Transcript
Page 1: PROPOSED ST JOSEPH CHALDEAN CHURCH · 2017-11-01 · PROPOSED ST JOSEPH CHALDEAN CHURCH 9-15 Memphis St, Mount Druitt NSW 2770 St. Joseph Chaldean Catholic Church BLACKTOWN CITY COUNCIL

GSPublisherVersion 0.0.100.100

a Suite 12, 82 Bathurst St. Liverpool

p (02) 9602 7636

f (02) 9601 8206

m 0424 498 298

e [email protected]

w www.monarchprojects.com.au

TITLE

PROJECT

GENERAL NOTESCheck all dimensions on site prior to commencement of construction.Figured dimensions shall always take place over scaled dimensions.Refer any discrepancies to Monarch Projects Pty Ltd immediately. Allworks to be in accordance with the current building code of Australia,Australian standards, statutory regulations and local authorities’requirements. Drawings not to be used for construction unlessotherwise noted.

CopyrightThis document and design remain copyright of Monarch Projects PtyLtd, and cannot be reproduced without prior written consent. They mustnot be used, reproduced or copied wholly or in part without writtenconsent of Monarch Projects Pty Ltd.

PROJECT DETAILS

ADDRESS

CLIENT

COUNCIL

SCALE

DATE

DRAWING DETAILS

DRAWN BY

JOB NO

REVISION0m 1 2 3 4 5

1:200 @ A1

9/08/2017

F. SAMI

MDES033

06

REVISIONSREVISION NO. DATE NOTES

CHECKED BY J. ZAIA

Site & Carpark Layout Plan

Site & Carpark Layout PlanOTHER NOTES:

Drawing No.

A01PROUD MEMBERS OF:

PROPOSED ST JOSEPH CHALDEAN CHURCH

9-15 Memphis St, Mount Druitt NSW 2770

St. Joseph Chaldean Catholic Church

BLACKTOWN CITY COUNCIL

CLIENT SKETCH26/05/201702

23/06/201703 For CLIENT APPROVAL

04/07/201704 AS PER ACCESS CONSULTANT REVISION

11/07/201705 Proposed cut and fill plan added

9/08/201706 FOR AUTHORITY APPROVAL

Calculations Table:LOT: 17, SEC 4, DP1128NO: 15 MEMPHIS STREET, MOUNT DRUITT NSW 2770AREA: 771.4m2 by DP

LOT: 18, SEC 4, DP1128NO: 13 MEMPHIS STREET, MOUNT DRUITT NSW 2770AREA: 771.4m2 by DP

LOT: 19, SEC 4, DP1128NO: 11 MEMPHIS STREET, MOUNT DRUITT NSW 2770AREA: 771.4m2 by DP

LOT: 20, SEC 4, DP1128NO: 09 MEMPHIS STREET, MOUNT DRUITT NSW 2770AREA: 771.4m2 by DP

TOTAL SITE AREA: 3,085.60m2 by DP

FLOOR AREAS:Main church hall inc. Alter: 443.18m2

Mezzanine & Choir Space: 63.87m2

After Mass gathering hall: 114.59m2

GF Parish residence: 82m2

FF Parish residence: 104.42m2

Public toilets: 28.5m2

TOTAL AREA: 836.56m2

(MEASUREMENTS TAKEN INTERNAL OF WALLS)

TOTAL AREA INCLUDINGEXTERNAL WALLS 862.07m2

(EXCLUDING: PORCHES, VOIDS, PATIOS, ALFRESCO,BALCONIES AND THE LIKE)

Parish Balcony Area: 9.76m2

Front Ramp Areas: 38.92m2

North Ramp Area: 8.25m2

South Ramp Area: 8.55m2

LANDSCAPE AREA: Including Planter boxesand carpark vegitations 309.56m2

ONSITE CARPARKING spaces:Seating Area Provided includingAlter space & Mezzanine 506m2

Rule: 1 space per 10sq.m of seating area Required Carparking Area506 / 10 = 50.6 (spaces)Provided carparking spaces 51 spacesIncluding 3 accessible spaces with shared zoneCARPARKING COMPLIES

