A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
Royal Lake Dredging and Restoration ProjectPardon Our Dust Meeting
May 9, 2016
![Page 2: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/2.jpg)
2
Royal Lake Dredging and Restoration
Agenda • Opening Remarks – Supervisor Cook
• Project Background - Stormwater Planning Division– Background– Major Project Elements– Summary of previous Pohick watershed dredging projects –
Lake Barton, Huntsman Lake, and Woodglen Lake
• Maintenance of Traffic, Trail Management, Tentative Construction Schedule – ASI Constructors
• Royal Lake Biology and fish save efforts – Stormwater Planning Division
• Construction Timeline Summary and Safety during construction – Stormwater Planning Division, Utilities Design and Construction Division, Park Authority
• Q&A
![Page 3: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/3.jpg)
3
Royal Lake Dredging and Restoration
Royal Lake – Quick Facts
• Drainage area = 2,477 Acres (3.67 square miles)
• Lake surface area = 37.5 acres
• Sediment pool capacity = 416,000 cubic yards (CY)
• Current sediment in lake =100,400 CY
• Estimated annual sediment load =4,400 CY / year 50 feet
100,400 CY
![Page 4: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/4.jpg)
4
Royal Lake Dredging and Restoration
Items of Work Dredging up to 51,220 CY of sediment (Phase I area) Access road improvement Demolition of the existing decanting basin fence and dewatering
structures Regrading of the existing decanting basin Temporary construction of a staging area and safety fence E&S and Control of Water measures Construction of two sediment forebay berms/weirs Construction of 340 feet of shoreline stabilization Construction of 130 feet of stream bank stabilization Installation of one new ACB ramp Replacement of an existing boat ramp with ACB ramp Installation of 65 fish habitat structures Restoration, seeding and landscaping of disturbed areas
![Page 5: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/5.jpg)
5
Royal Lake Dredging and Restoration
Scope of Work
A1 A2
B2B1
Zone Volume (CY)
A1 33,500
A2 5,600
B1 12,000
B2 3,800
![Page 6: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/6.jpg)
6
Royal Lake Dredging and Restoration
Water Depth
![Page 7: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/7.jpg)
7
Royal Lake Dredging and Restoration
Grading Plan
![Page 8: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/8.jpg)
8
Royal Lake Dredging and Restoration
Grading Plan
![Page 9: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/9.jpg)
9
Royal Lake Dredging and Restoration
Sediment Disposal Site – I-95 Landfill Complex
![Page 10: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/10.jpg)
10
Royal Lake Dredging and Restoration
Alternate disposal site – Noman Cole Pollution Control Plant
![Page 11: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/11.jpg)
11
Royal Lake Dredging and Restoration
Decanting Basin Restoration
Restored Decanting Basin
![Page 12: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/12.jpg)
12
Royal Lake Dredging and Restoration
Royal Lake – Riser Modifications, Existing and Proposed Lake Bottom
• The riser modifications will facilitate drawdown for future maintenance dredging and also includes a deep water release mechanism for improving downstream water quality.
• Proposed lake bottom will restore the estimated original contours and depth of the lake (in Phase I area).
