutions and Services
Access Control Command and ControlIntrusion Security Management
SystemIntelligent
Video Management
Siveillance™ SiteIQ Fire fighting System
°C
°C
Fire Alarm System
Detailed Engineering, supply, installation & commissioning of all the electromechanical works:
w Power Supply, Distribution System & Lighting.w Building Management System.w HVAC Systemw Plumbing Worksw Telephone, Data, Intercom, CCTV & Access Control Systems
Services Supplied:w Detailed engineering.w Supply & installation works w Testing, pre-commissioning, commissioning
& start up
Contract Description:
Grand Egyptian Museum – Phase II
Jolie Ville Summit Hotel, Sharm El Sheikh
Contract Description:
Detailed Engineering, Supply, Installation & Commissioning of all the Electromechanical Works, together with Finishing Works:
Services Supplied:
w Power Supply, Distribution System & Lighting.w Building Management System.w HVAC Systemw Plumbing Worksw Fire Fighting System w Fire Alarm, Telephone & Data, CCTV, MATV, DJ
& Public Address Systems
w Detailed engineering.w Project coordinationw Supply & installation works.w Testing, pre-commissioning, commissioning
& start up.
Golden Pyramids Plaza – Stay Bridge – City Stars
Contract Description:
Various security packages including the following items:
w IP based CCTV system .w Fire Alarm system.
Services Supplied:
w Installation works & Supply of security works
w Commissioningw Testing & Precommissioning
Pharaoh Gold mine –Marsa Allam
Services Supplied:
w Detailed engineering.w Supply & installation works.w Testing, pre-commissioning, commissioning
& start up.
Detailed Engineering, supply, installation & commissioning of the security systems works:
Equipments
Control
PLCs
LV Panels
MV Panels
Transformers
Diesel Generator
Mechanical System Piping
Instrumentation
Access Control System
CCTV
Contract Description:
The Polygon Construction Block 44 –WestownBusiness Park – Cairo/Alex Desert Road
Detailed Engineering, supply, installation & commissioning of all the electromechanical works:
Contract Description:
Power Supply, Distribution System & Lighting.
Building Management System.
HVAC System
Plumbing Works
Fire Fighting System
Fire Alarm, Security, Access, Telephone & Data, CCTV
Project is including the following:9 (Class A) office buildings, a business hotel, & a service appt building. The project occupies a total land area of 33,000 sq mt., a total build-up area of 86,000 sq. mt. situated km38 of Cairo/alex desert roadIt offers a parking area of 1700 cars capacity, banks, restaurants, & a full gym equipped with swimming pool & squash courts
Egyptian LNG Project – Idku, Beheira
Egyptian LNG Project – Idku, Beheira
HSBC Regional Off ice BankLEED Cert if icate