Salimus ConsultancySolar Energy and Sustainability
⚫ Solar Energy from Sustainability Perspective⚫ Sustainability’s Pyramid of Priorities:
⚫ Priority 1: Reduce Demand: Passive Design.
⚫ Priority 2: Energy Efficient Equipment.
⚫ Priority 3: Renewable Sources.
⚫ Case Studies:
⚫ DEWA HQ – Dubai, Al Jaddaf.
⚫ Saint-Gobain Multi Comfort House – Masdar City.
⚫ Ain Al Fayda 2000 Villas
⚫ Modern Trends⚫ Solar Roofs for RTA’s New Bus Stations
⚫ Dubai Clean Energy Strategy 2050
⚫ Mohammed bin Rashid Al Maktoum Solar Park
⚫ Shams Dubai Initiative, Dubai, UAE.
Contents
Solar Energy from Sustainability Perspective
⚫ Priority 1: Reduce Demand⚫ Implement Passive Design.
⚫ Priority 2: Energy Efficiency⚫ Use highly-efficient mechanical and
electrical equipment.
⚫ Priority 3: Renewable Sources⚫ Facilitation of renewable energy
installations.
Sustainability’s Pyramid of Priorities
⚫ Abu Dhabi – Estidama Building Rating System⚫ RE-6: Renewable Energy Percentage of the proposed buildings energy consumption is supplied through onsite renewable energy
⚫ Dubai – Al Saafat⚫ 504.04 On site Renewable Energy – Electrical power
generation Commissioning
UAE Sustainable Certification Schemes
For all new buildings, renewable energy must be generated on-site using solar panels, according to the following percentages of the actual electrical load of the building:a - 5% of the Bronze and Silver Sa’fa.b - 10% for Golden and Platinum Sa’fa.
Case Studies
⚫ Salimus Role:⚫ Energy Modeler (helped Obermeyer winning the competition).
⚫ Project Certification Target:⚫ LEED Platinum⚫ WELL Silver
DEWA - Al Sheraa Headquarters, Dubai, UAE.
Project: DEWA HQ - Al SheraaService: Energy ModelerTarget: LEED PlatinumLocation: Dubai, UAEGFA: 139,354 m2
Floors: B+G+4P+15F
Source: Obermeyer website.
⚫ Nearly Zero Energy Building (NZEB)⚫ Solar Roof: Shading and Energy Generation
⚫ Very efficient mechanical and electrical systems:⚫ Very efficient Cooling::
⚫ Chillers with magnetic bearings
⚫ Thermal storage
⚫ High COP 5.4 and NPLV 11.16
DEWA - Al Sheraa Headquarters, Dubai, UAE.
Project: DEWA HQ - Al SheraaService: Energy ModelerTarget: LEED PlatinumLocation: Dubai, UAEGFA: 139,354 m2
Floors: B+G+4P+15F
Source: Obermeyer website.
⚫ Very efficient lighting and automatic controls
⚫ LPDs 60% < ASHRAE 90.1-2007 baseline.
⚫ Daylight and Occupancy Sensors.
⚫ Very efficient AC and Ventilation Systems.
⚫ FCU Specific Fan Power of 0.3 W/l/s (50% < ASHRAE 90.1-2007 baseline).
⚫ FAHU 2.3 W/l/s (25% < ASHRAE 90.1-2007 baseline).
⚫ CHW Pumps Specific Pump Power of 279 [W/l/s] (20% < ASHRAE 90.1-2007 baseline).
DEWA - Al Sheraa Headquarters, Dubai, UAE.
Project: DEWA HQ - Al SheraaService: Energy ModelerTarget: LEED PlatinumLocation: Dubai, UAEGFA: 139,354 m2
Floors: B+G+4P+15F
Source: Obermeyer website.
⚫ Project Achievements:⚫ Nearly Zero Energy Building
(NZEB) ⚫ EUI 46.78 [kWh/m2/year]
⚫ Energy Savings 78.2%
⚫ Energy Simulation as per ASHRAE 90.1-2007.
DEWA - Al Sheraa Headquarters, Dubai, UAE.
