SCORECARD AND KPIS 101
Based on www.bscdesigner.com/scorecard-and-kpis-101.htmBy Aleksey Savkin, bscdesigner.com
BSC DESIGNER
![Page 2: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/2.jpg)
NOT ALL INDICATORS ARE KPIS
• It doesn’t make sense to call something “KPI” until a business context is defined.
BSC DESIGNER
![Page 3: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/3.jpg)
NOT ALL INDICATORS ARE KPIS
• It doesn’t make sense to call something “KPI” until a business context is defined.
• But I’ll be using the “KPI” term as it is more popularized.
BSC DESIGNER
![Page 4: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/4.jpg)
NOT ALL INDICATORS ARE KPIS
• It doesn’t make sense to call something “KPI” until a business context is defined.
• But I’ll be using the “KPI” term as it is more popularized.
• These aspects were discussed before… in the guide “from quantification to a metric”
BSC DESIGNER
![Page 5: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/5.jpg)
![Page 6: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/6.jpg)
WHAT PROBLEMS ARE KPIS AND A SCORECARD SUPPOSED TO SOLVE?
• Indicators are numerical values that are linked to some kind of process.
BSC DESIGNER
![Page 7: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/7.jpg)
WHAT PROBLEMS ARE KPIS AND A SCORECARD SUPPOSED TO SOLVE?
• Indicators are numerical values that are linked to some kind of process.
• Their primary goal is to show a number that can give us an idea about the current performance.
BSC DESIGNER
![Page 8: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/8.jpg)
WHAT PROBLEMS ARE KPIS AND A SCORECARD SUPPOSED TO SOLVE?
ON INDICATOR LEVEL:
• Show the current value.
BSC DESIGNER
![Page 9: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/9.jpg)
WHAT PROBLEMS ARE KPIS AND A SCORECARD SUPPOSED TO SOLVE?
ON INDICATOR LEVEL:
• Show the current value.• Introduce the performance function
BSC DESIGNER
![Page 10: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/10.jpg)
WHAT PROBLEMS ARE KPIS AND A SCORECARD SUPPOSED TO SOLVE?
ON INDICATOR LEVEL:
• Show the current value.• Introduce the performance function• Interpret the value of an indicator on a
baseline/target scale.
BSC DESIGNER
![Page 11: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/11.jpg)
WHAT PROBLEMS ARE KPIS AND A SCORECARD SUPPOSED TO SOLVE?
ON SCORECARD LEVEL:
• Group indicators into categories.
BSC DESIGNER
![Page 12: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/12.jpg)
WHAT PROBLEMS ARE KPIS AND A SCORECARD SUPPOSED TO SOLVE?
ON SCORECARD LEVEL:
• Group indicators into categories. • Specify the relevant importance.
BSC DESIGNER
![Page 13: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/13.jpg)
WHAT PROBLEMS ARE KPIS AND A SCORECARD SUPPOSED TO SOLVE?
ON SCORECARD LEVEL:
• Group indicators into categories. • Specify the relevant importance.• Calculate the performance of category.
BSC DESIGNER
![Page 14: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/14.jpg)
WHAT PROBLEMS ARE KPIS AND A SCORECARD SUPPOSED TO SOLVE?
ON SCORECARD LEVEL:
• Group indicators into categories. • Specify the relevant importance.• Calculate the performance of category.• Calculate the total performance.
BSC DESIGNER
![Page 15: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/15.jpg)
INDICATOR LEVEL
![Page 16: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/16.jpg)
THE VALUE OF AN INDICATOR
530 $
20 hours/week
BSC DESIGNER
![Page 17: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/17.jpg)
THE VALUE OF AN INDICATOR
530 $
20 hours/weekNumeric value
BSC DESIGNER
![Page 18: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/18.jpg)
THE VALUE OF AN INDICATOR
530 $
20 hours/weekNumeric value Measure unit
BSC DESIGNER
![Page 19: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/19.jpg)
THE ROLE OF THE PERFORMANCE FUNCTION
• What the value “530$” means?
BSC DESIGNER
![Page 20: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/20.jpg)
THE ROLE OF THE PERFORMANCE FUNCTION
• What the value “530$” means?
• Is it a high or low?
BSC DESIGNER
![Page 21: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/21.jpg)
THE ROLE OF THE PERFORMANCE FUNCTION
• We need a measurement scale !
BSC DESIGNER
![Page 24: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/24.jpg)
VALUE
TIME
We need a measurement scale !
BSC DESIGNER
![Page 25: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/25.jpg)
VALUE
TIME
MaxMax – means the maximal possible value of an indicator
We need a measurement scale !
BSC DESIGNER
![Page 26: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/26.jpg)
VALUE
TIME
MaxMax – means the maximal possible value of an indicator
Min Min – means the minimal possible value of an indicator
We need a measurement scale !
