Project Precinct Description Type Status Project Manager Contact Number
Arkansas Bend Park Group Bldg Gerald Daugherty (Pct 3) Community meeting building with event space for approximately 300 people, including restrooms, catering prep kitchen and storage.
Park Design Odette Tan, P.E. 512-854-7587
Public Works Improvement Projects (CIP) Summary Table
TRANSPORTATION AND NATURAL RESOURCES DEPARTMENTCYNTHIA McDONALD, COUNTY EXECUTIVE700 Lavaca StreetP.O. BOX 1748AUSTIN, TEXAS 78767(512)854-9418
David Greear, P.E., Assistant Public Works Director
Capital Improvement ProjectsCapital Improvement Projects (CIP) include the cost of buildings and other structures, infrastructure and capital-related additions, alterations, reconstruction, and installations that have a value of $5,000.00 or more and an estimated useful life greater than one year. The Transportation and Natural Resources Department (TNR) works primarily with infrastructures, which are long-lived capital assets that normally are stationary in nature and can be preserved for a significantly greater number of years than most capital assets.These include the construction of new or reconstruction or improvements of existing facilities that may fall under one of the following: · New parks development · Major drainage improvements· Roads · Bicycle lanes · Sidewalk and other pedestrian facilities· Expansion of the County’s bridge system
1
Monday, June 15, 2020
Project Precinct Description Type Status Project Manager Contact Number
Arkansas Bend Park Phase I Gerald Daugherty (Pct 3) Design and construction to improve beach, picnic areas, playgrounds, boat ramp, other amenities, and associated infrastructure for the day-use area and new campground and to restore disturbed land to natural conditions.
Park Completed Odette Tan, P.E. 512-854-7587
Arkansas Bend Park Phase II Gerald Daugherty (Pct 3) Complete overnight facilties with infrastructure and associated amenities
Park Pre-Construction
Odette Tan, P.E. 512-854-7587
Arroyo Doble / Twin Creeks Drainage Gerald Daugherty (Pct 3) Design and construct subdivision drainage improvements and make drainage improvements to the adjacent Bethel Church Road, Polk Road, and Wirth Road.
Drainage Design Tony Valdez, P.E. 512-854-7567
Arterial A (Engineering and ROW) Jeff Travillion (Pct 1) New MAD 4 arterial between US 290 East and Parmer Lane Roadway Design Mo Mortazavi, P.E. 512-854-7589
Bee Creek Road at Bee Creek Low Water Crossing- project supended
Gerald Daugherty (Pct 3) Improve existing low water crossing to all-weather crossing Bridge Completed Tony Valdez, P.E. 512-854-7567
Bee Creek Road Improvements Gerald Daugherty (Pct 3) Widen existing 2-lane road to 4-lane arterial from SH 71 to Highland Boulevard
Roadway Completed Tony Valdez, P.E. 512-854-7567
Bee Creek Sports Complex Gerald Daugherty (Pct 3) The Bee Creek Sports Complex will have soccer, baseball, and football fields, parking, restrooms, team meeting facility, trail head and primitive trail, playground area, maintenance building, and other amenities and associated infrastructure.
Park Design Odette Tan, P.E. 512-854-7587
Big Sandy Drive at Long Hollow Creek Low Water Crossing
Gerald Daugherty (Pct 3) Improve existing low water crossing to all-weather crossing Roadway Completed Mo Mortazavi, P.E. 512-854-7589
Bitting School Road at unnamed tributary to Wilbarger Creek
Jeff Travillion (Pct 1) Construct drainage structure to replace undersized existing culverts under Bitting School Road at unnamed tributary to Wilbarger Creek
Drainage Design Mo Mortazavi, P.E. 512-854-7589
Blake Manor Road Improvements Jeff Travillion (Pct 1) Widen Blake Manor Rd from 2-lane to 4-lane from East Metro Park to the proposed Wildhorse Connector (close to the Manor City Limits)
Roadway Design Miguel Villarreal, P.E. 512-854-7586
Blake Manor Shared Use Path Jeff Travillion (Pct 1) Shared use path along Blake Manor Rd from East Metro Park to the proposed Wildhorse Connector (near the Manor city limits)
Roadway Design Miguel Villarreal, P.E. 512-854-7586
Braker Lane I, Phase I Jeff Travillion (Pct 1) Realign Decker Lane from US 290 to Lindell Lane Roadway Completed Tony Valdez, P.E. 512-854-7567
Braker Lane I, Phases 2, 3, 4, 5 (Public-Private-Public)
Jeff Travillion (Pct 1) Extend Braker Lane from realigned Decker Lane to Parmer Lane at SH 130
Roadway Not Started Tony Valdez, P.E. 512-854-7567
2
Monday, June 15, 2020
Project Precinct Description Type Status Project Manager Contact Number
Braker Lane II, Phase 1 (Public-Private) Jeff Travillion (Pct 1) Extend Braker Lane from FM 973 to one mile east Roadway Completed Tony Valdez, P.E. 512-854-7567
Braker Lane II, Phase 2 (Public-Private) Jeff Travillion (Pct 1) Extend Braker Lane from one mile east of FM 973 to Taylor Lane
Roadway Completed Tony Valdez, P.E. 512-854-7567
Braker Lane North Extension (design only) Jeff Travillion (Pct 1) Extend Braker Lane form Samsung Blvd to Harris Branch Park as a 4-lane arterial. Dormant. COA participation required to complete design.
