INDOSAT
Specification of Personal
ProtectionEquipment (PPE) required to be used
I d t J P j t
7/21/2019 SI001 PPE - Indosat Jaguar Project Field Site Work v 01 1 (2013!11!27)
http://slidepdf.com/reader/full/si001-ppe-indosat-jaguar-project-field-site-work-v-01-1-20131127 2/34
I d t J P j t
Indosat Quality, Health & Safety, Environment Policy
Specification of Personal Protection Equipment (PPE)
Site Work
Document
Number
: ISAT-PGMT-OHSE-SAFS-SIST-
0001
Revisi on Number : 01. 1
SAFETY INSTRUCTION Issue Date : 27th
November, 2013
CONTENTS
1. PURPOSE ................................................................................................................ 2
2. SCOPE ..................................................................................................................... 2
3. REFERENCES ......................................................................................................... 2
4. DEFINITION - PERSONAL PROTECTION EQUIPMENT (PPE): ............................ 3
5. PROCEDURES - GENERAL.................................................................................... 3
6. RESPONSIBILITIES ................................................................................................ 3
7. PURCHASING AND SELECTION OF PERSONAL PROTECTIVE EQUIPMENT... 3
8. INTRODUCTION OF NEW PERSONAL PROTECTIVE EQUIPMENT .................... 3
9. TYPE OF PERSONAL PROTECTIVE EQUIPMENT ............................................... 49.1. Head Protection .................................................................................................................................. 4
9.2. Safety Helmet for Working at Height ................................................................................................ 4
required to be used for Telecommunication Field and
7/21/2019 SI001 PPE - Indosat Jaguar Project Field Site Work v 01 1 (2013!11!27)
http://slidepdf.com/reader/full/si001-ppe-indosat-jaguar-project-field-site-work-v-01-1-20131127 3/34
Indosat Quality, Health & Safety, Environment Policy
Specification of Personal Protection Equipment (PPE)
required to be used for T elecommunications Field andSite Work
Document
Number
: ISAT-PGMT-OHSE-SAFS-SIST-
0001
Revisi on Number : 01. 1
SAFETY INSTRUCTION Issue Date : 27th
November, 2013
1. PurposeThe purpose of this Safety Instruction is to ensure that all employees or any person entering a
workplace shall use appropriate Personal Protective Equipment (PPE) and to ensure that the
equipment is of the appropriate type and in good condition.
If necessary this Safety Instruction could be further expanded and developed with additional
instruction, manual or drawing by each division or department.
2. ScopeThis Safety Instruction is applied to all Indosat employees, including Suppliers and Contractors’
personnel and should be rigidly enforced to comply with Government of Indonesia
Menakertrans Regulation - Peraturan Menteri Tenaga Kerja dan Transmigarasi RI No PER.
08/MEN/V11/2010
3. References- Occupational Safety – Article 12, 13, 14, Act No.1 Year 1970
- Occupational Health and Safety Management System, Regulation of the Minister of
/ /
7/21/2019 SI001 PPE - Indosat Jaguar Project Field Site Work v 01 1 (2013!11!27)
http://slidepdf.com/reader/full/si001-ppe-indosat-jaguar-project-field-site-work-v-01-1-20131127 4/34
Indosat Quality, Health & Safety, Environment Policy
Specification of Personal Protection Equipment (PPE)
required to be used for T elecommunications Field and
Site Work
Document
Number
: ISAT-PGMT-OHSE-SAFS-SIST-
0001
Revisi on Number : 01. 1
SAFETY INSTRUCTION Issue Date : 27th
November, 2013
4. Definit ion - Personal Protection Equipment (PPE):The term "Personal Protection Equipment" (PPE) covers any item intended for wearing or
carrying by the worker with the aim of protecting him from one or more risks likely to cause
injury or jeopardize health while at work, in addition to any item or accessory having the samepurpose. (European Directive 89/686/EEC)
It is also commonly referred to in the industry as ‘Personal Protective Equipment’
5. Procedures - GeneralThis procedure outlines the processes associated with Personal Protective Equipment and every
division or department which is using the Personal Protective Equipment, is responsible forexecution in accordance to this procedure, when working on Indosat sites.
6. ResponsibilitiesThe following personnel are responsible for the procedures covered by this instruction:
- Line Managers
P j t M
7/21/2019 SI001 PPE - Indosat Jaguar Project Field Site Work v 01 1 (2013!11!27)
http://slidepdf.com/reader/full/si001-ppe-indosat-jaguar-project-field-site-work-v-01-1-20131127 5/34
Indosat Quality, Health & Safety, Environment Policy
Specification of Personal Protection Equipment (PPE)
required to be used for T elecommunications Field and
Site Work
Document
Number
: ISAT-PGMT-OHSE-SAFS-SIST-
0001
Revisi on Number : 01. 1
SAFETY INSTRUCTION Issue Date : 27th
November, 2013
Prior to the utilization of Personal Protective Equipment, the employees shall be trained and
certified by an Indonesian Government licenced and approved, Working at Height Training
provider, as well as the supplier of the PPE.