1

2

3

4

5

6

7

8

9

10

11

12 13 14 15 16 17

39 40 41 42 43 44 45 46 47 48 49 50 51

18 19 20 21 22 23 24 25 26 27

67891011121314151617 12345

38 28293031323334353637

3,000

3,600

3,000

5,123

1,62

0

1,38

8

1,25

0

1,25

0

1,25

0

5,123

1,00

0

16,8

9059

0

2,400

2,4001,000

1,00

0

6,14

0

1,000

1,25

0

6,065

1,500

1,500

2,400 2,400

5,50

0

1,62

0

1,27

0

13,343 650

6,566

14,9

68

1,20

0

TGSI

DESIGNATED BINSTORAGE AREA1.8m highSCREEN MESHPANELS

LETTER BOXAS PART OF

FENCE

37.48

1

37.55

6

37.59

9

37.60

0

37.51

2

37.50

1

37.52

1

37.49

1

37.47

0

37.43

4

37.44

6

37.46

3

37.53

0

37.55

537

.677

37.74

7

37.89

8

37.79

137

.743

37.67

7

37.64

4

37.59

637

.568

37.53

6

37.61

237

.582

37.58

9

37.58

6

37.59

237

.602

37.73

037

.748

37.81

237

.864

37.93

1

38.10

037

.952

37.90

4

37.95

937

.872

37.84

137

.790

37.72

2

37.63437.63

337

.733

37.65

037.68

1

37.66

637

.681

37.69

0

37.72

5 37.77

0

37.84

0

37.89

2

37.91

7

37.96

637

.962

37.84

437

.776

37.70

2

37.73

7

37.74

137

.753

37.87

2

37.89

1

37.70

3

37.61

9

37.58

437

.545

37.51

4

38.098

38.01

3

37.398

37.41

1

37.434

37.51

9

37.53

4

37.57

8

37.36

3

37.32

337

.30037

.329

37.56

5 37.56

0

37.57

7

37.64

9

37.39

0

37.43

6

37.59

6

37.62

5

37.47

9

37.71

9

37.75

8

37.70

637

.637

38.97

638.349

37.80

4

37.58

0

38.63

9

38.61

5

38.172

37.73

8

38.45

7

38.63

938.210

37.96

4

37.97

1

38.20

0

38.43

3

38.307

38.05

1

38.76

3

38.34

7

37.93

3

37.937

38.65

9

38.47

4

37.85

637

.749

38.835

38.252

37.76

7

37.71

6

38.59

8

38.77

4

38.103

37.79

3

38.45

4

38.50

9

38.12

1

38.05439

.094

38.12

1

38.34

2

38.658

38.28

8

37.90

8

37.86

8

38.84

4

38.406

37.95

1

38.800

38.51

8

38.30

2

37.79

7

38.51

9

38.71

1

38.196

38.075

37.86

1

38.28

7

38.50

2

38.32

3

38.130

38.91

6

38.32

3

38.05

7

38.03

4

38.56

6

38.40

0

37.83

4

37.84

1

37.51

2

37.50

4

37.83

5

37.79

0

37.39

7

37.51

0

37.07

6

37.14

1

37.076

37.53

6

37.60

2

37.49

3

37.54837

.660

37.73

7

37.79

5

37.88

7

38.37

6

38.37

6

38.48

2

38.25

7

38.27

5

38.10

0

37.93

037

.984

38.03

4

38.33

8

38.16

3

38.44

538

.338

37.66

6

37.442

37.96

5

37.76

3

37.67

9

37.57

3

37.51

4

37.46

0

37.43

2

37.41

4

37.35

5

37.34

1

37.31

6

37.28

3

37.26

1

37.25

6

37.20

4

37.17

8

37.09

7 37.174 37.23

1

37.26

0

37.27

6

37.31

8

37.37

7

37.40

237

.461

37.54

037

.598

37.63

8

38.13

1

38.04

5

37.82

6

WM

GARAGE

TILE ROOFBRICK HOUSE

N° 47

ROOF RIDGE RL=46.200

PER

GO

LA

SINGLE STOREY

TILE ROOFWEATHER BOARD HOUSE(CHURCH)