Roadway Started Mo Mortazavi, P.E. 512-854-7589
Bridge #109; Boyce Lane Jeff Travillion (Pct 1) Replace or rehabilitate bridge by TxDOT Bridge Design Mo Mortazavi, P.E. 512-854-7589
Bridge #113; Old Manor Road Jeff Travillion (Pct 1) Build new parallel bridge and rehab existing bridge. Bridge Completed Mo Mortazavi, P.E. 512-854-7589
Bridge #126 on Lund Carlson Jeff Travillion (Pct 1) Replace existing Bridge 126 on Lund Carlson with a new bridge.
Bridge Design Mo Mortazavi, P.E. 512-854-7589
Bridge #136; Lund Carlson Road Jeff Travillion (Pct 1) Replace or Rehabilitate bridge by TxDOT Bridge Completed Mo Mortazavi, P.E. 512-854-7589
Bridge #154; Old Highway 20 Jeff Travillion (Pct 1) Replace existing bridge with a new 2-lane bridge Bridge Completed Mo Mortazavi, P.E. 512-854-7589
Bridge #155; Old Highway 20 Jeff Travillion (Pct 1) Replace existing bridge with a new 2-lane bridge. Bridge Completed Mo Mortazavi, P.E. 512-854-7589
Bridge #229; Weiss Lane Brigid Shea (Pct 2) Bridge replaced by Pflugerville. Bridge Completed Mo Mortazavi, P.E. 512-854-7589
Bridge #302; Old San Antonio Road Gerald Daugherty (Pct 3) New parallel 2-lane bridge. Bridge Design Mo Mortazavi, P.E. 512-854-7589
Bullick Hollow @ FM2769 Gerald Daugherty (Pct 3) Add Left Turn Lane on westbound Bullick Hollow at The Intersection of FM2769.
Roadway Completed Chiddi N’Jie, P.E. (512) 854-7585
Bullick Hollow Road Safety Improvements Brigid Shea (Pct 2) From Oasis Bluff Dr to FM2769, spot shoulder improvements for bike\safety.
Roadway Construction Miguel Villarreal, P.E. 512-854-7586
Bullick Hollow Road Safety Improvements Gerald Daugherty (Pct 3) From Oasis Bluff Dr to FM2769, spot shoulder improvements for bike\safety.
Roadway Construction Miguel Villarreal, P.E. 512-854-7586
Caldwell Lane at River Timber Jeff Travillion (Pct 1) This project consists of the installation of cross culverts at the low point of the road at the bend, and a drainage easement with a drainage channel from the ROW to the high bank of the Colorado River.