9. Type of Personal Protective Equipment
9.1. Head Protection
Safety Helmet should NOT have stickers affixed to them, other than perhaps the
Indosat or Supplier company logo and then should only be done in an approved
manner consistent with the Manufacturers recommendations.
The user should have his Name and Blood Type on the front side of the helmets and
any allergies.
In the unlikely event that an accident occurs, details like knowledge of blood type
can save valuable time.
Any stickers or labels attached to the helmet, must NOT damage the surface of the
h l t
7/21/2019 SI001 PPE - Indosat Jaguar Project Field Site Work v 01 1 (2013!11!27)
http://slidepdf.com/reader/full/si001-ppe-indosat-jaguar-project-field-site-work-v-01-1-20131127 6/34
Indosat Quality, Health & Safety, Environment Policy
Specification of Personal Protection Equipment (PPE)
required to be used for T elecommunications Field and
Site Work
Document
Number
: ISAT-PGMT-OHSE-SAFS-SIST-
0001
Revisi on Number : 01. 1
SAFETY INSTRUCTION Issue Date : 27th
November, 2013
• Lateral deformation
• Electrical Insulation
• Molten Metal Splash
• No upward vision restriction
• Strong chin strap fastening
• Air ventilation
• Comply with EN 397 or ANSI Z89.1 Type I, Class E or equivalent
9.3. Regular Safety Helmet
* C hin stra
7/21/2019 SI001 PPE - Indosat Jaguar Project Field Site Work v 01 1 (2013!11!27)
http://slidepdf.com/reader/full/si001-ppe-indosat-jaguar-project-field-site-work-v-01-1-20131127 7/34
Indosat Quality, Health & Safety, Environment Policy
Specification of Personal Protection Equipment (PPE)
required to be used for T elecommunications Field and
Site Work
Document
Number
: ISAT-PGMT-OHSE-SAFS-SIST-
0001
Revisi on Number : 01. 1
SAFETY INSTRUCTION Issue Date : 27th
November, 2013
- Energy Absorber; absorbing strap, polyester
webbing L= 45mm, engaging peak force 2kN,
impact force reduction <6kN. (Comply with
EN 355 orequivalent)
- 2 braided rope with 1.5m minimum length,polyamide – white, 10.5mm diameter,
identification thread, and wear indicator.
(Comply with EN 354 or equivalent)
- 2 large Snap Hooks, strength > 23kN, high
strength forged galvanised steel, opening
50mm. (Comply with EN 362 or equivalent)
- Carabiner screw locking, high strengthgalvanised steel, breaking strength >25kN.
(Comply with EN 362 or equivalent)
- System breaking strength > 15kN
9.4.2. Full Body Harness
7/21/2019 SI001 PPE - Indosat Jaguar Project Field Site Work v 01 1 (2013!11!27)
http://slidepdf.com/reader/full/si001-ppe-indosat-jaguar-project-field-site-work-v-01-1-20131127 8/34
Indosat Quality, Health & Safety, Environment Policy
Specification of Personal Protection Equipment (PPE)
required to be used for T elecommunications Field and
Site Work
Document
Number
: ISAT-PGMT-OHSE-SAFS-SIST-
0001
Revisi on Number : 01. 1
SAFETY INSTRUCTION Issue Date : 27th
November, 2013
- Braided rope with 1.5m minimum length, polyamide –
white, 10.5mm diameter, identification thread, and wear
indicator. (Comply with EN 354 or equivalent)
- 1 small snap hook, strength > 23kN, high strength forged
galvanised steel, opening 18mm. (Comply with EN 362 orequivalent)
- Carabiner screw locking, high strength galvanised steel,
breaking strength >25kN. (Comply with EN 362 or
equivalent)
9.4.4. Hand Protection
Hand protection is important as your hands are used for climbing and holding on to objects or
parts of the antenna mounting structures when aloft.
As such they should be good quality and designed so that your fingers can feel the object you
are holding.