⚫ Project Overview:
⚫ Positive-Energy Building.
⚫ Meeting & exceeding Masdar’s requirements.
⚫ Excellence in light, air quality, temperature and acoustics comfort.
⚫ Equipped with latest technologies:
⚫ Electrochromic Glass (Sage Glass).
⚫ High-efficiency building materials.
⚫ Solar PV Roof.
⚫ High-efficiency HVAC system (VRF type).
Saint Gobain’s Multi Comfort House, Masdar, UAE.
Project: Saint Gobain’s MCHService: Energy Modeler, ICA, CxA.Target: LEED Gold, Estidama 4-PearlLocation: Masdar, Abu Dhabi, UAEGFA: 400 m2
Floors: G+2
Source: Obermeyer website.
⚫ Project Sustainability Targets:⚫ LEED Gold certification⚫ Estidama 4-Pearl certification⚫ Masdar Environmental KPIs compliance
⚫ Salimus Role:⚫ Energy Modeler (LEED, Estidama & Masdar).⚫ Commissioning Consultant (LEED & Estidama).
Saint Gobain’s Multi Comfort House, Masdar, UAE.
Project: Saint Gobain’s MCHService: Energy Modeler, ICA, CxA.Target: LEED Gold, Estidama 4-PearlLocation: Masdar, Abu Dhabi, UAEGFA: 400 m2
Floors: G+2
Source: Obermeyer website.
⚫ Project Achievements:
⚫ Positive Energy Building:
114.6% Energy Savings
⚫ Estidama Energy Simulation as per ASHRAE 90.1-2007.
⚫ Masdar Energy Simulation as per Masdar Energy Design Guidelines (MEDG v3).
⚫ LEED Energy Simulation as per ASHRAE 90.1-2010.
Saint Gobain’s Multi Comfort House, Masdar, UAE.
Dubai Clean Energy Strategy
⚫ The Dubai Clean Energy Strategy
2050 was launched by HH Sheikh
Mohammed bin Rashid Al Maktoum,
to provide 7% of Dubai’s total power
output from clean energy by 2020. This
target will increase to 25% by 2030 and
75% by 2050.
Dubai Clean Energy Strategy 2050HH Sheikh Mohammed bin
Rashid Al Maktoum
Dubai Clean Energy Strategy 2050
Clean energy = 75% of Dubai power output
Solar Park is the first milestone
Shams Dubai Initiative: Solar energy by Dubai
citizens, businesses and industries contribution.
⚫ Launched in 2012 by HH Sheikh Mohammed bin
Rashid Al Maktoum.
⚫ The largest single-site solar park in the world.
⚫ The solar park will generate:
⚫ 1,000MW by 2020
⚫ 5,000MW by 2030
⚫ Total investments up to AED 50 billion.
⚫ Upon completion, the solar park will reduce over
6.5 million tonnes of CO2 emissions annually.
Mohammed bin Rashid Al Maktoum Solar Park
Source: DEWA website.
⚫ Easy steps:
⚫ After obtaining the necessary approvals, site
works are undertaken.
⚫ Once the installation is complete, the contractor
or consultant submits a notification,
⚫ DEWA then conducts a technical inspection of
the site and install the required smart meters to
complete the connection process.
Shams Dubai Initiative, Dubai, UAE.
Source: DEWA website.
⚫ A total of 1,354 photovoltaic installations on residential,
commercial and industrial buildings in Dubai have been
connected by DEWA as part of the Shams Dubai initiative.
⚫ DEWA encourages
household and building
owners to install PV
panels to generate
electricity and connect
them to DEWA's grid.
The electricity is used
on site and the surplus
is exported to DEWA's
network.
Shams Dubai Initiative, Dubai, UAE.
Source: DEWA website.
⚫ Solar Roof features:⚫ Translucent Photovoltaic Panels. ⚫ Adequate balance of daylighting, shading and energy generation.
Solar Roofs for RTA’s New Bus Stations
Source: RTA Twitter page.Source: RTA Twitter page.
Salimus ConsultancyThank you!