Recent Developments and Future Projects at the ESRF
P. Berkvens
7th International Workshop on Radiation Safety at
Synchrotron Radiation Sources BNL, May 8-10, 2013
Recent Developments and Future Projects at the ESRF, P. Berkvens - RadSynch13, BNL, 8 May 2013 2
Recent Developments and Future Projects at the ESRF
Contents
Update on clinical trial projects at the ESRF
Stereotactic Synchrotron Radiation Therapy (SSRT)
Micro-beam Radiation Therapy (MRT)
ESRF Phase I Upgrade Programme
Phase I Upgrade Beamlines:
UPBL1 – ID01
UPBL7 – ID32
UPBL2 – ID31
UPBL4 – ID16
ESRF Phase II Upgrade Programme
Storage Ring Phase II Upgrade
1. Treatment Planning System: • Dose prescription D1 in tumour for given orientation. • Corresponding dose in water D2 at reference depth.
vz
3. Patient treatment: • Online measurement of delivered dose. • Patient Safety System.
2. Dosimetry calibration: • Calibration of therapy facility in terms of dose D2. • Cross-calibration of transmission ionisation
chamber.
Recent Developments and Future Projects at the ESRF, P. Berkvens - RadSynch13, BNL, 8 May 2013
Clinical trials at the ESRF: SSRT
3
Recent Developments and Future Projects at the ESRF, P. Berkvens - RadSynch13, BNL, 8 May 2013 4
PTW TLD holder for external control
Nom. Energy [keV]
Fieldsize [cm × cm]
Measuring depth [cm]
Dose ESRF [Gy]
Dose TLD [Gy]
Deviation [%]
Uncertainty k=1 [%]
80 5 × 5 10 0.970 0.980 -1.0 2.5
80 5 × 5 10 0.968 0.981 -1.3 2.5
80 5 × 5 3 1.028 1.024 0.4 2.5
80 5 × 5 5 0.976 0.972 0.4 2.5
80 5 × 5 3 1.038 1.038 0.0 2.5
80 5 × 5 5 0.974 0.972 0.2 2.5
80 5 × 5 5 0.978 0.982 -0.4 2.5
80 5 × 5 3 1.032 1.032 0.0 2.5
Clinical trials at the ESRF: SSRT
External control: TLD exposure, PTW Germany
Recent Developments and Future Projects at the ESRF, P. Berkvens - RadSynch13, BNL, 8 May 2013 5
Clinical trials at the ESRF: SSRT
Monte-Carlo based Treatment Planning System
Recent Developments and Future Projects at the ESRF, P. Berkvens - RadSynch13, BNL, 8 May 2013 6
# port
I [mA]
PTW semiflex
[Gy]
PTW transmission
1 [nC]
PTW transmission
2 [nC]
PTW 1 [nC/Gy]
PTW 2 [nC/Gy]
1 152.30 1177 43.30 44.30 36.79 37.64
2 152.17 1178 44.65 45.65 37.90 38.75
3 152.05 1176 44.60 45.60 37.93 38.78
4 151.93 1178 45.40 46.45 38.54 39.43
5 151.81 1171 43.10 44.05 36.81 37.62
6 151.68 1175 44.60 45.65 37.96 38.85
7 151.57 1174 44.65 45.65 38.03 38.88
8 151.45 1175 45.45 46.45 38.68 39.53
Clinical trials at the ESRF: SSRT
Cross calibration of transmission ionisation chamber for each individual beam, using the patient-specific collimators
Speed chair: 20 mm/s Vertical scan height: 7 cm
Height beam: 2 mm T = 22.7 oC
# of scans: 10 P = 995.7 mbar
Recent Developments and Future Projects at the ESRF, P. Berkvens - RadSynch13, BNL, 8 May 2013 7
# port
I [mA]
Dose
isocenter [Gy]