7/21/2019 SI001 PPE - Indosat Jaguar Project Field Site Work v 01 1 (2013!11!27)
http://slidepdf.com/reader/full/si001-ppe-indosat-jaguar-project-field-site-work-v-01-1-20131127 9/34
Indosat Quality, Health & Safety, Environment Policy
Specification of Personal Protection Equipment (PPE)
required to be used for T elecommunications Field and
Site Work
Document
Number
: ISAT-PGMT-OHSE-SAFS-SIST-
0001
Revisi on Number : 01. 1
SAFETY INSTRUCTION Issue Date : 27th
November, 2013
9.4.6. Safety Gloves for Regular Civil and Mechanical Works
• Distribution work protection
• Mechanical work protection
• Sharp surface, rough material protection
• Comply with EN 388 or equivalent
9.4.7. Safety Gloves for Electrical Works
• Electrical shock protection
• High voltage insulation
• Meet the ASTM D120
f l ( )
7/21/2019 SI001 PPE - Indosat Jaguar Project Field Site Work v 01 1 (2013!11!27)
http://slidepdf.com/reader/full/si001-ppe-indosat-jaguar-project-field-site-work-v-01-1-20131127 10/34
7/21/2019 SI001 PPE - Indosat Jaguar Project Field Site Work v 01 1 (2013!11!27)
http://slidepdf.com/reader/full/si001-ppe-indosat-jaguar-project-field-site-work-v-01-1-20131127 11/34
Indosat Quality, Health & Safety, Environment Policy
Specification of Personal Protection Equipment (PPE)
required to be used for T elecommunications Field and
Site Work
Document
Number
: ISAT-PGMT-OHSE-SAFS-SIST-
0001
Revisi on Number : 01. 1
SAFETY INSTRUCTION Issue Date : 27th
November, 2013
9.4.9.2. Safety Shoes – Ground usage
Steel toe cap meet impact resistance of 200 joules
Anti static
Anti fungicidal
High abrasion resistance
High padding for Achilles tendon and ankle bone protection
High resistance to sharp object
High slip resistance (sole must have a minimum coefficient of 0.60 slip resistance)
Medium Cut, exceeding Ankle height by > 1cm
Comply to EN 20345 or ANSI Z41 or equivalent
7/21/2019 SI001 PPE - Indosat Jaguar Project Field Site Work v 01 1 (2013!11!27)
http://slidepdf.com/reader/full/si001-ppe-indosat-jaguar-project-field-site-work-v-01-1-20131127 12/34
Indosat Quality, Health & Safety, Environment Policy
Specification of Personal Protection Equipment (PPE)
required to be used for T elecommunications Field and
Site Work
Document
Number
: ISAT-PGMT-OHSE-SAFS-SIST-
0001
Revisi on Number : 01. 1
SAFETY INSTRUCTION Issue Date : 27th
November, 2013
9.5. radiation hazard avoidance
9.5.1. personal radiat ion monitor
Compact, lightweight, easily carried as part of a climber’s set of tools and equipment
Suitable for Occupational Usage in detecting electromagnetic fields (EMF) with LED andSound Alarm indicators triggered by detection of EMF levels above specified thresholds both
below and above the set benchmarks. Occupational Levels from the standardsICNIRP/NCRP/ IEEE/ SC6 as a minimum.
7/21/2019 SI001 PPE - Indosat Jaguar Project Field Site Work v 01 1 (2013!11!27)
http://slidepdf.com/reader/full/si001-ppe-indosat-jaguar-project-field-site-work-v-01-1-20131127 13/34
Indosat Quality, Health & Safety, Environment Policy
Specification of Personal Protection Equipment (PPE)
required to be used for T elecommunications Field and
Site Work
Document
Number
: ISAT-PGMT-OHSE-SAFS-SIST-
0001
Revisi on Number : 01. 1
SAFETY INSTRUCTION Issue Date : 27th
November, 2013
9.7. collision hazard avoidance
9.7.1. high Visibilit y Vest
Bright coloured Yellow or Orange (Flourescent)
Reflective strips front and back
Covering entire torso
9.8. Dust Inhalation Prevention
9.8.1. Dust Mask
C f t EN1492001&A12009
7/21/2019 SI001 PPE - Indosat Jaguar Project Field Site Work v 01 1 (2013!11!27)
http://slidepdf.com/reader/full/si001-ppe-indosat-jaguar-project-field-site-work-v-01-1-20131127 14/34
Indosat Quality, Health & Safety, Environment Policy
Specification of Personal Protection Equipment (PPE)
required to be used for T elecommunications Field and
Site Work
Document
Number
: ISAT-PGMT-OHSE-SAFS-SIST-
0001