![Page 13: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/13.jpg)
13
Royal Lake Dredging and Restoration
Shoreline Restoration: Existing Condition
![Page 14: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/14.jpg)
14
Royal Lake Dredging and Restoration
Shoreline Protection
![Page 15: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/15.jpg)
15
Royal Lake Dredging and Restoration
Placement of Fish Habitat Structures
TREE BRANCH PILES
Rock Rubble Piles
![Page 16: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/16.jpg)
16
Royal Lake Dredging and Restoration
Stream Stabilization
![Page 17: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/17.jpg)
Pohick Creek Dredging and Lake Restoration Projects
Project Goals• Restore sediment pool capacity
– Downstream water quality benefits– Aesthetics
• Improve lake water quality and habitat• Provide long term maintenance improvements
Lake Barton: 2011Huntsman Lake: 2014Woodglen Lake: 2015Royal Lake: 2016
![Page 18: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/18.jpg)
Sources of Sediment
![Page 19: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/19.jpg)
Dredging Alternatives
1. Mechanically dredge deposited sediment and haul wet
2. Drain lake and dry deposited sediment in place before hauling
![Page 20: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/20.jpg)
Lake Barton Dredging in Progress
![Page 21: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/21.jpg)
Disposal Site – Sediment Reuse
• Topsoil for landfill cover• Topsoil product for resale
![Page 22: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/22.jpg)
Huntsman Lake Dam Rehabilitation Project Fish Relocation (May 2013)
![Page 23: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/23.jpg)
Huntsman Lake - Forebays
bank stabilizationaquatic bench
forebay
forebay berms
maintenance access
sanitary sewer
dam embankment
![Page 24: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/24.jpg)
24
Royal Lake Dredging and Restoration
Some Photos from the Huntsman Lake Dredging Project
![Page 25: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/25.jpg)
25
Royal Lake Dredging and Restoration
Some Photos from the Huntsman Lake Dredging Project
![Page 26: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/26.jpg)
26
Royal Lake Dredging and Restoration
Some Photos from the Huntsman Lake Dredging Project
![Page 27: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/27.jpg)
27
Royal Lake Dredging and Restoration
Some Photos from the Huntsman Lake Dredging Project
![Page 28: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/28.jpg)
28
Royal Lake Dredging and Restoration
Some Photos from the Huntsman Lake Dredging Project
![Page 29: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/29.jpg)
29
Royal Lake Dredging and Restoration
Some Photos from the Huntsman Lake Dredging Project
![Page 30: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/30.jpg)
30
Royal Lake Dredging and Restoration
Some Photos from the Huntsman Lake Dredging Project
![Page 31: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/31.jpg)
31
Royal Lake Dredging and Restoration
Some Photos from the Huntsman Lake Dredging Project
![Page 32: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/32.jpg)
Woodglen Lake Dredging and Restoration
32
Major Project Elements
Improved access road
Sediment forebayLake dredging,
shoreline restoration, lake habitat improvement
Removal and restoration of decanting
basin
Reforestation areas
Stream stabilization
Riser modifications
![Page 33: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/33.jpg)
Woodglen Lake Dredging and Restoration
33
Lake Drawdown
![Page 34: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/34.jpg)
Woodglen Lake Dredging and Restoration
The Lake After Draining
![Page 35: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/35.jpg)
Woodglen Lake Dredging and Restoration
Capital Facilities / Utilities Design and Construction Division / Transportation and Stormwater Construction Branch
Sediment Near the Forebay – To Be Removed
![Page 36: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/36.jpg)
Woodglen Lake Dredging and Restoration
Capital Facilities / Utilities Design and Construction Division / Transportation and Stormwater Construction Branch
Sediment Being Loaded
![Page 37: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/37.jpg)
![Page 38: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/38.jpg)
http://www.pwmag.com/erosion-control/dredging-up-savings_o_3.aspx
![Page 39: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/39.jpg)
Woodglen Lake Dredging and Restoration
Capital Facilities / Utilities Design and Construction Division / Transportation and Stormwater Construction Branch
Forebay Berm
![Page 40: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/40.jpg)
Woodglen Lake Dredging and Restoration
Modifications & Repairs – Principal Spillway Riser
![Page 41: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/41.jpg)
Woodglen Lake Dredging and Restoration
Capital Facilities / Utilities Design and Construction Division / Transportation and Stormwater Construction Branch
Stream Restoration Work – Lake Inlet
![Page 42: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/42.jpg)
42
Royal Lake Dredging and Restoration
Site Access and Maintenance of Traffic Plan
Pommeroy Drive Access Point
Gainsborough Drive Access Point
![Page 43: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/43.jpg)
43
Royal Lake Dredging and Restoration
Neighborhood Truck Route
![Page 44: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/44.jpg)
44
Royal Lake Dredging and Restoration
Trail Management Plan
![Page 45: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/45.jpg)
45
Royal Lake Dredging and Restoration
Royal Lake Biology • Reptiles and Amphibians• Fish• Benthic organisms (bottom layer)
– Birds & mammals feeding on mussels
![Page 46: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/46.jpg)
Frogs and Toads
46
http://www.fcps.edu/islandcreekes/ecology/bullfrog.htm
https://www.flickr.com/photos/dah_professor/3674098110/
http://capeannvernalpond.org/american-toad/
http://www.virginiaherpetologicalsociety.com/identification-keys/id-keys-frogs/Pseudacris.html
![Page 47: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/47.jpg)
Frog/toad response to prior lake de-watering
• Huntsman Lake– “Never have I seen such a plague of toadlets.”
