![Page 1: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/1.jpg)
Lake Constance 5D-Conference 2013
Resource Inclusive Model Schedules -Synchronizing “Object-based” Costing and
“Activity-based” Actuals
Ram Ganapathy, DPR Construction, Phoenix, Arizona
Nick Bokhoven, DPR Construction, San Diego, CA
![Page 2: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/2.jpg)
Lake Constance 5D-Conference 2013
WE EXIST TO BUILD GREAT THINGS
![Page 3: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/3.jpg)
Lake Constance 5D-Conference 2013
CORE VALUES
![Page 4: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/4.jpg)
Lake Constance 5D-Conference 2013
17LOCATIONSLOCATIONSLOCATIONSLOCATIONS
1,300FULLFULLFULLFULL----TIME STAFFTIME STAFFTIME STAFFTIME STAFF
1,400CRAFT EMPLOYEESCRAFT EMPLOYEESCRAFT EMPLOYEESCRAFT EMPLOYEES
DPR OFFICES
REDWOOD CITY, CA -
HQ
![Page 5: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/5.jpg)
Lake Constance 5D-Conference 2013
$0
$500,000,000
$1,000,000,000
$1,500,000,000
$2,000,000,000
$2,500,000,000
1990 1995 2000 2005 2010
DPR VOLUME20 years of success
3rd FASTEST GROWING
CO.
VOLUME REACHES $2
B
DPR
FOUNDED
Inc.
MAGAZINE
$1.4 B
$2.2 B
![Page 6: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/6.jpg)
Lake Constance 5D-Conference 2013
LARGEST CONTRACTOR LARGEST CONTRACTOR LARGEST CONTRACTOR LARGEST CONTRACTOR IN THE U.S.IN THE U.S.IN THE U.S.IN THE U.S.(ENR 2012)(ENR 2012)(ENR 2012)(ENR 2012)
RECORDABLE RECORDABLE RECORDABLE RECORDABLE INCIDENT RATE IN INCIDENT RATE IN INCIDENT RATE IN INCIDENT RATE IN
2011201120112011
2012 RANK ON FORTUNE’S 2012 RANK ON FORTUNE’S 2012 RANK ON FORTUNE’S 2012 RANK ON FORTUNE’S 100 BEST COMPANIES TO 100 BEST COMPANIES TO 100 BEST COMPANIES TO 100 BEST COMPANIES TO
WORK FOR LISTWORK FOR LISTWORK FOR LISTWORK FOR LIST
24 0.97 13
PERCENT OF ANNUAL PERCENT OF ANNUAL PERCENT OF ANNUAL PERCENT OF ANNUAL REVENUE FROM REPEAT REVENUE FROM REPEAT REVENUE FROM REPEAT REVENUE FROM REPEAT
CUSTOMERS (LAST 5 YRS.)CUSTOMERS (LAST 5 YRS.)CUSTOMERS (LAST 5 YRS.)CUSTOMERS (LAST 5 YRS.)
DPR FOCUSED CORE DPR FOCUSED CORE DPR FOCUSED CORE DPR FOCUSED CORE MARKETSMARKETSMARKETSMARKETS
LARGEST GREEN LARGEST GREEN LARGEST GREEN LARGEST GREEN CONTRACTOR IN THE CONTRACTOR IN THE CONTRACTOR IN THE CONTRACTOR IN THE
U.S. (ENR 2011)U.S. (ENR 2011)U.S. (ENR 2011)U.S. (ENR 2011)
90 5 19
![Page 7: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/7.jpg)
Lake Constance 5D-Conference 2013
•How?
•What?TOOLS
PROCESS
PEOPLE
•Why?PHILOSOPHY
5D VISION – START WITH WHY
![Page 8: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/8.jpg)
Lake Constance 5D-Conference 2013
WHAT IS OUR WHY?
“To inspire breakthrough
performance in delivering projects”
![Page 9: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/9.jpg)
Lake Constance 5D-Conference 2013
Timely Decisions
Reliable Information
Transparency
Commitment
Big Picture Clarity
High Performance
HIGH PERFORMANCE
TEAMING
![Page 10: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/10.jpg)
Lake Constance 5D-Conference 2013
BIM … IT’S BEYOND JUST GEOMETRY
IT’S A VISUAL DATABASE
![Page 11: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/11.jpg)
Lake Constance 5D-Conference 2013
Concept
Preconstruction
Construction
Post Completion
BIM THROUGH THE PROJECT LIFECYCLE
![Page 12: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/12.jpg)
Lake Constance 5D-Conference 2013
PROGRAM + ESTIMATE
BIM – FIELD
SEQUENCE
FIELD-BIM ACTUALS
CHANGE MANAGEMENT5D VISUALIZATION
![Page 13: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/13.jpg)
Lake Constance 5D-Conference 2013
BIM – FIELD SEQUENCE5D VISUALIZATION
![Page 14: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/14.jpg)
Lake Constance 5D-Conference 2013
5D VISUALIZATION BIM – FIELD SEQUENCE
![Page 15: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/15.jpg)
Lake Constance 5D-Conference 2013
BIM – FIELD SEQUENCE5D VISUALIZATION
![Page 16: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/16.jpg)
Lake Constance 5D-Conference 2013
5D VISUALIZATION BIM – FIELD SEQUENCE
![Page 17: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/17.jpg)
Lake Constance 5D-Conference 2013
5D VISUALIZATION CONSTRAINT MANAGEMENT
![Page 18: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/18.jpg)
Lake Constance 5D-Conference 2013
VDC Processes Drive Integration
Design Planning Production
![Page 19: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/19.jpg)
Lake Constance 5D-Conference 2013
2D/3D
Design
Cost
Planning
Schedule
Planning
Production
Management
Cost
ControllingAccounting
Bid
Management
Data
Analysis
Historical
Database
• Integrating our Estimates and Schedules
5D VISION
![Page 20: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/20.jpg)
Lake Constance 5D-Conference 2013
CURRENT STATE
2D/3D
Design
Cost
Planning
Schedule
Planning
Production
Management
Cost
Controlling
Data
Analysis
Historical
Database
Productivity
ES/EF AS/AF
Money
![Page 21: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/21.jpg)
Lake Constance 5D-Conference 2013
2D/3D
Design
Cost
Planning
Schedule
Planning
Production
Management
Cost
Controlling
Data
Analysis
Historical
Database
Productivity
Productivity Productivity
SOCIAL PLANNING WITH SCIENTIFIC SCHEDULING
Future State
![Page 22: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/22.jpg)
Lake Constance 5D-Conference 2013
Date
• Duration + Date
or
• Productivity +Crew
Does it matter?
