PT. PILAR BAHTERA MANDIRI
Mandiri
COMPANY PROFILE
Rukan Mangga Dua Square Blok E No. 22, Jl. Gunung Sahari Raya, Jakarta 14420 - IndonesiaPhone : +62 (0)21 6231 3622 / +62 (0)21 6231 3655 Fax : +62 (0)21 6231 1408 www.pilarbahteramandiri.com
PT. Pilar Bahtera Mandiri is known to have provided unparalleled attention and excellent after sales service support to its large customer base. We are proud to be known as our motto "Fullfill our commitment to Technology Leadership and Customer Satisfaction".
We are well known among the prestigious companies such as: Newmont Nusa Tenggara, Indonesia Power, Shell Indonesia, Orica, Pertamina, Rekayasa Industri, PLN, Tripatra, Angkasa Pura, Wijaya Karya, Nindya Karya, ABB, Areva, Geodipa, IKPT, Pertamina Geothermal Energy, Biznet Networks, JGC, Gunanusa, Krakatau Engineering, PGN, Semen Gresik, Holcim, Elnusa, Saipem, Suar Alam Engineering, Sulzer, Wasamitra, Yudhistira, Frisian Flag, Unilever, Ancol, etc
We realize that we were expected to provide ongoing and endless service support to our esteem customer. Supported by factory accredited technical team, having their skill and experience developed over the years, Pilar Bahtera Mandiri is your reliable partner for ensuring your process plant, equipment reliability and product quality. You can have complete assurance in our after sales service and support delivered to the highest standard with superior performance.
PT. Pilar Bahtera Mandiri, a member of Pilar Bahtera Group, offers a total design consultancy, pre-installation planning services, installation commissioning, after sales technical support and South East Asian through our network of associate and representative overseas.
Kind regards,
Ir. Herry Sofyan President Director
COM
PANY
INTR
ODUC
TION
Pilar Bahtera Group is multi corporations in field of electrical, civil construction, mechanical, and engineering company. One of Pilar company, Pilar Bahtera Mandiri started from industrial pump specialist providing industrial pump product, service and maintenance. In 2010, the project scope was expanded to water treatment contract thus water treatment division had been assembled.
BUSI
NESS
COR
E
Delivering and Installation of Industrial transfer Pump (API, ANSI and Non-API Standard) c/w driver
Delivering and Installation of submersible water pump
Delivering and Installation of fire pump
Delivering and Installation of gas compressors
Delivering and Installation of water treatment package (WWTP, WTP, STP, SWRO, BWRO, UF)
ORGA
NIZA
TION
PT. P
ILAR
BAH
TERA
MAN
DIRI
ORGA
NIZA
TION
STR
UCTU
RE
PROJ
ECT
HAND
LING
Upon awarded of contract, Pilar Bahtera Group will assign a project Management team exclusively concentrated to execute the project in accordance with the client requirement. The team will be lead by Pilar Bahtera's experienced project manager supported by experienced staff and local partners in where the works are carried out.The Project Manager will be assigned, fully authorized and responsible for all aspect of the project since start up to completion and commissioning, This includes all works required to proceed with the project execution i.e. planning, scheduling, finance, costing, monitoring, analyzing, engineering, purchasing, inspection, shipping, logistic, fabrication, erection, testng and commissioning.The Project Manager with task force teams will be directly responsible to client and his consultants on a daily basis and will be directly responsible to client and his consultants on a daily basis and will be working along with customer's project management team to ensure the successful completion of the project.
Pilar Bahtera Group will make maximum effort to proceed with the procurement on time as scheduled to ensure timely completion. The procurement manager will be assigned to handle all aspect of procurement of equipment.On receipt of equipment specification from engineering departement, procurement manager will invite quotation from the listed vendors as per contract document. Once offer is received, same will be technically evaluated by engineering to ensure the equipment is being supplied as per requirement of the contract specification. Commercial portion of the offer will be evaluated by main office procurement manager. After final negotiation, order will follow with various technical documents and ensure timely execution/delivery of equipment.Considering the project schedule, main office procurement team will proceed with the following:? Purchase / Procurement of equipments / components? Provide all necessary expediting to ensure time delivery
After the due process of contract awarded our Project Manager will conduct a kick off meeting to make sure that fabrication will done correctly by our highly crafted Fabrication team. Some of the point discussed here are:
Preparation schedule for various equipment and component in line with project schedule.Procurement of raw material such as structual steel section plates, electronic components, mechanical parts, etc.Organizing required procedure before commencement of fabrication as per requirement of the contract.Expediting the fabrication progress,coordination with project management team,engineering and various shop floor manager for time delivery of components.
