Transcript

0

SCALE 1" = 50’-0"

50 50

2

25

BHF 016-1(29)

NAD83 (1996)

NAVD88

N

VT ST

ATE P

LA

NE

GRID

False

Northin

g: 0.00

00

False

Easting

: 16404

16.6667

Origin La

titude:

42°30’

00.000

0"N

Central Me

ridian: 72

°30’00.00

00"W

US Sur

vey Fo

ot

Transv

erse M

ercato

r

NAD83

Vermon

t State

Planes

VT83

ANDOVER

5-28-2012

R. GILMAN

(MM = 2.6555)

STA 11+50.00

BEGIN PROJECT

STA 11+86.75

BEGIN BRIDGE

TH

E

WI

LLI

AM

S

RI

VE

R

MI

DD

LE

BR

AN

CH

OF

(MM = 2.6785)

STA 12+75.00

END PROJECT

STA 12+35.25

END BRIDGE

FL

OW

10+00 11+00 12+00 13+00

14+0

0

14+7

514

+75

C. CARLSON, P.E.

LONDONDERRY

TO

CHESTERTO

VT 11

28-FEB-2014

PRELIMINARY PLANS

VERM ONTFREEDOM ANDUNITY

CANADA

ORLEANSESSEX

WASHI

NGTON

LAMOILLE

FRANKLIN

GR

AN

D IS

LE

ADDISON

CHIT

TENDEN

ORANGE

CA

LE

DO

NIA

WIN

DS

OR

RUTLAND

BE

NNIN

GT

ON

WINDHAM

N

VT

ST

AT

E P

LA

NE

GRID

APPROVED DATE

SHEET 1 OF SHEETS

DATUM

VERTICAL

HORIZONTAL

SURVEYED DATE :

SURVEYED BY :

PROJECT MANAGER :

PROJECT NAME :

PROJECT NUMBER :

NEW YORK

State of

MASSACHUSETTS

Commonwealth of

NEW HAMPSHIRE

State of

BRIDGE PROJECT

PROPOSED IMPROVEMENT

PLANS.

SPECIAL PROVISIONS AS ARE INCORPORATED IN THESE

REVISIONS AND SUCH REVISED SPECIFICATIONS AND

FOR USE ON THIS PROJECT, INCLUDING ALL SUBSEQUENT

FEDERAL HIGHWAY ADMINISTRATION ON JULY 20, 201 1

FOR CONSTRUCTION DATED 201 1, AS APPROVED BY THE

WITH THESE PLANS AND THE STANDARD SPECIFICATIONS

CONSTRUCTION IS TO BE CARRIED ON IN ACCORDANCE

DEVELOPMENT.

ADMINISTRATION OR THE DIRECTOR OF PROGRAM

CHANGES AS MAY BE REQUIRED BY THE FEDERAL HIGHWAY

THESE PLANS ARE SUBJECT TO SUCH ENGINEERING

AGENCY OF TRANSPORTATION

STATE OF VERMONT

QUALITY ASSURANCE PROGRAM : LEVEL DIRECTOR OF PROGRAM DEVELOPMENT

LENGTH OF PROJECT:

LENGTH OF ROADWAY:

LENGTH OF STRUCTURE:

PROJECT DESCRIPTION:

PROJECT LOCATION:

BHF 016-1(29)

ANDOVER

COUNTY OF WINDSOR

TOWN OF ANDOVER

ROUTE NO : VT RTE 11, RURAL MINOR ARTERIAL BRIDGE NO : 41

125.00 FEET

76.54 FEET

48.46 FEET

REMOVAL AND REPLACEMENT OF DECK AND SUPERSTRUCTURE WITH MINOR SUBSTRUCTURE REPAIRS

APPROXIMATELY 4.0 MILES EAST OF THE INTERSECTION OF VT 11 AND VT 121

3 25

s12b140typ.dgn

VT ROUTE 11 ROADWAY TYPICAL SECTION

BRIDGE TYPICAL SECTION

SCALE: �" = 1’-0"

*

C

GRADE

FINISH

ANDOVER

BHF 016-1(29)

S. PIRO

GRADE

FINISH

FLOW

VT 11

L

SCALE: �" = 1’-0"

CONCRETE PAVEMENT

* 3" BITUMINOUS

*

1�" TYPE IVS

1�" TYPE IVS OVER

(SEE STANDARD S-360A)

BOX BEAM (TYP)

GALVANIZED 2 RAIL

BRIDGE RAILING,

SAND BORROW

SUBBASE

- AGGREGATE SURFACE COURSE

- PAVEMENT (TOTAL THICKNESS)

SURFACE

+/- 1"

+/- 1"

+/- �"

+/- �"

MATERIAL TOLERANCES(IF USED ON PROJECT)

2�" TYPE IIS

2�" TYPE IIS OVER

1�" TYPE IVS OVER

1�" TYPE IVS OVER

28-FEB-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

-0.020

C. CARLSON

D. PETERSON

DETAIL SD-502.00)(TYP)

DRIP NOTCH (SEE STRUCTURES

-0.020

D. PETERSON

2’-0"

1’-6"

(TYP)

SHOULDERTO CURB (TYP)

5’-0" 11’-0" TRAVEL LANE 5’-6"11’-0" TRAVEL LANE

33’-0" FACE OF RAIL TO FACE OF RAIL

36’-0" FASCIA TO FASCIA

(DEPTH VARIES)

GRADED CRUSHED STONE

24" SUBBASE OF DENSE

-0.020

VARIES

CONCRETE PAVEMENT

* 8" BITUMINOUS

WITHOUT GUARDRAIL WITH GUARDRAIL

-0.060

SURFACE COURSE

6" AGGREGATE

~

12’-0" CLEAR ZONE FOR CUT

20’-0" CLEAR ZONE FOR FILL

SHOULDER (TYP)

2’-0"16’-0" FACE OF RAIL11’-0" TRAVEL LANE5’-0"

VARIES

(TYP)

6" (TYP)

7" (TYP)

TORCH APPLIED

WATERPROOFING,

SHEET MEMBRANE

1:2.5

~

SEED FORMULA) (TYP)

4" TOPSOIL (RURAL AREA

4’-0"

CLEAR ZONE

(TYP)

28" NEXT D BEAM

CL

VT 11

-0.020

W/2.4M (8 FEET) POSTS (SEE STANDARD G-1)

HD STEEL BEAM GUARDRAIL, GALVANIZED

TYPICAL SECTIONS SHEET

3’-9"5’-0"2’-5�"

(TYP) (TYP)(TYP)

28-FEB-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

S. PIRO

4 25LEGEND SHEET

ANDOVER

BHF 016-1(29)

s12b140legend.dgn

C. CARLSON

D. PETERSON D. PETERSON

CZ

DITCH

FOUNDATION

GARDEN

HEDGE

E

L

T

R

D

BK

AH

STA

POE

POB

PRC

PCC

PT

CC

PI

PC

CURVE EXTERNAL DISTANCE

CURVE LENGTH OF

CURVE TANGENT LENGTH

CURVE RADUIS OF

CURVE DEGREE OF (100FT)

BACK STATION SUFFIX

AHEAD STATION SUFFIX

STATION PREFIX

POINT OF ENDING

POINT OF BEGINNING

POINT OF REVERSE CURVE

POINT OF COMPOUND CURVE

POINT OF TANGENCY

CENTER OF CURVE

POINT OF INTERSECTION

POINT OF CURVATURE

WITH PROPOSED ANNOTATION.