Dose ref. 2 cm [Gy]
Number of scans
Speed [mm/s]
Dose delivered
[Gy]
Difference dose
delivered / dose
prescribed [%]
1 172.3 0.6056 2.831 30 25.59 2.824 -0.24
2 172.1 0.6056 1.0429 11 26.92 1.041 -0.16
3 171.9 0.6056 0.9653 10 26.65 0.963 -0.22
4 171.7 0.6056 0.8177 9 28.6 0.816 -0.16
5 171.6 0.6056 1.7575 18 25.14 1.754 -0.20
6 171.4 0.6056 2.2954 24 25.4 2.291 -0.20
7 171.2 0.6056 3.6814 39 25.29 3.673 -0.24
8 170.9 0.6056 4.066 43 25.18 4.057 -0.21
Clinical trials at the ESRF: SSRT
Cross calibration of transmission ionisation chamber for each individual beam, using the patient-specific collimators
8 Recent Developments and Future Projects at the ESRF, P. Berkvens - RadSynch13, BNL, 8 May 2013
Clinical trials at the ESRF: SSRT
9 Recent Developments and Future Projects at the ESRF, P. Berkvens - RadSynch13, BNL, 8 May 2013
Clinical trials at the ESRF: SSRT
0
2
4
6
8
10
12
14
16
18
0 50 100 150 200
Series1
Series2
Recent Developments and Future Projects at the ESRF, P. Berkvens - RadSynch13, BNL, 8 May 2013
stored beam current (mA)
measured dose rate (kGy/s)
Dw,Q = Dw,scan × zbeam
vz
2 × 2 cm2 field
Ion recombination effect MRT PTW pinpoint 31014 (0.015 cm3)
Ion collection time 20 s Dose rate 99.5%: 265 Gy/s 99.0%: 580 Gy/s Pulse dose 99.5 %: 3.5 mGy 99.0 %: 7 mGy
Clinical trials at the ESRF: MRT
10
Recent Developments and Future Projects at the ESRF, P. Berkvens - RadSynch13, BNL, 8 May 2013
stored beam current (mA)
normalised measured dose rate / mA
Dw,Q = Dw,scan × zbeam
vz
2 × 2 cm2 field
Ion recombination effect MRT PTW pinpoint 31014 (0.015 cm3)
Ion collection time 20 s Dose rate 99.5%: 265 Gy/s 99.0%: 580 Gy/s Pulse dose 99.5 %: 3.5 mGy 99.0 %: 7 mGy
0.9
0.95
1
1.05
1.1
1.15
1.2
0 50 100 150 200
without gas filter
1
Clinical trials at the ESRF: MRT
11
Recent Developments and Future Projects at the ESRF, P. Berkvens - RadSynch13, BNL, 8 May 2013 12
ESRF Phase I Upgrade Program
Recent Developments and Future Projects at the ESRF, P. Berkvens - RadSynch13, BNL, 8 May 2013 13
ESRF Phase I Upgrade Program
Recent Developments and Future Projects at the ESRF, P. Berkvens - RadSynch13, BNL, 8 May 2013 14
Belledonne
Chartreuse
Chartreuse
EX2 Chartreuse and Belledonne Experimental Halls
Belledonne
Recent Developments and Future Projects at the ESRF, P. Berkvens - RadSynch13, BNL, 8 May 2013 15
Phase I Upgrade Beamlines: UPBL01 – ID01
UPBL1: Diffraction imaging for nano-analysis
horizontal slit 2 mm (± 0.074 mrad)
vertical slit 4 mm (± 0.089 mrad)
distance from middle of straight section
13.5
m
22
.5 m
Transmission through front end
6 GeV: 1/ = 0.085 mrad
vertical slit
1.E+06-1.E+07
1.E+05-1.E+06
1.E+04-1.E+05
1.E+03-1.E+04
1.E+02-1.E+03
1.E+01-1.E+02
1.E+00-1.E+01
1.E-01-1.E+00
10 m 26.1 m -5 cm
5 cm
Sv/h