BSC DESIGNER
![Page 27: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/27.jpg)
VALUE
TIME
Max
Min
We need a measurement scale !
BSC DESIGNER
![Page 28: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/28.jpg)
THE PERFORMANCE OF AN INDICATOR CAN BE CALCULATED AS
Performance (Value), % = x 100%(Value – Min)
(Max – Min)
BSC DESIGNER
![Page 29: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/29.jpg)
In our example:
Value = 530Min = 0Max = 600
THE PERFORMANCE OF AN INDICATOR CAN BE CALCULATED AS
BSC DESIGNER
![Page 30: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/30.jpg)
THE PERFORMANCE OF AN INDICATOR CAN BE CALCULATED AS
Performance (Value), % = x 100%
= 88%
(530– 0)
(600 – 0)
BSC DESIGNER
![Page 31: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/31.jpg)
The performance function of KPI
Source: www.bscdesigner.com
Performance (Value), % = ((Value – Min) / (Max – Min)) * 100%
With a linear growth of the “value” the performance will also grow linearly
![Page 32: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/32.jpg)
THE PERFORMANCE FUNCTION IS NOT ALWAYS LINEAR
!BSC DESIGNER
![Page 33: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/33.jpg)
THE PERFORMANCE FUNCTION IS NOT ALWAYS LINEAR
• For example, the performance might grow very slowly in the beginning, but then increase rapidly
BSC DESIGNER
![Page 34: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/34.jpg)
The performance function of KPI
Source: www.bscdesigner.com
Performance (Value), % = Power(Value,10) / Power(Max, 10)
The performance might grow very slowly in the beginning, but then increase rapidly.
![Page 35: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/35.jpg)
Performance (Value), % = x 100%Power (Value,10)
Power (Max, 10)
THE PERFORMANCE FUNCTION IS NOT ALWAYS LINEAR
BSC DESIGNER
![Page 36: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/36.jpg)
WITH THE INCREASE OF THE VALUE THE PERFORMANCE MIGHT BE
DECREASING
!BSC DESIGNER
![Page 37: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/37.jpg)
WITH THE INCREASE OF THE VALUE THE PERFORMANCE MIGHT BE
DECREASING
• For example, the more waiting time there is in the support center, the lower is its performance.
BSC DESIGNER
![Page 38: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/38.jpg)
The performance function of KPI
Source: www.bscdesigner.com
Performance (Value), % = ((Max – Value) / (Max – Min)) * 100%
With the increase of the value the performance might be decreasing as well.
![Page 39: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/39.jpg)
Performance (Value), % = x 100%(Max – Value)
(Max – Min)
WITH THE INCREASE OF THE VALUE THE PERFORMANCE MIGHT BE
DECREASING
BSC DESIGNER
![Page 40: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/40.jpg)
CALCULATING THE PROGRESS
• Sometimes it is necessary to focus attention on a very specific part of the performance interval.
BSC DESIGNER
![Page 41: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/41.jpg)
VALUE
TIME
Max
Min
CALCULATING THE PROGRESS
BSC DESIGNER
![Page 42: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/42.jpg)
VALUE
TIME
Max
Min
CALCULATING THE PROGRESS
Planning horizonHistorical
valuesBSC DESIGNER
![Page 43: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/43.jpg)
VALUE
TIME
Max
Min
CALCULATING THE PROGRESS
Planning horizonHistorical
values
Baseline
Target
BSC DESIGNER
![Page 44: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/44.jpg)
VALUE
TIME
Max
Min
CALCULATING THE PROGRESS
Planning horizonHistorical
values
Baseline
Target
“Min” and “Max” are used to calculate the performance of
the KPI.
BSC DESIGNER
![Page 45: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/45.jpg)
VALUE
TIME
Max
Min
CALCULATING THE PROGRESS
Planning horizonHistorical
values
Baseline
Target
“Min” and “Max” are used to calculate the performance of
the KPI.
The performance answers the question: “What is the overall performance of the
KPI?”
BSC DESIGNER
![Page 46: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/46.jpg)
VALUE
TIME
Max
Min
CALCULATING THE PROGRESS
Planning horizonHistorical
values
Baseline
Target“Baseline” and “Target” are used to calculate the progress.
BSC DESIGNER
![Page 47: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/47.jpg)
VALUE
TIME
Max
Min
CALCULATING THE PROGRESS
Planning horizonHistorical
values
Baseline
Target
“Baseline” and “Target” are used to calculate the progress.
The progress answers the question: “To what extent was the target achieved?”
BSC DESIGNER
![Page 48: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/48.jpg)
THIS MIGHT SOUND A LITTLE BIT COMPLICATED TO DO…
• This might sound a little bit complicated to do if you use MS Excel or similar software
• A professional scorecard software, like BSC Designer will automate these tasks for you.