Revisi on Number : 01. 1
SAFETY INSTRUCTION Issue Date : 27th
November, 2013
9.9. Personal Protective Equipment Util izat ion
9.9.1. PPE Utilization for Excavation, Concrete Pouring,
Installation and Commissioning:
9.9.2. PPE Util izat ion for Other Civi l Works:
7/21/2019 SI001 PPE - Indosat Jaguar Project Field Site Work v 01 1 (2013!11!27)
http://slidepdf.com/reader/full/si001-ppe-indosat-jaguar-project-field-site-work-v-01-1-20131127 15/34
Indosat Quality, Health & Safety, Environment Policy
Specification of Personal Protection Equipment (PPE)
required to be used for T elecommunications Field and
Site Work
Document
Number
: ISAT-PGMT-OHSE-SAFS-SIST-
0001
Revisi on Number : 01. 1
SAFETY INSTRUCTION Issue Date : 27th
November, 2013
9.9.4. PPE Util izat ion for Ground Activities:
9.9.5. PPE Util izat ion for Electrical Works:
7/21/2019 SI001 PPE - Indosat Jaguar Project Field Site Work v 01 1 (2013!11!27)
http://slidepdf.com/reader/full/si001-ppe-indosat-jaguar-project-field-site-work-v-01-1-20131127 16/34
Indosat Quality, Health & Safety, Environment Policy
Specification of Personal Protection Equipment (PPE)
required to be used for T elecommunications Field and
Site Work
Document
Number
: ISAT-PGMT-OHSE-SAFS-SIST-
0001
Revisi on Number : 01. 1
SAFETY INSTRUCTION Issue Date : 27th
November, 2013
9.9.6. PPE Ut il ization for Rooftop Works:
7/21/2019 SI001 PPE - Indosat Jaguar Project Field Site Work v 01 1 (2013!11!27)
http://slidepdf.com/reader/full/si001-ppe-indosat-jaguar-project-field-site-work-v-01-1-20131127 17/34
9.9.7. Detailed Guidance for PPE Util ization
For detailed guidance in Personal Protective Equipment utilization, please refer to the table below:
Indosat PPE Product Usage Matrix
Working
at Height
Helmet
Regular
Helmet
Working
at Height
Gloves
Regular
Gloves
Electrical
Gloves
Working
at Height
Safety
Shoes
Regular
Safety
Shoes
Safety
Rubber
Boots
Excavation Works Concrete Pouring Other Civil Work s
Tower Erection - Climb er/Painter Tower Erection - Ground Work er * *
Electrical Works
Technical Site Survey
Ant enn a & Feed er Ins tall atio n at Heig ht Ant enn a & Feed er In st allati on - Grou nd Wo rk s BTS/Node-B/MW Installatio n Commissioning
Rooftop Work s *
Climbing Rooftop * * * Non-Rooftop Ground Only * *
Civil
Mechanical
Electrical
Survey & Design
Rooftop
Telecom Implementation
Field Inspect ion and Audit
Foot Protection
Act ivi tie sEye
Protection
Head Protection
Full Body
Harness
Hand Prote ction
Drop
Hazard
Avo idan ce
Radiation
Hazard
Avo idanc e
Collision
Hazard
Avoi danc e
7/21/2019 SI001 PPE - Indosat Jaguar Project Field Site Work v 01 1 (2013!11!27)
http://slidepdf.com/reader/full/si001-ppe-indosat-jaguar-project-field-site-work-v-01-1-20131127 18/34
Indosat Quality, Health & Safety, Environment Policy
Specification of Personal Protection Equipment (PPE)
required to be used for Telecommunications Field and
Site Work
Document
Number
: ISAT-PGMT-OHSE-SAFS-SIST-
0001
Revi si on Num be r : 01. 1
SAFETY INSTRUCTION Issue Date : 27th
November, 2013
ISAT-QHSE-SI001-PPE Confidential (Rahasia) Page 1 of 34
7/21/2019 SI001 PPE - Indosat Jaguar Project Field Site Work v 01 1 (2013!11!27)
http://slidepdf.com/reader/full/si001-ppe-indosat-jaguar-project-field-site-work-v-01-1-20131127 19/34
10. USE AND CARE OF THE PERSONAL PROTECTIVEEQUIPMENTS
The following instructions are specific to the equipment detailed above:
10.1. Safety HelmetThe Safety Helmet is intended for providing protection to the head and must be worn
whenever there is a legal requirement to wear one or whenever there is a risk of head injury.
10.1.1. Fitting and adjustment
For adequate protection the Safety Helmet must fit or be adjusted to the size of the user’s
head.
The Safety Helmet must only be worn properly with the peak facing forward.
To alter the fit, adjust the harness at the rear of the Safety Helmet and ensure a comfortable fit
is made around the crown of the head.