FEATURES WITH HEAVIER LINEWEIGHT, IN COMBINATION

FOR EXISTING FEATURES, ALSO USED FOR PROPOSED

THESE ARE COMMON VAOT SURVEY POINT SYMBOLS

BODY OF WATER EDGE

WOOD LINE

STONE WALL

ROAD EDGE PAVEMENT

ROAD EDGE GRAVEL

DRIVEWAY EDGE

RAILROAD TRACKS

LEDGE EXPOSED

BRUSH LINE

WALL

SLOPE RIGHTS

SURVEY LINE

6F PROPERTY BOUNDARY

4F PROPERTY BOUNDARY

PROPERTY LINE (P/L)

TOWN BOUNDARY LINE

COUNTY BOUNDARY LINE

STATE BOUNDARY LINE

C

FENCE STEEL POST

FENCE (EXISTING)

FENCE WOOD POST

CULVERT (EXISTING)

ELECTRIC+CABLE

CABLE (TV)

ELECTRIC+TELEPHONE

UTILITY POLE GUY WIRE

ELECTRIC+TELEPHONE

PLAN LAYOUT MATCHLINE

CLEAR ZONE

TELEPHONE

ELECTRIC

CABLE+TELEPHONE

ELECTRIC+CABLE+TELEP.

ELECTRIC+TELEPHONE

ELECTRIC+CABLE

CABLE+TELEPHONE

SANITARY SEWER (SEPTIC)

ELECTRIC+CABLE+TELEP.

WATER LINE

GAS LINE

TELEPHONE

CABLE (TV)

ELECTRIC

CULVERT PROPOSED

BOTTOM OF DITCH L

STRUCTURE SUBSURFACE

HISTORIC DIST

ARCH

T&E

HISTORIC

AG

HABITAT

FLOOD PLAIN

.

SR SR SR

L

P P

L

FILTER CURTAIN

SILT FENCE

SILT FENCE WOVEN WIRE

EPSC MEASURES

WETLAND BOUNDARY

RIPARIAN BUFFER ZONE

SOIL TYPE BOUNDARY

HISTORIC STRUCTURE

HISTORIC DISTRICT BOUNDARY

HISTORIC AREA

AGRICULTURAL LAND

HAZARDOUS WASTE AREA

ENVIRONMENTAL RESOURCES

FISH & WILDLIFE HABITAT

FLOOD PLAIN

STORM WATER

USDA FOREST SERVICE LANDS

WILDLIFE HABITAT SUIT/CONN

CHECK DAM

ARCHEOLOGICAL BOUNDARY

ARCHEOLOGICAL & HISTORIC

UTILITY SYMBOLOGY

UNDERGROUND UTILITIES

ABOVE GROUND UTILITIES (AERIAL)

PROJECT DESIGN & LAYOUT SYMBOLOGY

CODE DESCRIPTIONPOINT

COMMON TOPOGRAPHIC POINT SYMBOLS

DESCRIPTION

PROPOSED GEOMETRY CODES

CODE

BARRIER FENCE

EPSC LAYOUT PLAN SYMBOLOGY

PROJECT CONSTRUCTION SYMBOLOGY

EROSION MATTING

PROJECT CONSTRUCTION FEATURES

STONE FILL

TOE OF FILL SLOPE

TOP OF CUT SLOPE CONVENTIONAL TOPOGRAPHIC SYMBOLOGY

EXISTING FEATURES

CONVENTIONAL BOUNDARY SYMBOLOGY

STRIPING LINE REMOVAL

REQUIRING RE-VEGETATION

DISTURBED AREAS

THREATENED & ENDANGERED SPECIES

SHEET PILES

HAZARDOUS WASTE

WSO

WELL

VCTRL

TSIGN

TIE

TEL

STUMP

SIGN

SHRUB

SAT

S

RRSL

RRSIG

POST

PMK

PM

MM

MH

MB

LI

IPIPE

IP

HYD

HVCTRL

HCTRL

H

GV

GUYW

GUY

GSO

GP

GASFIL

FPOLE

EL

DITHR

COMB

CB

BND

BM

APL

PERMANENT EASEMENT LINE (P)

TEMPORARY EASEMENT LINE (T)

BOUNDARY LINES

DESCRIPTIONCODE

IRON PIN TO BE SET

BNDNS

IPNS

CALC

POINT

STATE ROW

TOWN ROW

STATE ROW (LIMITED ACCESS)

PROJECT DEMARCATION FENCE

TREE PROTECTION ZONE (TPZ)

PROPOSED STATE R.O.W.

PROPOSED STATE R.O.W. (LIMITED ACCESS)

BOUND TO BE SETBNDNS

IPNS

BOUND SET

IRON PIN SET

R.O.W. ABBREVIATIONS (CODES) & SYMBOLS

OHW

USED TO CLARIFY AS NEEDED.

VARY, PLAN ANNOTATIONS AND NOTES SHOULD BE

SHEET COVERS THE BASICS. SYMBOLOGY ON PLANS MAY

AS NOTED ON PROJECT PLAN SHEETS. THIS LEGEND

LINEWEIGHT, IN COMBINATION WITH PROJECT ANNOTATION,

USED FOR EXISTING & PROPOSED FEATURES WITH HEAVIER

STANDARD CONVENTIONAL SYMBOLOGY. THE SYMBOLOGY IS

THE SYMBOLOGY ON THIS SHEET IS INTENDED TO COVER

SYMBOLOGY LEGEND NOTE

GENERAL INFORMATION

ROAD GUARDRAIL

WATER SHUT OFF

WELL

CONTROL VERTICAL

SIGN W/DOUBLE POST

TIE

TELEPHONE POLE

STUMP

SIGN

SHRUB

SATELLITE DISH

TREE SOFTWOOD

RAILROAD SWITCH LEVER

RAILROAD SIGNAL

POST STONE/WOOD

PROJECT MARKER

PARKING METER

MILE MARKER

MANHOLE (MH)

MAILBOX

LIGHT - STREET OR YARD

IRON PIPE

IRON PIN

HYDRANT

CONTROL HORIZ. & VERTICAL

CONTROL HORIZONTAL

TREE HARDWOOD

GATE VALUE

GUY WIRE

GUY POLE

GAS SHUT OFF

GUIDE POST

GAS FILLER

FLAGPOLE

ELECTRIC POWER POLE

DROP INLET THROATED DNC

COMBINATION POLE

CATCH BASIN

BOUND

BENCH MARK

BOUND APPARENT LOCATION

PROW PROPOSED ROW POINT

LENGTH LENGTH CARRIED ON NEXT SHEET

EXISTING ROW POINT

(T)

(P)

UE

SR

R&REP

R&RES

LAND

I&M

HWY

EC

DRIVE

DR

DIT

D&C

CUL

CONST

CH

TEMPORARY EASEMENT

PERMANENT EASEMENT

UTILITY EASEMENT

SLOPE RIGHT

REMOVE & REPLACE

REMOVE & RESET

LANDSCAPE EASEMENT

INSTALL & MAINTAIN EASEMENT

HIGHWAY EASEMENT

EROSION CONTROL

DRIVEWAY EASEMENT

DRAINAGE EASEMENT

DITCH EASEMENT

DISCONNECT & CONNECT

CULVERT EASEMENT

CONSTRUCTION EASEMENT

CHANNEL EASEMENT

ORDINARY HIGH WATER (OHW)

WETLAND BUFFER ZONE

28-FEB-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

S. PIRO

5 25

ANDOVER

BHF 016-1(29)

C. CARLSON

D. PETERSON D. PETERSON

SURVEY TIE SHEET

s12b140tie.dgn

DATUM

VERTICAL

HORIZONTAL

ALI

GN

ME

NT

TI

ES

TR

AV

ER

SE

TI

ES

GP

S

CO

NT

RO

L

POI

NT

S

NAVD 88

NAD 83 (96)

ADJUSTMENT NONE

NORTH =

EAST =

ELEV. =

NORTH =

EAST =

ELEV. =

NORTH =

EAST =

ELEV. =

NORTH =

EAST =

ELEV. =

NORTH =

EAST =

ELEV. =

NORTH =

EAST =

ELEV. =

HVCTRL #4 NORTH = 277421.339

EAST = 1586957.674

ELEV. = 1067.003

NORTH =

EAST =

ELEV. =

HVCTRL #3 NORTH = 277154.304

EAST = 1586402.825

ELEV. = 1077.701

NORTH =

EAST =

ELEV. =

HVCTRL #1

EAST = 1583690.570

ELEV. = 1137.542

NORTH = 276627.440

SIMONSVILLE HVCTRL #2

EAST = 1585221.640

ELEV. = 1104.463

NORTH = 276452.330

SIMONSVILLE AZ MK

*MAIN TRAVERSE COMPLETED 5/28/2012 BY R.GILMAN P.C. & P.WINTERS & C.CYR

SIGN AND A FIBERGLASS WITNESS POST.