�
�
�
�
PROJECT MANAGEMENT
PROCUREMENT
FABRICATION
PT. P
ILAR
BAH
TERA
MAN
DIRI
ORGA
NIZA
TION
STR
UCTU
RE
Ir. PrabowoManaging Director
COM
PANY
POL
ICY
DIAMOND RIBBON SERVICE PACKAGE (DRSP) FOR OUR PRODUCT AND SERVICES PORTO FOLIO
We realize from the beginning that service is a key issue of all equipments that belong to our portfolio whose purposes are to enhance availability, performance and maintain reliability of the critical systems.
It is our commitment to maintain a network of customer support engineers throughout Indonesia and overseas. This would enables us to not only meet our customer's response time needs, but also to meet those needs with factory trained, professional engineers completely qualified to service all range of our product and services.
The backup the above commitment, we proudly represent our DRSP supported by our engineering division and our main dealers.
This service package mainly consist of the following basic program as follows: Preliminary Inspection, Equipment Start-up, After Sales Service Commitment, Assured Maintenance, Training Program, Spare-Parts Inventory and 24 hours hot line service.
PRELIMINARY INSPECTION
EQUIPMENT START-UP
AFTER SALES SERVICE
SERVICE COMMITMENT
Most of equipments belong to our portfolio are imported from overseas Principals. Although those units have gone through final factory test and carry their own test certificate, we do aware that those units have experienced a long trip to our warehouse.
For this reason we feel the necessity to do the preliminary inspection on every unit we received, to make sure that those units are in good condition as far as electrical and physical properties is concerned.
Thanks to our Principals for their reliable units and excellent export packing.
Every units will be tested in our workshop prior delivery to site location. This standard procedure would consist of measuring, testing, calibration, etc, to make sure that the unit works properly according to the manufacturer standard specifications.
Our factory trained customer support engineers would provide on-site start-up supervision for all products range that belong to our business. This supervision assures customer that:- All inspections and test are performed prior to start-up.- On-site personnel are trained in operating and trouble-shooting procedures- The equipment is operating according to specification before power is applied to the critical load
For every units installed, we provide the highest standard of quality and diligent in after sales servicing within the 12 months warranty period. This after sales covers the following:1. Routine maintenance visit once every three months to make sure that the unit is in proper order and works according to the specification given.2. Repair visit during emergency and stock spare-parts3. Free replacement to any defective parts during warranty period4. On-site training for field operator.
The most important part of our Diamond Ribbon Service Package being our service commitment. We are committed to provide two hours
response time for Jabodetabek area, 1 day response time for Java Island and first available flight for exceed of Java and Indonesia (South East Region) during emergency with one hour mean time to repair (MTTR).
To fulfill our commitment due to additional request from valuable customer, we also absorb a change to develop local site for quick maintenance due to high necessary.
After the warranty period, we offer customer our assured maintenance contract at a friction cost, handles by our high skill factory trained customer engineers which assure the customer for the following securities:1. Assurance on the system availability.2. Continued first priority support on service spare-parts availability.3. Protection from un-expected budget in case of any failure, which in most cases would greatly exceed the assured maintenance cost.4. Maintaining a higher salvage value in case of trade in.
The assured maintenance would cover the following task :
1. Two to four times a year scheduled maintenance visits.2. Committed response time in the event of equipment emergencies.
3. Free replacement of any defectives parts.4. Incorporation of any field modification necessary to ensure equipment performance.5. Free training for new operator.
In addition to the training normally included with equipment start-up, more detail comprehensive training course has also available on-site, at our office or even at our factory work shop.
The main idea behind this training program, besides to meets customer's maintenance personnel needs, is also become our human resources tool which is provide us with periodic supply of customer support engineers to meet our system installation growth.
We committed herewith that we would keep all spare parts available within 10 years time after the particular model were discontinued in our inventory for emergency requirement.
However for the customer in remote area, we encouraged our customers to maintain on-site inventory of the specific spares. Recommended list are available to our product ranges.
