Shabelle River
Challenges and solutions
Robbert van der Steeg, WOCCA
Source: SWALIM
El Nino in 2015• Flash floods• High water level• Preparedness at
regional level• Drought in parts of
Ethiopia• Weak points were
mapped
Perception of the people• Loss of productive assets and sometimes lives• Flood frequency increases• Past measures: dredging, maintenance of canals and
embankments• Solutions:
– Strengthening river Embankment– De-silting of the River Bed– Preposition of Sand Bags at village Level– Continuous recording of the River Level – Rehabilitation of Sabun/FAO canal and Chinese Canal that can
reduce the risk of Floods.
Characteristics of the River
• Lots of sedimentation• Serves irrigation system since 1925 (Weir)• Limited maintenance since the war started• Concrete intakes but many are done with
sandbags (although diminishing)• Floods are increasing in frequency• Floods can also be caused by overflowing of
the embankment
Sedimentation
Photo GSA/YME
Weir
Irrigation system and flood relief canal
Information source: MottMacDonald
Solutions
• Higher embankments• Higher embankments further away from the
river• Restoration of the flood relief system• Dredging
Embankment improvement
Irrigation system and flood relief canal
Information source: MottMacDonald
Dredging