16 Recent Developments and Future Projects at the ESRF, P. Berkvens - RadSynch13, BNL, 8 May 2013
Phase I Upgrade Beamlines: UPBL01 – ID01
1.E-02
1.E-01
1.E+00
1.E+01
1.E+02
1.E+03
1.E+04
1.E+05
1.E+06
1.E+07
1.E+06-1.E+07
1.E+05-1.E+06
1.E+04-1.E+05
1.E+03-1.E+04
1.E+02-1.E+03
1.E+01-1.E+02
1.E+00-1.E+01
1.E-01-1.E+00
1.E-02-1.E-01
1.E-021.E-01
1.E+001.E+01
1.E+021.E+03
1.E+041.E+05
1.E+061.E+07
1.E+06-1.E+07
1.E+05-1.E+06
1.E+04-1.E+05
1.E+03-1.E+04
1.E+02-1.E+03
1.E+01-1.E+02
1.E+00-1.E+01
1.E-01-1.E+00
1.E-02-1.E-01
Collimator
Horizontal slits
Movable absorber
1.E-021.E-01
1.E+001.E+01
1.E+021.E+03
1.E+041.E+05
1.E+061.E+07
1.E+06-1.E+07
1.E+05-1.E+06
1.E+04-1.E+05
1.E+03-1.E+04
1.E+02-1.E+03
1.E+01-1.E+02
1.E+00-1.E+01
1.E-01-1.E+00
1.E-02-1.E-01 1.E-02
1.E-01
1.E+00
1.E+01
1.E+02
1.E+03
1.E+04
1.E+05
1.E+06
1.E+07
1.E+06-1.E+07
1.E+05-1.E+06
1.E+04-1.E+05
1.E+03-1.E+04
1.E+02-1.E+03
1.E+01-1.E+02
1.E+00-1.E+01
1.E-01-1.E+00
1.E-02-1.E-01
Vertical slits
Collimator
Horizontal slits
Movable absorber
Vertical slits
Sv/h
Sv/h
Sv/h
Sv/h
1.E-02
1.E-01
1.E+00
1.E+01
1.E+02
1.E+03
1.E+04
1.E+05
1.E+06
1.E+07
1.E+06-1.E+07
1.E+05-1.E+06
1.E+04-1.E+05
1.E+03-1.E+04
1.E+02-1.E+03
1.E+01-1.E+02
1.E+00-1.E+01
1.E-01-1.E+00
1.E-02-1.E-01
Sv/h
horizontal
vertical
Gas-bremsstrahlung transmission in ESRF Front End
17 Recent Developments and Future Projects at the ESRF, P. Berkvens - RadSynch13, BNL, 8 May 2013
1.E+06-1.E+07
1.E+05-1.E+06
1.E+04-1.E+05
1.E+03-1.E+04
1.E+02-1.E+03
1.E+01-1.E+02
1.E+00-1.E+01
1.E-01-1.E+00
1.E+06-1.E+07
1.E+05-1.E+06
1.E+04-1.E+05
1.E+03-1.E+04
1.E+02-1.E+03
1.E+01-1.E+02
1.E+00-1.E+01
1.E-01-1.E+00
1.E+06-1.E+07
1.E+05-1.E+06
1.E+04-1.E+05
1.E+03-1.E+04
1.E+02-1.E+03
1.E+01-1.E+02
1.E+00-1.E+01
1.E-01-1.E+00
1.E+06-1.E+07
1.E+05-1.E+06
1.E+04-1.E+05
1.E+03-1.E+04
1.E+02-1.E+03
1.E+01-1.E+02
1.E+00-1.E+01
1.E-01-1.E+00
Sv/h
0 mrad 1.5 mrad 1.75 mrad 2 mrad
Gas-bremsstrahlung transmission in ESRF Front End
18 Recent Developments and Future Projects at the ESRF, P. Berkvens - RadSynch13, BNL, 8 May 2013
Recent Developments and Future Projects at the ESRF, P. Berkvens - RadSynch13, BNL, 8 May 2013 19
Gas-bremsstrahlung transmission in ESRF Front End
Energy (MeV)
Number of photons / s / MeV
Recent Developments and Future Projects at the ESRF, P. Berkvens - RadSynch13, BNL, 8 May 2013 20
BS1 BS2 BS3
36.22 m 39. m 42 m
OH1 Lead wall
EndOH1
InOH2
+ 7 mm
+ 27 mm
Impact +40.9 mmØ = (40.9-17)*2 =47.8
BS4
48.5m
29.6m
1 st Mirror WBMAngle 7.07 mrad
39.05 m 48.55m36.342m
Pipe Ø 60,3 ep 2With lead
BS1 BS2 BS329.6 m
36.22 m 36.342m 39 m 42.0 m
OH2
1 st Mirror WBM+ 7 mm
+ 27 mm
Angle 4005µradIncidence 2002 µrad
Angle 1057 µradIncidence 528 µrad
BS4
48.5 m39.05 m
42.05 m 55.9 m
Phase I Upgrade Beamlines: UPBL01 – ID01
BS 5 BS 6
Angle 1 mrad
+ 7 mm
+ 27 mm
Axe sample WB +17 mm