HOUSE, 14.0 M (45.9 FT) EAST OF POLE NO. 1/230A/220-A, AND 1.8 M (5.9 FT) SOUTH OF A STOP

HILL ROAD, 11.3 M (37.1 FT) WEST OF THE NORTHWEST PORCH CORNER OF A 1 1/2 STORY WOOD FRAME

LOWER THAN THE CENTERLINE OF VT.ROUTE 11, 3.6 M (11.8 FT) EAST OF THE CENTERLINE OF HOWARD

MONUMENT SET 1.1 M (3.6 FT) DEEP. IT IS 16.3 M (53.5 FT) SOUTH OF AND ABOUT 0.3 M (1.0 FT)

RIGHT. THE MARK IS SET 2 CM BELOW GROUND SURFACE IN THE TOP OF 30 CM DIAMETER CONCRETE

MI (6.0 KM) TO THE INTERSECTION OF HOWARD HILL ROAD RIGHT AND THE SITE OF THE MARK ON THE

OF VT.ROUTES 121 AND 11 IN NORTH WINDHAM LONDONDERRY) GO NORTHEAST ALONG VT.ROUTE 11 FOR 3.7

GENERAL LOCATION ANDOVER, VT. IN THE VILLAGE OF SIMONSVILLE. TO REACH FROM THE INTERSECTION

POLE NO. 242/227, AND 1.6 M (5.2 FT) SOUTH OF A FIBERGLASS WITNESS POST.

OF VT.ROUTE 11, 33.3 M (109.3 FT) NORTHWEST OF POLE NO.237, 39.4 M (129.3 FT) NORTHEAST OF

IS 5.5 M (18.0 FT) NORTH OF AND ABOUT 0.3 M (1.0 FT) LOWER THAN THE NORTH EDGE OF PAVEMENT

HILL ROAD (SOUTH) . THE MARK IS SET IN THE TOP OF A 0.8 X 0.6 M (2.0 FT) ROCK OUTCROP. IT

0.3 MI (0.5 KM) WEST OF THE INTERSECTION OF VT.ROUTE 11 AND HILL TOP ROAD (NORTH) AND HOWARD

MI (5.5 KM) TO THE SITE OF THE MARK ON THE LEFT IN A ROCK OUTCROP IN A GRASSY AREA. IT IS

OF VT.ROUTES 121 AND 11 IN NORTH WINDHAM (LONDONDERRY) GO NORTHEAST ALONG VT.ROUTE 11 FOR 3.4

GENERAL LOCATION ANDOVER, VT. IN THE VILLAGE OF SIMONSVILLE. TO REACH FROM THE INTERSECTION

S. PINE

.

S. BASSWOOD

M.MAPLE

3 M. MAPLE

M. MAPLE

57.55

49.49

21.88

21.48

ELEV: 11073.34

BM #1 RRSIR

20.80

N

VT

ST

AT

E

PL

AN

E

GRID

N

VT

ST

AT

E

PL

AN

E

GRID

SCALE 1" = 20’-0"

20 0 20

N

VT ST

ATE P

LA

NE

GRID

False

Northin

g: 0.00

00

False

Easting

: 16404

16.6667

Origin La

titude:

42°30’

00.000

0"N

Central Me

ridian: 72

°30’00.00

00"W

US Sur

vey Fo

ot

Transv

erse M

ercator

NAD83

Vermon

t State

Planes

VT83

LAYOUT

28-FEB-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

S. PIRO

6 25LAYOUT SHEET

ANDOVER

BHF 016-1(29)

C. CARLSON

D. PETERSON D. PETERSON

s12b140nu1.dgn

VT 11 STA 13+25.00 - 13+75.00 RT

CONSTRUCT DRIVE (PAVED)

VT11 STA 13+25.00 - 13+75.00

VT11 STA 10+50.00 - 11+00.00

COLD PLANING, BITUMINOUS PAVEMENT

LIMITS (TYP)

CONSTRUCTION

STA 10+50.00

BEGIN APPROACH

FG = 1068.71’

STA 12+35.25

END BRIDGE

STA 13+75.00

END APPROACH

STA 10+00.00

POB

STA 13+20.39

PI

= 90° LT

=CHANNEL STA 51+00.00

MAINLINE STA 12+25.00

STA 14+10.77

PT

STA 14+75.00

POESTA 52+00.00

POE

STA 50+00.00

POB

50

+00

51

+00

52

+00

STA 11+50.00

BEGIN PROJECT STA 12+75.00

END PROJECT

TYPE II (TYP)

STONE FILL

VT 11 STA 10+50.00 - 13+75.00 LT/RT

4" YELLOW LINE

VT 11 STA 10+50.00 - 13+75.00 RT

VT 11 STA 10+50.00 - 13+75.00 LT

4" WHITE LINE

VT 11 STA 12+33.95 - 12+44.00 LT

VT 11 STA 12+33.95 - 12+58.50 RT

VT 11 STA 11+45.00 - 11+87.99 LT

VT 11 STA 11+40.00 - 11+87.99 RT

STONE FILL, TYPE II

VT11 STA 12+34.79 - 13+00.91 LT

VT11 STA 12+34.63 - 12+97.33 RT

VT11 STA 11+23.47 - 11+87.63 LT

VT11 STA 11+23.27 - 11+87.09 RT

REMOVAL AND DISPOSAL OF GUARDRAIL

VT 11 STA 12+33.73 - 12+63.48 RT

VT 11 STA 12+33.65 - 12+65.13 LT

VT 11 STA 11+57.66 - 11+88.25 RT

VT 11 STA 11+57.66 - 11+88.25 LT

GUARDRAIL APPROACH SECTION, GALVANIZED 2 RAIL BOX BEAM

VT11 STA 11+88.25 - 12+33.65 LT

VT11 STA 11+88.25 - 12+33.73 RT

BRIDGE RAILING, GALVANIZED 2 RAIL BOX BEAM

VT11 STA 12+65.13 - 13+03.75 LT

VT11 STA 12+63.48 - 12+99.93 RT

VT11 STA 11+20.16 - 11+57.66 LT

VT11 STA 11+20.16 - 11+57.66 RT

MANUFACTORED TERMINAL SECTION, TANGENT

R=16’

VT 11 STA 12+35.20 - 12+76.03 LT

VT 11 STA 12+35.20 - 12+73.78 RT

VT 11 STA 11+47.03 - 11+86.74 LT

VT 11 STA 11+47.03 - 11+86.74 RT

CAST-IN-PLACE CONCRETE CURB, TYPE B

10+00 11+00 12+0013+00

14+0

0

14+7

514

+75

E = 7.30’

L = 182.31’

T = 91.93’

R = 575.00’

CURVE (1)

STA 12+28.46

PC

(TYP)

FG = 1069.38’

STA 11+86.75

BEGIN BRIDGE

HVCTRL

100

HVCTRL

101

HVCTRL

102

HVCTRL

103

HVCTRL

4

TIE

DIST=21.48

TIE

DIST=20.80TIE

DIST=21.88

MED.

SPRUCE

MED.

