L U N D S U N I V E R S I T E T
Project management in R&D Integration and scope management
Kristian Widén, PhD
![Page 2: Project management in R&D Integration and scope management](https://reader033.vdocuments.mx/reader033/viewer/2022042822/56812b99550346895d8fbcee/html5/thumbnails/2.jpg)
2
L U N D S U N I V E R S I T E T
Project Integration Management
• Includes the processes and activities needed to identify, define, combine, unify and coordinate the variuos processes and activities in the project needed to fulfill the scope of the project.
![Page 3: Project management in R&D Integration and scope management](https://reader033.vdocuments.mx/reader033/viewer/2022042822/56812b99550346895d8fbcee/html5/thumbnails/3.jpg)
3
L U N D S U N I V E R S I T E T
Three delimations
• Scope• Time• Cost
![Page 4: Project management in R&D Integration and scope management](https://reader033.vdocuments.mx/reader033/viewer/2022042822/56812b99550346895d8fbcee/html5/thumbnails/4.jpg)
4
L U N D S U N I V E R S I T E T
Project Integration Management
• Project charter• Preliminary scope statement• Project management plan• Direct and manage project execution• Monitor and control project work• Integrated change control• Close project
![Page 5: Project management in R&D Integration and scope management](https://reader033.vdocuments.mx/reader033/viewer/2022042822/56812b99550346895d8fbcee/html5/thumbnails/5.jpg)
5
L U N D S U N I V E R S I T E T
The framework for project integration
![Page 6: Project management in R&D Integration and scope management](https://reader033.vdocuments.mx/reader033/viewer/2022042822/56812b99550346895d8fbcee/html5/thumbnails/6.jpg)
6
L U N D S U N I V E R S I T E T
Project Charter
• A document that formally authorises a project• Includes:
– Requirements– Business needs– Project purpose– Project manager with defined authority– Milstone scheduel– Stakholders– Context– Summary budget
![Page 7: Project management in R&D Integration and scope management](https://reader033.vdocuments.mx/reader033/viewer/2022042822/56812b99550346895d8fbcee/html5/thumbnails/7.jpg)
7
L U N D S U N I V E R S I T E T
Project Management Plan
• Map the whole project• Includes all other plans• Coordinate all other plans• Directs the project team• Baseline for monitoring and controle
![Page 8: Project management in R&D Integration and scope management](https://reader033.vdocuments.mx/reader033/viewer/2022042822/56812b99550346895d8fbcee/html5/thumbnails/8.jpg)
8
L U N D S U N I V E R S I T E T
Project management plan, common parts
• Introduction• Scope• Time• Cost• Quality, environmental management• Human resources• Communication• Risk• Procurement
![Page 9: Project management in R&D Integration and scope management](https://reader033.vdocuments.mx/reader033/viewer/2022042822/56812b99550346895d8fbcee/html5/thumbnails/9.jpg)
9
L U N D S U N I V E R S I T E T
Project Execution
• Perform activities to reach project objectives• Implement the planned methods• Create, control, verify and validate deliverables• Manage risks• Adapt approved changes• Manage communication• .....
![Page 10: Project management in R&D Integration and scope management](https://reader033.vdocuments.mx/reader033/viewer/2022042822/56812b99550346895d8fbcee/html5/thumbnails/10.jpg)
10
L U N D S U N I V E R S I T E T
Monitor and control
• Monitor and control processe asociated with– Initiating, planning, executing and closing
• Performance versus plan• Assess performance• Colect and destribute information
![Page 11: Project management in R&D Integration and scope management](https://reader033.vdocuments.mx/reader033/viewer/2022042822/56812b99550346895d8fbcee/html5/thumbnails/11.jpg)
11
L U N D S U N I V E R S I T E T
Integrated change control
• Two types of changes– Project owner introduced– Project result
• Needs to be analysed• If the change affects either of the three
delimitations of the project – Owners choice
![Page 12: Project management in R&D Integration and scope management](https://reader033.vdocuments.mx/reader033/viewer/2022042822/56812b99550346895d8fbcee/html5/thumbnails/12.jpg)
12
L U N D S U N I V E R S I T E T
Close Project
• Adminsitrative closure– Details everything that anyone needs to do to
close the project• Contract closure
– Includes alla activities and interaction to close contracts
![Page 13: Project management in R&D Integration and scope management](https://reader033.vdocuments.mx/reader033/viewer/2022042822/56812b99550346895d8fbcee/html5/thumbnails/13.jpg)
13
L U N D S U N I V E R S I T E T
• Define the scope of the project?• Can change the boundaries of the project?
Who?
![Page 14: Project management in R&D Integration and scope management](https://reader033.vdocuments.mx/reader033/viewer/2022042822/56812b99550346895d8fbcee/html5/thumbnails/14.jpg)
14
L U N D S U N I V E R S I T E T
Scope Management
• Scope planning• Scope definition• Create WBS• Scope verification• Scope control
![Page 15: Project management in R&D Integration and scope management](https://reader033.vdocuments.mx/reader033/viewer/2022042822/56812b99550346895d8fbcee/html5/thumbnails/15.jpg)
15
L U N D S U N I V E R S I T E T
Scope
• Product scope– Fetures or requirments of the result of the
project• Project scope
– Features or requirement on the execution of the project
![Page 16: Project management in R&D Integration and scope management](https://reader033.vdocuments.mx/reader033/viewer/2022042822/56812b99550346895d8fbcee/html5/thumbnails/16.jpg)
16
L U N D S U N I V E R S I T E T
Execise
• What are the main scope of a research project (academic), PhD project and a R&D Project (non-academic)?
