DRAFTSchedule
2017 2018 2019 2020 2021Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Segment 1 - 402 Interchange
Segment 2 - 402 to Crossroads
Segment - 3 Crossroad to SH 392
Segment 4 - Crossroads to Cache la Poudre
Segment 5 - Poudre to Mulberry
Segment 6 - US 34
Design
Design
Design
Design
Design
Phase I
Phase I
Phase I
Phase I
Phase I
Phase II
Phase II
Phase II
Phase II
Phase II
Phase III
Phase III
Phase III
Phase III
Construction
Construction
Construction
Construction
Tolling Integration/Lane Testing
Final Tolling Testing
Final Tolling Testing
Go Live!
Construction
DesignPhase IConstruction
Tolling Integration/Lane Testing
Tolling Integration/Lane Testing
Final Tolling Testing
Tolling Integration/Lane Testing
Final Tolling Testing
Tolling Integration/Lane Testing
Final Tolling Testing
1Segment
2Segment
3Segment
5Segment
4Segment
6Segment
E MulberrySt
E ProspectRd
POE
Cache la Poudre RiverBig Thompson River
E HarmonyRd
KechterRd
CrossroadsBlvd
KendallPkwy GW
RR
UPRR
Park-n-Ride
2525
25 14