MAPLES

EXISTING BRIDGE INFO

CONCRETE T-BEAM,

WIDENED WITH STEEL BEAMS

BUILT IN 1927,

WIDENED IN 1963

SPAN = 44’

WIDTH = 35’

BENCHMARK

RR SPIKE IN POLE

ELEV = 1073.34

EXISTING R.O.W.

EXISTI

NG R.

O.W.

EXISTI

NG R.

O.W.

EXISTING R.O.W.

MI

DD

LE

BR

AN

CH

OF

TH

E

WI

LLI

AM

S

RI

VE

R

FL

OW

18"

RC

P

FL

OW

18" CPEPFLOW

STONE FILL

VT 11

TO LONDONDERRY

VT 11

TO CHESTER

GRAVEL

DRIVE

GRAVEL

DRIVE

GRAVEL

DRIVE

GUYPOLE

ARTESIAN

WELL

BENCHMARK

RR SPIKE IN ROOT

ELEV = 1066.48COMB

#221/2/210

GUY WIRE

GUY WIRE

COMB

#221A

COMB

#1/220/209

GUY WIRE

COMB

#1/208

GUY WIRE

COMB

#1/218/207

GUY WIRE

GUY WIRECOMB

#1/222/2/211

WOOD FENCE

WOOD FENCE

.

FINISH GRADES ALONG PROPOSED CENTERLINE.

ELEVATIONS SHOWN TO THE NEAREST HUNDREDTH ARE

EXISTING GROUND ALONG PROPOSED CENTERLINE.

ELEVATIONS SHOWN TO THE NEAREST TENTH ARE

NOTE:

VERTICAL SCALE: 1" = 10’-0"

HORIZONTAL SCALE: 1" = 20’-0"

PROFILE ALONG VT 11

VT-11 PROPOSED

28-FEB-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

C. CARLSON

D. PETERSON

S. PIRO

D. PETERSON

BHF 016-1(29)

ANDOVER

7 25PROFILE SHEET

1030

1040

1050

1060

1070

1080

1090

11001100

1030

1040

1050

1060

1070

1080

1090

11001100

10

+00

10

+25

10

+50

10

+75

11

+00

11

+25

11

+50

11

+75

12

+00

12

+25

12

+50

12

+75

13

+00

13

+25

13

+50

13

+75

14

+00

14

+25

GROUND

EXISTING

STA 12+75.00

END PROJECT

STA 10+50.00

MATCH EXISTING

BEGIN APPROACH

STA 13+75.00

MATCH EXISTING

END APPROACH

1071.25

1070.91

1070.57

1070.23

1069.89

1069.55

1069.20

1068.86

1068.52

1068.18

1067.84

1067.50

1067.16

1066.81

1071.6

1071.3

1070.8

1070.4

1070.0

1069.6

1069.4

1055.3

1055.4

1068.5

1068.2

1067.8

1067.5

1067.1

1066.8

1066.5

STA 11+50.00

BEGIN PROJECT

PVI 13+75.00

ELEV 1066.81

-1.3652%

ELEV 1071.25

PVI 10+50.00

FG = 1069.38

STA 11+86.75

BEGIN BRIDGE

FG = 1068.71

STA 12+35.25

END BRIDGE

s12b140pro.dgn

0.02

0.04

0.06

0

-0.02

-0.04

VT 11 BANKING DIAGRAM

-0.06

e = -0.0204

STA 10+50.00

e = -0.0611

STA 13+75.00

e = -0.0187

STA 10+50.00

e = 0.0456

STA 13+75.00

VERTICAL SCALE: 1" = 0.02 ’/’

HORIZONTAL SCALE: 1" = 20’-0"

-0.08

10

+50

10

+75

11

+00

11

+25

11

+50

11

+75

12

+00

12

+25

12

+50

12

+75

13

+00

13

+25

13

+50

13

+75

14

+25

0.02

0.04

0.06

0

-0.02

-0.04

-0.06

-0.08

10

+00

0.080.08

10

+25

28-FEB-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF8 25

ANDOVER

BHF 016-1(29)

AND SHOULDER

LEFT TRAVEL LANE

14

+00

C. CARLSON

D. PETERSON

S. PIRO

STA 11+86.75

BEGIN BRIDGE

STA 12+35.25

END BRIDGE

BANKING DIAGRAM

AND SHOULDER

RIGHT TRAVEL LANE

e = -0.0609

STA 13+25.00

e = 0.0444

STA 13+25.00

STA. 13+75.00

MATCH EXISTING

END APPROACH

STA. 12+75.00

END PROJECTSTA 10+50.00

MATCH EXISTING

BEGIN APPROACH

STA 11+50.00

BEGIN PROJECT

D. PETERSON

s12b140pro.dgn

103

11

10

103

103

GR

EE

NM

OU

NT

AIN

R.R.

CHESTER-

CHESTER DEPOT

URBAN COMPACT

GASSETTS

REEDVILLE

100

GR

EE

N

MTN.

R.R.

103131

GREEN

MTN.

R.R.

CAVENDISH

155

100

100

10011

11

28-FEB-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF9 25

1

7

LONDONDERRY

WESTON

LUDLOW

ANDOVER

BHF 016-1(29)

s12b140detour.dgn

BRIDGE 41

100

121

C. CARLSON

D. PETERSON

S. PIRO

D. PETERSON

TRAFFIC CONTROL SHEET

B

A

35

SCALE 1" = 20’-0"

20 0 20

N

VT ST

ATE P

LA

NE

GRID

False

Northin

g: 0.00

00

False

Easting

: 16404

16.6667

Origin La

titude:

42°30’

00.000

0"N

Central Me

ridian: 72

°30’00.00

00"W

US Sur

vey Fo

ot

Transv

erse M

ercator

NAD83

Vermon

t State

Planes

VT83

28-FEB-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

S. PIRO

10 25

ANDOVER

BHF 016-1(29)

C. CARLSON

D. PETERSON D. PETERSON

UTILITY LAYOUT SHEET

s12b140util.dgn

UTILITY LAYOUT

COMB

#221/2/210

COMB

#221A

COMB

#1/220/209

COMB

#1/208

COMB

#1/218/207COMB

#1/222/2/211

10+00 11+00 12+0013+00

14+0

0

14+7

514

+75

STA 12+75.00

END PROJECT

FG = 1068.72’

STA 12+35.20

END BRIDGE

STA 10+50.00

BEGIN APPROACH

STA 11+50.00

BEGIN PROJECT

STA 13+75.00

END APPROACH

FG = 1069.38’

STA 11+86.74

BEGIN BRIDGE

CAN BE DE-ENERGIZED AT THE REQUEST OF THE CONTRACTOR

NOTE: THE SECTION BETWEEN COMB 220 & 221

RETAIN EXISTING POLE

AND GUY WIRE

REMOVE EXISTING POLE

AND GUY WIRE

REMOVE EXISTING POLE

STA. 12+82.0 39’-0" RIGHT

NEW POLE W/ ANCHOR COMB 220

AND GUY WIRE

RETAIN EXISTING POLE

REMOVE EXISTING POLE

TO THE NEW POLE

CONNECT EXISTING SERVICE LINE

STA. 10+89.0 35’-0" RIGHT

NEW POLE W/ ANCHOR COMB 221 TO NEW POLE

AND ELECTRIC/TELEPHONE RISERS

CONNECT EXISTING SERVICE LINE

STA. 13+79.50 23’-6" RIGHT

NEW POLE W/ ANCHOR

.