• What are the relation between these?
![Page 17: Project management in R&D Integration and scope management](https://reader033.vdocuments.mx/reader033/viewer/2022042822/56812b99550346895d8fbcee/html5/thumbnails/17.jpg)
17
L U N D S U N I V E R S I T E T
Scope planning
• To define scope it i needed to balance the scope according to the project
• Various inputs are needed– Context– Product requirements– Organisational know-how– Stakeholders requirements– Etc.
![Page 18: Project management in R&D Integration and scope management](https://reader033.vdocuments.mx/reader033/viewer/2022042822/56812b99550346895d8fbcee/html5/thumbnails/18.jpg)
18
L U N D S U N I V E R S I T E T
Scope definition
• Detailed scope definition is crucial for project success
• Well defined scope gives– Conformance between goal and result– Cooperation and communication– Motivation– Clear project closure
![Page 19: Project management in R&D Integration and scope management](https://reader033.vdocuments.mx/reader033/viewer/2022042822/56812b99550346895d8fbcee/html5/thumbnails/19.jpg)
19
L U N D S U N I V E R S I T E T
Scope definition
• Defining scope– Divide into managable goals/requirements
• Managebale goalS/requirements ensures– Better planning of time, cost and resources– Defined baseline– Easier to identify responsibilities
![Page 20: Project management in R&D Integration and scope management](https://reader033.vdocuments.mx/reader033/viewer/2022042822/56812b99550346895d8fbcee/html5/thumbnails/20.jpg)
20
L U N D S U N I V E R S I T E T
Scope definition
• When it comes to objectives, think SMART:– Specific– Measurable– Accepted– Realistic– Time limitied
![Page 21: Project management in R&D Integration and scope management](https://reader033.vdocuments.mx/reader033/viewer/2022042822/56812b99550346895d8fbcee/html5/thumbnails/21.jpg)
21
L U N D S U N I V E R S I T E T
Exercise
• What is the aim of a PhD project?
• What are the objectives of a PhD project?
![Page 22: Project management in R&D Integration and scope management](https://reader033.vdocuments.mx/reader033/viewer/2022042822/56812b99550346895d8fbcee/html5/thumbnails/22.jpg)
22
L U N D S U N I V E R S I T E T
Scope definition
• Prioritise objectives
• Scope• Time• Cost
![Page 23: Project management in R&D Integration and scope management](https://reader033.vdocuments.mx/reader033/viewer/2022042822/56812b99550346895d8fbcee/html5/thumbnails/23.jpg)
23
L U N D S U N I V E R S I T E T
Work Breakdown Structure, WBS
Work Breakdown Structure, WBS:• Definie the the complete scope of the project• Is a deliverabl oriented hierarchical decomposition of the
project
”…..all the work required,
and only the work required,
to complete the project successfully”
![Page 24: Project management in R&D Integration and scope management](https://reader033.vdocuments.mx/reader033/viewer/2022042822/56812b99550346895d8fbcee/html5/thumbnails/24.jpg)
24
L U N D S U N I V E R S I T E T
1 Project
1.1 Motor
1.1.1 1.1.2 1.1.3
1.2 Chassi
1.2.1 1.2.2 1.2.3
1.3 Body
1.3.1 1.3.2 1.3.3
Akt. 2Akt. 5 Akt. 4
Akt. 3 Akt. 6Akt. 7Akt. 1
Akt. 1
Work Breakdown Structure, WBS
![Page 25: Project management in R&D Integration and scope management](https://reader033.vdocuments.mx/reader033/viewer/2022042822/56812b99550346895d8fbcee/html5/thumbnails/25.jpg)
25
L U N D S U N I V E R S I T E T
Guidlines for the WBS
1. A work package should only exist ones
2. The woek in one work package is the sum of all the packages on the level below
3. Each work package has only one responsible
4. The WBS structure should follow the actual work progress
5. The project team should take part in formulating the WBS
6. Document each work package
![Page 26: Project management in R&D Integration and scope management](https://reader033.vdocuments.mx/reader033/viewer/2022042822/56812b99550346895d8fbcee/html5/thumbnails/26.jpg)
26
L U N D S U N I V E R S I T E T
Exersice
• PhD project (Scope)– Courses– 4 papers (journal papers)– Cover
![Page 27: Project management in R&D Integration and scope management](https://reader033.vdocuments.mx/reader033/viewer/2022042822/56812b99550346895d8fbcee/html5/thumbnails/27.jpg)
27
L U N D S U N I V E R S I T E T
Work package descriptions
• ID and name• Scope and requirements (what shall be done)• Who is responsible• Time• Cost• Dependences