Review meeting on Production pulses
of Kharif & Rabi ,2011-12On
2nd September, 2011
State :- Assam
1. Crop-wise Area sown position of Kharif Pulses during Kharif 2011 as compared to last year.
Sl.no
Name of pulses Crop
Target of area in 000
ha
Area sown as on
31.08.2011
Difference Area
between target and
achievement
Reason of difference in
area
1 Pigeon pea 10.00 07.00 3.00 Excessive rain at sowing time as well as non-availability of good quality seed.
2 Black Gram 52.00 32.00 20.00 Sowing is going on
3 Green Gram 11.00 4.00 7.00 Sowing is going on
2. Crop-wise Production target and expected Production of Kharif Pulses during Kharif 2011 as compared to last year.
Sl.no
Name of pulses Crop
Target of Production
in 000 tonnes
Expected Production
in O00 tonns
Difference Production between
target and achievemen
t
Reason of difference
in Production
1 Pigeon pea 7.90 6.00 1.90 Less coverage
2 Black Gram 33.00 33.00 - Target will be achieved due to good monsoon.
3 Green Gram 6.00 6.00 - Target will be achieved due to good monsoon
3. Crop-wise Area and Production targets of Rabi Pulses during Rabi 2011-12 as compared to last year.
Sl.no
Name of pulses Crop
Target of area
in 000 ha
Target Production in 000 tonnes
Proposed additional area during 2011-12 as
compared to last year
(area 000 ha)
Proposed additional production
during 2011-12 as
compared to last year.
(Production 000 tonnes)
1 Lentil 32.00 20.00 10.00 9.002 Pea 33.00 24.00 11.00 11.003 Gram 3.00 1.80 1.00 0.804 Black gram 30.00 15.00 20.00 10.005 Green Gram 10.00 5.00 6.00 3.006 Rajmah &
others0.16 9.00 9.00 4.00
4. Details of Contingent Planning during Rabi 2011-12 to meet the deficient production of pulses during Kharif 2011.
Sl.no
Name of pulses Crop Area Expansion of Rabi Pulses ( in 000 ha
1 Lentil 10.00
2 Pea 11.00
3 Gram 1.00
4 Black gram 20.00
5 Green Gram 6.00
6 Rajmah & others 9.00
a Through area Expansion of Rabi pulses
4. Details of Contingency Planning during Rabi 2011-12 to meet the deficient production of pulses during Kharif 2011.
Sl.no
Name of pulses Crop Additional area under certified seed distribution( in 000 ha)
1 Lentil 10.002 Pea 11.003 Gram 1.004 Black gram 20.005 Green Gram 6.00
6 Rajmah & others 9.00
b Additional area under IPM in pigeonpea 2500 ha of pigeon pea area will be covered under IPM during the year 2011-12 additionally.
c Additional area under certified seed distribution
4. Details of Contingency Planning during Rabi 2011-12 to meet the deficient production of pulses during Kharif 2011.
Sl.no
Name of intervention Requirement of quantity
1 Distribution of minikit of Lentil, Pea, Black gram
20000 nos
2 Distribution of Pump sets 25000 nos4 Pipe for carrying water from source
to field20000 nos
3 Distribution of Vermicompost 48000 tonnes 5 Tarpaulin ( size =5 mX5m) 20000 nos
6 Lime 100000 ha
7 STW boring material 25000 nos
8 Seed bin 25000 nos
d. Any other interventions
5.1 PHYSICAL AND FINANCIAL PROGRESS REPORT ON NFSM –PULSES DURING- 2011-12
Sl. No
Interventions Unit Targets asApproved by GOI
Achievement as on April/2011 to August /2011
Remarks
Physical Financial
Physical Financial
Distribution of Certified Seeds
Qtl 6395 76.740 1560 - Committed expenditure
5.2 Physical and Financial Progress of A3P during Kharif 2011
Sl. No
Interventions Unit Targets asApproved by GOI
Achievement as on April/2011 to Jun/2011
Remarks
Physical
Financial(lakh)
Physical Financial
1 Demonstration on Black gram ( 1000 ha per unit)( @ Rs 4800 per ha)District :- Baska, Dhubri, Nowgoan.
nos 3 nos 144.00 - - Progress going on
2 Additional Demonstration on Black gram from saving from 2 Arahar unit ,2010-11( 1000 ha per unit)( @ Rs 4800 per ha) Udalguri district
nos 2.250 108.00 Progress going on
5.3 Physical and Financial Progress of 60000 Village Programme 2011-12 (Not implemented in the state )
5.4 Physical and Financial Progress of e-pest surveillance Under A3P during Kharif 2011
Sl. No
Interventions Unit Targets asApproved by GOI
Achievement as on April/2011 to Jun/2011
Remarks
Physical
Financial(lakh)
Physical Financial
1 Demonstration on black gram ( @ 150 per ha)(per unit 1000 ha)
3 nos 3000 ha
4.50 In Progress.
2 Additional Demonstration on Black gram saving from 2 Arahar unit ,2010-11 (per unit 1000 ha)
2.25 nos
2250 ha
3.375 In Progress.
5.6 Scheme –wise reason of less achievement in pulses programme ,if any
Sl. No Scheme Reason
1 NFSM-Pulses 1. Fund for the year 2011-12 yet to be received 2. Non availability of Quality Seeds
2 A3P Programme is in initial stage and complete fund yet to be received.
3 60000 village Not for our state
4 E-pest surveillance In Progress
5.7. Requirement of additional fund for additional programme of pulses .
Sl.no
Name of intervention Requirement of fund(Rs in lakh)
1 Distribution of minikit of Lentil, Pea, Black gram
2 Distribution of Pump sets 2500.004 Pipe for carrying water from source
to field3000.00
3 Distribution of Vermicompost 480.005 Tarpaulin ( size =5 mX5m) 620.00
6 Lime 750.00
7 STW boring material 3000.00
8 Seed bin 1250.00
11600.00
6. Any other issue
• Special pulses production for Char areas (reverine areas) may be taken.
• Special thrust on Majuli ( world biggest river island) for production of pulses.