Download - Sbua preso (3)

Transcript
Page 1: Sbua preso (3)

SOUTH BEACH UNIVERSAL ACCESS

Page 2: Sbua preso (3)

OBJECTIVES•  Provide direct access into the bay South Beach for young dinghy sailors, swimmers with disabilities and kayakers 

 • To build a structure that is minimal in size and bulk whilst integrating with the surrounding built environment both functionally and aesthetically 

 • To avoid interference with the communities amenity and enjoyment of South Beach

 • To facilitate the accretion of sand against the rocks in the northern corner of South Beach thereby effectively increasing the size of the beach

Page 3: Sbua preso (3)
Page 4: Sbua preso (3)
Page 5: Sbua preso (3)
Page 6: Sbua preso (3)
Page 7: Sbua preso (3)
Page 8: Sbua preso (3)
Page 9: Sbua preso (3)

SBUA: Pro- forma costing ($,000)  

SeasideWall              500 Ramp              350 Landscaping                50 

Sub total              900 

Club SideWall/bund              200 Fill                60 Landscaping                10   

Sub total              270 

Total           1,170 

Page 10: Sbua preso (3)

Top Related