We maintain an around the clock hot-line which puts the customer in contract with an experience technical representative. In the event of an emergency, this person is qualified to diagnose the problem on the phone, ship the emergency parts on the next available flight and dispatch a field and dispatch a field engineer to the as required.
Our technical representative would be available through the following special number:Service Hotline: +62 21 6231 3622 / 55 Obviously, we can be reached at the following regular number during office hour:1. Phone no. :+[62] (21) 6231 3622 / 55 (hunting)2. Facsimile no. :+[62] (21) 6231 1408
ASSURED MAINTENANCE
TRAINING PROGRAM
SPARE-PARTS INVENTORY
24 HOURS HOT LINE SERVICES
PUM
P DI
VISI
ON
REDDY BUFFALOES FIRE PUMPS (USA)
Reddy Buffaoes Pump (USA) is a world leader in manufactured UL listed and FM approved fire pumps. As Indonesia sole agent of R-B pumps, We have professional engineers supported by mechanical & electrical skill and tools to ensure the best quality and performance
5-Year Warranty is grantedfor our fire pump products such as :- Horizontal split case pump- Vertical inline pump (ANSI)- Vertical turbine
Our scope of business includesPumps supply, repairs, maintenance and providing accessories & spare parts
ROTECH PUMPS (CANADA)
Supported by Rotech.co, Ontario Canada, we provide a wide range of pump products, including ANSI, self-priming, and multistage pumps
PUMPSENSE PUMPS
A wide range of pump choice were available from ANSI, API, self priming pumps, and more, provided by Pumpsense.corp
Contact us to get more information about our products, such as fire pumps, ANSI,API standard, and a wide range of pump choice
Control panel supply, installation, maintenance & repairwere done by well trained technician andengineer supported by advance tools to ensure customer satisfaction
WAT
ER D
IVIS
ION
Pilar Bahtera Group is supported by expert from Diponegoro Water Research & Engineering (DEWARE), Universitas Diponegoro Semarang for plant troubleshooting and water management. Pilar Bahtera Group also gives funding to Deware in research and development of water and wastewater treatment technology.
Dr I Nyoman Widiasa, an expert on the field of water
treatment, membrane system design and operation problem solving (troubleshooting), has more than 10 years experience
in his field and is involved in various projects and research concerning water treatment, water recycling, and membrane.Several industrial cooperation with him as the main consultant involving TKPN Bawen for process water supply, PT Pertamina EP, PT Pertamina UP Cilacap, PT Kaltim fertilizer, water recycling mall with PT Pilar Bahtera Mandiri, and several other industries.Dr I Nyoman Widiasa is currently acting as a faculty
member in the department of chemical engineering, Faculty of Engineering, Diponegoro University (UNDIP), and became
chairman of the Diponegoro Water Research (Deware), where he continued to contribute in the field of water management and
the application of membrane technology to develop sustainable water and water recycling process (re-use of water).
OUR PARTNERS
WATER TREATMENT EXPERT
Our main objective is to expand water recycling, use wastewater as source to produce clean water, thus reduce environmental water source consumption. Waste water can be recovered up to 80%, or further to Zero Waste Disposal level by optimization of sewage treatment plant.- Support Go Green program from the Government- Protect environment water supply- Provide sustainable daily water supply - Cost reduction- Small usage of electricity
OUR OBJECTIVES
As a result of partnership with Universitas Diponegoro, our strong point is to provide problem solving supported by advanced technology and accurate analyzing equipment.
WAT
ER R
ECYC
LING
Water management by Water Recycling- Reduce usage of environmental water source up to 80%- Provide quality water- Sustainable supply of water quantity- Cost reduction
The most important aspect is to change public perception, that in today water crisis, STP effluent is much safer than surface water, and is easier to treated into clean water.
Pilar water management involves integrated technology, which means we do not rely only on single product/technology to solve problems in wastewater plant. The technology preference is different for each plant, thus the existing plant need to be evaluated first by our engineer visit before we can suggest the best technology to fit user needs.The main focus of our work is to reduce environmental water source by water recycling system. Wastewater from foodcourt/kitchen, lavatory, and cooling tower blowdown are treated to meet clean water standard (PERMENKES RI No. 416/MENKES/PER/IX/1990). Further purification to meet drinking water standard is also optional at user preference.The wastewater can be recovered in the range of 80% recovery up to zero waste condition to fit user preference. However, made up water from environmental water source is still needed due water lost in process which cannot be recovered, such as cooling water for chiller unit.
