Project Overview
Application Migration for
Client Name Concealed
2nd Client Name Concealed
InnovaIT Web Services
Project Goals
Maintain a hosting environment that best balances performance needs with economic considerations
Maintain a high level of application security Achieve an elevated level of confidence and
control in the hosting environment Provide an environment that better allows for
growth, application development and maintenance Create corporate values that enhance strategic
and operational management
Key Project Issues
New Jointly-owned Dell PowerEdge 1600SC server
Co-location in local data center (provided by W3)
Technical support for mail, infrastructure provided by W3 Internet.
FOR MORE INFO...
www.w3internet.com
Specifications
Platform Specs High Performance Intel Zeon Processor Fault Tolerant Data Redundancy (redundant disk mirror) Windows 2000 Advanced Server Operating System
Standards and implementation goals Application reliability in the range of 3-9s (99.9%) or better Application performance at a high level characterized by
substantial processor speed and memory Security and integrity of intellectual property and proprietary code An economical solution that approaches or meets the previous
goals while maintaining costs at a reasonable rate
Procedures
Overview Migration Plan (this document) Receiving and Setup Migration Implementation & Testing SLA & Maintenance
FOR MORE INFO...
http://www.microsoft.com/windows2000/advancedserver/
Procedures
Migration Plan Prepare Reviews
2nd Client Name Concealed Client Name Concealed W3 Internet
Approval
Procedures
Receiving and Setup System Tests Operating System Installation and Configuration Physical Connection to Data Centre, UPS IP addressing Terminal Services Client Application Installation & Testing
Procedures
Migration – Transition Plan Web/Application
DNS Server Entries by W3 Domain Transfer (takes up to 48 hours) Database Integrity
Transfer database Set up temporary web re-directs to IP address
Mail Temporary Re-direct to Sympatico or Personal Accounts Set-up of MX Records by W3
Procedures
Migration – Contingency Plan InnovaIT first client One client at a time Full test with each client installation Roll-back capable to original location
Schedule
Milestones [Working Days]
FOR MORE INFO...
http://24.138.36.116/Application Hosting Proposal2.doc
1 2 3 4 5 6 7 8 9 Days
Migration PlanMigration Plan
Implementation TestingImplementation Testing
SLA & DevelopmentSLA & Development
Receiving SetupReceiving Setup
MigrationMigration
Current Status Progress
Migration Plan (Complete) Receiving & Setup
Floor Tests Passed O/S Installed and Configured
Migration Applications Prepared
Implementation (Not Started) SLA and Maintenance
Ongoing SLA Plans on all applications Further Development plans pending migration completion
Unexpected delays or issues None expected
Related Documents
Project plan http://24.138.36.116/Application%20Hosting%20Proposal2.doc
System Specs http://24.138.36.116/Application%20Hosting
%20Proposal2%20addendum.doc
Post mortem Mid January – venue TBA