Drainage Design Miguel Villarreal, P.E. 512-854-7586
Caldwell Lane Drainage Margaret Gomez (Pct 4) Construct erosion protection dike for Caldwell Lane at Lower Colorado River
Drainage Completed Tony Valdez, P.E. 512-854-7567
Cameron Road Improvements Brigid Shea (Pct 2) Widen and realign existing 2-lane road to 4-lane divided arterial with bike lanes and sidewalk from Gregg Lane to SH 130
Roadway Pre-Construction
Chiddi N’Jie, P.E. (512) 854-7585
3
Monday, June 15, 2020
Project Precinct Description Type Status Project Manager Contact Number
Cameron Road Improvements Jeff Travillion (Pct 1) Widen and realign existing 2-lane road to 4-lane divided arterial with bike lanes and sidewalk from Gregg Lane to SH 130
Roadway Pre-Construction
Chiddi N’Jie, P.E. (512) 854-7585
Circle Drive Safety Improvements Gerald Daugherty (Pct 3) Bike/shoulder safety improvements, at spot locations, From HWY 290 to Thomas Springs Rd
Roadway Construction Miguel Villarreal, P.E. 512-854-7586
Circle Drive/US 290W Intersection Improvements
Gerald Daugherty (Pct 3) Realign Spring Valley Drive at Circle Drive and US 290W Roadway Completed Tony Valdez, P.E. 512-854-7567
Citation Avenue Drainage retrofit Margaret Gomez (Pct 4) Improve drainage of current areas in Thoroughbred Farms neighborhood
Drainage Design Tony Valdez, P.E. 512-854-7567
County Line Road at Elm Creek Jeff Travillion (Pct 1) Replace undersized bridge and adjacent structure on County Line Road where Elm Creek crosses.
Bridge Not Started Miguel Villarreal, P.E. 512-854-7586
Decker Lake Road (Public-Private-Public) Jeff Travillion (Pct 1) Extend Decker Lake Road from FM 973 to SH 130 SB Frontage Road
Roadway Completed Tony Valdez, P.E. 512-854-7567
Decker Lane / Hog Eye Sidewalk Jeff Travillion (Pct 1) Construct sidewalk on Hog Eye Road from Decker Lane to Community First Village.
Pedestrian Completed Odette Tan, P.E. 512-854-7587
Decker Lane Sidewalk Jeff Travillion (Pct 1) Construct a five foot wide by 1.63 mile concrete sidewalk within existing right-of-way along the west side of Decker Lane (FM 3177) from Loyola Lane to Daffan Lane.
Pedestrian Completed Odette Tan, P.E. 512-854-7587
Deer Creek Substandard Roads (Lake Park, Lake Beach & Lake Shore)
Gerald Daugherty (Pct 3) Improve Lake Park Dr, Lake Beach Dr and Lake Shore Dr in Deer Creek Subdivision to meet County Substandard Road standards.
Roadway Completed Katharine Hardin, P.E. (512) 854-7598
East Metro Park Community Pavilion Foundation Repair
Jeff Travillion (Pct 1) Structural evaluation of Community Pavilion building and design for structural foundation repair
Park Design Odette Tan, P.E. 512-854-7587
Ed Acklin Rd @ unnamed tributary Jeff Travillion (Pct 1) Drainage structures to replace undersized culverts Drainage Construction Miguel Villarreal, P.E. 512-854-7586
El Rey Boulevard Sidewalk Gerald Daugherty (Pct 3) Construct sidewalk along El Rey Blvd. from US 290W to Espanola Trail
Pedestrian Completed Katharine Hardin, P.E. (512) 854-7598
Elroy Road at FM 812 Margaret Gomez (Pct 4) Design and construction of one additional southbound lane on Elroy Road at the intersection of FM 812
Roadway Completed Odette Tan, P.E. 512-854-7587
Elroy Road widening Margaret Gomez (Pct 4) Reconstruction of Elroy Road between McAngus Rd and Kellam Rd from 2 lanes to 4 lanes divided, with shoulders and sidewalks.