FG = 1068.71’

STA 12+35.25

END BRIDGE

28-FEB-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

S. PIRO

11 25

ANDOVER

BHF 016-1(29)

s12b140pe.dgn

C. CARLSON

D. PETERSON D. PETERSON

PLAN AND ELEVATION SHEET

ELEVATION

N

VT ST

ATE P

LA

NE

GRID

False

Northin

g: 0.00

00

False

Easting

: 16404

16.6667

Origin La

titude:

42°30’

00.000

0"N

Central Me

ridian: 72

°30’00.00

00"W

US Sur

vey Fo

ot

Transv

erse M

ercato

r

NAD83

Vermon

t State

Planes

VT83

1060

1070

1080

1090

51

+00

PLAN

1050

1060

1070

1080

1090

TH

E

WI

LLI

AM

S

RI

VE

R

MI

DD

LE

BR

AN

CH

OF

FG = 1069.35’

STA 11+89.00

L BEARING #1C

FG = 1068.75’

STA 12+33.00

L BEARING #2C

Q100

WOOD FENCE

~ = 90°

CHANNEL STA 51+00.00

VT 11 STA 12+25.00 =

11+00 12+00

13+00

STA 12+28.46

PC

ST

A 13

+20.39

PI

90°

TO CL BEARING

GALVANIZED 2 RAIL BOX BEAM (LEFT)

GALVANIZED 2 RAIL BOX BEAM (RIGHT)

48’-3�" PAY LIMIT BRIDGE RAILING

EL= 1064.0’

44’-0" CL BEARING

GALVANIZED 2 RAIL BOX BEAM (TYP)

48’-7�" PAY LIMIT BRIDGE RAILING29’-1" - PAY LIMITS GUARDRAIL APPROACH SECTION

1:1.5 1:1.5

1:1.51:1.5

37’-6" TANGENTAL TERMINAL

SEE STANDARD G-19

1’-6"

(TYP)

WW1

WW2 WW4

WW3

TYPE II (TYP)

STONE FILL,

FG = 1069.38’

STA 11+86.75

BEGIN BRIDGE

TYPE II (TYP)

STONE FILL,

SCALE 1" = 10’-0"

10 0 10

SCALE 1" = 10’-0"

10 0 10

VT 11 MATERIAL TRANSITION DETAIL

10

+50

10

+75

ST

A. 11

+50.00

BE

GI

N

PR

OJ

EC

T

ST

A. 10

+50.00

BE

GI

N

AP

PR

OA

CH

ST

A. 13

+75.00

EN

D

AP

PR

OA

CH

ST

A. 12

+75.00

EN

D

PR

OJ

EC

T

ST

A. 11

+86.75

BE

GI

N

BRI

DG

E

ST

A. 12

+35.25

EN

D

BRI

DG

E

ST

A. 11

+00.00

TR

AN

SI

TI

ON

BE

GI

N

MA

TE

RI

AL

ST

A. 13

+25.00

TR

AN

SI

TI

ON

EN

D

MA

TE

RI

AL

11

+00

11

+25

11

+50

11

+75

12

+50

12

+75

13

+00

13

+25

13

+50

13

+75

GRADED CRUSHED STONE

24" SUBBASE OF DENSE

GRADED CRUSHED STONE

24" SUBBASE OF DENSE

SLAB

15" APPROACH

SLAB

15" APPROACH

3"

8"

28-FEB-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

S. PIRO

12 25

ANDOVER

BHF 016-1(29)

C. CARLSON

D. PETERSON D. PETERSON

MATERIAL TRANSITION

25’-0"25’-0"

50’-0"

LIMITS OF COLD PLANING (TYP)

(TYP) (TYP)

4’-0"

1�

"

s12b140pro.dgn

BEGIN APPROACH

28-FEB-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

S. PIRO

13 25

ANDOVER

BHF 016-1(29)

s12b140xs.dgn

C. CARLSON

D. PETERSON D. PETERSON

VT 11 CROSS SECTIONS SHEET 1

BEGIN APPROACH

1030

1040

1050

1060

1070

1080

1090

1100

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

10+25

1030

1040

1050

1060

1070

1080

1090

1100

1030

1040

1050

1060

1070

1080

1090

1100

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

10+50

1030

1040

1050

1060

1070

1080

1090

1100

1030

1040

1050

1060

1070

1080

1090

1100

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

10+75

1030

1040

1050

1060

1070

1080

1090

1100

1030

1040

1050

1060

1070

1080

1090

1100

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

11+00

1030

1040

1050

1060

1070

1080

1090

1100

STA.10+25 TO STA.11+00

-0.020 -0.019

1:-4.0 -0.020 -0.019

1:-4.0

1:-2.0

-0.020 -0.020 1:-2.3

F.G. = 1070.91

F.G. = 1070.57MATCH EXISTING

BEGIN PROJECT

END APPROACH

GRUBBING MATERIAL

GEOTEXTILE UNDER STONE FILL

BEGIN STONE FILL, TYPE II

STA 11+45.00 LT & 11+40.00 RT

28-FEB-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

S. PIRO

14 25

ANDOVER

BHF 016-1(29)

s12b140xs.dgn

C. CARLSON

D. PETERSON D. PETERSON

VT 11 CROSS SECTIONS SHEET 2

1030

1040

1050

1060

1070

1080

1090

1100

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

11+25

1030

1040

1050

1060

1070

1080

1090

1100

1030

1040

1050

1060

1070

1080

1090

1100

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

11+50

1030

1040

1050

1060

1070

1080

1090

1100

1030

1040

1050

1060

1070

1080

1090

1100

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

1030

1040

1050

1060

1070

1080

1090

1100

1030

1040

1050

1060

1070

1080

1090

1100

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

11+75

1030

1040

1050

1060

1070

1080

1090

1100

STA.11+25 TO STA.11+75

1:-2.0

-0.020 -0.008 1:-2.0

1:-1.8

-0.020 0.003 1:-1.7

1:-1.5

-0.060 -0.020 0.011-0.0601:-1.5

1:-1.5

-0.020 0.015 1:-1.5

11+67.75

F.G. = 1070.23

F.G. = 1069.89

F.G. = 1069.66

F.G. = 1069.55

RESUME ROADWAY

END BRIDGE

BEGIN BRIDGE

END ROADWAY

GRUBBING MATERIAL

GEOTEXTILE UNDER STONE FILL

END STONE FILL, TYPE II

STA 11+85.75 LT & RT

GRUBBING MATERIAL

GEOTEXTILE UNDER STONE FILL

BEGIN STONE FILL, TYPE II

STA 12+35.25 LT & RT

28-FEB-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

S. PIRO

15 25

ANDOVER

BHF 016-1(29)

s12b140xs.dgn

C. CARLSON

D. PETERSON D. PETERSON

VT 11 CROSS SECTIONS SHEET 3

1030

1040

1050

1060

1070

1080

1090

1100

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

1030

1040

1050

1060

1070

1080

1090

1100

1030

1040

1050

1060

1070

1080

1090

1100

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

12+00

1030

1040

1050

1060

1070

1080

1090

1100

1030

1040

1050

1060

1070

1080

1090

1100

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

12+25

1030

1040

1050

1060

1070

1080

1090

1100

1030

1040

1050

1060

1070

1080

1090

1100

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

1030

1040

1050

1060

1070

1080

1090

1100

STA.11+87 TO STA.12+35

-0.020 0.020

-0.020 0.020

-0.020 0.020

-0.020 0.020

11+87.75

12+35.25

F.G. = 1069.38

F.G. = 1069.20

F.G. = 1068.86

F.G. = 1068.72

1:2.5

1:1.5 1:1.

5

1:

1.

