![Page 1: Quality Assurance Workshop Steel Mill Quality (QC Process and … · 2018-05-08 · Microsoft PowerPoint - Quality Assurance Workshop Steel Mill Quality (QC Process and Issues)2018](https://reader033.vdocuments.mx/reader033/viewer/2022042806/5f756e138813075ef66374b9/html5/thumbnails/1.jpg)
www.dot.state.pa.us
Steel Mill Quality (QC Process and Issues)
![Page 2: Quality Assurance Workshop Steel Mill Quality (QC Process and … · 2018-05-08 · Microsoft PowerPoint - Quality Assurance Workshop Steel Mill Quality (QC Process and Issues)2018](https://reader033.vdocuments.mx/reader033/viewer/2022042806/5f756e138813075ef66374b9/html5/thumbnails/2.jpg)
www.dot.state.pa.us
2/19/2018 Pennsylvania Department
of Transportation
Processes for Producing Plate Steels
Traditional
Processing
Thermo-Mechanical
Controlled Processing (TMCP)
Heat TreatmentHotRolling
Normalizing
ControlledRolling
Quenching & Tempering
AcceleratedCooling
Te
mp
era
ture
, °F
0
2400
400
800
1200
1600
2000
![Page 3: Quality Assurance Workshop Steel Mill Quality (QC Process and … · 2018-05-08 · Microsoft PowerPoint - Quality Assurance Workshop Steel Mill Quality (QC Process and Issues)2018](https://reader033.vdocuments.mx/reader033/viewer/2022042806/5f756e138813075ef66374b9/html5/thumbnails/3.jpg)
www.dot.state.pa.us
Steel Mill Quality (QC Process and Issues)
Mill Defects
![Page 4: Quality Assurance Workshop Steel Mill Quality (QC Process and … · 2018-05-08 · Microsoft PowerPoint - Quality Assurance Workshop Steel Mill Quality (QC Process and Issues)2018](https://reader033.vdocuments.mx/reader033/viewer/2022042806/5f756e138813075ef66374b9/html5/thumbnails/4.jpg)
www.dot.state.pa.us
Steel Mill Quality (QC Process and Issues)
Mill DefectsDefects in steel products are defined as deviations in appearance, shape, dimension, macro-structure / micro-structure, and/or chemical properties when compared with the specifications given in the technicalstandards or any other normative documents in force.Defects are detected either through visual inspection or with the help of instruments and equipment.
![Page 5: Quality Assurance Workshop Steel Mill Quality (QC Process and … · 2018-05-08 · Microsoft PowerPoint - Quality Assurance Workshop Steel Mill Quality (QC Process and Issues)2018](https://reader033.vdocuments.mx/reader033/viewer/2022042806/5f756e138813075ef66374b9/html5/thumbnails/5.jpg)
www.dot.state.pa.us
Steel Mill Quality (QC Process and Issues)
Mill Defects
![Page 6: Quality Assurance Workshop Steel Mill Quality (QC Process and … · 2018-05-08 · Microsoft PowerPoint - Quality Assurance Workshop Steel Mill Quality (QC Process and Issues)2018](https://reader033.vdocuments.mx/reader033/viewer/2022042806/5f756e138813075ef66374b9/html5/thumbnails/6.jpg)
www.dot.state.pa.us
2/19/2018 6
Why Quality Assurance?
• no defined expectations
• no verification of history
• no inspection
• no certification
• No Guarantees
Here is what happens without it.
![Page 7: Quality Assurance Workshop Steel Mill Quality (QC Process and … · 2018-05-08 · Microsoft PowerPoint - Quality Assurance Workshop Steel Mill Quality (QC Process and Issues)2018](https://reader033.vdocuments.mx/reader033/viewer/2022042806/5f756e138813075ef66374b9/html5/thumbnails/7.jpg)
www.dot.state.pa.us
Industry quality standards requirematerials to be tested at themanufacturer and the results of these tests be submitted
through a report, also called a Mill Sheet, Mill Certificate or Mill Test Certificate (MTC). The
only way to trace a steel plate back to its Mill Sheet is the Heat Number. A heat number is similar to a lot number, which is used to identify production runs of any other product for quality control purposes.
