Page 1: Segment 1 - 402 Interchange DRAFT - codot.gov Integration/Lane Testing Final Tolling Testing: Tolling Integration/Lane Testing Final Tolling Testing: 1

DRAFTSchedule

2017 2018 2019 2020 2021Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

Segment 1 - 402 Interchange

Segment 2 - 402 to Crossroads

Segment - 3 Crossroad to SH 392

Segment 4 - Crossroads to Cache la Poudre

Segment 5 - Poudre to Mulberry

Segment 6 - US 34

Design

Design

Design

Design

Design

Phase I

Phase I

Phase I

Phase I

Phase I

Phase II

Phase II

Phase II

Phase II

Phase II

Phase III

Phase III

Phase III

Phase III

Construction

Construction

Construction

Construction

Tolling Integration/Lane Testing

Final Tolling Testing

Final Tolling Testing

Go Live!

Construction

DesignPhase IConstruction

Tolling Integration/Lane Testing

Tolling Integration/Lane Testing

Final Tolling Testing

Tolling Integration/Lane Testing

Final Tolling Testing

Tolling Integration/Lane Testing

Final Tolling Testing

1Segment

2Segment

3Segment

5Segment

4Segment

6Segment

E MulberrySt

E ProspectRd

POE

Cache la Poudre RiverBig Thompson River

E HarmonyRd

KechterRd

CrossroadsBlvd

KendallPkwy GW

RR

UPRR

Park-n-Ride

2525

25 14

39234402

Top Related