When not in use or during transportation, the Safety Helmet should be stored in a container
h h f d l h f h l d b b d
7/21/2019 SI001 PPE - Indosat Jaguar Project Field Site Work v 01 1 (2013!11!27)
http://slidepdf.com/reader/full/si001-ppe-indosat-jaguar-project-field-site-work-v-01-1-20131127 20/34
Indosat Quality, Health & Safety, Environment Policy
Specification of Personal Protection Equipment (PPE)
required to be used for T elecommunications Field and
Site Work
Document
Number
: ISAT-PGMT-OHSE-SAFS-SIST-
0001
Revisi on Number : 01. 1
SAFETY INSTRUCTION Issue Date : 27th
November, 2013
The useful life of the Safety Helmet is affected by many factors including the cold, heat,
chemicals, sunlight and misuse.
The Safety Helmet should be examined daily for obvious signs of cracking, brittleness or
damage to either helmet of harness.
The date of manufacture is moulded into the peak of the Safety Helmet.
While the Safety Helmet is free from defects, it is suitable for its intended purpose.
Under normal circumstances the Safety Helmet should offer adequate protection for 2-3 years.
Do not attach components from different manufacturers, to the Safety Helmet.
The Safety Helmet may be cleaned with the use of good quality soap and warm water and dried
with a soft cloth.
The Safety Helmet should not be cleaned with abrasive substances or solvents and must not be
stored in direct sunlight or in contact with any solvents.
7/21/2019 SI001 PPE - Indosat Jaguar Project Field Site Work v 01 1 (2013!11!27)
http://slidepdf.com/reader/full/si001-ppe-indosat-jaguar-project-field-site-work-v-01-1-20131127 21/34
Indosat Quality, Health & Safety, Environment Policy
Specification of Personal Protection Equipment (PPE)
required to be used for T elecommunications Field and
Site Work
Document
Number
: ISAT-PGMT-OHSE-SAFS-SIST-
0001
Revisi on Number : 01. 1
SAFETY INSTRUCTION Issue Date : 27th
November, 2013
10.2. Full Body Safety Harness
The Full Body safety harness has been designed for working at heights, on towers, guyed masts,
monopoles or other structures.
It is intended to be used with a lanyard or positioning lanyard to secure the worker against the
structure, leaving his hands free for the task to be performed.
WARNING: THE BELT/LANYARD SYSTEM MUST NOT BE USED AS A FALL ARRESTER
A Full Body Safety Harness shall be worn under any circumstances when climbing a monopole,
self-supporting tower or guyed mast or under any circumstances where there is a likelihood,that the user may turn upside down.
NO OTHER FORM OF SAFETY BELT IS SUITABLE OR SHALL BE WORN
10.2.1. Use of the full body safety harness
Before each use, a close visual inspection to check that the Full Body Safety Harness is in a
f
7/21/2019 SI001 PPE - Indosat Jaguar Project Field Site Work v 01 1 (2013!11!27)
http://slidepdf.com/reader/full/si001-ppe-indosat-jaguar-project-field-site-work-v-01-1-20131127 22/34
Indosat Quality, Health & Safety, Environment Policy
Specification of Personal Protection Equipment (PPE)
required to be used for T elecommunications Field and
Site Work
Document
Number
: ISAT-PGMT-OHSE-SAFS-SIST-
0001
Revisi on Number : 01. 1
SAFETY INSTRUCTION Issue Date : 27th
November, 2013
Whenever possible choose an anchor point ABOVE the users position and avoid any anchor
point whose strength may be doubtful.
Preferably use structural anchors provided for this purpose, or anchoring points able to hold
more than 1500 Kg.
Any harness that has withstood a fall or which appears doubtful on visual examination must
immediately be withdrawn from service.
Only one competent, approved person may decide whether to put it back in service and
harnesses must be checked at least once a year.
Protect the Full Body Safety Harness against any risk that may arise in the work environment,
such as thermal, electrical or mechanical shock, splattered acid or weld metal, paint etc.
DO NOT MODIFY THE EQUIPMENT
10.2.2. Storage and Maintenance
7/21/2019 SI001 PPE - Indosat Jaguar Project Field Site Work v 01 1 (2013!11!27)
http://slidepdf.com/reader/full/si001-ppe-indosat-jaguar-project-field-site-work-v-01-1-20131127 23/34
Indosat Quality, Health & Safety, Environment Policy
Specification of Personal Protection Equipment (PPE)
required to be used for T elecommunications Field and
Site Work
Document
Number
: ISAT-PGMT-OHSE-SAFS-SIST-
0001
Revisi on Number : 01. 1
SAFETY INSTRUCTION Issue Date : 27th
November, 2013
THIS SAFETY EQUIPMENT MUST ONLY BE USED BY A PERSON PREVIOUSLY TRAINED AND
CERTIFIED FOR WORKING AT HEIGHTS
10.2.4. Directions for Use
To don your harness we recommend you proceed as follows:
Take the harness by the dorsal D-ring, slip on the shoulder straps one after the other, taking
care not to twist them.