Typical wastewater treatment technology we used are in range of pretreatment technology (grease trap, DAF, screening), biological process (Activated sludge/bioreactor, Rotational Biological Contactor/RBC, Membrane Bioreactor/MBR), post treatment process (Clarifier/Sedimentation, Chemical dosing), and further purification process (Sand filter, Carbon Filter, Ultrafiltration membrane, Reverse Osmosis membrane).
WAT
ER R
EUSE
SCH
EME
Cost covered in our water price :? Repair of Existing equipment o (Blower, electric motor, pump, panel & electrical component)o Pilar Bahtera Group has division which support the mechanical, pump, motors, civil
works and electrical maintenance. Thus we provide fast, free maintenance with best recondition quality
? Maintaining condition of new equipment o Pump, membrane, panel and all of other additional equipment becomes our
responsibilities? Provide 24-hours operator equipped with analysis kito standard operator analysis kit : pH meter, Im hoff, TDS meter, amperemeter o Standard company analysis kit : turbidity meter, multiparameter analyzer? Blower routine maintenance o filter cleaning, fat and oil changing, v-belt maintenance? STP routine maintenance : o FOG(Fat, oil, grease) handling, solid waste discharge, Activated sludge nutrition,
chlorine dosing, cleaning chemicals? Covers cost for routine water analysis o Usually use third party such as IPB or Sucofindo based on Kepmenkes 1990 standard,
once/month for clean water standards, once/6-month for effluent standards? Covers PDAM water / Deep well cost when water quality/quantity has not met
Cost factor we covers :- Plant & Equipment investment- Operator- Maintenance & Service (include equipment repair, daily activity, FOG management)- Spent Chemical (Chlorine & Cleaning chemical)- Electricity (Option between new equipment only or existing equipment included)
PROJ
ECT
REFE
RENC
ES
WATER TREATMENT PLANT
SUPPLY OF EQUIPMENT**Attached in the updated page behindndSSUPPPLAtttac
Y OF EQhed in the updated page b
IDR USD
A
1
ProyekPengembangan Pondok Tengah
Supply 5 unit slurry pump + diesel engine prime mover
Cupuintan
Pertamina EP Pengembangan Pondok Tengah
31-Jan-07 1,700,000,000.00
2 Replacement
SupplyGrindex sump pump for hot water
Kaltim Parna Industri 13-Feb-07 7,252.00
3 Maintenance
SupplyWeldingPower Supply, Weldingtransformer
Jeil Fajar Indonesia 4-Jun-07 38,700,000.00
4 MaintenanceSupply spare part Johnson Pump
Menara Mas 8-Jun-07 36,900,000.00
5 MaintenanceSupply spare part National Oil Well
ElnusaWorkoverServices (EWS)
30-Jul-07 15,165.00
6 Newinvestment
SupplyCentrifugalPump API 610
Pertamina EP Region Jawa 31-Aug-07 26,000.00
7 Newinvestment
SupplyJohnsontransfer pump
Pertamina UP-V Balikpapan 24-Mar-08 215,000,000.00
8 Maintenance Service pump Pertamina UP-V Balikpapan 1-Jun-08 40,000,000.00
9 Newinvestment
SupplyCentrifugalmultistagePump + DEUTZ diesel engine prime mover
Pertamina EP Region Jawa 13-Jun-08 61,392.00
10 ReplacementWater dillution pump (self priming type)
Kaltim Parna Industri 15-Aug-08 127,940,000.00
11 Newinvestment
SupplyCentrifugalPump for chemicalcleaning
Kaltim Parna Industri 22-Aug-08 4,175.00
12 Gresik Oil Terminal