N° 15

ROOF RIDGE RL=42.875

PORCH

FFL=38.100

FFL=37.670

GARAGE

EAVE&GUTTER RL=40.600

EAVE&GUTTER RL=40.655

FFL=38.070

POR

CH

PPPP

TEL TEL

GULLY PIT

SVHYD

PP

PP

SMH

SMH

PITPIT

STORAGESHED

FFL=37.975ROOF RIDGE RL=41.155

FFL=38.385EAVE

&GU

TTER

RL=

43.5

25

CONCRETE FOOTPATH

CO

NC

RET

E

FO

OTP

ATH

CO

NC

RET

E

FO

OTP

ATH

old driveway

DRIVEWAY

DRIVEWAY

CONCRETE FOOTPATH

BITUMEN DRIVEWAY

NO. 13

CONCRETE

FOOTP

ATH

DR

IVEW

AY

SINGLE STOREY

TILE ROOFBRICK HOUSE

N° 11

ROOF RIDGE RL=42.460

FFL=38.425

VER

AND

AAW

NIN

G

EAVE&GUTTER RL=40.670

CONCRETE AREADRIVEWAY

DRIVEWAY

SINGLE STOREY

TILE ROOFBRICK HOUSE

N° 9

ROOF RIDGE RL=43.880

FFL=

38.5

95

EAVE&GUTTER RL=41.395

EAVE&GUTTER RL=41.920

SINGLE STOREY

TILE ROOFW.B. HOUSE

N° 7

ROOF RIDGE RL=43.230

FFL=

39.1

70

PATI

O

DURHAM STREET

MEM

PHIS

STR

EET

RL=37.520(AHD)CUT IN KERB

BM

BRICK STORAGER.R.RL=42.225FFL=38.735

FOOTPATHFOOTPATH

37.500

37.500

37.500

STATU

E

COL.

38.000

38.000

38.500

38.500

39.000

TWO STOREY

EXIS

TIN

G

K

ERB

& G

UTT

EREX

ISTI

NG

K

ERB

& G

UTT

EREXISTING KERB & GUTTER

LOT 17DP 1128

SITE AREA=771.4sqm(BY DP)

LOT 18DP 1128

SITE AREA=771.4sqm(BY DP)

LOT 19DP 1128

SITE AREA=771.4sqm(BYDP)

LOT 20DP 1128

SITE AREA=771.4sqm(BY DP)

LOT 21DP 1128

WC

STORAGE

FFL=38.330ROOF RIDGE RL=41.390

EAVE&GUTTER RL=40.620

SHED SHED

BDY(95°05'00" - 50.900m) METAL FENCE

BDY(95°05'00" - 50.900m) COLOURBOND FENCE

BDY(95°05'00" - 50.900m)

BDY(95°05'00" - 50.900m) NO FENCE

COLOURBOND FENCE

COLOURBOND FENCEBDY(95°05'00" - 50.900m)

CO

LOU

RBO

ND

FEN

CE

BDY(

5°05

'00"

-15.

240m

)

CO

LOU

RBO

ND

FEN

CE

BDY(

5°05

'00"

-15.

240m

)

CO

LOU

RBO

ND

FEN

CE

BDY(

5°05

'00"

-15.

240m

)C

OLO

UR

BON

D F

ENC

EBD

Y(5°

05'0

0"-1

5.24

0m)

MET

AL F

ENC

EBD

Y(5°

05'0

0"-1

5.24

0m)

NO

T FE

NC

EDBD

Y(5°

05'0

0"-1

5.24

0m)

BDY(

5°05

'00"

-15.

240m

)BD

Y(5°

05'0

0"-1

5.24

0m)

FFL=

38.5

95PO

RC

H

W

EXISTING STRUCTURE TO BEREMOVED

EXISTINGSTRUCTURE HASBEEN REMOVED

EXISTING STRUCTURE TO BEREMOVED

EXISTING STRUCTURE TO BEREMOVED

EXISTINGSTRUCTURE HASBEEN REMOVED

EXISTINGSTRUCTURE TOBE REMOVED

TREE TO BEREMOVED

TREE TO BEREMOVED

TREE TO BEREMOVED

TREE TO BEREMOVED

TREE TO BEREMOVED

RAMP1 in 14 GRADE

RL:

38.

48

RL:

38.3

04R

L:38

.304

RL:

37.9

51R

L:37

.951

RL:

37.2

71

SHARED

ZONE

RL:

38.4

8

RL:

37.9

98

RL:

38.4

8

RL:

38.1

21

RL: 38.48

RL: 38.845

RAMP 1 in 14 Grade

PLAN

TER

BOX

RAMP1 in 14 GRADE

RAMP1 in 14 GRADE

RAMP1 in 14 GRADE

RL:

38.

48

RL:

38.3

04R

L:38

.304

RL:

37.9

51R

L:37

.951

RL:

