Download - SEE YOU NEXT YEAR ON 21·22·23 October
SEE YOU NEXT YEAR ON21·22·23 October
Closing / Cierre / Amaiera
Venue
It received the Apex Award for Best Convention Centre of the World 2003
The Conference Centre and Concert Hall.
Euskalduna Jauregia. Bilbao / Spain
One of the most outstanding contemporary works carried out by Spanish architects
The Conference Centre and Concert Hall.
Euskalduna Jauregia. Bilbao / Spain
Opening
Supporting the present and building the future
Opening – Begoña Laibarra, Jesús de la Maza, Cristina Oyón and Doron Cherkovsky
29
Tutorials
“Testing is a process that gives a judgment about the quality of the system andthe measure in wich ot can be expected that the set goals are going to be reached”
Tutorial 1 - Master class: Applying the Result driven test principles in your work
Derk-Jan de Grood - Collis (The Netherlands)29
“Technical people like to fix things, it’s in their nature. But identify issues, please don’t resolve them.”
Paul Jorgensen - Grand Valley State University (USA)
Tutorial 2 - Industrial-Strength Technical Inspections
29
Keynotes
“Site integration time is often reduced - airport opening date is fixed - to ‘no time left’ ”
Keynote - Testing the Heathrow Terminal 5 Baggage Handling System
Roger Derksen - Transfer Solutions (The Netherlands)29
“The programmer wants to make a program right and the tester wants the program to fail”
Keynote - Programs that test themselves
Bertrand Meyer - Swiss Federal Institute of Technology (Switzerland)30
“Testing is a growing business...good news for us!”
Keynote – Challenges of Testing on the Telecommunications Industry
Jussi Mäkinen – Oulu Innovation Ltd / Octopus Network (Finland)31
Tracks
“Grid QCM requires less human effort to be used because it is almost fully automatable”
TRACK A · QA Management(1) - Grid-QCM: the grid Quality Certification Model
Adriano Rippa - Engineering Ingegneria Informatica S.p.A. (Italy)29
“The goals of change request workflow are visibility,traceability and communication between teams”
TRACK A · QA Management(2) - Designing Change Request Workflows
Eric Mariacher - Logitech (France)29
“In-built test automation software has control over the application as an ‘insider’ ”
TRACK B · Test Automation(1) - Let’s get into the product!!! “In-built Automation Software”
Abhisheck Talwar - Adobe Systems India Pvt. Ltd. Noida (India)29
“Getting an early start with test automation has contributed to the success of projects”
TRACK B ·Test Automation(2) - From Manual Testing to an Automated Testing Framework
Alvin Sumter - Cox Newspaper (USA)29
“TestGrip describes a vision on test policy and its impact on the test organisation, based upon working experience”
TRACK C ·Test Management (1) - Test Policy: Gaining Control on IT Quality and Processes
Chris Schotanus - Lógica-Testmanagement & Consultancy (The Netherlands)30
“In Vertical approach, testers for different components work togetherbringing deeper knowledge of their features”
TRACK C ·Test Management(2) - Vertical approach in managing testing of Software projects
Myroslav Palenychka - IBM Rational Modeling Tools (Canada)30
“‘RISKI’ is a framework for dynamic risk identificationand analysis”
TRACK C ·Test Management(3) - RISKI: An efficient Risk Driven Methodology for Woftware QA
Sudipta Debnat - Aricent technologies (India)30
“Testing should continue as long as the costs of detecting and repairing defects during testing are lower than the costs if the defects occurs during production”
TRACK C ·Test Management(4) - Risk Based Test Strategy Judged
Leo van der Aalst - Sogeti Nederland B.V (The Netherlands)30
“The need is to plan, in an early stage of the system development,how each requirement shall be verified”
TRACK C ·Test Management(5) - Requirement Verification Matrix (RVM)
Avner Engel - Holon Institute of Technology (HIT) (Israel)30
“Testing is a process that provides insight into, and advice on,quality and the related risks”
TRACK D · Testing Techniques (1) - Exploratory Testing put in practise
Erik Boelen - QA Consult Services (Belgium)30
“Threat modeling is a technique where you can identify the possible attack vectors and vulnerabilities your application can face and identify the potential attack points your
application can have”
TRACK D · Testing Techniques(2) - Resolving Security Test Coverage Dilemma: A threat modeling based approach
Vaibhav Mittal & Vibhore Garg - Adobe Systems India (India)30
“Observation KPIs can be used to measure ‘ Project Health’ or for ‘Product Readiness Review ‘ after testing”
TRACK D · Testing Techniques(3) – Test KPIs
Anil Kumar - Aricent Technologies (UK)30
“By adopting MDD, developers increased their productivity to offer morecomplex and more competitive products in less time...”