0

GRUBBING MATERIAL

GEOTEXTILE UNDER STONE FILL

END STONE FILL, TYPE II

STA 12+44.00 LT

GRUBBING MATERIAL

GEOTEXTILE UNDER STONE FILL

END STONE FILL, TYPE II

STA 12+58.50 RT

BEGIN APPROACH

END PROJECT

28-FEB-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

S. PIRO

16 25

ANDOVER

BHF 016-1(29)

s12b140xs.dgn

C. CARLSON

D. PETERSON D. PETERSON

VT 11 CROSS SECTIONS SHEET 4

1030

1040

1050

1060

1070

1080

1090

1100

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

12+50

1030

1040

1050

1060

1070

1080

1090

1100

1030

1040

1050

1060

1070

1080

1090

1100

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

1030

1040

1050

1060

1070

1080

1090

1100

1030

1040

1050

1060

1070

1080

1090

1100

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

12+75

1030

1040

1050

1060

1070

1080

1090

1100

1030

1040

1050

1060

1070

1080

1090

1100

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

13+00

1030

1040

1050

1060

1070

1080

1090

1100

STA.12+50 TO STA.13+00

1:-2.8 -0.027 0.024

1:-1.6

1:-1.9

-0.029 -0.0251:-1.9

1:-2.0 -0.038 0.031

1:-4.0

1:4.0-0.050

0.0381:-4.0

12+55.25

F.G. = 1068.52

F.G. = 1068.45

F.G. = 1068.18

F.G. = 1067.84

1:2.

8

1:2.

8

CONSTRUCT DRIVE

STA 13+25.00 RT - STA 13+75.00 RT END APPROACH

28-FEB-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

S. PIRO

17 25

ANDOVER

BHF 016-1(29)

s12b140xs.dgn

C. CARLSON

D. PETERSON D. PETERSON

VT 11 CROSS SECTIONS SHEET 5

1030

1040

1050

1060

1070

1080

1090

1100

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

13+25

1030

1040

1050

1060

1070

1080

1090

1100

1030

1040

1050

1060

1070

1080

1090

1100

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

13+50

1030

1040

1050

1060

1070

1080

1090

1100

1030

1040

1050

1060

1070

1080

1090

1100

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

13+75

1030

1040

1050

1060

1070

1080

1090

1100

1030

1040

1050

1060

1070

1080

1090

1100

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

14+00

1030

1040

1050

1060

1070

1080

1090

1100

STA.13+25 TO STA.14+00

1:4.1-0.061

0.0441:-4.0

1:4.1-0.061

0.045 -0.031

-0.0610.046

F.G. = 1067.50

F.G. = 1067.16

MATCH EXISTING

28-FEB-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

S. PIRO

18 25

1030

1040

1050

1060

1070

1080

1090

1100

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

50+70

1030

1040

1050

1060

1070

1080

1090

1100

1030

1040

1050

1060

1070

1080

1090

1100

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

50+75

1030

1040

1050

1060

1070

1080

1090

1100

1030

1040

1050

1060

1070

1080

1090

1100

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

50+80

1030

1040

1050

1060

1070

1080

1090

1100

1030

1040

1050

1060

1070

1080

1090

1100

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

50+90

1030

1040

1050

1060

1070

1080

1090

1100

STA.50+70 TO STA.50+90

ANDOVER

BHF 016-1(29)

C. CARLSON

D. PETERSON D. PETERSON

CHANNEL CROSS SECTIONS SHEET 1

s12b140xs.dgn

OHWOHW

OHW

28-FEB-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

S. PIRO

19 25

1030

1040

1050

1060

1070

1080

1090

1100

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

51+00

1030

1040

1050

1060

1070

1080

1090

1100

1030

1040

1050

1060

1070

1080

1090

1100

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

51+10

1030

1040

1050

1060

1070

1080

1090

1100

1030

1040

1050

1060

1070

1080

1090

1100

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

51+20

1030

1040

1050

1060

1070

1080

1090

1100

1030

1040

1050

1060

1070

1080

1090

1100

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

51+25

1030

1040

1050

1060

1070

1080

1090

1100

STA.51+00 TO STA.51+25

ANDOVER

BHF 016-1(29)

s12b140xs.dgn

C. CARLSON

D. PETERSON D. PETERSON

CHANNEL CROSS SECTIONS SHEET 2

OHW

OHW

OHW

OHW

S. PIRO

20 25

C. CARLSON

BHF 016-1(29)

ANDOVER

D. PETERSON D. PETERSON

EPSC NARRATIVE

28-FEB-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

s12b140ero_det.dgn

SPRUCE

MED.

MAPLES

MED.

EXISTING R.O.W.

EXISTI

NG R.

O.W.

EXISTI

NG R.

O.W.

EXISTING R.O.W.

TH

E

WI

LLI

AM

S

RI

VE

R

MI

DD

LE

BR

AN

CH

OF

FL

OW

18"

RC

P

FL

OW

18" CPEPFLOW

STONE FILL

TO LONDONDERRY

VT 11

TO CHESTERVT

11

GRAVEL

DRIVE

GRAVEL

DRIVE

GRAVEL

DRIVE

WELL

ARTESIAN

10+00 11+00 12+0013+00

14+0

0

14+7

514

+75

28-FEB-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF21 25

ANDOVER

BHF 016-1(29)

SCALE 1" = 20’-0"

20 0 20

C. CARLSON

D. PETERSON

S. PIRO

D. PETERSON

N

VT ST

ATE P

LA

NE

GRID

False

Northin

g: 0.00

00

False

Easting

: 16404

16.6667

Origin La

titude:

42°30’

00.000

0"N

Central Me

ridian: 72

°30’00.00

00"W

US Sur

vey Fo

ot

Transv

erse M

ercator

NAD83

Vermon

t State

Planes

VT83

EPSC EXISTING LAYOUT

EXISTING LAYOUTs12b140bdr_ero.dgn

HYDROLOGICAL SOIL GROUP: A

K-FACTOR = .24, 3%-8% SLOPES

(POTENTIALLY HIGHLY ERODIBLE)

COLTON FINE SANDY LOAM

SOIL INFORMATION:

HYDROLOGICAL SOIL GROUP: A

K-FACTOR = .17, 25%-60% SLOPES

(HIGHLY ERODIBLE)

ADAMS LOAMY FINE SAND

SOIL INFORMATION:

SEE "LEGEND SHEET" FOR LEGEND

REFER TO CROSS SECTIONS FOR FINAL GROUND CONTOURS

NOTE:

1060

1060

1060

1060

1060

1060

1060

.

1070

1070

1070

1070

1070

1070

1070

MED.

SPRUCE

MED.

MAPLES

EXISTING R.O.W.

EXISTI

NG R.

O.W.

EXISTI

NG R.

O.W.

EXISTING R.O.W.

MI

DD

LE

BR

AN

CH

OF

TH

E

WI

LLI

AM

S

RI

VE

R

FL

OW

18"

RC

P

FL

OW

18" CPEPFLOW

STONE FILL

VT 11

TO LONDONDERRY

VT 11

TO CHESTER

GRAVEL

DRIVE

GRAVEL

DRIVE

GRAVEL

DRIVE

ARTESIAN

WELL

STA 10+50.00

BEGIN APPROACH

FG = 1068.71’

STA 12+35.25

END BRIDGE

STA 13+75.00

END APPROACH

50

+00

51

+00

52

+00

STA 11+50.00

BEGIN PROJECT STA 12+75.00

END PROJECT

TYPE II (TYP)

STONE FILL

10+00 11+00 12+0013+00

14+0

0

14+7

514

+75

FG = 1069.38’

STA 11+86.75

BEGIN BRIDGE

28-FEB-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF22 25

ANDOVER

BHF 016-1(29)

C. CARLSON

D. PETERSON

S. PIRO

D. PETERSON

N

VT ST

ATE P

LA

NE

GRID

False

Northin

g: 0.00

00

False

Easting

: 16404

16.6667

Origin La

titude:

42°30’

00.000

0"N

Central Me

ridian: 72

°30’00.00

00"W

US Sur

vey Fo

ot

Transv

erse M

ercator

NAD83

Vermon

t State

Planes

VT83

EPSC CONSTRUCTION LAYOUT

SCALE 1" = 20’-0"

20 0 20

CONSTRUCTION LAYOUTs12b140bdr_ero.dgn

ZO

NE

RI

PA

RI

AN

BU

FF

ER

ZO

NE

RI

PA

RI

AN

BU

FF

ER

ZO

NE

RI

PA

RI

AN

BU

FF

ER

ZO

NE

RI

PA

RI

AN

BU

FF

ER

ENTRANCE

CONSTRUCTION

STABALIZED

ENTRANCE

CONSTRUCTION

STABALIZED

SEE "LEGEND SHEET" FOR LEGEND

REFER TO CROSS SECTIONS FOR FINAL GROUND CONTOURS

NOTE:

1060

1060

1060

1060

1060

1060

.