37.2

71PL

ANTE

RBO

X

RAMP1 in 14 GRADE

RAMP1 in 14 GRADE

SHARED

ZONE

RAMP 1 in 14 Grade

PROPOSEDDRIVEWAY

PROPOSEDDRIVEWAY

PROPOSEDDRIVEWAY

ACCESSIBLE

ACCESSIBLE

ACCESSIBLE

PEDESTRIANENTRY

GROUND FLOOR AREAINCLUDING EXTERNAL

WALLSAREA: 743m2

RL: 38.48

RL: 38.48

LOWER ALTERRL: 38.93

HIGHERALTERRL: 39.08

RL: 38.93

RL: 38.48

RL: 38.48

PARISH OFFICE &PRIEST RESIDENCE

RL: 38.48

PUBLIC TOILETS

old driveway

old

driv

eway

31,2

48

DESIGNATED BINSTORAGE AREA1.8m highSCREEN MESHPANELS

LETTER BOXAS PART OF

FENCE

DESIGNATED BINSTORAGE AREA1.8m highSCREEN MESHPANELS

LETTER BOXAS PART OF

FENCE

1

2

3

4

5

6

7

8

9

10

11

12 13 14 15 16 17

39 40 41 42 43 44 45 46 47 48 49 50 51

18 19 20 21 22 23 24 25 26 27

67891011121314151617 12345

38 28293031323334353637

2,400

5,50

0

8,08

05,

500

1,00

01,000

6,95

0

2,400

2,400

2,400

1,000

1,00

0

6,14

0

2,5001,000

1,25

0

2,400 2,400 2,400

5,50

0

6,065

6,06

5

1,00

05,

500

6,143

5,800

7,286

1,500

1,500

2,400 2,400

5,50

0

5,50

0

1,38

8

1,62

0

1,27

0

REMOVABLEBOLLARDS

REMOVABLEBOLLARDS

RAMP1 in 14 GRADE

RL:

38.

48

RL:

38.3

04R

L:38

.304

RL:

37.9

51R

L:37

.951

RL:

37.2

71

SHARED

ZONE

RL:

38.4

8

RL:

37.9

98

RL:

38.4

8

RL:

38.1

21

RL: 38.48

RL: 38.845

RAMP 1 in 14 Grade

PLAN

TER

BOX

RAMP1 in 14 GRADE

RAMP1 in 14 GRADE

RAMP1 in 14 GRADE

RL:

38.

48

RL:

38.3

04R

L:38

.304

RL:

37.9

51R

L:37

.951

RL:

37.2

71PL

ANTE

RBO

X

RAMP1 in 14 GRADE

RAMP1 in 14 GRADE

SHARED

ZONE

RAMP 1 in 14 Grade

PROPOSEDDRIVEWAY

PROPOSEDDRIVEWAY

PROPOSEDDRIVEWAY

ACCESSIBLE

ACCESSIBLE

ACCESSIBLE

PEDESTRIANENTRY

GROUND FLOOR AREAINCLUDING EXTERNAL

WALLSAREA: 743m2

BASIX COMMITMENTS NOTES *REFER TO APPROVED BASIX REPORT*

WATER

Fixtures All Shower Heads All toilet flushing systems All kitchen taps All bathroom taps

3 star (> 6 but <= 7.5 L/min) 4 star 4 star 5 star

Alternative

water source

Individual water tank to collect run off from at least 150 m2 of roof area - Tank size min 2400

litres

Landscape connection Toilet connection Laundry connection Pool top up

Yes Yes - -

ENERGY Hot water system: Gas instantaneous 5 star

Bathroom ventilation system: Individual fan, ducted to façade or roof manual switch on/off

Kitchen ventilation system: Individual fan, ducted to façade or roof manual switch on/off

Laundry: Individual fan, ducted to façade or roof manual switch on/off

Cooling system: 1 Phase air-conditioning EER 2.5-3.0 (zoned)

Heating system: 1 Phase air-conditioning EER 2.5-3.0 (zoned)

Natural lighting: As per BASIX

Artificial lighting: As per BASIX

Must install a gas cooktop & electric oven in the kitchen of the dwelling.

Alternative

energy

Must install a photovoltaic system with the capacity to generate at least 1.2 peak kilowatts

NatHERS Summary

Building Elements Material Detail External walls Brick veneer R2.0 Bulk insulation

Internal walls Plasterboard on studs

Common walls

between dwellings

Brick

Plasterboard on studs

-

Ceiling Plasterboard R3.5 bulk insulation to ceilings

with roof above

Floors Concrete

Timber

-

Roof Metal roof, Medium Colour

Foil (sisalation) to underside of

roof

Windows Sliding windows & doors

Aluminium Frame, single glazed clear

U Value 6.70 or less and SHGC

0.70 +/- 5%

Glazed doors

Aluminium Frame, single glazed clear

U Value 6.70 or less and SHGC

0.57 +/- 5%

Lighting: Dwellings have been rated with non-ventilated downlights – as per NatHERS certificate

Self-closing dampers to exhaust fans

Note: Insulation specified must be installed in accordance with Part 3.12.1.1 of the BCA

North

M O

N A

R C

H

P R O J E C T S

www.monarchprojects .com

.au

Top Related