TRACK D · Testing Techniques(4) - Extending Model Driven Development to Model Driven Testing
Moshe S. Cohen - Telelogic (Israel)30
“The product is a solution. If the problem isn’t solved, the product doesn’t work”
TRACK D · Testing Techniques(5) - Comparing Agile Testing Techniques
Paul Jorgensen - Grand Valley State University (USA)30
“Test factory provides a standarized platform for proposing and delivering application testing services and enables faster response to customer requests”
TRACK E · Testing Organisations(1) - Test Factory Implementation at Zurich CoE
Javier Fernández-Pello & Raúl Alares - Zurich Insurance (Spain)31
“Finally the salaries of testers and developers are getting equal”
TRACK E · Testing Organisations(2) - Independent Software Testing Group
Karina Gomes - C.E.S.A.R. (Brasil)31
“Hire for people with added values – Avoid hiring YOUin another suit”
TRACK E · Testing Organisations(3) - Assuring your test organisation Quality - find the best for the job?
Galit Zucker - QA Consultant (Israel)31
“CMMI = not how we do it but how well we do it”
TRACK F · Configuration Management(1) - 5 Steps of Configuration Management Functionalities
Eric Mariacher - Logitech (France)31
TRACK F · Configuration Management(2) - Lesson learned in Test - and configuration management
Eric Megens - High Tech Solutions (The Netherlands)31“Avoid branching as much as possible, keep the lifetime short”
“Configuration Management is the implementation of a database that containsdetails of the organisation’s elements that are used in the provision
and management of its IT services”
TRACK F · Configuration Management(3) - Configuration Control: Keep items synchronized
Juan Carlos Sánchez Mirabal - NTE SA / Werfen Group (Spain)31
Tool Lab
PPOOA, a model base approach for the architecture and performance evaluation of real-time systems
TOOL LAB
Jose Luis Fernandez (PPOOA)29
Functional Test Management and Planning with Telelogic DOORS
TOOL LAB
Telelogic (IBM)30
IRQA Demo: Corporate Solution for Requirement Engineering
TOOL LAB
Visure Solutions30
SQS Test Framework
TOOL LAB
SQS31
Round Table
What is the future of testing? Threats of open source? No! ‘Professional developers’ have the advantage of R&D
which always brings the tools one step further.
Round Table
31
Events
Speakers Warming Up - 28th October 2008
28
Speakers Warming Up - 28th October 2008
28
The Dinner
Conference Dinner at Sociedad Bilbaína30th October 2008
30
The Dinner
Conference Dinner at Sociedad Bilbaína30th October 2008
30
Chairmen
QA&TEST 2008 Chairmen
Thanks!
Attendees
The attendees
Best Speaker award
Best Speaker Award
Eric Megens - High Tech Solutions (The Netherlands)
Congratulations!
Exhibition
QA&TEST 2008 Exhibitors
QA&TEST 2008 Exhibitors
QA&TEST 2008 Exhibitors
Team QA&TEST 2008
Team QA&TEST 2008
Thank you for coming / Gracias por venir / Eskerrik asko etortzeagatik
SEE YOU NEXT YEAR ON21·22·23 October