54.08 m OH2
Angle 1.116 mrad
74 m
Impact +42.2 mmØ = (42.2-17)*2 =50.4mm
BS 1
36 m
BS 6
74.0 m20 * 4
Angle 0.529 mrad
If we have a pipe with a Ø 60 the beam hits it at 74 m + (28/0.529) = 127,7 m from the source in this case we are in EH1
28 mm20 mm30 mm
EndOH2
OH3
Pipe Ø 60,3 ep 2With lead
Pipe Ø 60,3 ep 2With lead
Recent Developments and Future Projects at the ESRF, P. Berkvens - RadSynch13, BNL, 8 May 2013 21
Phase I Upgrade Beamlines: UPBL01 – ID01
Recent Developments and Future Projects at the ESRF, P. Berkvens - RadSynch13, BNL, 8 May 2013 22
BS1 BS2 BS329.6 m
36.22 m 36.342m 39 m 42.0 m
OH1 insidelead wall
OH2
1 st Mirror WBM+ 7 mm
+ 27 mm
Angle 4005µradIncidence 2002 µrad
Angle 1057 µradIncidence 528 µrad
Impact +37.6 mm
Axe sample +17 mm
Impact +20 mm
BS4
48.5 m
39.05 m
42.05 m 55.9 m
ndOH2
EndOH1 In
OH2
BS1 BS2 BS3
36.22 m 39. m 42 m
OH1 Lead wall
EndOH1
InOH2
+ 7 mm
+ 27 mm
Impact +40.9 mmØ = (40.9-17)*2 =47.8
BS4
48.5m
29.6m
1 st Mirror WBMAngle 7.07 mrad
Axe sample +17 mm
39.05 m48.55m
36.342m
Pipe Ø 60,3 ep 2With lead
Pipe Ø 60,3 ep 2With lead
W block 100 x 100 x W10 + Cu22 + W90
Impact WB Aperture 20mm x 4mm Center at 17 mm from WB
W block 50 x 30 x 50
Aperture 20mm x 4mm Center at 17 mm from WB
Recent Developments and Future Projects at the ESRF, P. Berkvens - RadSynch13, BNL, 8 May 2013 23
Phase I Upgrade Beamlines: UPBL7 – ID32
UPBL7: Soft X-ray beamline for magnetic and electronic spectroscopy
Recent Developments and Future Projects at the ESRF, P. Berkvens - RadSynch13, BNL, 8 May 2013 24
1.103 – 1.104
1.102 – 1.103
1.101 – 1.102
1.100 – 1.101
1.10-1 – 1.100
1.10-2 – 1.10-1
1.10-3 – 1.10-2
1.10-4 – 1.10-3
1.10-5 – 1.10-4
1.10-6 – 1.10-5
1.10-7 – 1.10-6
1.10-8 – 1.10-7
1.10-9 – 1.10-8
Sv/h
bremsstrahlung
neutrons
synchrotron radiation
Phase I Upgrade Beamlines: UPBL7 – ID32
Sv/h1.1012 – 1.1013
1.1011 – 1.1012
1.1010 – 1.1011
1.109 – 1.1010
1.108 – 1.109
1.107 – 1.108
1.106 – 1.107
1.105 – 1.106
1.104 – 1.105
1.103 – 1.104
1.102 – 1.103
1.101 – 1.102
1.100 – 1.101
1.10-1 – 1.100
1.10-2 – 1.10-1
1.10-3 – 1.10-2
,n X
Recent Developments and Future Projects at the ESRF, P. Berkvens - RadSynch13, BNL, 8 May 2013 25
Phase I Upgrade Beamlines: UPBL7 – ID32
Recent Developments and Future Projects at the ESRF, P. Berkvens - RadSynch13, BNL, 8 May 2013 26
Phase I Upgrade Beamlines: UPBL2 – ID31
UPBL2: High energy beamline for buried interface structures and materials processing
horizontal slit 2 mm (± 0.074 mrad)
vertical slit 4 mm (± 0.089 mrad)
distance from middle of straight section
13.5
m
22
.5 m
Transmission through ID31 front end
6 GeV: 1/ = 0.085 mrad
vertical slit
23.18 m 23.33 m 23.48 m
10 cm 5 cm
2 cm
beam
beam 1 mm 1.5 mm
15 mm1 mm 1.5 mm
vertical slits horizontal slits
tungsten backing
15 mm
10 cm 5 cm
8 mm
8 mm