Adjust one and then the other shoulder strap by pulling or releasing the slack end, so that the
buttock strap is firmly in place under the buttocks.
Do up the waist belt by passing the male buckle through the female, and adjust its tension by
pulling or releasing the slack end of the belt.
Pull one and then the other thigh strap through the crotch and latch each strap on each of the
female buckles located at the hips, by passing the male buckle through the female.
Make sure not to cross the straps.
7/21/2019 SI001 PPE - Indosat Jaguar Project Field Site Work v 01 1 (2013!11!27)
http://slidepdf.com/reader/full/si001-ppe-indosat-jaguar-project-field-site-work-v-01-1-20131127 24/34
Indosat Quality, Health & Safety, Environment Policy
Specification of Personal Protection Equipment (PPE)
required to be used for T elecommunications Field and
Site Work
Document
Number
: ISAT-PGMT-OHSE-SAFS-SIST-
0001
Revisi on Number : 01. 1
SAFETY INSTRUCTION Issue Date : 27th
November, 2013
10.3. Safety Positi oning Belt
The Safety Positioning Belt has been designed for working at heights, on roof tops, on poles or
other structures.
It is used with a Lanyard or Adjustable Positioning Lanyard to secure the worker against the
structure, leaving his hands free for the task to be performed.
WARNING: THE BELT/LANYARD SYSTEM MUST NOT BE USED AS A FALL ARRESTER
A Safety Positioning Belt shall not be worn under any circumstances when climbing a
monopole, self-supporting tower or guyed mast or under any circumstances where there is a
likelihood, that the user may turn upside down.
A Safety Positioning Belt typically shall be used for working on rooftops or other uses, where it
is necessary to restrain workers.
10.3.1. Use of the Safety Posit ioning Belt
Before each use, check that the Safety Positioning Belt is in a serviceable condition, checking
7/21/2019 SI001 PPE - Indosat Jaguar Project Field Site Work v 01 1 (2013!11!27)
http://slidepdf.com/reader/full/si001-ppe-indosat-jaguar-project-field-site-work-v-01-1-20131127 25/34
7/21/2019 SI001 PPE - Indosat Jaguar Project Field Site Work v 01 1 (2013!11!27)
http://slidepdf.com/reader/full/si001-ppe-indosat-jaguar-project-field-site-work-v-01-1-20131127 26/34
Indosat Quality, Health & Safety, Environment Policy
Specification of Personal Protection Equipment (PPE)
required to be used for T elecommunications Field and
Site Work
Document
Number
: ISAT-PGMT-OHSE-SAFS-SIST-
0001
Revisi on Number : 01. 1
SAFETY INSTRUCTION Issue Date : 27th
November, 2013
When checking the Carabiner, irrespective of type, ensure that the spring loaded gate is
working correctly and that the Carabiner functions exactly as specified.
Note:
When using a Screw type Carabiner, the correct operation is to tighten the screw barrel, until
finger tight and then withdraw the screw ¼ turn.
If there is any doubt about the correct functionality of a Carabiner, withdraw it from service
immediately.
Protect the Safety Positioning Belt against any risk that may arise in the work environment,
such as thermal, electrical or mechanical shock, splattered acid or weld metal, paint, etc.
In use, the Carabiner should be protected against any hazards in the work environment e.g.
thermal or electrical shocks, mechanical impacts, paint, splattered acid or so forth.
The Carabiner should be cleaned regularly and stored it in a ventilated area.
7/21/2019 SI001 PPE - Indosat Jaguar Project Field Site Work v 01 1 (2013!11!27)
http://slidepdf.com/reader/full/si001-ppe-indosat-jaguar-project-field-site-work-v-01-1-20131127 27/34
Indosat Quality, Health & Safety, Environment Policy
Specification of Personal Protection Equipment (PPE)
required to be used for T elecommunications Field and
Site Work
Document
Number
: ISAT-PGMT-OHSE-SAFS-SIST-
0001
Revisi on Number : 01. 1
SAFETY INSTRUCTION Issue Date : 27th
November, 2013
10.4.3. Use, fi tting, care and adjustment
Before an Automatic Snap Hook is used for the first time, it is recommended to check carefully
that the equipment is compatible with the other system components and should preferably be
of the same manufacture, to ensure that the equipments are intercompatible.
Before an Automatic Snap Hook is used each time, it should be checked for the following:
Deformations
Signs of wear
Correct locking system operation
When checking the Automatic Snap Hook, irrespective of type, ensure that the spring loaded
gate is working correctly and the Automatic Snap Hook functions exactly as specified.