Quantity Hr/Unit # Crews Duration� � �
INTEGRATED SCHEDULING
![Page 23: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/23.jpg)
Lake Constance 5D-Conference 2013
Project
SUPERSTRUCTURE
B10
INTERIOR FINISHES
C20
WALL
FOUNDATIONS
A1010.10
COLUMN
FOUNDATIONS
A1010.30
FLOOR
CONSTRUCTION
B1010
WALL FINISHES
C2010
FOUNDATIONS
A10
03.11.00
Concrete
Forming
STANDARD
FOUNDATIONS
A1010
03.21.00
Reinforcement
Bars
03.31.00
Structural
Concrete
Uniformat Level 2
Uniformat Level 3
Uniformat Level 4
Master Format
CONSISTENT CODING
BASIC DISCIPLINES
Task
Coding
Code
Layout
(hr/unit)
Code
Set Formwork
Code
Strip Formwork
![Page 24: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/24.jpg)
Lake Constance 5D-Conference 2013
CostDesign Output Production Planning
MODEL PROGRESSION
![Page 25: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/25.jpg)
Lake Constance 5D-Conference 2013
UNIFORMAT
CODEASSEMBLY TYPE
CRITICAL SIZE –
STUD/MASONRY
UNIQUE
CONDITION
IDENTIFIER
FIRE RATING &
STC RATING
• 1 HR
• 2 HR
• STC –
35
• STC - 90
STANDARDIZED CONTENTExample - C1010_A3A_1hr_35
![Page 26: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/26.jpg)
Lake Constance 5D-Conference 2013
Case Study: DPR Drywall
![Page 27: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/27.jpg)
Lake Constance 5D-Conference 2013
ITEMS QB MATERIAL
SYSTEMS GROUPS
![Page 28: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/28.jpg)
Lake Constance 5D-Conference 2013
ITEMS QB MATERIAL
SYSTEMS GROUPS
![Page 29: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/29.jpg)
Lake Constance 5D-Conference 2013
![Page 30: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/30.jpg)
Lake Constance 5D-Conference 2013
GetGetGetGet
GiveGiveGiveGive GetGetGetGet
GiveGiveGiveGive GetGetGetGet
GiveGiveGiveGive GetGetGetGet
GiveGiveGiveGive GetGetGetGet
GiveGiveGiveGive
![Page 31: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/31.jpg)
Lake Constance 5D-Conference 2013
![Page 32: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/32.jpg)
Lake Constance 5D-Conference 2013
![Page 33: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/33.jpg)
Lake Constance 5D-Conference 2013
![Page 34: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/34.jpg)
Lake Constance 5D-Conference 2013
![Page 35: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/35.jpg)
Lake Constance 5D-Conference 2013
![Page 36: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/36.jpg)
Lake Constance 5D-Conference 2013
![Page 37: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/37.jpg)
Lake Constance 5D-Conference 2013
Can this work be done?Committed to the WorkConfirm the deliverable
was met
![Page 38: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/38.jpg)
Lake Constance 5D-Conference 2013
When theory fails…Lessons learned
� Transparency & Honesty in Commitments
� Estimate vs. Schedule Level of Granularity
� Actuals quantification
� Disruptions to continuous work flow
![Page 39: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/39.jpg)
Lake Constance 5D-Conference 2013
BEHAVIOR
Our
on the Project...
commitment
collaboration communication
trust
efficiency
optimization
flow
reliability
PERFORMANCE…drives project
The line between success and failure is rarely ‘the technology
doesn’t work as advertised.” It’s almost always about the
people.
![Page 40: Resource Inclusive Model Schedules - HTWG Konstanz](https://reader031.vdocuments.mx/reader031/viewer/2022012109/61dc645fb6258361c65bfc63/html5/thumbnails/40.jpg)
Lake Constance 5D-Conference 2013
Thank You
Questions & Discussion