Side view
Top view ID31 special horizontal / vertical collimator
27 Recent Developments and Future Projects at the ESRF, P. Berkvens - RadSynch13, BNL, 8 May 2013
Gas-bremsstrahlung transmission in ID31 Front End
Recent Developments and Future Projects at the ESRF, P. Berkvens - RadSynch13, BNL, 8 May 2013 28
10 m 26.12 m -5 cm
5 cm
Sv/h
10 m 26.12 m -5 cm
5 cm
Gas-bremsstrahlung transmission in ID31 Front End
horizontal
vertical
synchrotron
1.E-05
1.E-04
1.E-03
1.E-02
0 500 1,000 1,500
photons
neutrons
total
distance along side wall (cm)
effective dose rate ( Sv/h)
1.E-05
1.E-04
1.E-03
1.E-02
1.E-01
1.E+00
0 200 400 600 800 1,000 1,200 1,400
0 mm
3 mm
6 mm
9 mm
12 mm
15 mm
18 mm
21 mm
24 mm
27 mm
30 mm
distance along side wall (cm)
effective dose rate ( Sv/h)
Recent Developments and Future Projects at the ESRF, P. Berkvens - RadSynch13, BNL, 8 May 2013 29
bremsstrahlung 30 mm Pb side wall
1.E-04
1.E-03
1.E-02
1.E-01
1.E+00
1.E+01
1.E+02
1.E+03
1.E+04
1.E+05
-200 -100 0 100 200 300 400 500 600
3 mm
6 mm
9 mm
12 mm
15 mm
18 mm
21 mm
24 mm
27 mm
30 mm
Side wall 200 cm
distance along side wall (cm)
effective dose rate ( Sv/h)
Synchrotron radiation In-vacuum cryogenic undulator Bmax = 1.2 T Period: 14 mm 2 × 2 meters
Phase I Upgrade Beamlines: UPBL2 – ID31
Recent Developments and Future Projects at the ESRF, P. Berkvens - RadSynch13, BNL, 8 May 2013 30
Phase I Upgrade Beamlines: UPBL4 – ID16 (NiNa)
Nano-Imaging and Nano-Analysis beamline phase contrast imaging, chemical mapping and spectroscopy on the nano-scale
Recent Developments and Future Projects at the ESRF, P. Berkvens - RadSynch13, BNL, 8 May 2013 31
1.E+05-1.E+06
1.E+04-1.E+05
1.E+03-1.E+04
1.E+02-1.E+03
1.E+01-1.E+02
1.E+00-1.E+01
1.E-01-1.E+00
1.E-02
1.E-01
1.E+00
1.E+01
1.E+02
1.E+03
1.E+04
1.E+05
1.E+06
1.E+05-1.E+06
1.E+04-1.E+05
1.E+03-1.E+04
1.E+02-1.E+03
1.E+01-1.E+02
1.E+00-1.E+01
1.E-01-1.E+00
1.E-02-1.E-01
1.E-02
1.E-01
1.E+00
1.E+01
1.E+02
1.E+03
1.E+04
1.E+05
1.E+06
1.E+05-1.E+06
1.E+04-1.E+05
1.E+03-1.E+04
1.E+02-1.E+03
1.E+01-1.E+02
1.E+00-1.E+01
1.E-01-1.E+00
1.E-02-1.E-01
Sv/h
ID16 canted section Front end 2.7 mrad canting
200 mA 1. 10-9 mbar
Phase I Upgrade Beamlines: UPBL4 – ID16 (NiNa)
10 m 26.1 m
Recent Developments and Future Projects at the ESRF, P. Berkvens - RadSynch13, BNL, 8 May 2013 32
1.00E+04-1.00E+05
1.00E+03-1.00E+04
1.00E+02-1.00E+03
1.00E+01-1.00E+02
1.00E+00-1.00E+01
1.00E-01-1.00E+00
1.00E-02-1.00E-01
1.00E-03-1.00E-02
-5.00E+01
-4.00E+01
-3.00E+01
-2.00E+01
-1.00E+01
0.00E+00
1.00E+01
2.00E+01
3.00E+01
0.00E+002.00E+024.00E+026.00E+028.00E+021.00E+031.20E+031.40E+031.60E+031.80E+032.00E+03
Axis Title
Axis Title
Chart Title
Series1
ID16 Optics hutch 200 mA 1. 10-9 mbar
Photon effective dose rate ( Sv/h)
Phase I Upgrade Beamlines: UPBL4 – ID16 (NiNa)