1070

1070

1070

1070

1070

1070

MED.

SPRUCE

MED.

MAPLES

EXISTING R.O.W.

EXISTI

NG R.

O.W.

EXISTI

NG R.

O.W.

EXISTING R.O.W.

MI

DD

LE

BR

AN

CH

OF

TH

E

WI

LLI

AM

S

RI

VE

R

FL

OW

18"

RC

P

FL

OW

18" CPEPFLOW

STONE FILL

VT 11

TO LONDONDERRY

VT 11

TO CHESTER

GRAVEL

DRIVE

GRAVEL

DRIVE

GRAVEL

DRIVE

ARTESIAN

WELL

STA 10+50.00

BEGIN APPROACH

FG = 1068.71’

STA 12+35.25

END BRIDGE

STA 13+75.00

END APPROACH

50

+00

51

+00

52

+00

STA 11+50.00

BEGIN PROJECT STA 12+75.00

END PROJECT

TYPE II (TYP)

STONE FILL

10+00 11+00 12+0013+00

14+0

0

14+7

514

+75

FG = 1069.38’

STA 11+86.75

BEGIN BRIDGE

28-FEB-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF23 25

ANDOVER

BHF 016-1(29)

SCALE 1" = 20’-0"

20 0 20

C. CARLSON

D. PETERSON

S. PIRO

D. PETERSON

N

VT ST

ATE P

LA

NE

GRID

False

Northin

g: 0.00

00

False

Easting

: 16404

16.6667

Origin La

titude:

42°30’

00.000

0"N

Central Me

ridian: 72

°30’00.00

00"W

US Sur

vey Fo

ot

Transv

erse M

ercator

NAD83

Vermon

t State

Planes

VT83

EPSC FINAL LAYOUT

FINAL LAYOUTs12b140bdr_ero.dgn

SEE "LEGEND SHEET" FOR LEGEND

REFER TO CROSS SECTIONS FOR FINAL GROUND CONTOURS

NOTE:

1060

1060

1060

1060

1060

1060

.

1070

1070

1070

1070

1070

1070

ROADWAYS AND TRANSPORTATION FACILITIES

ADAPTED FROM VTRANS TECHNICAL LANDSCAPE MANUAL FOR

28-FEB-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

S. PIRO

24 25

C. CARLSON

BHF 016-1(29)

ANDOVER

D. PETERSON D. PETERSON

EPSC DETAIL SHEET 1

s12b140ero_det.dgn

SYMBOL

CONSTRUCTION SPECIFICATIONS

VERMONT DEPARTMENT OF ENVIRONMENTAL CONSERVATION

ORIGINALLY DEVELOPED BY USDA-NRCS

ADAPTED FROM DETAILS PROVIDED BY: NEW YORK STATE DEC

NOT TO SCALESTAPLESTAPLE

JUTE MESH

EROSION CONTROL MATTING

EXCELSIOR BLANKET

FIRMLY

TAMP SOIL

4"MIN

DETAIL 1 TERMINAL FOLD

3"MIN

1"MIN

STAPLE DETAIL

SHALL BE PLACED LOOSELY OVER GROUND SURFACE. DO NOT STRETCH.

DISTURBED AREAS SHALL BE SMOOTHLY GRADED. EROSION CONTROL MATERIAL

APPROXIMATELY 12" INTERVALS.

ALL TERMINAL ENDS AND TRANSVERSE LAPS SHALL BE STAPLED AT

REQUIRED PER 4’X150’ ROLL OF MATERIAL.

ARE REQUIRED PER 4’X225’ ROLL OF MATERIAL AND 125 STAPLES ARE

APART AND IN ROWS APPROXIMATELY 3’ APART. APPROXIMATELY 175 STAPLES

STAPLES ARE TO BE PLACED ALTERNATELY, IN COLUMNS APPROXIMATELY 2’

APPLY FERTILIZER, LIME SEED PRIOR TO PLACING MATTING.

5.

4.

3.

2.

1.

REVISIONS

APRIL 16, 2007 JMF

DETAIL 2 JUNCTION SLOT

6"12" 12"

EXCELSIOR BLANKET

EROSION CONROL MATTING

JUTE MESH

STAPLESSTAPLES

DETAIL 3 ANCHOR SLOT

EROSION CONTROL MATTING

EXCELSIOR BLANKET

JUTE MESH STAPLE

STAPLES

12"

FIRMLY

TAMP SOIL

4" MIN6"-12"

6"-12"6"-12"

DETAIL 4 LAP JOINT

3

2

1

H

V

4

TOGETHER

EXCELSIOR BLANKET SHALL BE BUTTED

JUTE MESH, EROSION CONTROL MATTING

(RECP) SIDE SLOPE

CONTROL PRODUCT

ROLLED EROSION

ESTABLISHING VEGETATION.

APPLY TO SLOPES GREATER THAN 3H:1V OR WHERE NECESSARY TO AID IN

JANUARY 13, 2009 WHF

CONSTRUCTION GUIDANCE

GROWTH OF GRASS.

TO SEPTEMBER 15 AND AFTER APRIL 15 CAN BETTER ENSURE A VIGOROUS

TURF ESTABLISHMENT: PLACING SEED, FERTILIZER, LIME AND MULCH PRIOR

TYPES OF SOIL AMENDMENTS TO BE APPLIED

AND THE TYPE OF HYDROSEED WILL ULTIMATELY DICTATE THE AMOUNTS AND

HYDROSEEDING: ALTHOUGH GUIDANCE IS GIVEN ABOVE THE SITE CONDITIONS

DIRECTED BY THE ENGINEER.

TOPSOIL: TO BE USED WITH SEED AS INDICATED ON THE PLANS, OR AS

ACHIEVE 90% GROUND COVER OR AS DIRECTED BY THE ENGINEER.

HAY MULCH: TO BE PLACED ON EARTH SLOPES AT THE RATE OF 2 TONS/ACRE,

DIRECTED BY THE ENGINEER

FERTILIZER AND LIMESTONE: SHALL FOLLOW RATES SHOWN ON PLAN OR AS

WEIGHT AND SHALL BE FREE OF ALL NOXIOUS SEED.

ALL SEED MIXTURES: SHALL NOT HAVE A WEED CONTENT EXCEEDING 0.40% BY

ESTABLISHED LAWN AREAS DISTURBED BY THE CONTRACTOR.

URBAN SEED MIX: USE AS INDICATED IN THE PLANS AND/OR FOR ALL

ESTABLISHED UPLAND (NON WETLAND) AREAS DISTURBED BY THE CONTRACTOR.

RURAL SEED MIX: USE AS INDICATED IN THE PLANS AND/OR FOR ALL

8.

7.

6.

5.

4.

3.

2.

1.

REVISIONS

TURF ESTABLISHMENT

JUNE 23, 2009 WHF

JANUARY 15, 2010 WHF

FEBRUARY 16, 2011 WHF

WITH SECTION 651 FOR SEED (PAY ITEM 651.15)

THIS WORK SHALL BE PERFORMED IN ACCORDANCE

GUIDANCE.

THE VT AGENCY OF NATURAL RESOURCES FOR ADDITIONAL

EROSION PREVENTION & SEDIMENT CONTROL -2006- " FROM

REFER TO "THE VERMONT STANDARDS & SPECIFICATIONS FOR

NOTES:

(PAY ITEM 653.21).