Roadway Construction Chiddi N’Jie, P.E. (512) 854-7585
Fitzhugh Road Gerald Daugherty (Pct 3) Add shoulders on both sides of Fitzhugh Road from US290 to 2.9 miles west to Travis County Line
Roadway Design Chiddi N’Jie, P.E. (512) 854-7585
4
Monday, June 15, 2020
Project Precinct Description Type Status Project Manager Contact Number
Flint Rock Road Gerald Daugherty (Pct 3) Widen/Safety Improvements on Flint Rock Road from RM620 to Serene Hills Drive
Roadway Completed Tony Valdez, P.E. 512-854-7567
FM 1626 Improvements Gerald Daugherty (Pct 3) Improve FM 1626 to 4-lane arterial with center turn lane, paved shoulders/bike lane and sidewalk from west of Bear Creek Bridge to FM 2304
Roadway Pre-Construction
Tony Valdez, P.E. 512-854-7567
FM 969 Improvements (TxDOT Pass-Through Toll Finance), Phase I
Jeff Travillion (Pct 1) Improve FM 969 to 4-lane arterial with center turn lane, paved shoulders and sidewalk from FM 3177 to FM 973
Roadway Construction Miguel Villarreal, P.E. 512-854-7586
FM 969 Improvements (TxDOT Pass-Through Toll Finance), Phase II
Jeff Travillion (Pct 1) Improve FM 969 to 4-lane arterial with center turn lane, paved shoulders and sidewalk from FM 973 to Hunters Bend Road
Roadway Design Miguel Villarreal, P.E. 512-854-7586
FM 973 to Blake Manor Road Connector Jeff Travillion (Pct 1) New 4-lane arterial from FM973 to Blake Manor Road Roadway Design David Greear, P.E. (512) 854-7650
Fort Smith Trail Substandard Road Gerald Daugherty (Pct 3) Improve Fort Smith Trail off Debba Drive for acceptance into County maintained roadway system
Roadway Completed Miguel Villarreal, P.E. 512-854-7586
Frate-Barker Road Gerald Daugherty (Pct 3) Reconstruction of two lane road to a four lane divided roadway section from Brodie Lane to Manchaca Road with bike lanes and sidewalks.
Roadway Completed Chiddi N’Jie, P.E. (512) 854-7585
Frate-Barker Road Margaret Gomez (Pct 4) Reconstruction of two lane road to a four lane divided roadway section from Brodie Lane to Manchaca Road with bike lanes and sidewalks.
Roadway Completed Chiddi N’Jie, P.E. (512) 854-7585
Gilbert Road Extension Jeff Travillion (Pct 1) Extend Gilbert Road from FM 969 to Austin's Colony Roadway Completed Miguel Villarreal, P.E. 512-854-7586
Grand Avenue Parkway - GAP Brigid Shea (Pct 2) Construct four lane roadway with bike lanes and sidewalks from Bratton Lane westward toward existing 4 lane section of Grand Avenue Parkway at Crissom Lane
Roadway Design David Greear, P.E. (512) 854-7650
Great Divide @ Little Barton Creek (evaluation only)
Gerald Daugherty (Pct 3) Study only. Conceptual evaluations of preliminary design alternatives and receive community feedback.
Drainage Completed Miguel Villarreal, P.E. 512-854-7586
Great Divide bridge Gerald Daugherty (Pct 3) Bridge structure to replace undersized culverts at low water crossing
Bridge Not Started Mo Mortazavi, P.E. 512-854-7589
Gregg Ln at Wilbarger Creek Jeff Travillion (Pct 1) Replace undersized culvert Drainage Design Katharine Hardin, P.E. (512) 854-7598
Hamilton Pool Road Safety Improvements 1 Gerald Daugherty (Pct 3) Phase I of Safety Improvements along Hamilton Pool Road; replacement of the Bridge over Hamilton Creek and addition of Turn Lanes at the Entrance to the Hamilton Pool Preserve and Stage Coach Rd.
Roadway Completed Chiddi N’Jie, P.E. (512) 854-7585
5
Monday, June 15, 2020
Project Precinct Description Type Status Project Manager Contact Number
Hamilton Pool Road Safety Improvements, Phase II
Gerald Daugherty (Pct 3) Various identified safety improvements from RR 12 to the top of the East bank of the Pedernales River
Roadway Not Started Chiddi N’Jie, P.E. (512) 854-7585
Harold Green Extension Jeff Travillion (Pct 1) Extend Harold Green Road from SH130 eastward to Austin's Colony as a 2 lane arterial with bike lanes and sidewalks
Roadway Design Miguel Villarreal, P.E. 512-854-7586
Highland Boulevard (Public-Private) Gerald Daugherty (Pct 3) Extend Highland Boulevard from Rough Hollow Drive to Bee Creek Road
Roadway Completed Tony Valdez, P.E. 512-854-7567
Hodde Lane Roadway Realignment Jeff Travillion (Pct 1) Realign roadway Roadway Design Mo Mortazavi, P.E. 512-854-7589
Hog Eye Rd @ Harris Branch Creek Jeff Travillion (Pct 1) Drainage Structure to replace undersized culverts. Drainage Design Katharine Hardin, P.E. (512) 854-7598