If there is any doubt about the correct functionality of an Automatic Snap Hook, withdraw it
from service immediately.
In use, the Automatic Snap Hook should be protected against any hazards in the work
7/21/2019 SI001 PPE - Indosat Jaguar Project Field Site Work v 01 1 (2013!11!27)
http://slidepdf.com/reader/full/si001-ppe-indosat-jaguar-project-field-site-work-v-01-1-20131127 28/34
Indosat Quality, Health & Safety, Environment Policy
Specification of Personal Protection Equipment (PPE)
required to be used for T elecommunications Field and
Site Work
Document
Number
: ISAT-PGMT-OHSE-SAFS-SIST-
0001
Revisi on Number : 01. 1
SAFETY INSTRUCTION Issue Date : 27th
November, 2013
It is advisable therefore that the Lanyard shall be of the same manufacture as the other
components, to ensure inter-compatibility.
10.5.1. Use, fi tting, care and adjustment
Before using a Lanyard it must be thoroughly checked.
Lanyards of the approved type are supplied with ‘Eye Splices’ at each end and these should be
visually checked for wear.
If thimbles are fitted, these should also be checked for wear.
The Lanyard has a coloured thread woven inter the rope and the rope and the thread shall bechecked for wear and abrasions and if there are any signs of wear to the strands of the rope,
the Lanyard should not be used.
Lanyards are available in different lengths and a Lanyard of the correct length shall always be
selected for the use intended.
If during use the Lanyard becomes wet, it should be washed in clean water and allowed to dry
7/21/2019 SI001 PPE - Indosat Jaguar Project Field Site Work v 01 1 (2013!11!27)
http://slidepdf.com/reader/full/si001-ppe-indosat-jaguar-project-field-site-work-v-01-1-20131127 29/34
Indosat Quality, Health & Safety, Environment Policy
Specification of Personal Protection Equipment (PPE)
required to be used for T elecommunications Field and
Site Work
Document
Number
: ISAT-PGMT-OHSE-SAFS-SIST-
0001
Revisi on Number : 01. 1
SAFETY INSTRUCTION Issue Date : 27th
November, 2013
Before going aloft, check that the structure is designed for the use of a positioning system (small
diameter members are to be prohibited, as well as sharp or penetrating edges).
The Adjustable Positioning Lanyard should be adjusted to the pole or structure so that a free fall of no
more than 0.5 m is possible, when working.
Protect the Adjustable Positioning Lanyard against any risk that may arise in the work
environment, such as thermal, electrical or mechanical shock, splattered acid, sharp edges,
splattered weld metal, etc.
Do not modify this equipment.
Do not add any element to the system.
Before each use, check that the Adjustable Positioning Lanyard and the adjustment device is in
serviceable condition, checking namely for:
Incipient breakage of the ropes
Thimble deformation
7/21/2019 SI001 PPE - Indosat Jaguar Project Field Site Work v 01 1 (2013!11!27)
http://slidepdf.com/reader/full/si001-ppe-indosat-jaguar-project-field-site-work-v-01-1-20131127 30/34
Indosat Quality, Health & Safety, Environment Policy
Specification of Personal Protection Equipment (PPE)
required to be used for T elecommunications Field and
Site Work
Document
Number
: ISAT-PGMT-OHSE-SAFS-SIST-
0001
Revisi on Number : 01. 1
SAFETY INSTRUCTION Issue Date : 27th
November, 2013
10.6.3. Checks required prior to each use
Like any personal protective equipment, the Adjustable Positioning Lanyard must be checked:
Before each use
At least once a year by a qualified person or an approved organisation
10.7. Work Gloves
Work Gloves are intended to be worn whenever there is risk of injury to the hands and fingers
and shall be of the leather type, with reinforced palms and fingers.
It should be remembered that Work Gloves will not necessarily prevent damage to the hands orfingers, but will substantially reduce skin damage and they should be used whenever lifting or
moving heavy objects, pulling, handling ropes, cutting or handling any materials which would
dirty the hands, etc.
10.7.1. 5.2.26 Use, f it ting, care and adjustment
Work gloves are intended to be used and therefore they will get dirty and worn.
7/21/2019 SI001 PPE - Indosat Jaguar Project Field Site Work v 01 1 (2013!11!27)
http://slidepdf.com/reader/full/si001-ppe-indosat-jaguar-project-field-site-work-v-01-1-20131127 31/34
Indosat Quality, Health & Safety, Environment Policy
Specification of Personal Protection Equipment (PPE)
required to be used for T elecommunications Field and
Site Work
Document
Number
: ISAT-PGMT-OHSE-SAFS-SIST-
0001
Revisi on Number : 01. 1
SAFETY INSTRUCTION Issue Date : 27th
November, 2013
Electricians’ Gloves that have been issued for service, but are not in use should be kept in
containers used solely for that purpose or in a place where they will not be subject to
mechanical or chemical damage.
