![Page 1: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge](https://reader036.vdocuments.mx/reader036/viewer/2022062508/60367065ee3d78513841ee80/html5/thumbnails/1.jpg)
White Oak Lake Reconstruction Project
October 18, 2017
At Thomas Woodland Center
White Oak Lake Reconstruction Project
March 26, 2018
Public Meeting At Thomas Woodland Center
![Page 2: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge](https://reader036.vdocuments.mx/reader036/viewer/2022062508/60367065ee3d78513841ee80/html5/thumbnails/2.jpg)
Phasing and Project Orientation
2
Kaplan Culvert
Lail Culvert
Swift Culvert
Phase 2
White Oak Lake
DA = 1.2 sq. mi.
Phase 1§ Lail, Kaplan, and Swift Culverts
Phase 2 § Pineview Drive Culvert§ Swift Drive Culvert§ Driveway Bridge§ Bank Stabilization
Phase 3§ White Oak Lake
You Are Here
![Page 3: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge](https://reader036.vdocuments.mx/reader036/viewer/2022062508/60367065ee3d78513841ee80/html5/thumbnails/3.jpg)
Project Objectives
3
1. Improve public safety 2. Reconstruct failing or missing lake
controls (embankment, riser, emergency spillway)
3. Move embankment out of future NCDOT I-440 widening project
4. Address future maintenance challenges5. Reduce downstream flooding
§ Eliminate roadway flooding for a 10-year flood§ Minimize flooding of homes and yards
![Page 4: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge](https://reader036.vdocuments.mx/reader036/viewer/2022062508/60367065ee3d78513841ee80/html5/thumbnails/4.jpg)
I-440 Right-of-Way Line
4
Proposed Spillway
Proposed Dam Embankment
New NCDOT Right-of-Way
Line
Existing Dam Embankment
Proposed Riser/Barrel
![Page 5: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge](https://reader036.vdocuments.mx/reader036/viewer/2022062508/60367065ee3d78513841ee80/html5/thumbnails/5.jpg)
Flood Reduction
5
§ Lower normal pool from 401.8’ to 397.0’§ Raise emergency spillway from 402’ to 403.3’§ Install new riser with 90” dia. Barrel§ Take temporary storage from 0 cf. to more than 1,500,000 cf.§ Peak flow is delayed by almost one hour
Proposed Temporary StorageProposed Top of Dam
Proposed Normal Pool
Temporary Storage Permanent Lake Level
Existing Normal Pool
Proposed pond bottom to be determined
![Page 6: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge](https://reader036.vdocuments.mx/reader036/viewer/2022062508/60367065ee3d78513841ee80/html5/thumbnails/6.jpg)
Current Lake
6
![Page 7: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge](https://reader036.vdocuments.mx/reader036/viewer/2022062508/60367065ee3d78513841ee80/html5/thumbnails/7.jpg)
Failed Primary Spillway
7
![Page 8: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge](https://reader036.vdocuments.mx/reader036/viewer/2022062508/60367065ee3d78513841ee80/html5/thumbnails/8.jpg)
Failed Primary Spillway
8
![Page 9: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge](https://reader036.vdocuments.mx/reader036/viewer/2022062508/60367065ee3d78513841ee80/html5/thumbnails/9.jpg)
Failed Emergency Spillway
9
![Page 10: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge](https://reader036.vdocuments.mx/reader036/viewer/2022062508/60367065ee3d78513841ee80/html5/thumbnails/10.jpg)
Failed Emergency Spillway
10
![Page 11: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge](https://reader036.vdocuments.mx/reader036/viewer/2022062508/60367065ee3d78513841ee80/html5/thumbnails/11.jpg)
Tree Lined Dam Embankment
11
![Page 12: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge](https://reader036.vdocuments.mx/reader036/viewer/2022062508/60367065ee3d78513841ee80/html5/thumbnails/12.jpg)
Design Objectives
12
Reduce downstream flows
Convey 500-yr flood with 1.0’ of freeboard on top of dam
Avoid flooding of FFE in 500-yr flood
Avoid garage flooding in the 100-yr flood
Maintain lake footprint (if possible)
Target a normal pool depth of 3.0 ‘
![Page 13: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge](https://reader036.vdocuments.mx/reader036/viewer/2022062508/60367065ee3d78513841ee80/html5/thumbnails/13.jpg)
Summary of Proposed WSELs
13
5227 Melbourne Road - Garage @ 409.2’
5207 Hawksbury Ln Road FFE @ 408.5’
10-yr WSEL = 403.3 Top of Dam = 406.5
100-yr WSEL = 404.75se Emergency Spillway = 403.3
500-yr WSEL = 405.1
* Presented design elevations are subject to final design changes to best achieve project goals
![Page 14: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge](https://reader036.vdocuments.mx/reader036/viewer/2022062508/60367065ee3d78513841ee80/html5/thumbnails/14.jpg)
Summary of Flows Changes
14
Existing Conditions
10-yr Q = 553 cfs
100-yr Q = 1112 cfs
500-yr Q = 1317 cfs
Proposed Conditions
10-yr Q = 305 cfs
100-yr Q = 749 cfs
500-yr Q = 882 cfs
* Presented design flows are subject to final design changes to best achieve project goals
![Page 15: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge](https://reader036.vdocuments.mx/reader036/viewer/2022062508/60367065ee3d78513841ee80/html5/thumbnails/15.jpg)
Proposed Improvements
15
Emergency Spillway
RavenwoodDrive
I-440
Riser
90” Dia. Barrel
![Page 16: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge](https://reader036.vdocuments.mx/reader036/viewer/2022062508/60367065ee3d78513841ee80/html5/thumbnails/16.jpg)
Proposed Lake Footprint