Steel Mill Quality (QC Process and Issues)
![Page 8: Quality Assurance Workshop Steel Mill Quality (QC Process and … · 2018-05-08 · Microsoft PowerPoint - Quality Assurance Workshop Steel Mill Quality (QC Process and Issues)2018](https://reader033.vdocuments.mx/reader033/viewer/2022042806/5f756e138813075ef66374b9/html5/thumbnails/8.jpg)
www.dot.state.pa.us
Steel Mill Quality (QC Process and Issues)
ASTM A709-Standard Specification forStructural Steel for Bridges
Grade Yield36 [250] 36 [250]
50 [345] 50 [345]
50S [345S] 50 [345]
50W [345W] 50 [345]
HPS 50W
[HPS 345W] 50 [345]
50CR [345CR] 50 [345]
HPS 70W
[HPS 485W] 70 [485]
HPS 100W
[HPS 690W] 100 [690]
![Page 9: Quality Assurance Workshop Steel Mill Quality (QC Process and … · 2018-05-08 · Microsoft PowerPoint - Quality Assurance Workshop Steel Mill Quality (QC Process and Issues)2018](https://reader033.vdocuments.mx/reader033/viewer/2022042806/5f756e138813075ef66374b9/html5/thumbnails/9.jpg)
www.dot.state.pa.us
Heat # 74277, the "7"indicates furnace number, "4"indicates Years of MeltedMetals, and The last three isMelt number
Steel Mill Quality (QC Process and Issues)
![Page 10: Quality Assurance Workshop Steel Mill Quality (QC Process and … · 2018-05-08 · Microsoft PowerPoint - Quality Assurance Workshop Steel Mill Quality (QC Process and Issues)2018](https://reader033.vdocuments.mx/reader033/viewer/2022042806/5f756e138813075ef66374b9/html5/thumbnails/10.jpg)
www.dot.state.pa.us
Why Inspection?
![Page 11: Quality Assurance Workshop Steel Mill Quality (QC Process and … · 2018-05-08 · Microsoft PowerPoint - Quality Assurance Workshop Steel Mill Quality (QC Process and Issues)2018](https://reader033.vdocuments.mx/reader033/viewer/2022042806/5f756e138813075ef66374b9/html5/thumbnails/11.jpg)
www.dot.state.pa.us
Quality Assurance Steel Manufacturing
-Steel Beam Fabrication-Rolled Beams
Training
Quality Assurance Program For Bridge Fabrication
![Page 12: Quality Assurance Workshop Steel Mill Quality (QC Process and … · 2018-05-08 · Microsoft PowerPoint - Quality Assurance Workshop Steel Mill Quality (QC Process and Issues)2018](https://reader033.vdocuments.mx/reader033/viewer/2022042806/5f756e138813075ef66374b9/html5/thumbnails/12.jpg)
www.dot.state.pa.us
Why Inspection?
It is the Law.
Federal funding requires you to have a quality assurance
program.
CFR 23
3 levels:
QC
QA
Independent QA
![Page 13: Quality Assurance Workshop Steel Mill Quality (QC Process and … · 2018-05-08 · Microsoft PowerPoint - Quality Assurance Workshop Steel Mill Quality (QC Process and Issues)2018](https://reader033.vdocuments.mx/reader033/viewer/2022042806/5f756e138813075ef66374b9/html5/thumbnails/13.jpg)
www.dot.state.pa.us
Quality Assurance
The Beginning
Quality Assurance Program For Bridge Fabrication
![Page 14: Quality Assurance Workshop Steel Mill Quality (QC Process and … · 2018-05-08 · Microsoft PowerPoint - Quality Assurance Workshop Steel Mill Quality (QC Process and Issues)2018](https://reader033.vdocuments.mx/reader033/viewer/2022042806/5f756e138813075ef66374b9/html5/thumbnails/14.jpg)
www.dot.state.pa.us
• Federal Regulation CFR 23, Part637 Section 637.207 Quality Assurance Program-
• Two Parts
– Acceptance Program
– Independent Assurance Program
PennDOT’s Quality Assurance Program For Bridge Fabrication
![Page 15: Quality Assurance Workshop Steel Mill Quality (QC Process and … · 2018-05-08 · Microsoft PowerPoint - Quality Assurance Workshop Steel Mill Quality (QC Process and Issues)2018](https://reader033.vdocuments.mx/reader033/viewer/2022042806/5f756e138813075ef66374b9/html5/thumbnails/15.jpg)
www.dot.state.pa.us
• Pennsylvania State Regulation:
– Pennsylvania Statutes
• Title 36. Highways and Bridges
– Chapter 1A State Highway Law
» ARTICLE IV. Construction, Improvement, Maintenance and Repair of State Highways
» 36 P.S. Part 670
» Section 670.401: Duty on Department of Highways
PennDOT’s Quality Assurance Program For Bridge Fabrication