Supplychemical(additive)injectionPump
KrakatauEnginering Shell Indonesia 18-Sep-08 30,500.00
13 Depot BenoaSupplyCentrifugalPump API 610
Baharu Penta Kencana
Pertamina Unit Pemasaran 19-Sep-08 16,850.00
14 Depot BenoaSupply Deutz Generator Set TD226 B6
Baharu Penta Kencana
Pertamina Unit Pemasaran 9-Jan-09 16,850.00
SUPPLY TRANSFER PUMPS
COMPLETED PROJECTS
NO PROJECTNAME
SCOPEDESCRIPTION CONTRACTOR END USER PO DATE
PO VALUE
15
760MW Tj Priok Gas Fired Power Plant ExpansionProject
Supply water transfer pump
Wasa Mitra Engineering
IndonesiaPower UB Tj Priok
16-Jan-09 59,000,000.00
16 MaintenanceSupply gear Pump Brand Koshin
MTU Indonesia 13-Feb-09 6,750,000.00
17Supply Booster CentrifugalPump
Lintas Daya, CV 24-Mar-09 7,000,000.00
18
SupplySouthern Cross Pump + electric motor
ThiessContractorIndonesia
7-Apr-09 8,280.00
19 Depot BenoaSupplyCentrifugalPump API 610
Baharu Penta Kencana 14-Apr-09 18,000.00
20 Maintenance Service pump Kaltim Parna Industri 8-May-09 9,000.00
21 Maintenance Service pump Kaltim Parna Industri 20-May-09 127,940,000.00
22
SupplySouthern Cross Pump + electric motor
ThiessContractorIndonesia
3-Jun-09 5,302.00
22 Gresik Oil Terminal
Supply Diesel Stroge Pump
KrakatauEnginering Shell Indonesia 4-Jun-09 2,250.00
23 Maintenance
SupplySouthern Cross Booster Pump CDLF 16-60
KalimantanMiningServices(Orica)
25-Jun-09 4,015.00
24 Newinvestment
SupplyCentrifugalVertical In-Line Pump + 30kW variablespeed drive
Pertamina EP Region Jawa 10-Oct-09 268,424,000.00
25
Watertreatment & waterinjectionJatibarang
Supply water injectionpump (50000 BPD), API 610, with electric motor (VSD duty)
Citra Panji Manunggal
Pertamina EP Region Jawa 23-Mar-10 500,000.00
26 Re-aktivationX-ray platform
Crude transfer pump with 45kW variable speed drive)
PetrotechPenta Nusa
Pertamina EP Region Jawa 25-Mar-10 85,000.00
27Gajah Baru DevelopmentProject
SupplyJohnsonhorizontalcentrifugalpump ISO standard
MetitoIndonesia
Premier Oil Indonesia 22-Apr-10 61,900.00
28 Newinvestment
Supply various size Deep Blue CentrifugalPump + electric motor
PT Pertamina EP Region Jawa
28-Jun-10 84,145.00
29 ReplacementWater dillution pump (self priming type)
Kaltim Parna Industri 5-Oct-10 8,250.00
30 MFO receivingfacility
KCB Gear Pump & SIGMA Gear Pump
Lima Elang NusantaraGlobalindo
PLN Nusa TenggaraTimur
14-Oct-10 200,000,000.00
31 ReplacementSupplycentrifugalpump
Manara Mas Pertamina EP Region KTI 14-Apr-11 240,000,000.00
32 ReplacementSupplycentrifugalpump
Manara Mas Pertamina EP Region KTI 15-Apr-11 25,000.00
33 Newinvestment
Supply water injectionpump + electric motor drivercomplete with piping system
Geo Dipa Energi 4-Feb-11 1,750,000,000.00
1 Newinvestment
SupplyTransfer Pump (Jambi)
PT. Sele Raya Merangin Dua 26-Apr-13 48,690.00
SupplyUnloadingPump
PT. Sele Raya Merangin Dua 3-Sep-13 55,000.00
SupplyLoadingPump
PT. Sele Raya Merangin Dua 13-Sep-13 26,950.00
2 NewInvestment
SupplyTransfer Pump
PT. Sele Raya Merangin Dua 16-Sep-13 99,900.00
B
1
Watertreatment & waterinjectionJatibarang
Supply 3 units Guascor Gas GeneratingSet SFGLD 560/55
Citra Panji Manunggal
Pertamina EP Region Jawa 23-Mar-10 1,071,000.00
2 Newinvestment
Supply 1 unit gas genset Guascor SFGM560, 925kW