(Resident in Huntsman area)
• Bradley Acres Pond– Retrofitted SWM Wet pond– “It’s biblical,” said a resident
• Predaceous diving beetles• Toads and toadlets• 5-lined skinks
47
![Page 48: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/48.jpg)
Turtles
48http://www.virginiaherpetologicalsociety.com/reptiles/turtles/yellow-bellied-slider/Yellow-bellied%20Slider%20(Trachemys%20scripta).jpg
http://www.virginiaherpetologicalsociety.com/reptiles/turtles/northern-red-bellied-cooter/northern_red-bellied_cooter.php
http://www.virginiaherpetologicalsociety.com/reptiles/turtles/turtles_of_virginia.htm
http://www.virginiaherpetologicalsociety.com/reptiles/turtles/red-eared-slider/red-eared.JPG
![Page 49: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/49.jpg)
Fishes – Electrofishing
49
![Page 50: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/50.jpg)
Fishes – Electrofishing
50
![Page 51: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/51.jpg)
Fishes – Electrofishing
51
![Page 52: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/52.jpg)
Fishes
52
![Page 53: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/53.jpg)
Fishes
53
![Page 54: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/54.jpg)
Fishes
54
![Page 55: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/55.jpg)
Fishes - Release
55
![Page 56: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/56.jpg)
56
Freshwater Mussels – Mussel Life Cycle
http://www.fishwild.vt.edu/mussel/research/life_history.html
![Page 57: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/57.jpg)
Pyganodon cataracta and Utterbackia imbecilis
57
Eastern FloaterP. cataracta
Paper PondshellU. imbecillis
![Page 58: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/58.jpg)
Woodglen Lake Dredging and Restoration
Project Benefits
• Removed over 40,000 CY of sediment• Facilitated future maintenance dredging operations by:
• Providing a 9,000 CY sediment forebay• Improving the existing access road• Providing truck staging areas
• Provided improvements and repairs for the principal spillway riser• Installed fish habitat structures within the lake• Provides the following annual (estimated ) reductions in the downstream
sediment and nutrient loadings:• Total Suspended Solids (TSS) 14.6 tons/year• Total Nitrogen (TN) 1,075 lbs/year• Total Phosphorus (TP) 67 lbs/year
![Page 59: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/59.jpg)
59
Royal Lake Dredging and Restoration
• Lake drawdown Scheduled to begin week of May 9th (this week!)
• Dredging activities to commence by mid-June, 2016• Project duration: 12 months• Lake will remain mostly drained for entire project• Lake filling after project completion is dependent on
rainfall conditions, and it is expected filling will be initiated by June, 2017
Summary of construction timeline
![Page 60: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/60.jpg)
60
Royal Lake Dredging and Restoration
Lake Drawdown and Safety
![Page 61: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/61.jpg)
61
Royal Lake Dredging and Restoration
Lake Drawdown and Safety
![Page 62: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/62.jpg)
62
Royal Lake Dredging and Restoration
Safety During Construction
• Contractor is required to comply with Fairfax County’s Construction Safety Resolution.
• For all residents, keeping safe means following two simple rules:
1. Please stay outside the construction limits at all times!2. Observe construction activities from a safe distance.
![Page 63: Royal Lake Dredging and Restoration Project: Pardon Our Dust Meeting May 9, 2016](https://reader036.vdocuments.mx/reader036/viewer/2022062522/58d1e3ac1a28ab51448b46eb/html5/thumbnails/63.jpg)
63
Royal Lake Dredging and Restoration
Contact information
Stormwater Planning Division 703-324-5500, TTY 711 or by email: Joe Riley-Ryan: [email protected] Dipmani Kumar: [email protected]
Utilities Design and Construction Division703-324-5111, TTY 711 or by email:Bill Nolan: [email protected]
Thank you.