![Page 16: Quality Assurance Workshop Steel Mill Quality (QC Process and … · 2018-05-08 · Microsoft PowerPoint - Quality Assurance Workshop Steel Mill Quality (QC Process and Issues)2018](https://reader033.vdocuments.mx/reader033/viewer/2022042806/5f756e138813075ef66374b9/html5/thumbnails/16.jpg)
www.dot.state.pa.us
•Fabricators•A6
•Steel Specification
•ASTM A709
• Inspection Consultant Agencies
• State Structural Material Unit
STATE
Independent QA
QA Acceptance
Quality Control
State QA Program
Specifications
Quality Assurance Program For Bridge Material Manufacturing/Fabrication
![Page 17: Quality Assurance Workshop Steel Mill Quality (QC Process and … · 2018-05-08 · Microsoft PowerPoint - Quality Assurance Workshop Steel Mill Quality (QC Process and Issues)2018](https://reader033.vdocuments.mx/reader033/viewer/2022042806/5f756e138813075ef66374b9/html5/thumbnails/17.jpg)
www.dot.state.pa.us
Specifications
• PENNDOT PUB 408:2011 SECTION 1105
• AWS Codes
– AWS D1.5 2008 Bridge Welding Code
• Steel ASTM A709 GR 36, 50, 50W
– AWS D1.1 2008 Structural Welding Code
• Tubular
2/19/2018 17
![Page 18: Quality Assurance Workshop Steel Mill Quality (QC Process and … · 2018-05-08 · Microsoft PowerPoint - Quality Assurance Workshop Steel Mill Quality (QC Process and Issues)2018](https://reader033.vdocuments.mx/reader033/viewer/2022042806/5f756e138813075ef66374b9/html5/thumbnails/18.jpg)
www.dot.state.pa.us
Welding Processes
• ESW (Electro Slag Welding)
• FCAW (Flux Cored Arc Welding)
• GMAW (Gas Metal Arc Welding)
• SAW (Submerged Arc Welding)
• SW (Stud Welding)
• SMAW (Shielded Metal Arc Welding)
2/19/2018 18
![Page 19: Quality Assurance Workshop Steel Mill Quality (QC Process and … · 2018-05-08 · Microsoft PowerPoint - Quality Assurance Workshop Steel Mill Quality (QC Process and Issues)2018](https://reader033.vdocuments.mx/reader033/viewer/2022042806/5f756e138813075ef66374b9/html5/thumbnails/19.jpg)
www.dot.state.pa.us
2/19/2018 Pennsylvania Department of
Transportation
19
Surface Preparation
Metalizing
Seal Coat
Metallizing Operation:
![Page 20: Quality Assurance Workshop Steel Mill Quality (QC Process and … · 2018-05-08 · Microsoft PowerPoint - Quality Assurance Workshop Steel Mill Quality (QC Process and Issues)2018](https://reader033.vdocuments.mx/reader033/viewer/2022042806/5f756e138813075ef66374b9/html5/thumbnails/20.jpg)
www.dot.state.pa.us
Architectural Treatments for Precast Concrete Products
Cold Camber Rolled
Cold Camber:
![Page 21: Quality Assurance Workshop Steel Mill Quality (QC Process and … · 2018-05-08 · Microsoft PowerPoint - Quality Assurance Workshop Steel Mill Quality (QC Process and Issues)2018](https://reader033.vdocuments.mx/reader033/viewer/2022042806/5f756e138813075ef66374b9/html5/thumbnails/21.jpg)
www.dot.state.pa.us
Architectural Treatments for Precast Concrete Products
Design Consultant Training
Welding Inspection Training
NDT Training
Bolt Training
Training:
![Page 22: Quality Assurance Workshop Steel Mill Quality (QC Process and … · 2018-05-08 · Microsoft PowerPoint - Quality Assurance Workshop Steel Mill Quality (QC Process and Issues)2018](https://reader033.vdocuments.mx/reader033/viewer/2022042806/5f756e138813075ef66374b9/html5/thumbnails/22.jpg)
www.dot.state.pa.us
Architectural Treatments for Precast Concrete Products
Issues – Concerns – Future Actions
![Page 23: Quality Assurance Workshop Steel Mill Quality (QC Process and … · 2018-05-08 · Microsoft PowerPoint - Quality Assurance Workshop Steel Mill Quality (QC Process and Issues)2018](https://reader033.vdocuments.mx/reader033/viewer/2022042806/5f756e138813075ef66374b9/html5/thumbnails/23.jpg)
www.dot.state.pa.us
• I AM WATCHING YOU
MAKE ME HAPPY
Quality Assurance Program For Bridge Fabrication
![Page 24: Quality Assurance Workshop Steel Mill Quality (QC Process and … · 2018-05-08 · Microsoft PowerPoint - Quality Assurance Workshop Steel Mill Quality (QC Process and Issues)2018](https://reader033.vdocuments.mx/reader033/viewer/2022042806/5f756e138813075ef66374b9/html5/thumbnails/24.jpg)
www.dot.state.pa.us
Questions?
ALL OF YOU ARE… the Link to Quality
PennDOT’s Quality Assurance Program For Bridge Fabrication