MATTING (PAY ITEM 653.20) OR PERMANENT EROSION MATTING

653 AND AS SHOWN IN THE PLANS FOR TEMPORARY EROSION

THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH SECTION

NOT TO SCALE

SILT FENCE

SYMBOL

CLOTH

FILTER

GROUND

EXISTING

50’MIN

3’

GROUND

EXISTING

12’MIN

10’ MIN

10’ MIN

28-FEB-2014

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

S. PIRO

25 25

C. CARLSON

BHF 016-1(29)

ANDOVER

D. PETERSON D. PETERSON

EPSC DETAIL SHEET 2

s12b140ero_det.dgn

SYMBOL

CONSTRUCTION SPECIFICATIONS

NOT TO SCALE

ANCHOR

GRADING LIMIT

CONSTRUCTION

ANCHORS

LENGTH B/T

100’ MAX

10’ MINBARRIER

FLOATING SILT

EXISTING HIGHWAY

FL

OW

BOTTOM

WATERWAY

SYSTEM

ANCHOR

WEIGHTED

ABUTMENT

BRIDGEBARRIER

FLOATING SILT

REVISIONS

AA

SECTION A-A

JANUARY 13, 2009 WHF

APRIL 1, 2008 WHF

ITEM 649.61).

SECTION 649 FOR GEOTEXTILE FOR FILTER CURTAIN (PAY

THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH

FILTER CURTAIN

A WATERWAY WITH STREAM VELOCITIES GREATER THAN 1.5 FEET/SECOND.

FILTER CURTAIN SHALL NOT BE PLACED ACROSS A FLOWING WATERWAY, OR IN

TO CONFORM TO THE BOTTOM OF THE WATERWAY.

THE WEIGHTED ANCHOR SYSTEM SHALL BE A TYPE WHICH ALLOWS THE CURTAIN

MINIMIZING THE ESCAPE OF SEDIMENTS INTO WATERWAY.

THE CURTAIN SHALL BE REMOVED BY SLOWLY PULLING TOWARD THE SHORE

MAXIMUM 100’ LENGTH BETWEEN ANCHORS.

DISTURBANCE.

LAST SECTION SHALL TERMINATE A MINIMUM OF 10’ BEYOND LIMIT OF

5.

4.

3.

2.

1.

SEPTEMBER 4, 2009 WHF

RIPRAP TYPICAL

TYPE OR USE OF COFFERDAM IF USED.

CURTAIN. IT IN NO WAY DEFINES THE

OF A TYPICAL INSTALLATION OF FILTER

NOTE: THIS DRAWING IS A DEPICTION

CONSTRUCTION SPECIFICATIONS

VERMONT DEPARTMENT OF ENVIRONMENTAL CONSERVATION

ORIGINALLY DEVELOPED BY USDA-NRCS

ADAPTED FROM DETAILS PROVIDED BY: NEW YORK STATE DEC

SEE NOTE #3 FOR POST SPACING

(SEE NOTE #1)

WOVEN WIRE FENCE

16" MIN

FILTER CLOTH

EMBED 6"MIN

FLOW

FLOW

WOVEN WIRE

AND POST)

(UPSLOPE OF WIRE

FILTER CLOTH

CLOTH 6" MIN

EMBED FILTER

4"

SEDIMENT REACHES HALF OF FABRIC HEIGHT.

MAINTENANCE SHALL BE PERFORMED AS NEEDED AND MATERIAL REMOVED WHEN

SILT FENCE

REVISIONS

MARCH 21, 2008 WHF

FLOW

POST DETAIL

OVER-LAPPED BY 6" AND FOLDED.

WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER THEY SHALL BE

DECEMBER 11, 2008 WHF

JANUARY 13, 2009 WHF

GUIDANCE.

THE VT AGENCY OF NATURAL RESOURCES FOR ADDITIONAL

EROSION PREVENTION & SEDIMENT CONTROL -2006- " FROM

REFER TO "THE VERMONT STANDARDS & SPECIFICATIONS FOR

NOTES:

SILT FENCE, WOVEN WIRE REINFORCED (PAY ITEM 649.515).

FOR SILT FENCE (PAY ITEM 649.51) OR GEOTEXTILE FOR

SECTION 649 AND AS SHOWN IN THE PLANS FOR GEOTEXTILE

THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH

MAX. MESH OPENING.

STORMWATER PERMIT. WOVEN WIRE SHALL BE A MIN. 14 GAUGE WITH A 6"

RECEIVING WATERS WHEN THE PROJECT FALLS UNDER A CONSTRUCTION

WOVEN WIRE REINFORCED FENCE IS REQUIRED WITHIN 100’ UPSLOPE OF

OR APPROVED EQUIVALENT.

FILTER CLOTH SHALL BE EITHER FILTER X, MIRAF1100X, STABILINKA T140N

6’.

EXCEED 4’ AND WHEN ELONGATION IS <50%, POST SPACING SHALL NOT EXCEED

FILTER-CLOTH FENCE, WHEN ELONGATION IS >50%, POST SPACING SHALL NOT

POST SPACING FOR WIRE-BACKED FENCE SHALL BE 10’ MAXIMUM. FOR

WITH TIES SPACED EVERY 24" AT TOP AND MID SECTION.

TIES. FILTER CLOTH IS TO BE FASTENED SECURELY TO WOVEN WIRE FENCE

WOVEN WIRE FENCE IS TO BE FASTENED SECURELY TO FENCE POSTS WITH WIRE

6.

5.

4.

3.

2.

1.

SYMBOL

CONSTRUCTION SPECIFICATIONS

GUIDANCE.

THE VT AGENCY OF NATURAL RESOURCES FOR ADDITIONAL

EROSION PREVENTION & SEDIMENT CONTROL -2006- " FROM

REFER TO "THE VERMONT STANDARDS & SPECIFICATIONS FOR

NOTES:

VERMONT DEPARTMENT OF ENVIRONMENTAL CONSERVATION

ORIGINALLY DEVELOPED BY USDA-NRCS

ADAPTED FROM DETAILS PROVIDED BY: NEW YORK STATE DEC

5:1

PAVEMENT

EXISTING

PAVEMENT

EXISTING

PLAN VIEW

12’MIN

ENTRANCE

CONSTRUCTION

STABILIZED

REVISIONS

MARCH 24, 2008 WHF

9.

8.

7.

6.

5.

4.

3.

2.

1.

JANUARY 13, 2009 WHF

OR AS SPECIFIED IN THE CONTRACT.

SECTION 653 FOR VEHICLE TRACKING PAD (PAY ITEM 653.35)

THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH

EQUIVALENT.

STONE SIZE- USE 1-4" STONE, RECLAIMED OR RECYCLED CONCRETE

30’ MINIMUM LENGTH APPLIES).

LENGTH- NOT LESS THAN 50’ (EXCEPT ON A SINGLE RESIDENCE LOT WHERE A

THICKNESS- NOT LESS THAN 8".

WHERE INGRESS OR EGRESS OCCURS. 24’ IF SINGLE ENTRANCE TO SITE.

WIDTH- 12’ MINIMUM, BUT NOT LESS THAN THE FULL WIDTH AT POINTS

STONE.

GEOTEXTILE MUST BE PLACED OVER THE ENTIRE AREA PRIOR TO PLACING

PERMITTED.

PIPING IS IMPRACTICAL, A MOUNTABLE BERM WITH 5:1 SLOPES WILL BE

CONSTRUCTION ENTRANCES SHALL BE PIPED BENEATH THE ENTRANCE. IF

SURFACE WATER- ALL SURFACE WATER FLOWING OR DIVERTED TOWARD

PUBLIC RIGHTS-OF-WAY MUST BE REMOVED IMMEDIATELY.

RIGHTS-OF-WAY, ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO

WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC

MAINTENANCE- THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH

DEVICE.

WITH STONE AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING

WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED

ACCORDING TO PERMIT REQUIREMENTS.