Ni-branch
Recent Developments and Future Projects at the ESRF, P. Berkvens - RadSynch13, BNL, 8 May 2013 33
1.00E+04-1.00E+05
1.00E+03-1.00E+04
1.00E+02-1.00E+03
1.00E+01-1.00E+02
1.00E+00-1.00E+01
1.00E-01-1.00E+00
1.00E-02-1.00E-01
1.00E-03-1.00E-02
-5.00E+01
-4.00E+01
-3.00E+01
-2.00E+01
-1.00E+01
0.00E+00
1.00E+01
2.00E+01
3.00E+01
0.00E+002.00E+024.00E+026.00E+028.00E+021.00E+031.20E+031.40E+031.60E+031.80E+032.00E+03
Axis Title
Axis Title
Chart Title
Series1
ID16 Optics hutch 200 mA 1. 10-9 mbar
Photon effective dose rate ( Sv/h)
Phase I Upgrade Beamlines: UPBL4 – ID16 (NiNa)
Na-branch
Recent Developments and Future Projects at the ESRF, P. Berkvens - RadSynch13, BNL, 8 May 2013 34
Photon effective dose rate ( Sv/h) 1 100
1 10-1
1 10-2
1 10-3
1 10-4
1 10-5
1.00E-04
1.00E-03
1.00E-02
1.00E-01
1.00E+00
0 200 400 600 800 1,000 1,200
0 mm
3 mm
6 mm
9 mm
12 mm
15 mm
18 mm
21 mm
24 mm
27 mm
30 mm1.00E-05
1.00E-04
1.00E-03
1.00E-02
1.00E-01
1.00E+00
-150-100-50050100150200
0 cm
1 cm
2 cm
3 cm
4 cm
5 cm
6 cm
7 cm
8 cm
9 cm
10 cm
Side walls Back walls
1.00E-04
1.00E-03
1.00E-02
1.00E-01
1.00E+00
0 200 400 600 800 1,000 1,200
0 mm
3 mm
6 mm
9 mm
12 mm
15 mm
18 mm
21 mm
24 mm
27 mm
30 mm
ID16 Optics hutch 200 mA 1. 10-9 mbar
Phase I Upgrade Beamlines: UPBL4 – ID16 (NiNa)
Recent Developments and Future Projects at the ESRF, P. Berkvens - RadSynch13, BNL, 8 May 2013 35
Effective dose rate ( Sv/h)
ID16 Optics hutch 200 mA 1. 10-9 mbar
1.50 10-2
1.25 10-2
1.00 10-2
0.75 10-3
0.50 10-3
0.25 10-3
0
3 cm Pb 3 cm Pb 3 cm Pb 10 cm Pb 10 cm Pb
Phase I Upgrade Beamlines: UPBL4 – ID16 (NiNa)
Recent Developments and Future Projects at the ESRF, P. Berkvens - RadSynch13, BNL, 8 May 2013 36
Phase I Upgrade Beamlines: UPBL4 – ID16 (NiNa)
Recent Developments and Future Projects at the ESRF, P. Berkvens - RadSynch13, BNL, 8 May 2013 37
Phase II Upgrade: Storage ring upgrade
Parameter Existing Lattice New Lattice
Energy, E [GeV] 6.04 6.04
Circumference, C [m] 844 844
RF frequency, fRF [MHz] 352 352
Beam current [mA] 200 200
Horizontal Emittance [pm ·rad] 4000 150
Vertical Emittance [pm ·rad] 4 3
Beta at ID center, βx , βy [m] 37.6 , 3.0 (high β)
0.35 , 3.0 (low β)
3.6 , 3.6
Beam size at ID center, σx , σy [μm] 413 , 3.9 (high β)
50 , 3.9 (low β)
24 , 3.3
Beam div. at ID center, σx’ , σy’ [μrad] 10 , 1.3 (high β)
107, 1.3 (low β)
6.4 , 0.91
White paper
Injector Upgrade
Prototyping , R&D
Technical Design Study
Engineering Design
Calls for Tender
Manufacturing, Construction and Test
Vercors building construction
Assembly and preparation
End User mode
Beam back to BL
Installation
Commissioning
2 Beamlines in Chartreuse
2 Beamlines in Vercors
Recent Developments and Future Projects at the ESRF, P. Berkvens - RadSynch13, BNL, 8 May 2013
1 Year
Shutdown
User Mode
38