16* Presented design flows are subject to final design changes to best achieve project goals
![Page 17: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge](https://reader036.vdocuments.mx/reader036/viewer/2022062508/60367065ee3d78513841ee80/html5/thumbnails/17.jpg)
Proposed Emergency Spillway/Plunge Pool
17
Emergency Spillway
90” Dia. Barrel
Riser
Concrete Plunge Pool
Rip-Rap Transition
NCDOT Culvert
![Page 18: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge](https://reader036.vdocuments.mx/reader036/viewer/2022062508/60367065ee3d78513841ee80/html5/thumbnails/18.jpg)
Proposed Emergency Spillway
18
§ 35’ wide concrete lined spillway§ Crest elevation = 403.3’§ Top of dam elevation is 406.5’
Emergency Spillway
Ravenwood Drive
I-440
![Page 19: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge](https://reader036.vdocuments.mx/reader036/viewer/2022062508/60367065ee3d78513841ee80/html5/thumbnails/19.jpg)
Proposed Riser/Barrel
19
§ 10’x10’ concrete riser (vault)§ 90” dia. barrel (110 LF)§ Steel trash rack§ Anti-vortex plate
![Page 20: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge](https://reader036.vdocuments.mx/reader036/viewer/2022062508/60367065ee3d78513841ee80/html5/thumbnails/20.jpg)
Proposed Riser/Barrel
20
BarrelConcrete Riser
Concrete Foundation
Trash Rack
Elev. 397.0’
Riser Top Elev. 401.9’
![Page 21: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge](https://reader036.vdocuments.mx/reader036/viewer/2022062508/60367065ee3d78513841ee80/html5/thumbnails/21.jpg)
Proposed Sewer Improvements
21
Existing Sewer
Proposed Sewer
Existing Sewer
Existing Lake Surface
![Page 22: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge](https://reader036.vdocuments.mx/reader036/viewer/2022062508/60367065ee3d78513841ee80/html5/thumbnails/22.jpg)
Construction Access Options
22
![Page 23: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge](https://reader036.vdocuments.mx/reader036/viewer/2022062508/60367065ee3d78513841ee80/html5/thumbnails/23.jpg)
Construction Access Options
23
Wade Property
HorstProperty
MarklingProperty
Powell Drive
Hawksburg Lane
Ebert Property
Proposed Spillway
Proposed Riser/Barrel
![Page 24: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge](https://reader036.vdocuments.mx/reader036/viewer/2022062508/60367065ee3d78513841ee80/html5/thumbnails/24.jpg)
Maintenance Access
24
Access RouteShore Protection
Concrete Riser Structure
![Page 25: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge](https://reader036.vdocuments.mx/reader036/viewer/2022062508/60367065ee3d78513841ee80/html5/thumbnails/25.jpg)
Fish Restocking
25
§ Remove and Relocate§ Restock after Construction§ NC State Fisheries Guidelines
% of Adults & % of Fingerlings
![Page 26: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge](https://reader036.vdocuments.mx/reader036/viewer/2022062508/60367065ee3d78513841ee80/html5/thumbnails/26.jpg)
Dam Classification
26
Hazard Classification = High
Size = Small (total storage of 68 acre-feet and height = 17 feet)
Regulated by NC Dam Safety
Emergency Operation Plan
Submittal for Dam Safety Permit
![Page 27: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge](https://reader036.vdocuments.mx/reader036/viewer/2022062508/60367065ee3d78513841ee80/html5/thumbnails/27.jpg)
Permitting
27
§ NC Dam Safety
§ US Army Corps: Ø < ½ wetland impacts (PCN submittal – Nationwide Permit)
§ NCDWR 401§ NCDENR Erosion Control Permit § NCDOT Encroachment Permit
§ City of Raleigh Permits
![Page 28: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge](https://reader036.vdocuments.mx/reader036/viewer/2022062508/60367065ee3d78513841ee80/html5/thumbnails/28.jpg)
Easement Acquisition
28
Easement Types§ Temporary Construction Easement (TCE)
§ Permanent Sanitary Sewer Easement (PSE)
§ Permanent Drainage Easement (PDE)
Easement Requirements§ Public Utilities – No structures (sheds, fences, etc.) in sanitary
sewer easement
§ Stormwater Management – Allow exceptions for fencing on a
case-by-case basis
![Page 29: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge](https://reader036.vdocuments.mx/reader036/viewer/2022062508/60367065ee3d78513841ee80/html5/thumbnails/29.jpg)
Project Schedule – White Oak Lake
29
March 2018: 65% design complete
March 26, 2018: Public meeting
March - June 2018: Private utility relocation, obtain permits, easement
acquisition; finalized construction plan
May- June 2018: Project bid
Permits must be in hand to begin construction. Delays in receiving permits could delay start of construction. Dates reflect a projected scheduled which may have
to be adjusted to account for delays in acquiring permits and approvals to begin construction
August 2018: Project award
September: Project construction begins
October 2019: Project completed
![Page 30: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge](https://reader036.vdocuments.mx/reader036/viewer/2022062508/60367065ee3d78513841ee80/html5/thumbnails/30.jpg)
Questions?
Questions?
![Page 31: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge](https://reader036.vdocuments.mx/reader036/viewer/2022062508/60367065ee3d78513841ee80/html5/thumbnails/31.jpg)
Project Contact Information and Updates
City of Raleigh Stormwater Management Division
David Kiker [email protected]
Raleighnc.gov (Search “White Oak Lake”)[email protected]
919-996-4074