BSC DESIGNER
![Page 49: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/49.jpg)
SCORECARD LEVEL
![Page 50: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/50.jpg)
THE RELEVANT IMPORTANCE OF KPIS
A support center has two KPIs:
– “Average email response time,” hours
BSC DESIGNER
![Page 51: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/51.jpg)
THE RELEVANT IMPORTANCE OF KPIS
A support center has two KPIs:
– “Average email response time,” hours– “First contact resolution rate,” %
BSC DESIGNER
![Page 52: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/52.jpg)
THE RELEVANT IMPORTANCE OF KPIS
A support center has two KPIs:
– “Average email response time,” hours– “First contact resolution rate,” %
What KPI is more important?
BSC DESIGNER
![Page 53: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/53.jpg)
THE RELEVANT IMPORTANCE OF KPIS
• A company can make ”Average email response time” equal to 10 minutes,
BSC DESIGNER
![Page 54: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/54.jpg)
THE RELEVANT IMPORTANCE OF KPIS
• A company can make ”Average email response time” equal to 10 minutes,
• But this will not make customers happy, as the “First contact resolution rate” will be very low.
BSC DESIGNER
![Page 55: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/55.jpg)
THE RELEVANT IMPORTANCE OF KPIS
• A company can make ”Average email response time” equal to 10 minutes,
• But this will not make customers happy, as the “First contact resolution rate” will be very low.
• Good response time is important, but what is more important is the high quality of the answers.
![Page 56: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/56.jpg)
THE RELEVANT IMPORTANCE OF KPIS
• To reflect this idea we need a concept of “weight” :
– “Average email response time,” hours– “First contact resolution rate,” %
BSC DESIGNER
![Page 57: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/57.jpg)
THE RELEVANT IMPORTANCE OF KPIS
• To reflect this idea we need a concept of “weight” :
– “Average email response time,” hours; weight = 4– “First contact resolution rate,” %; weight = 6
BSC DESIGNER
![Page 58: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/58.jpg)
THE RELEVANT IMPORTANCE OF KPIS
• To reflect this idea we need a concept of “weight” :
– “Average email response time,” hours; weight = 4– “First contact resolution rate,” %; weight = 6
Now we know that “First contact resolution rate” is more important than “Average email response
time.”
BSC DESIGNER
![Page 59: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/59.jpg)
CALCULATING THE TOTAL PERFORMANCE
• The performance of a category can be calculated by taking in account the performance values of each indicator and their weights.
BSC DESIGNER
![Page 60: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/60.jpg)
CALCULATING THE TOTAL PERFORMANCE
• Here we have the structure of the scorecard C1..4 – are categories. Metric-i,j are indicators together with their weight and performance values:
BSC DESIGNER
![Page 61: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/61.jpg)
CALCULATING THE TOTAL PERFORMANCE
• Let’s convert this into a different notation:
BSC DESIGNER
![Page 62: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/62.jpg)
CALCULATING THE TOTAL PERFORMANCE
• We had our weight on a scale 1..10, so before moving ahead we need to calculate a normalized weight:
BSC DESIGNER
![Page 63: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/63.jpg)
CALCULATING THE TOTAL PERFORMANCE
• The total performance value for the selected category is be calculated as:
Where: – Ni is the number of metrics on i-level;
– NWi,j – is a normalized weight of j-metric on i-level;
– NSi,j – is a performance of j-metric on i-level.BSC DESIGNER
![Page 64: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/64.jpg)
CALCULATING THE TOTAL PERFORMANCE
• The final formula for the total performance index of the scorecard will be:
Where M is a number of categories.
BSC DESIGNER
![Page 65: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/65.jpg)
CALCULATING THE TOTAL PERFORMANCE
• These calculations are simple if you don’t have subcategories in your scorecard.
BSC DESIGNER
![Page 66: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/66.jpg)
CALCULATING THE TOTAL PERFORMANCE
• These calculations are simple if you don’t have subcategories in your scorecard.
• If you had subcategories, the weight of these subcategories should be taken into account in a similar way.
BSC DESIGNER
![Page 67: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/67.jpg)
CALCULATING THE TOTAL PERFORMANCE
• These calculations are simple if you don’t have subcategories in your scorecard.
• If you had subcategories, the weight of these subcategories should be taken into account in a similar way.
• Professional scorecard software like BSC Designer will automate these calculations so that you can focus on the business side.
BSC DESIGNER
![Page 68: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/68.jpg)
CALCULATING THE TOTAL PERFORMANCE
• Professional scorecard software like BSC Designer will automate these calculations so that you can focus on the business side.
![Page 69: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/69.jpg)
MORE ABOUT THE BALANCED SCORECARD
Find more insightful articles about the Balanced Scorecard in ”Articles” section at www.bscdesigner.com
BSC DESIGNER
![Page 70: Scorecard and KPIs 101](https://reader033.vdocuments.mx/reader033/viewer/2022061222/54c1880e4a795987038b456d/html5/thumbnails/70.jpg)
THANK YOU!