Pertamina EP Region Jawa 17-Dec-09 394,000.00
3 Replacement
Supply 3 units Guascor Gas GeneratingSet SFGM 560
Pertamina EP Region KTI 30-May-11 1,800,000.00
ONGOING PROJECTS
SUPPLY GAS ENGINE / GAS GENSET
COMPLETED PROJECTS
ONGOING PROJECTS
1 NewInvestment
Supply 2 Unit Diesel Genset 1000 KVA c/w PanelIncomingOutgoing
PT.PERTAMINA EP Asset 5 Field Papua
10-Jun-13 740,000.00
C
1 Maintenance
SupplyDaewooDoosan diesel fire fighting
Bintang, CV 12-Feb-09 23,000.00
2 Maintenance
Spare part TOHATSUportable fire pump
Pertamina EP Region KTI 5-Jun-09 10,500,000.00
3 Replacement
Supplyportable fire pump (CDI Tohatsu2202/1H07)
Pertamina EP Region KTI 31-Aug-10 4,750,000.00
4 Newinvestment
Supply diesel genset fire pump
Bukit Asam
5 Newinvestment
Supply fire pumps + diesel engine
Pilar Bahtera Global
Pertamina EP Region KTI 260,000.00
6 Newinvestment
Supply Fire Water Pump System di SKG & Loading Terminal
PT. PERTAMINA EP Asset 5 Field Bunyu
11-Sep-13 418,000.00
1 NewInvestment
Supply Supply 2 (Dua) Unit Fixed Fire Pump Kap. 2000 GPM @300 Psi c/w Jockey Pump
PT.PERTAMINA EP Asset 5 Field Sangatta
5-Jun-13 1,125,000.00
2 NewInvestment
Suplly Electric Fire Pump
PT. WAHAN SAFETY 27-Jul-13 135,252.00
3 ReplacmentSupply Diesel Fire Pump 750 GPM
PT.PERTAMINA EP Asset 5 Field Bunyu
18-Aug-13 236,000.00
D
1 Newinvestment
Supply RO (ReverseOsmosis)System
Manara Mas Pertamina EP Region KTI 14-Dec-10 400,000,000.00
2 NewInvestment
Supply RO (ReverseOsmosisSystem)
Menara MasPertamina EP Asset 5 Field Bunyu
E
SUPPLY FIRE PUMPS AND / OR DRIVER
SUPPLY WATER TREATMENT SYSTEM
BOT / BOO WATER TREATMENT SYSTEM
COMPLETED PROJECTS
COMPLETED PROJECTS
ONGOING PROJECTS
1 NewInvestment
BOO (Build, Operate,Own) re-use waste water treatmentplant, 10 years contract,capacity 500 m3/day
CibuburJunction 22-Mar-10
2 NewInvestment
BOO (Build, Operate,Own) re-use waste water treatmentplant, 10 years contract,capacity 250 m3/day
Tamini Square 1-Jan-13
3 NewInvestment
BOT (Build, Operate,Transfer) re-use waste watertreatmentplant, 10 years contract,capacity 500 m3/day
Plaza FX Life Style 1-Jan-13
4 NewInvestment
BOT (Build, Operate,Transfer) re-use waste watertreatmentplant, 10 years contract,capacity 700 m3/day
BeachwalkKuta Bali 4-Feb-14
5,232,904,000.00 7,422,118.00
ONGOING PROJECTS
Total Value
Company Name : PT. PILAR BAHTERA MANDIRICompany Head Office : Rukan Mangga Dua Square Blok E No.22
Jl. Gunung Sahari Raya, Jakarta 14420, IndonesiaTelephone : +62 21 6231 3622
+62 21 6231 3655Fax +62 21 6231 1408President Director : Ir. Herry SofyanManaging Director : Ir. PrabowoWebsite : www.pilarbahteramandiri.comEmail : [email protected] Offered- Project Management- Design and Engineering- Supply , Installation and Commissioning- Design, Fabrication, Installation and Commissioning- Maintenance- Trouble shooting- Repair- Rental- Investment (BOT, BOO)
Fluid Engineering Pvt. Ltd. – Pumpsense fire pump
Rotech Pump & Systems Inc - The Company Engaged in the Manufacture of International
High Quality Centrifugal Pumps to meet all requirements (DIN, ANSI, API Standard)
Reddy – Buffaloes Pump, Inc – Fire Pump UL, FM, NFPA.
CORPORATE DETAILS
Deware, Universitas Diponegoro Semarang– Water research & Engineering.