Hog Eye Rd @ Trib to Harris Branch Crk Jeff Travillion (Pct 1) Drainage structure to replace undersized culvert Drainage Design Katharine Hardin, P.E. (512) 854-7598
Howard Lane I Brigid Shea (Pct 2) Reconstruction of a two-lane road to a four-lane divided curb and gutter road with sidewalks and bicycle lanes from Dessau Road to Cameron Road
Roadway Completed Chiddi N’Jie, P.E. (512) 854-7585
Howard Lane II (Public-Private-Public) Jeff Travillion (Pct 1) Extend Howard Lane from Cameron Road to SH 130 Roadway Completed Chiddi N’Jie, P.E. (512) 854-7585
Hunters Bend sidewalk Jeff Travillion (Pct 1) A new sidewalk along Hunters Bend Road between Austin's Colony Boulevard and Red Tail Trail
Pedestrian Completed Katharine Hardin, P.E. (512) 854-7598
Jesse Bohls (Design and ROW only) for Realignment and improvements
Jeff Travillion (Pct 1) Engineering and ROW for the realignment of Jesse Bohls at Weiss Lane to align with E. Pflugerville Pkwy as a 2 lane roadway with shoulders from Weiss to approximately 1 mile east then continue with added shoulders to Cameron
Roadway Started Chiddi N’Jie, P.E. (512) 854-7585
Jesse Bohls Road Bridge (#231) Brigid Shea (Pct 2) Replace bridge and realign approaching roadway Bridge Completed Mo Mortazavi, P.E. 512-854-7589
Kellam Road Margaret Gomez (Pct 4) Two lane divided road being 1st phase of a planned four lane divided road with sidewalk and associated bridges and water quality ponds.
Roadway Completed Chiddi N’Jie, P.E. (512) 854-7585
Kimbro Road/Parsons Road Bridge (#164) Jeff Travillion (Pct 1) Replace bridge and realign approaching roadway Bridge Completed Mo Mortazavi, P.E. 512-854-7589
Lake Oak Estates (CDBG) Gerald Daugherty (Pct 3) Reconstruct substandard roads - Cavalier Canyon Drive, Bowling Lane, Holly Lane
Roadway Completed Katharine Hardin, P.E. (512) 854-7598
Ledgestone Terrace at Pen Creek Trib Gerald Daugherty (Pct 3) Drainage Structure to replace undersized culvert Drainage Design Miguel Villarreal, P.E. 512-854-7586
Linden Rd at Maha Creek Margaret Gomez (Pct 4) Replace and raise undersized bridge and culverts Drainage Design Mo Mortazavi, P.E. 512-854-7589
Littig Road Bridge #161 Jeff Travillion (Pct 1) replace functionally obsolete bridge structure that is load posted with new bridge.
Bridge Design Mo Mortazavi, P.E. 512-854-7589
6
Monday, June 15, 2020
Project Precinct Description Type Status Project Manager Contact Number
Lost Creek Sidewalk Gerald Daugherty (Pct 3) Construct sidewalks within Lost Creek MUD (public-public partnership)
Pedestrian Completed Katharine Hardin, P.E. (512) 854-7598
Manda Carlson Road Bridge #134 Jeff Travillion (Pct 1) Replace functionally obsolete bridge with new bridge Bridge Design Mo Mortazavi, P.E. 512-854-7589
McKinney Falls Parkway Extension Margaret Gomez (Pct 4) Construct 4-lane divided road from William Cannon Drive to Thaxton Lane with bike lanes and sidewalks, plus a 48" waterline (for City of Austin), and reconstruction of Thaxton Lane..
Roadway Completed Chiddi N’Jie, P.E. (512) 854-7585
McKinney Falls Parkway Pedestrian Way Margaret Gomez (Pct 4) Construct pedestrian way on west side from William Cannon Drive to McKinney Falls State Park
Pedestrian Completed Mo Mortazavi, P.E. 512-854-7589
McNeil Road Drainage Improvements Brigid Shea (Pct 2) Drainage improvements to relieve McNeil Drive between Howard Lane and Ashton Wood Dr from flooding
Drainage Design Miguel Villarreal, P.E. 512-854-7586
Moya Park - Moore's Crossing Bridge Repair Margaret Gomez (Pct 4) Repair Moore's Bridge Crossing that was damaged during the October 2015 floods
Park Completed Odette Tan, P.E. 512-854-7587
Northeast Metro Park BMX Site Improvements
Brigid Shea (Pct 2) Parking, restroom, utilities & misc. improvements for BMX track site
Park Completed Odette Tan, P.E. 512-854-7587
Northeast Metro Park Soccer Field Improvements
Brigid Shea (Pct 2) Convert 4 soccer fields to synthetic turf, install sports lighting, and build associated improvements
Park Construction Odette Tan, P.E. 512-854-7587
Northeast Metro Park South Entrance Road Brigid Shea (Pct 2) Construction of new park entrance road from Wells Branch Parkway to the park including hike and bike trail, Bridge, and parking facilities.
