Project ManagementBy : Loay Qabaha
AN-Najah National University
civil engineering department
![Page 2: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/2.jpg)
Learning Objectives
• Defining project management
• The importance of project management
• The role of the project manager
• Keys to successful projects
• Managing the Contractor
• Managing the Project
![Page 3: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/3.jpg)
![Page 4: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/4.jpg)
Professional and conscientious project management is critical
to a successful outcome!
![Page 5: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/5.jpg)
Learning Objectives
Defining project management
• The importance of project management
• The role of the project manager
• Keys to a successful project
• Managing the Contractor
• Managing the Project
![Page 6: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/6.jpg)
What is a Project?
A temporary and one-time endeavor
undertaken to create a unique product or
service, which brings about beneficial
change or added value
![Page 7: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/7.jpg)
Project Management 101
The very first thing you learn in project
management is..
that the focus of a Project Manager is
always…
![Page 8: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/8.jpg)
PM Triple Constraints
• Time
• Cost
• Scope
Manage these or they will
manage you!
![Page 9: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/9.jpg)
Defining Project
Management
• The application of knowledge, skills, tools
and techniques to project activities to
meet project requirements
• Organizing and managing resources so
the project is completed within defined
scope, quality, time and cost constraints
![Page 10: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/10.jpg)
![Page 11: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/11.jpg)
Learning Objectives
Defining project management?
The importance of project management
• The role of the project manager
• Keys to a successful project
• Managing the Contractor
• Managing the Project
![Page 12: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/12.jpg)
Why IT Projects Fail
![Page 13: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/13.jpg)
Why IT Projects Fail
• Weak business case
• Lack of senior management commitment
• Inadequate project planning(budget, schedule, scope, etc.)
![Page 14: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/14.jpg)
Why IT Projects Fail (cont’d)
• Absence of user involvement
• New or unfamiliar technology
• Lack of defined, clear,
or concise requirements
![Page 15: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/15.jpg)
Why IT Projects Succeed
![Page 16: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/16.jpg)
Why IT Projects Succeed
1. Sound project management processes
2. Project tied to the organization’s business goals
3. Senior management commitment
![Page 17: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/17.jpg)
Why IT Projects Succeed
4. Good change management
5. Detailed requirements
6. Realistic schedule
7. Good stakeholder relationships
![Page 18: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/18.jpg)
Why IT Projects Succeed
8. Empowered project manager
9. Skilled and appropriate team members with defined roles and responsibilities
10. Availability of funding
![Page 19: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/19.jpg)
What makes this all work?
A good, solid professional project
manager
![Page 20: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/20.jpg)
Learning Objectives
Defining project management
The importance of project management
The role of the project manager
• Keys to successful projects
• Managing the Contractor
• Managing the Project
![Page 21: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/21.jpg)
![Page 22: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/22.jpg)
![Page 23: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/23.jpg)
![Page 24: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/24.jpg)
EMPOWERMENT
![Page 25: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/25.jpg)
Project Management Skills
• Program area knowledge, standards,
and regulations
• Understand the project environment
![Page 26: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/26.jpg)
Project Management Skills
• General management skills
(budgeting, scheduling)
• Communication skills
• Interpersonal skills
![Page 27: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/27.jpg)
![Page 28: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/28.jpg)
The project manager makes
things happen!
![Page 29: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/29.jpg)
Learning Objectives
Defining project management?
The importance of project management
The role of the project manager
Keys to successful projects
• Managing the Contractor
• Managing the Project
![Page 30: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/30.jpg)
Keys to Successful
Projects
or
…Duh?!?
Things you already
know but let’s review
anyway
![Page 31: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/31.jpg)
PLAN
![Page 32: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/32.jpg)
• Identify all stakeholders up front!
• Develop the project plan beforestarting the project
•Establish communications protocols
PLAN
![Page 33: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/33.jpg)
•Define your requirements in detail
•Establish a speedy conflict resolution
process
•Make contingency plans
•Plan a reasonable roll-out schedule
PLAN
![Page 34: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/34.jpg)
LEAD
![Page 35: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/35.jpg)
•Ensure strong, committed managementsupport
•Connect the business goals to the ITproject
•Assign an experienced project manager
LEAD
![Page 36: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/36.jpg)
•Establish clearly defined directions
•Be proactive
•Give IT and program a seat at the table
LEAD
![Page 37: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/37.jpg)
•Set clear performance expectations
•Ask for technical assistance
•Do not start roll-out until pilot is complete!
LEAD
![Page 38: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/38.jpg)
COMMUNICATE
![Page 39: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/39.jpg)
•Communicate objectives frequently
•Recognize different perspectives
•Check assumptions frequently
Communicate
![Page 40: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/40.jpg)
•Manage expectations
•Share success and broadcast achievements
•Invite feedback
Communicate
![Page 41: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/41.jpg)
MANAGE
![Page 42: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/42.jpg)
•Ensure the system design reflects sound planning
•Hold the reins on irrational exuberance!
