Download - SHEET 24

Transcript
  • CB

    CB

    CB

    CB

    CB

    CB

    SEPTICTANK

    OVER FLOW WATERTO PUBLIC SEWER

    TO PUBLIC SEWER

    TO PUBLIC SEWER

    TO MAIN WATER SOURCE

    M

    GV

    CV

    F

    FF

    F

    F

    FF

    F

    F

    SHO.

    SHO.

    SHO.

    WCWS

    WCWS

    WCWS

    FD

    FD

    FD

    FD

    FD

    FD

    FD

    LAVLAV

    LAVLAV

    LAV

    WC

    WC

    WCCO

    CO

    KS

    1.) PLUMBING INSTALLATION SHALL CONFORM TOTHE RULES AND REGULATIONS OF THE LATESTEDITION OF THE NATIONAL PLUMBING CODE

    2.) ALL HORIZONTAL PIPING SHALL BE IN A PRACTICAL ALIGNMENT AND SHALL BE GIVEN A SLOPE OF

    4.) PLUMBING INSTALLATION SHALL BE UNDER THERESPONSIBLE SUPERVISION OF A LISENCEDMASTER PLUMBER

    3.) ROUGHING-INS SHALL BE WELL PROTECTED AGAINTS

    NOT LESS THAN 2 PERCENT

    POSSIBLE BREAKAGE

    GENERAL SPECIFICATIONS

    CB

    DS

    LAV

    FD

    CO

    WC

    CATCH BASIN

    DOWNSPOUT

    LAVATORY

    FLOOR DRAIN

    CLEAN OUT

    WATER CLOSET

    SHOWER

    GATE VALVE

    CHECK VALVE

    METER

    FAUCET

    KITCHEN SINK

    SH

    GV

    CV

    M

    F

    KS

    LEGEND

    SEPTIC TANKST

    PRESENTED BY:

    EVSU_CAAD_BSAR 4A STUDENT

    SUBJECT: PROJECT TITLE:

    LOCATION:

    CHECKED BY:

    DATE CHECKED:

    SHEET CONTENTS: SHEET NO.

    PLUMBING

    SCALE

    MANAGBANAG, EMMANUEL II L.MAGALLANES, EDRALYN COMP

    413TWO - STOREY RESIDENTIAL BLDG. ARCH. HERVY G. CATILOGO, UAP

    INSTRUCTOR

    P42 24

    ISOMETRIC LAYOUT SCALE 1:100 MTS

    TWO - STOREY RESIDENTIAL BLDG.

    P24 24

    ISOMETRIC LAYOUT N.D.T.S.

    GENERAL SPECIFICATION

    LEGEND

    N.D.T.S.

    N.D.T.S.


Top Related