Roadway Completed Chiddi N’Jie, P.E. (512) 854-7585
Northeast Metro Phase III Amenity Center Brigid Shea (Pct 2) Construct an amenity center with playscape, shed, restroom, parking, etc.
Park Completed Miguel Villarreal, P.E. 512-854-7586
Northeast Metro Phase III Skate Park Brigid Shea (Pct 2) Construct a skate park Park Completed Miguel Villarreal, P.E. 512-854-7586
Old Lockhart Road Shoulders Margaret Gomez (Pct 4) Add shoulders on both sides of Old Lockhart Road from Slaughter Lane to Thaxton Road
Roadway Started Katharine Hardin, P.E. (512) 854-7598
Old Manor Road Safety Improvements Jeff Travillion (Pct 1) Improve the existing 2 lane roadway and add shoulders from Ferguson cut-off Rd to Johnny Morris Rd and add left turn lanes at major intersections
Roadway Design Chiddi N’Jie, P.E. (512) 854-7585
Old San Antonio Road shoulders Gerald Daugherty (Pct 3) Add shoulders on both sides of Old San Antonio Road from FM1626 to Hays County Line
Roadway Started Katharine Hardin, P.E. (512) 854-7598
7
Monday, June 15, 2020
Project Precinct Description Type Status Project Manager Contact Number
Onion Creek Greenway II Margaret Gomez (Pct 4) Design and construction of a major shared–use trail, recreational facilities and support infrastructure on Travis County-owned land from Satellite 4 Office to the confluence of Onion Creek with the Colorado River.
Park Design Odette Tan, P.E. 512-854-7587
Onion Creek Greenway Phase III Margaret Gomez (Pct 4) Design and construction of a concrete hike and bike trail from Richard Moya Park to Barkley Meadows Park.
Park Design Odette Tan, P.E. 512-854-7587
Onion Creek Greenway, Phase 1A Margaret Gomez (Pct 4) Hike and Bike Trail from FM 973 to SH 71 Park Completed Miguel Villarreal, P.E. 512-854-7586
Pace Bend Park Boat Ramp Gerald Daugherty (Pct 3) Construction of a new boat ramp Park Completed Miguel Villarreal, P.E. 512-854-7586
Park Boat Ramp Renovations Margaret Gomez (Pct 4) Reconstruction of two (2) boat ramps located at Webberville and Little Webberville Parks.
Park Completed Odette Tan, P.E. 512-854-7587
Park West Drainage Improvements Gerald Daugherty (Pct 3) Drainage improvements at the Parks West Office in Precinct 3
Drainage Completed Odette Tan, P.E. 512-854-7587
Parmer Lane Extension Phase IIB (Public-Private-Public)
Jeff Travillion (Pct 1) Extend Parmer Lane from Cap Metro Railroad ROW to Braker Lane Extension
Roadway Completed Tony Valdez, P.E. 512-854-7567
Pearce Lane Widening Margaret Gomez (Pct 4) Widen Pearce Lane from Kellam Road to the Bastrop County Line at Wolf Lane. Also add left turn lanes on Pearce at approaches to intersection with Kellam Road
Roadway Design Tony Valdez, P.E. 512-854-7567
Pedernales Canyon Trail @ Lick Creek Gerald Daugherty (Pct 3) Drainage structure to replace undersized culverts Bridge Not Started Katharine Hardin, P.E. (512) 854-7598
Quinlan Park Road Improvements Brigid Shea (Pct 2) Construct center turn lane from Bella Mar Trail to Tierra Grande Trail
Roadway Completed Miguel Villarreal, P.E. 512-854-7586
Rancho Alto Road Substandard Road Gerald Daugherty (Pct 3) Improve 500' of Rancho Alto Rd north of FM 1626 to meet County standards for acceptance into County maintained road system
Roadway Completed Tony Valdez, P.E. 512-854-7567