(Ensure the system design reflects the system you need and can afford at this pointin time)
Manage
![Page 43: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/43.jpg)
•Train all staff in a timely fashion
•Make extensive testing a priority!
•Make the most of pilot testing!
Manage
![Page 44: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/44.jpg)
![Page 45: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/45.jpg)
![Page 46: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/46.jpg)
A good project team can
be the key to a successful
project!
![Page 47: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/47.jpg)
Think Big, Think Fast, Think Ahead
![Page 48: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/48.jpg)
![Page 49: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/49.jpg)
Learning Objectives
Defining project management
The importance of project management
Defining the role of the project manager
Keys to a successful project
Managing the Contractor
• Managing the Project
![Page 50: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/50.jpg)
![Page 51: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/51.jpg)
Manage the Contractor
Enforce the terms of the contract and meet the
requirements of the RFP
![Page 52: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/52.jpg)
Manage the Contractor
• Don’t “marry” the contractor
• Trust but question
• Their bottom line is the bottom line
• Your bottom line is a working system
• Nothing is ever free
• The end product is only as good as your requirements
![Page 53: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/53.jpg)
Provide Performance
Feedback
• Build performance reviews into the
contract
• Be clear and specific
• Be timely
• The State is ultimately accountable for the
project
![Page 54: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/54.jpg)
![Page 55: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/55.jpg)
Learning Objectives
What is project management?
Why is it important?
The role of the project manager
Keys to success projects
Keys to a successful projects
Managing the Contractor
Managing the Project
![Page 56: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/56.jpg)
Manage the Project
Successful project
management is delivering a
quality product that meets the
customer’s requirements within
time, scope, and budget.
![Page 57: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/57.jpg)
PM Triple Constraints
• Time
• Cost
• ScopeManage these or they will
manage you!
![Page 58: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/58.jpg)
Project Management Potholes
![Page 59: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/59.jpg)
Project Management
Potholes
Giving away the farm
Giving the contractor or developer too
much control, responsibility, or
authority
![Page 60: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/60.jpg)
![Page 61: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/61.jpg)
Project Management
Potholes
Being a Sugar Daddy
Not managing scope creep
![Page 62: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/62.jpg)
Beware of scope creep
![Page 63: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/63.jpg)
But what is it?
![Page 64: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/64.jpg)
• Gradual, progressive increase in the
project’s scope that is not noticed
immediately
• Occurs when additional requirements result
in scope change and can cause cost and
schedule overruns
![Page 65: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/65.jpg)
Ask these questions!
• Is it a must?
• Can the customer/user do the job without it?
• Does it contribute to the viability of the
system?
• Does it add value as a feature/function to the
system?
• Is it worth the additional cost?
![Page 66: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/66.jpg)
Keeping Control of the Budget
![Page 67: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/67.jpg)
Budget/Cost Management
• Monitor project spending
• When a variance occurs,
determine the cause
• Change the execution of the
project, reduce scope, or
submit an APDU
• Prevent unapproved
changes to the project
![Page 68: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/68.jpg)
Project Management
Potholes
Buying a car without
checking under the hood
Focusing on the system front-end
processes
![Page 69: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/69.jpg)
Focus on the entire project
Report?
What report?
What is a report?
Documentation….duh…
![Page 70: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/70.jpg)
Project Management
Reporting
• Establish reporting requirements upfront
• Include the good, the bad, and the ugly
• Be brief but accurate
• Management really does want to know!
![Page 71: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/71.jpg)
![Page 72: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/72.jpg)
Project Management
Potholes
You snooze, you lose
Not obtaining prior approval
![Page 73: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/73.jpg)
Not Obtaining Federal Prior Approval
May cost the State funding that may have been approved if
submitted in advance!
Retroactive
Approvals
![Page 74: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/74.jpg)
Submit APDUs Timely!
• Annuals are due within 90 days of the
anniversary of the approval date
• As Needed are due as soon as the trigger
condition (time, budget, scope) becomes
known to the State
![Page 75: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/75.jpg)
Summary
Defined project management
Importance of project management
Role of the project manager
Keys to successful projects
Managing the Contractor
Managing the Project
![Page 76: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/76.jpg)
Project Management Resources
• Project Management Institute – home of the Project Management Body of Knowledge (PMBOK)http://www.pmi.org/Pages/default.aspx
• NYS Project Management Guidebook Release 2http://www.oft.state.ny.us/pmmp/guidebook2/index.htm
• FNS Handbook 901, Chapter 5http://www.fns.usda.gov/apd/Handbook_901/V_1-2/Chapter_5.pdf
![Page 77: Project management ,By :Loay Qabaha -An-Najah National University -Nublus_palestine](https://reader033.vdocuments.mx/reader033/viewer/2022051709/5872e4d21a28abfa548b5bed/html5/thumbnails/77.jpg)
An engraved invitation from FNS Handbook 901