When Electricians Gloves become soiled in use, they may be washed in soap and water at atemperature not exceeding 65C, thoroughly dried and dusted with talcum powder.
If insulating compounds such as tar and paint continue to adhere to the Electricians Glove, they
may be wiped immediately with a suitable solvent and then immediately washed as previously
described.
Petrol, Paraffin or White Spirit shall not be used to remove such compounds.
Electricians’ Gloves that become wet in use by washing must be dried thoroughly, but not in a
manner that will cause the temperature of the Electricians Gloves to exceed 65C.
Electricians’ Gloves that are used frequently should be re-tested at intervals of not more than
7/21/2019 SI001 PPE - Indosat Jaguar Project Field Site Work v 01 1 (2013!11!27)
http://slidepdf.com/reader/full/si001-ppe-indosat-jaguar-project-field-site-work-v-01-1-20131127 32/34
Indosat Quality, Health & Safety, Environment Policy
Specification of Personal Protection Equipment (PPE)
required to be used for T elecommunications Field and
Site Work
Document
Number
: ISAT-PGMT-OHSE-SAFS-SIST-
0001
Revisi on Number : 01. 1
SAFETY INSTRUCTION Issue Date : 27th
November, 2013
Normal polishing of the lens should be done with a ‘Lens Cloth’ and use of tissue paper
handkerchiefs, is not recommended, as the lens can become scratched.
If the Safety Glasses have been used in a dusty environment, they should be washed as
described above, before polishing.
Store Safety Glasses in a dry place at room temperature.
10.9. Safety Goggles
Safety Goggles are intended to be used whenever there is a risk of eye damage and are
designed to provide chemical, impact, dust and UV protection.
Safety Goggles are designed to be used over spectacles, if worn by the user.
10.9.1. Use, fi tting, care and adjustment
Safety Goggles are of the adjustable type and should fit comfortably.
The elastic headband shall be adjusted to allow a comfortable fit.
7/21/2019 SI001 PPE - Indosat Jaguar Project Field Site Work v 01 1 (2013!11!27)
http://slidepdf.com/reader/full/si001-ppe-indosat-jaguar-project-field-site-work-v-01-1-20131127 33/34
Indosat Quality, Health & Safety, Environment Policy
Specification of First Aid Kits required to be used for
Telecommunications Field and Site Work
Document
Number
: ISAT-QHSE-SI001-PPE
Revis ion Num be r : 01. 0
SAFETY INSTRUCTION Issue Date : 18th
July, 2013
ISAT-QHSE-SI001-PPE Confidential (Rahasia) Page 6 of 34
Document Control Sheets
Document Contents
Issue NoIssue
Date
Issued
By
Nature of
Amendment
Document
Type
Document
StatusWr it ten b y Rev iewed b y A pp rov ed b y
Document
Reference #
Document
Template
Version
Issue v01.0July 12,
2012Indosat
Initial release of Safety
Instruction based on
2011 Indosat QHSE
Plan and Policy
Approved IssuedLord John E.
Shazell
ISAT-PGMT-OHSE-
SAFS-SIST-0001v1.0
Issue v01.127 Nov
2013
Indosat
Revised instruction
based on RAN
Modernisation ProjectRequirel
Approved IssuedLord John E.
Shazell
ISAT-PGMT-OHSE-
SAFS-SIST-0001
v1.0
7/21/2019 SI001 PPE - Indosat Jaguar Project Field Site Work v 01 1 (2013!11!27)
http://slidepdf.com/reader/full/si001-ppe-indosat-jaguar-project-field-site-work-v-01-1-20131127 34/34
Indosat Quality, Health & Safety, Environment Policy
Specification of Personal Protection Equipment (PPE)
required to be used for Telecommunications Field and
Site Work
Document
Number
: ISAT-PGMT-OHSE-SAFS-SIST-
0001
Revis ion Num be r : 01. 1
SAFETY INSTRUCTION Issue Date : 27th
November, 2013
ISAT-QHSE-SI001-PPE Confidential (Rahasia) Page 1 of 34
Document Template
Issue NoIssue
Date
Issued
By
Nature of
Amendm ent
Document
Type
Document
StatusWritten by Reviewed by Approved by
Template
Reference #
Issue v01.018th July
2013Indosat
Initial release of Safety
Instruction template
Approved
DocumentIssued
John Shazell,
TeleconsultBruce Beros