Road Reconstruction/ Recycle Jeff Travillion (Pct 1) Recycle in place various roads in Pct 1 & Pct 4, Burleson-Manor, Rodriguez, Laws, Eiler and Maha Loop Roads
Roadway Completed Katharine Hardin, P.E. (512) 854-7598
Road Reconstruction/ Recycle Margaret Gomez (Pct 4) Recycle in place various roads in Pct 1 & Pct 4, Burleson-Manor, Rodriguez, Laws, Eiler and Maha Loop Roads
Roadway Completed Katharine Hardin, P.E. (512) 854-7598
Ross Road North Auxiliary Lane Margaret Gomez (Pct 4) Add Pedestrian Signal & Auxiliary Ln from St. Thomas Dr to the northernmost driveway of Del Valle High School SEE DRONE VIDEO of completed project at: https://www.dropbox.com/s/8qupxv419be5q0r/Ross%20rd%20final%20video.MOV?dl=0
Roadway Completed Chiddi N’Jie, P.E. (512) 854-7585
8
Monday, June 15, 2020
Project Precinct Description Type Status Project Manager Contact Number
Ross Road South Margaret Gomez (Pct 4) Widen the existing 2 lane roadway to a 3 lane divided roadway with bike lanes and sidewalks from Pearce Lane to Heine Farm Road
Roadway Design Chiddi N’Jie, P.E. (512) 854-7585
Rowe Lane Safety Improvements Jeff Travillion (Pct 1) Safety improvements from SH 130 to Martin Lane Roadway Completed Mo Mortazavi, P.E. 512-854-7589
Sandy Beach Road Substandard Road Gerald Daugherty (Pct 3) Improve 1300' of Sandy Beach Road between Deer Creek Skyview and Lake Shore Dr to meet County standards
Roadway Completed Miguel Villarreal, P.E. 512-854-7586
Slaughter Lane East Extension Margaret Gomez (Pct 4) Extend Slaughter from Goodnight Ranch to Thaxton Road Roadway Construction Mo Mortazavi, P.E. 512-854-7589
Slaughter Lane Extension - Goodnight Margaret Gomez (Pct 4) Extend Slaughter from Bluff Springs thru Goodnight Ranch Roadway Completed Mo Mortazavi, P.E. 512-854-7589
Slaughter Lane-Goodnight Phase II Margaret Gomez (Pct 4) Design of W. Bound lanes of Slaughter Lane between Old Lockhardt and Vertex Blvd. Construction By Developer
Roadway Started Mo Mortazavi, P.E. 512-854-7589
South Pleasant Valley Road Margaret Gomez (Pct 4) Construct a new 4-lane divided roadway with bike lanes and sidewalks from FM1327 to Bradshaw Road approximately 1,000 feet south of River Plantation Drive
Roadway Design Tony Valdez, P.E. 512-854-7567
Spicewood Springs Low Water Crossing #1 Gerald Daugherty (Pct 3) Replace low water crossing with new bridge at the location of low water crossing #1
Bridge Design Mo Mortazavi, P.E. 512-854-7589
Springdale Road Sidewalk Jeff Travillion (Pct 1) Add sidewalk along the west side of Springdale Road from Ferguson Lane to US290
Pedestrian Design Odette Tan, P.E. 512-854-7587
Steiner Ranch Area Evacuation Brigid Shea (Pct 2) The Steiner Ranch Area Evacuation project is identified as a critical safety project. This project will address a needed evacuation route out of the Steiner Ranch area, located in Precinct 2.
Roadway Design Katharine Hardin, P.E. (512) 854-7598
Steiner Ranch Blvd/FM 620 Intersection Study
Brigid Shea (Pct 2) Preliminary engineering study for Steiner Ranch/FM 620 intersection improvements
Roadway Completed Miguel Villarreal, P.E. 512-854-7586
Tandem Blvd Improvements Brigid Shea (Pct 2) Improve Tandem Blvd between Mopac Expy and Well Branch Pkwy to meet County Substandard Road standards.
Roadway Completed Odette Tan, P.E. 512-854-7587
Taylor Lane Jeff Travillion (Pct 1) Widen 2-lane road to 4-lane arterial from Braker Lane extension to Blake Manor Road
Roadway Design Tony Valdez, P.E. 512-854-7567
Thaxton Road Margaret Gomez (Pct 4) Widen existing 2 lane roadway to a 4 lane roadway with bike lanes and sidewalks from McKinney Falls Pkwy to Sassman Rd
Roadway Design Chiddi N’Jie, P.E. (512) 854-7585
Thomas Springs Rd at Circle Drive LTL Gerald Daugherty (Pct 3) Add left turn lane on eastbound Circle Drive at Thomas Springs Road
Roadway Pre-Construction
Chiddi N’Jie, P.E. (512) 854-7585
9
Monday, June 15, 2020
Project Precinct Description Type Status Project Manager Contact Number
Thomas Springs road widening Gerald Daugherty (Pct 3) Add 6' shoulders on Thomas Springs from Circle Drive to SH71
Bike Design Tony Valdez, P.E. 512-854-7567
Tom Sassman Rd at Maha Creek Margaret Gomez (Pct 4) Construct Bridge to replace existing culverts Bridge Design Mo Mortazavi, P.E. 512-854-7589
Tumbleweed Trail @ Trib to Lake Austin Gerald Daugherty (Pct 3) Replace the existing 36" concrete pipe with a larger structure in order to reduce roadway overtopping during storm events.
Drainage Design Chiddi N’Jie, P.E. (512) 854-7585
Tuscany South-Springdale Jeff Travillion (Pct 1) Extend Tuscany Way as a four lane divided curb and gutter road from US290 E to Springdale Road
Roadway Completed Chiddi N’Jie, P.E. (512) 854-7585
Webberville Park Maintenance Facility Jeff Travillion (Pct 1) New maintenance facility at Webberville Park Park Construction Odette Tan, P.E. 512-854-7587
Weiss Lane Improvements Jeff Travillion (Pct 1) Safety improvements from Pecan Street to Cele Road Roadway Construction Mo Mortazavi, P.E. 512-854-7589
Wells Branch Parkway Comprehensive Study Brigid Shea (Pct 2) Evaluate and improve safety, roadway geometrics and signal coordination and efficiency along Wells Branch Parkway from IH35 to Loop 1
Roadway Design David Greear, P.E. (512) 854-7650
Wells Branch Parkway Extension I & II Brigid Shea (Pct 2) Widen Wells Branch Parkway to four lanes between Immanuel Rd and its terminus at killingsworth Ln (West) , and extend new four lane divided road approximately 1 mile to it intersection with Killingsworth Lane (East), all with bike lanes and sidewalks.
Roadway Completed Chiddi N’Jie, P.E. (512) 854-7585
Wells Branch Parkway Extension III Brigid Shea (Pct 2) Extension of 4-lane divided roadway with bike lanes and sidewalk from Killingsworth Lane to Cameron Road.
Roadway Design Chiddi N’Jie, P.E. (512) 854-7585
Wells Branch Pkwy @ Howard Lane Brigid Shea (Pct 2) Improve/extend left turn lanes on Wells Branch Parkway between Mopac and Howard Lane intersections.
Roadway Construction Miguel Villarreal, P.E. 512-854-7586
Wells Branch W-2A Substandard Roads Brigid Shea (Pct 2) Improve substandard roads - Rick Whinery Dr, Quiet Pond Ct, Emmett Pkwy
Roadway Completed Katharine Hardin, P.E. (512) 854-7598
Westminster Glen Sidewalk Brigid Shea (Pct 2) Install sidewalk on one side of Westminster Glen Avenue from City Park Road to Narrow Ridge Drive.
Pedestrian Construction Odette Tan, P.E. 512-854-7587
Wildhorse Connector Jeff Travillion (Pct 1) New 4-lane Divided Arterial Road from Parmer Lane to FM 973
Roadway Not Started Chiddi N’Jie, P.E. (512) 854-7585
William Cannon Drive Phase 2 Margaret Gomez (Pct 4) New 4-lane arterial from McKinney Falls Parkway to US 183
Roadway Design Tony Valdez, P.E. 512-854-7567
10
Monday, June 15, 2020
Project Precinct Description Type Status Project Manager Contact Number
Wyldwood Rd at Slaughter Creek Gerald Daugherty (Pct 3) In the procurement process for design phase services. The study has been completed, including evaluating conceptual culvert replacement designs and gathering community feedback.
Drainage Not Started Miguel Villarreal, P.E. 512-854-7586
11
Monday, June 15, 2020